29 - Progress Schedule and Progress Report.pdf

PDF 107 KB Posted

Attached to
Relocate Kirtland Sunshades
Solicitation number
FA3099-22-R-0001
Issued by

About this file

This document contains a progress schedule and report for a federal construction project as well as details of a related federal contract opportunity solicitation. The progress schedule outlines the planned and actual completion percentages for various work elements of a project from January 1900 through May 2023. It includes signatures from the installations engineer, contracting officer, and contractor.

The related solicitation seeks offers to remove and dismantle two four-bay sunshades at Kirtland Air Force Base in New Mexico, grind down the footers, transport the sunshades to Laughlin Air Force Base in Texas, and install them with new footers, lighting, and any replacement parts. The acquisition is set aside for small businesses under NAICS code 236220 with a size standard of $39.5 million. Interested parties can download the solicitation once released from the website and it will result in a firm-fixed price contract for the work. Offerors must register in SAM to be eligible for award. The soliciting agency is the Air Force Air Education and Training Command.

View the file

Other files

File Type Posted
Attach 37 - B219 Information.pdf PDF
FA309922R0001 Amendment 004.pdf PDF
Attach 36 - CASS Sys As-built.pdf PDF
Attach 35 - Questions and Answers Revised 30 June.pdf PDF
Attach 38 - Rows V and W.pdf PDF
Attach 39 - Disconnect Panel.jpg JPG image
Solicitation Amendment FA309922R00010003 SF 30.pdf PDF
Attach 32 - Past Performance Questionnaire.pdf PDF
Solicitation Amendment FA309922R00010002 SF 30.pdf PDF
Attach 30 - NM20220044 New Mexico Wage Rate.pdf PDF
Attch 33 - Bays 4 and 5 sheet 1 sun shade canopies elevation.pdf PDF
Attach 34 - Bays 4 and 5 sheet 2 sun shade canopies details.pdf PDF
Attach 35 - Solicitation Questions and Answers.pdf PDF
Attach 31 - TX20220186 Texas Wage Rate.pdf PDF
Solicitation Amendment FA309922R00010001 SF 30 (1).pdf PDF
Solicitation - FA309922R0001.pdf PDF
10 - Schedule of Material Submittals.pdf PDF
25 - UFC 3-575-01 Lightning And Static Electricity Protection Systems.pdf PDF
15 - UFC 3-250-01 Pavement Design For Roads And Parking Areas.pdf PDF
13 - UFC 3-201-01 Civil Engineering.pdf PDF
22 - UFC 3-260-16 O-M Manual Standard Practice For Airfield Pavement Condition Surveys.pdf PDF
12 - UFC 1-200-01 DoD Building Code.pdf PDF
07 - EQ Contractor Tech Specs March 2021.pdf PDF
23 - UFC 3-301-01 Structural Engineering.pdf PDF
16 - UFC 3-250-04 Standard Practice For Concrete Pavements With Change 2.pdf PDF
14 - UFC 3-220-01 Geotechnical Engineering.pdf PDF
28 - Entry Authority List (EAL).pdf PDF
01 - AETC Installation Excellence Guide.pdf PDF
18 - UFC 3-260-01 Airfield And Heliport Planning And Design With Change 1.pdf PDF
17 - UFC 3-250-11 Soil Stabilization And Modifications For Pavements.pdf PDF
20 - UFC 3-260-03 Airfield Pavement Evaluation.pdf PDF
09 - LAFB_Architectural_Compatibility_Guide.pdf PDF
11 - Security Requirements for SOW.pdf PDF
06 - DD 1354 - Transfer and Acceptance of DoD Real Property.pdf PDF
27 - Division 01 Specifications.pdf PDF
21 - UFC 3-260-04 Airfield And Heliport Marking.pdf PDF
08 - FAA_Form_7460-1.pdf PDF
19 - UFC 3-260-02 Pavement Design For Airfields.pdf PDF
24 - UFC 3-535-01 Visual Air Navigation Facilities With Change 3.pdf PDF
26 - Contractor Fire Prevention Briefing Guide 3.0.pdf PDF
03 - AF IMT 3000 Material Approval Submittal.pdf PDF
04 - C-D Debris Disposal Report Tracker.pdf PDF
02 - AF IMT 103 Base Civil Engineering Work Clearance Request.pdf PDF
05 - C-D Debris Monthly Disposal Report.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LINE NO. % 18‐Jan 1‐Feb 15‐Feb 29‐Feb 14‐Mar 28‐Mar 11‐Apr 25‐Apr 9‐May 23‐May 6‐Jun 20‐Jun 4‐Jul 18‐Jul 1‐Aug 15‐Aug 29‐Aug 12‐Sep 26‐Sep 10‐Oct 24‐Oct 7‐Nov 21‐Nov 5‐Dec 19‐Dec 2‐Jan 16‐Jan 30‐Jan 13‐Feb 27‐Feb 13‐Mar 27‐Mar 10‐Apr 24‐Apr 8‐May 22‐May A C D 31‐Jan 14‐Feb 28‐Feb 13‐Mar 27‐Mar 10‐Apr 24‐Apr 8‐May 22‐May 5‐Jun 19‐Jun 3‐Jul 17‐Jul 31‐Jul 14‐Aug 28‐Aug 11‐Sep 25‐Sep 9‐Oct 23‐Oct 6‐Nov 20‐Nov 4‐Dec 18‐Dec 1‐Jan 15‐Jan 29‐Jan 12‐Feb 26‐Feb 12‐Mar 26‐Mar 9‐Apr 23‐Apr 7‐May 21‐May 4‐Jun

0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

WKLY ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐> #DIV/0! 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% TOTAL ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐> 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

WKLY ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐>

TOTAL ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐>

12. APPROVED BY:

INSTALLATIONS ENGINEER'S SIGNATURE

34 0

39 0

35 0

36 0

38 0

Report ‐‐‐‐‐‐‐‐‐‐>

6. ACTUAL STARTING DATE January 0, 1900

7. ACTUAL COMPLETION DATE

WORK ELEMENTS

#DIV/0!

#DIV/0!

B

5. PROJECT NO.

CONTRACTING OFFICER'S SIGNATURE

17 0

SCHEDULED COMPLETION

24 0

25 0

31 0

29 0

28 0

30 0

ACTUAL COMPLETION

22 0

15 0

41 0

23 0

26 0

32 0

0.00%

0.00%

DATE SIGNED

8. PROJECT TITLE

9. SUBMITTED BY:

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

DATE SIGNED

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

CONTRACTOR'S SIGNATURE

NOTICE TO PROCEED:

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

CONTRACT PROGRESS SCHEDULE

(SEE CONTRACTOR'S INSTRUCTIONS ON REVERSE)

1. CONTRACT NO.

January 0, 19003. COMPLETION DATE

11. APPROVAL RECOMMENDED BY:

2. STARTING DATE January 0, 1900

4. PURCHASE REQUEST NO.

DATE SIGNED

10. CONTRACTOR'S NAME & ADDRESS

File details come from the government source that posted it. Updated .