This document contains questions and answers regarding a federal solicitation for relocating sunshades at Kirtland Air Force Base and Laughlin Air Force Base. The solicitation seeks the removal and dismantling of two existing sunshades at Kirtland AFB, transporting them to Laughlin AFB, and installing them along with new footers, lighting, and replacement parts. The acquisition is set aside for small businesses under NAICS code 236220 with a size standard of $39.5 million. Interested parties can download the solicitation and must be registered in SAM to be eligible for award. The government anticipates awarding a firm-fixed price contract. Questions cover project scope details including existing site conditions, electrical requirements, concrete specifications, and painting requirements.
View the file
Other files
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Question Answer Please confirm we are to dismantle the two existing rows of 4 bay parking spots. We are submitting this question as during the site walk there was some discussion of dismantling one row of 5 bay parking. Confirmed that only the two existing rows of 4 bay parking sports are being dismantled.
Does the government intend to publish the original sunshade drawings that were submitted stamped, sealed, and with the words “Confidential Property of Agate, Inc” along with patent-pending? Did the government receive in writing from Agate, Inc. permission to publish the company’s proprietary information?
There is no current patent on the original sunshade drawings. IAW FAR 52.236‐21 (d) Shop drawings means drawings, submitted to the Government by the Contractor, subcontractor, or any lower tier subcontractor pursuant to a construction contract, showing in detail (1) the proposed fabrication and assembly of structural elements, and (2) the installation (i.e., fit, and attachment details) of materials or equipment. It includes drawings, diagrams, layouts, schematics, descriptive literature, illustrations, schedules, performance and test data, and similar materials furnished by the contractor to explain in detail specific portions of the work required by the contract. The Government may duplicate, use, and disclose in any manner and for any purpose shop drawings delivered under this contract.
The existing sunshades were constructed in 2005. The existing sunshades were engineered per 1997 UBC, 12 PSF roof live load, 80 mph wind load, exposure “C”, 4 PSF framing load, and designed in accordance with seismic zone 2B (Ca-0.28). The specification states “Provide certified engineered drawings for the re-construction of the eight sunshades. In addition, the specifications reference the Contractor shall be responsible for researching all historical weather conditions within the local area and shall install the sunshades to withstand these conditions. Wind pressure shall be computed and applied using a basic wind speed of 110 miles per hour. If certain members do not meet the government's desired 2018 International Building Code should the Contractor include the cost of a new steel member in the base bid? Yes, if there are new members to be added, the Contractor should include that cost in the base bid.
Under the description of work – “Conduits shall be removed vertically to the 90-degree bend avoiding water getting into the conduit.”. Please describe what we are to do with the existing end of the conduit? Are we to plug the end of the conduit and simply patch the concrete? Yes. Plug the conduit and then patch the concrete.
The scope of work states, “Full depth replacement of concrete where existing anchor bolts flush existed and fill voids with a pourable epoxy.” The existing anchor bolts are 4 each per column - ¾” diameter embedded deep into the concrete. In past projects we simply grind the anchor bolts down below the flightline concrete surface and cap them with a pourable epoxy. Please clarify how the contractor is to remove and cap the existing anchor bolts?
The existing bolts at Kirtland will need to be completed removed and the concrete will need to be filled where the bolts were displaced. They will not be ground down.
Under specification L-10. Submitting The Proposal - Please confirm we can submit the 20% Bid Bond with the Bid Proposal via email? No. Please submit all bonding as hard copies with the original raised seal.
Please confirm that all existing bolts and fasteners are to be replaced with new ones that are made in American?
All construction materials shall conform to the requirements of solicitation and resulting contract, including FAR 52.225‐9 Buy American ‐ Construction Materials (Nov 2021), 52.225‐13 Restrictions on Certain Foreign Purchases (Feb 2021), and DFARs 252.225‐7001 Buy American and Balance of Payments Program (Dec 2017), 252.225‐7002 Qualifying Country Sources as Subcontractors (Dec 2017), 252.225‐7048, Export‐Controlled Items (June 2013)
With the replacement of all bolts and nuts, will you require Nyloc nuts on all A307 bolted connections to prevent the connection from loosening under wind conditions? Any bolts requested for use can be submitted to the Government as a submittal for approval.
Does the government require the existing cable bracing, strand grips, eye bolts, hillside washers, and nuts to be replaced? If they are not in good working condition, or do not function properly, yes.
It was pointed out on the end of the canopy a series of screws, closely spaced, 6” o.c. that were used to retain the end screen fabricate. Will the government require all of the existing fasteners be removed and discarded before new sunscreen is applied? Yes, they will need to be removed in order to place a new fabric canopy. After installation, fasteners will need to be replaced as required.
Along the lines of question #10, will all of the screws remaining in the tops of each purlin be required to be removed before the new sunscreen fabricate is applied? If they are in the way of installing the new fabric, they will need to be removed and replaced after installation.
Does the government want the sunshade steel repainted before the new sunscreen is applied? We are submitting this question because the scope of work refers us to the Installation Excellence Guide Air Education and Training Command. Within the specification of the AETC, it references the local command colors to be selected within the range of neutral and earth tones If the sunshade needs to be reapinted, the Contractor will do so before the canopy is installed.
The scope of work does not address if the government wants new sunscreen applied to the ends of the parking rows. Please clarify? Yes, sunscreen will be applied to the ends of the rowsd as well as the tops.
Will the government require a manufacturer’s warranty on the re-constructed sunshades? If yes, how many years? Yes, one year for electrical/utilities. Lights are 5‐year warranty. Structures will be 20 years.
The Contractor is to “Provide certified engineered concrete foundation drawings based on the existing expansion soils. New sunshades foundations will include 30-inch diameter x 13-feet-0-inches deep, drilled concrete caissons with engineered steel reinforcements.” The specifications reference UFC 3-220- 01 Geotechnical Engineering, will the government provide a geotechnical soils investigation for the new location at Laughlin? If not, will the Contractor be required to perform a geotechnical soil investigation? No, Laughlin is not capable of doing this testing. The contractor will have to do the investigation.
How thick is the existing flightline concrete at Laughlin AFB where we are to install the sunshades?
SOW states the Contractor shall conduct site surveys to include above and below ground grade conditions assessments. The Government does not have that information on file.
Concrete sampling and testing, will the government provide this service, or will the Contractor pay for the services of a third-party testing company? The contractor will be required to look into third‐party testing.
Will the government provide the following information for Laughlin AFB. Currently there are no existing as‐builts on file.
As-built drawings of the flightline. Currently there are no existing as‐builts on file.
Existing airfield pavement. Currently there are no existing as‐builts on file.
Existing aircraft tie-downs. Currently there are no existing as‐builts on file.
Existing underground utilities. There is only a partial CASS system.
Existing adequate power source for powering new obstruction lights. Currently there are no existing as‐builts on file.
Under the structural design criteria, it states, “The structure shall be built to mitigate bird roosting and nesting within the sunshade structure.” Will the government clarify this statement? Does the government want bird netting applied to the re-installed sunshades and if so, please specify what is the largest hole size permitted Yes, The Government is requiriung bird nesting mitigation. Netting holes will be no larger than 3/4".
Under the structural design criteria, the government provided the aircraft dimensions and clearances for the desired parked plane. Has the government checked and confirmed the specified aircraft will properly fit under the sunshades with the required clearances? If the specified aircraft encroaches within a clearance dimension is the government willing to issue a waiver? Yes, the aircraft fit under the sunshades.
The specification references UFC 3-575-01 Lightning and Static Electricity Protection Systems. Within this broad specification are NFPA 70 and NFPA 780. Yes
Shepherd’s Crook – without existing drawings please specify how many new static grounding units the Contractor is required to install? Needs to be new material. Number of rods depends on how many aircraft go in each bay and how many tie downs are required per aircraft. Should be 48 total Under lightning protection and grounding – please clarify if the relocated sunshades are to be grounded? Sunshades shall be grounded per UFC and NEC.
Does the government desire air terminals to be installed to enhance the overall lightning protection to the sunshade?
Follow NFPA 780 and UFC 3‐757‐01. From UFC: If lightning protection is required and the structure is steel I‐beam or roundheavy beam construction and continuous to ground, air terminals are not necessary as thestructural steel forms a large air terminal. Grounding will be addressed specific to each facility.Tubular steel assemblies do not meet the intent of protection against lightning
What is the desired light intensity of the LED fixtures to illuminate the aircraft under the sunshades? Lighting intensity needs to be in conformance with UFC 5‐530‐01 Before commencing onsite work at the Laughlin AFB site, we understand the requirements for filling out the AF Form 103 and the AF 3000 Form. Will the government require the Contractor to scan the proposed area for the new concrete caissons utilizing GPR (ground penetrating radar) for an additional layer of safety? Yes, the Government will require the Contrator to use GPR to scan the airfield for concrete caissons.
Under the barricade specification, it states, “Contractor shall use Low Profile Construction Barricades. Barricades shall have no separation or as instructed by the CO.” Please clarify if we can space the barricades apart if they are tied together with colored rope and if so at what is the maximum spacing permitted? Barricades must connect together. Spacing with rope does not prevent FOD
When working on the flight line will portable toilets be permitted, or will the Contractor be directed to use the permanent restrooms on-site? Portable toilets are not to be on the airfield due to winds Within the specification titled, “On-Site Field Oversight” – A superintendent and Quality Control (QC) manager, approved by the Government, must be on-site whenever work is being performed. The superintendent and the QC manager shall not be the same person.” There was a verbal discussion regarding this requirement, and we would like to obtain further clarification. For this project, the superintendent and Quality Control manager will be required to be two separate individuals.
If we submit the resume of our superintendent and can establish 10+ years of experience working on active flight lines will the government allow our superintendent to also be our Quality Control Manager? No.
Under Existing Site Conditions, it states the Contractor is responsible to conduct a site survey and validate existing site conditions. It goes on to state “Above and below grade condition assessment”. Please confirm the government will provide a soil report and as-built of the proposed area for construction or the requirement for below-grade condition assessment will not be obtainable The Government does not have any existing soil reports or as‐builts for this area.
Under specification section 5.4 Warranty – The Contractor shall prepare and submit the Transfer and Acceptance of DoD Real Property. If the sunshades are going to be considered real property, then please clarify if this project is subject to Prevailing Wages? If yes, please provide a copy of the Prevailing Wage Determination. Additionally, under the Laughlin specifications, 12.4 Temporary Signage, it references the displaying of the Wage Decision. Lastly, there is a reference under contract clauses 52.222-6 Construction Wage Rate Requirements. Wage scales have been published as part of this amendment.
Under specification section 5.4 Warranty – “The bolting to the concrete shall have a 5-year warranty against any material defects, corrosion, and deterioration.” During our site visit at Kirtland AFB, it was mentioned the existing sunshades were constructed in 2005. The 17-year-old paint has held up well but has some signs of corrosion developing around the base plates and connections. Please clarify if the government wants the sunshades repainted or waive the 5-year warranty against corrosion and deterioration? Sunshades shall be repainted.
Within Part II – Written Technical Proposal, Subfactor 2: Personnel/Team Qualifications – “Progress Schedule (Attachment 29).” Would the government please provide a copy of Attachment 29? Progress Schedule (Attachment 29) is listed in SAM.gov with the original solicitation package.
Within Section M – Evaluation Factors for Award – “C. The Government will evaluate past performance on an offeror based on (i) the references provided by the offeror and any past performance information obtained from survey/questionnaire (Attachment 7),” Would the government provide a copy of Attachment 7? Please see attachment 32 ‐ Past Performance Questionnaire Will exiting jersey barriers be moved to allow transport trucks and heavy lifting equipment access to site during removal? Yes. Any barriers displaced must be replaced to original location by the Contractor.
All existing canopy base plates are flush to the existing concrete, will it be an allowable method to cut / grind anchor bolt flush to the concrete and add joint sealant to seal the penetration? Least intrusive method to existing concrete. This should be fine. There shall be no protrusions from the bolt and vehicles must be able to smoothly drive over it.
Remove and transport 2 total existing structures, consisting of 4 bays per structure, correct? Yes.
Area around structures fenced with minimal traffic , will the contractor be required to provided low profile barriers with lighting? Lighted/Low profile barriers will be used around the construction site Are we allowed to use the immediate are as a lay down area for our equipment and two structures prior to loading and shipping? Yes. Kirtland AFB will provide a plan to Laughlin AFB for the contractor.
It was mentioned at the site visit that as built where available. Will these documents be added to the solicitation? Currently there are only partial as‐builts for the CASS system. Please see the attached information to the solicitation.
During the site visit it was determined that power has been already disconnected to the structures. Is there is power source nearby available for hand tools? No.
Will our transportation vehicles be allowed to use the Truman Gate? Contractors will be expected to use Hickman gate for large transport and Truman gate will serve as an alternative.
Will any special documentation be required to remove the structures from the facility, structures are government property? Kirtland AFB is working on transferring the property to Laughlin AFB.
Can a copy of the sign in sheet be provided? No. Sign in sheets will not be made publically available.
During the site visit we were shown a drawing with a layout of the canopies, will this document be added to the solicitation? The shop drawings for the canopies are attached with this amendment.
Need to identify where our nearest power source will be for electrical , can as built drawings be made available on all existing utilities? B219 is the closest. Drawings have been provided.
Is there a bore log of the existing soils? The Government does not have any bore logs.
What is Depth of the existing concrete where canopies will be placed? This depth varies between 12" and 24" Will the contractor have access to the entire area where the 2 new canopies are being installed for the duration of the project? Yes The SOW calls minimum clearance requirements the Aircraft . These are structures have been previously been fabricated to their current dimensions. Has this been taken into consideration? Yes.
Will trucks carrying the canopies be allowed access during normal business HRS ? Yes Will major lifting activities be allowed during normal business HRS ? Yes The finishes on the existing structure has held out fairly well , will Laughlin accept paint touchups or will we be required to paint the entire structure to meet Laughlin paint scheme? If it does not meet Laughlin requirmentrs, the whole structures will need to be repainted to standards.
Will the superintendent / quality control be allowed to be the same person? Yes.
Can you please provide the wage scales for both locations? Wage scales have been published as part of this amendment.
Please provide as-built drawings for flight line Rows X and Y reflecting the following information: Currently there are only partial as‐builts for the CASS system. Please see the attached information to the solicitation.
Current dimensional airfield paint markings. Will the existing striping be sufficient? If not please provide the new proposed layout? Can you provide a specification for the aircraft pavement markings? Striping will be required at Laughlin AFB. Specification for striping are in UFC 3‐260‐01.
What is the quantity of existing aircraft tie downs? If current tie-downs are in the wrong locations please provide the quantity to be removed and a drawing reflecting the desired new locations. Tie‐downs will not need to be relocated.
There was a verbal comment made onsite about relocating the air and power underground. Please provide as-builts of the current utility locations and a drawing reflecting the new desired locations. Currently there are no existing as‐builts on file.
Please provide the current thickness of the existing flight line concrete? The Government does not have any existing soil reports or as‐builts for this area.
Can the government provide a soil report for two new rows of concrete caissons? If a geotechnical report is not available will the government require the Contractor to provide one to support the new concrete foundations? If the Contractor has to perform a geotechnical investigation, may we perform these tasks during the workweek or must we perform the work on the weekend? Ye Does the government want the Contractor to install the concrete caissons as drawn or does the government require the Contractor to provide new engineered concrete caissons per either an existing soils report or a new one that the Contractor is required to develop? Since we do not have as‐builts, the Contractor will need to provide new engineered caissons.
Are there any written specifications and or requirements for installing the new concrete foundation into the existing flight line concrete? Are we required to simply patch back in the immediate area of the new concrete foundation or remove and replace the existing concrete with the next existing concrete to the nearest existing concrete joint?
The contractor should be able to patch the immediate area of the new concrete foundation. However, the Contractor shall reference UFC 3‐260‐02 for further guidance.
Can the government provide information on the existing GPUs CE Does not have this information, however the contractor should not have to touch these since they do not relate to the aircraft for Kirtland sunshades and will not be changed during this project
Can the government provide information on the desired LED lights and obstruction lights? It was mentioned at the site walk that the government could provide the make and model of the desired electrical fixtures.
Lighting intensity needs to be in conformance with UFC 5‐530‐01. A specific light will not be directed by the Government. Any light fixtures will be submitted as a submittal for approval.
Will the Contractor be permitted to work both Row X and Y simultaneously? If yes there is considerable savings in both time and money associated with the efficiency. Yes.
We understand we must install FAA low profile, lighted barricades around the perimeter of our work area. May we stretch them 10’ apart and tie them together with colored rope or do you require the barricades to be interlocked? Barricades must connect together. Spacing with rope does not prevent FOD After the construction of the sunshades, and FOD inspection, does the base require the Contractor to run a vacuum truck over the entire work area before the base will accept the sunshades? FOD must be removed at all times. Vacuum is preferred however other means are acceptable as long as all FOD is removed.
Will the bid submittal form be modified to separate the costs associated with Kirtland AFB vs. Laughlin AFB? This question was raised due to the New Mexico tax situation. An additional line item has been added in order to separate the costs associated with Kirtland AFB and Laughlin AFB.
We understand the current project is not funded but maybe by September 30th. Based on today’s turbulent times with material shortages and constant material increases we will have to bid to extend the pricing for an extended time. Can the government state how long the bid proposal is to remain valid?
The longer we have to hold the price the larger the material escalation contingency will be added. Proposals must remain valid for 90 days after the proposal closing date in accorandance with the solicitation, block 13.d.
The current specifications reflect 75 Calendar days for the engineering and permits and 150 Calendar days for construction. When you evaluate Calendar days vs. workdays less the required time for review and approval the current times are tight and may not be achievable. Can the government extend the times to 90 workdays and 160 workdays?
In accordance with the solicitation, block 11 the period of performance is negotiable. Please include proposed period of performance in the submitted proposal.
Based on the number of questions to be responded to, the upcoming holiday, we are requesting a time extension to submit the bid 3 weeks after the receipt of the final government responses.
This proposal was extended in order to ensure all questions are answered. This amendment is allowing for a second round of questions and the government will continue to review all information to allow for adequate time for proposal preparation and submission.
Can you please provide copies of the site visit sign in sheets? No. Sign in sheets will not be made publically available.
Statement of Work Section 2. Description of Work states to provide Obstruction Lighting for Sunshades. During the site visit it was indicated that a Make and Model for the desired lights could be provided. Please provide. Please reference question 59.
Statement of Work Section 2. Description of Work states to provide Obstruction Lighting for Sunshades. What quantity of lights is required per bay?
Should it match the existing quantity installed on the shade structures? Reference UFC 3‐535‐01, Chapter 06 During the site visit at Laughlin electrical was discussed. Please confirm that the only electrical required is for the obstruction lighting. If not, what other electrical requirements are included in the project? Electrical will also be required for the GPUs During the site visit at Laughlin the government discussed an electrical panel in Building 219 that would feed the project. There was an electrical manhole located near the future sunshade’s location. Is there a spare conduit running from this manhole to the electrical panel that can be used for obstruction lighting power or will trenching all the way back to the electrical building be required? If trenching is required this will result in signifcant additional cost to the project. Since the government does not have the as‐builts, this is something that will have to have eyes‐on. A small amount of trecnhing may be required.
During the site visit at Laughlin the government discussed an electrical panel in Building 219 that would feed the project. This building was not visited during the site walk. Please provide a map showing the location of this building Was provided with last round of questions.
During the site visit at Laughlin the government discussed an electrical panel in Building 219 that would feed the project. This building was not visited during the site walk. If a spare conduit is not available, then trenching to this panel will be required. Is the panel located inside the building or outside? This is not an actual building but rather a fenced in area. That is where the panel will be located.
During the site visit at Laughlin the government discussed an electrical panel in Building 219 that would feed the project. This building was not visited during the site walk. Has the government confirmed that this panel has available capacity to accommodate the new lighting load? The government will need to get eyes on the panel to verify that it is large enough/has the capacity.
Will a disconnect or subpanel for the obstruction lighting be required at each sunshade? An electrical panel or disconnect will be needed for any lighting or outlets at each sunshade.
There is no mention in the SOW for an engineer signed and sealed electrical design. Is an engineer signed and sealed electrical design required as part of this project for the obstruction lighting and associated electrical feeds? Should not need a design. There are specs and requirements in the UFCs and NECs SOW Section 3.5 states that the structure shall be properly grounded to provide protection against any electrical surges, to include, but not limited to, lightning protection and surges from primary feeder. Please confirm that each shade structure is required to have a lightning protection system engineered and installed? Yes, this is requried.
SOW Section 3.5 states that the structure shall be properly grounded to provide protection against any electrical surges, to include, but not limited to, lightning protection and surges from primary feeder. Do we have to provide surge protection at the electrical panel feeding the obstruction lighting or is surge protection already in place at that panel? Panel has surge protection SOW Section 3.5 states, “the sunshades' electrical power system shall be installed to have power brought to them from Laughlin AFB's primary electrical power distribution. Coordination with Rio Grande Electric Coop (RGEC) shall be made for any primary electrical requirements and installation. The Government shall assist the Contractor in this.” This conflicts to what was discussed at the site visit. Is the panel that was discussed in Building 219 owned by RGEC or the government? Government owns panel. No coordination with RGEC is needed.
SOW Paragraph 5.2 states, “Commissioning shall be done for electrical (grounding, lighting). Is this commissioning required to be performed by a 3rd party commissioning agent? Yes.
At the Laughlin site visit we observed that a new trench was installed the length of where the canopy will be installed that appears to provide utilities to a Compressed Air system. Please provide As-Built drawings that indicate what is located in these trenches showing depth of utilities, type of utilities, etc. Currently there are only partial as‐builts for the CASS system. Please see the attached information to the solicitation.
Please provide any specific underground utility trench requirements (minimum depth to electrical conduits, bedding requirements). Please see the trenching attachment.
Please provide pavement section requirements for patching of any underground utility trench to include base type and thickness, concrete type and thickness, and any reinforcement requirments. Please see the trenching attachment.
Is all concrete on the airfield required to meet 650 psi flexural strength or will the governemnt accept compressive strength test data? Plesae note there is no current test data for 650 flexural strength concrete in the Laughlin or San Antonio areas. If required to submit 650 psi flex test data then contract will incur significnat cost and schedule impacts to prepare an acceptable mix design.
Since it assumed that there will be no aircraft loads impacting the concrete footing to be placed below each structural column, a compressive strength mix should be acceptable as long as it meets structural design requirements as specified by a licensed Structural Engineer. (UFC 3‐301‐01 Structural Engineering)
Please confirm that 650 psi flexural strength concrete will not be required for sunshade column foundations as these will not be subject to airfield wheel loading? Please provide the test data.
During the Laughlin site visit the governemnt had a drawing showing the approximate placement of the sunshades. Can the government provide this exhibit? Currently there are no existing as‐builts on file.
Statement of Work Section 2. Description of Work states full depth replacement of concrete where existing anchors bolts flush existed and fill voids with a pourable epoxy…. Yes, this is required at Kirtland AFB.
During the site visit at Kirtland it was indicated that no pavement marking restoration would be required. Please confirm. If pavement marking restoration is required please provide an as-built so a scope of work can be determined. Striping will NOT be quired at Kirtland AFB.
Statement of Work Section 3. Sunshade Design/Construction provides Aircraft Design Sizing. This information seems applicable if we were designing a need sunshade only. Since we are only re-installng an existing sunshade please confirm that this information is not relevant to the contractor. This information is not necessarily relevant to the contract but gives sizes as a reference.
Does the government have a geotechnical report for this area? The Government does not have any geotechnical report for this area.
Statement of Work Section 3.2 states that the structure shall be built to mitigate bird roosting and nesting within the shade structure. Is netting beneath the fabric required? Yes, The Government is requiriung bird nesting mitigation. Netting holes will be no larger than 3/4".
To property quantify the extent of the sunshade demo and re-installation as-builts of the existing sunshades are needed. Please provide as-builts so that pricing can be prepared. Currently there are no existing as‐builts on file.
Statement of Work Section 2 Description of Work requires airfield pavement marking removal and striping if layout design requires relocation of aircraft. We do not know if the layout will result in relocation of aircraft as we do not have any information on placement of the sunshades. We would need the government to tell us whether the placement will result in the relocation of aircraft for bidding purposes and provide a drawing showing required re-striping.
Please provide or indicate that no striping is required. Striping will be required at Laughlin AFB. Specification for striping are in UFC 3‐260‐01.
SOW Paragraph 2 states, “Provide certified engineered drawings for the re‐construction of the eight sunshades.” Please clarify that “certified engineered” means drawings designed and sealed by a Texas licensed Structural Engineer? Yes, that is correct.
SOW Paragraph 2 states, “Provide certified engineered drawings for the re‐construction of the eight sunshades.” We understand that this system was originally designed by a bidding contractor Agate Steel. We are requesting access to the original signed and sealed calculations for the sunshades currently installed at Kirtland.
This information is needed to validate that the existing system will meet code requirements at Laughlin AFB. Kirtland AFB does not have these. They have sent everything they have, which have already been provided as the designs for Kirtland Sunshades, at Kirtland.
Based on observations made during the Kirtland site visit, the existing shade structural steel appears to have performed as intended; however, the sunscreen fabric has failed. The fabric failure appears to have occurred where it fastens to the structural steel with screws and washers. In our opinion (based on engineering research and discussions with fabric manufacturers) is that the fabric failure is likely a result of the system used to fasten the fabric to the superstructure. The system used (screws with washers fastened to rafters) concentrates wind loads at anchors and along edge of rafters, essentially sawing the fabric over time. Utilizing the existing system, it is highly likely this will occur again and therefore a guarantee of the fabric remaining in place for 5 years is unlikely. Please confirm that no installation warranty will be required on the installation of the fabric on the structure. We need to have a warranty.
Based on observations made during the Kirtland site visit, the existing shade structural steel appears to have performed as intended; however, the sunscreen fabric has failed. The fabric failure appears to have occurred where it fastens to the structural steel with screws and washers. In our opinion (based on engineering research and discussions with fabric manufacturers) is that the fabric failure is likely a result of the system used to fasten the fabric to the superstructure. The system used (screws with washers fastened to rafters) concentrates wind loads at anchors and along edge of rafters, essentially sawing the fabric over time. Utilizing the existing system, it is highly likely this will occur again. Please confirm the government will require the awarded contractor to provide a different fabric fastening detail to ensure a similar failure does not occur again. If it ensures failure does not occur again, yes that should be taken into consideration with the design.
Statement of Work Paragraph 3.2 references “historical weather conditions….install sunshades to withstand these conditions.” Please confirm that the Contractor is required to meet local code design load requirements (ASCE 7‐10 design wind pressures) or provide more stringent requirements if required. Yes, should meet local requirements.
Statement of Work Section 2. Description of Work states to install new 80% sunscreen with a five‐year warranty. Is this sunscreen a fabric material? Yes.
Statement of Work Section 2. Description of Work states to install new 80% sunscreen with a five‐year warranty. Are there any other specific requirements other than this? If they are not stated in the SOW, no.
As the contract is being administered in Texas but some work is being performed in New Mexico, will the New Mexico portion of the work be subject to New Mexico Gross Receipts Tax? That determination will have to be made by the vendor and their tax consultant.
During the initial Q&A responses, several answers alluded to the potential of having to re‐paint the structure to match existing sunshades at Laughlin AFB. As this requirement has been added after both site visits it is not possible for us to definitively know whether the shade structures need to be re‐painted. This information has to be known if we are to include this cost in our proposal. Please confirm whether our bid should include re‐painting the structures or whether paint is not required. Yes, needs to be repainted to Laughlin brown. (Attachment 09, LFAB Architectual Compatibility Guide) If painting of the structures is required, there is a wide range of potential paint options none of which are “code required.” To ensure consistent pricing, what are the specific minimum painting requirements for the structures? Sunshades shall be painted to match existing sunshades per Attachment 09, LFAB Architectual Compatibility Guide section 3.4.10.
There are conflicting statements in the original Q&A responses with regards to grinding of anchor bolts at Kirtland AFB. The following responses were provided:
• The scope of work states, “Full depth replacement of concrete where existing anchor bolts flush existed and fill voids with a pourable epoxy.” The existing anchor bolts are 4 each per column ‐ ¾” diameter embedded deep into the concrete. In past projects we simply grind the anchor bolts down below the flightline concrete surface and cap them with a pourable epoxy. Please clarify how the contractor is to remove and cap the existing anchor bolts?
Response: The existing bolts at Kirtland will need to be completed removed and the concrete will need to be filled where the bolts were displaced. They will not be ground down.
The second question is as follows:
• All existing canopy base plates are flush to the existing concrete, will it be an allowable method to cut /grind anchor bolt flush to the concrete and add joint sealant to seal the penetration? Least intrusive method to existing concrete.
Response: This should be fine. There shall be no protrusions from the bolt and vehicles must be able to smoothly drive over it.
During the site visit at Kirtland, representatives indicated that the response to the second question was preferred, allowing the bolts to be ground down and finished My apologies for the mix up. Kirtland AFB will accept grinding of the anchor bolts and seal with joint sealant.
It is our understanding from the Statement of Work that we are installing the existing structure and therefore assume that all the members are sufficient. Per the SOW, the only new components will be new bolts and fasteners. Per the SOW, "the reassembly of the sunshades will include all new bolts and fasteners" (Section 2. Description of work)
The following question and response were included in the original Q&A Amendment:
Q: The existing sunshades were constructed in 2005. The existing sunshades were engineered per 1997 UBC, 12 PSF roof live load, 80 mph wind load, exposure “C”, 4 PSF framing load, and designed in accordance with seismic zone 2B (Ca-0.28). The specification states “Provide certified engineered drawings for the re-construction of the eight sunshades. In addition, the specifications reference the Contractor shall be responsible for researching all historical weather conditions within the local area and shall install the sunshades to withstand these conditions. Wind pressure shall be computed and applied using a basic wind speed of 110 miles per hour. If certain members do not meet the government's desired 2018 International Building Code should the Contractor include the cost of a new steel member in the base bid?
A: Yes, if there are new members to be added, the Contractor should include that cost in the base bid.
Without possession of the original design calculations and analysis that only Agate Steel has in their possession, it is not reasonable to expect bidding contractors to know whether additional members will be required. Based on the information provided, we can only assume that that the existing structure is sufficient. Please confirm that we are to assume that the existing structure is sufficient and that if post award analysis and calculations indicate otherwise the cost of these additional members will be handled via a modification of the contract.
Yes. That is sufficient.
The following question and response were included in the original Q&A Amendment:
Q: Does the government require the existing cable bracing, strand grips, eye bolts, hillside washers, and nuts to be replaced?
A: If they are not in good working condition, or do not function properly, yes.
Per the Statement of Work, the re-assembly of the sunshades will include all new bolts and fasteners. It is reasonable for the contractor to include this cost, however without a thorough investigation of the existing shade structure it is not possible for bidding contractors to determine whether cable bracing and other structural members are in good working condition. Please confirm that the contractor is to only include new bolts and fasteners per the SOW and that after award if other members are determined to need replacement after thorough investigation a modification would be provided to account for this additiona cost.
14. The following question and response were included in the original Q&A Amendment:
Q: Does the government require the existing cable bracing, strand grips, eye bolts, hillside washers, and nuts to be replaced?
A: If they are not in good working condition, or do not function properly, yes.
Per the Statement of Work, the re-assembly of the sunshades will include all new bolts and fasteners. It is reasonable for the contractor to include this cost, however without a thorough investigation of the existing shade structure it is not possible for bidding contractors to determine whether cable bracing and other structural members are in good working condition. Please confirm that the contractor is to only include new bolts and fasteners per the SOW and that after award if other members are determined to need replacement after thorough investigation a modification would be provided to account for this additiona cost.
Yes. Follow the SOW.
The following questions were included in the original Q&A Amendment:
Q: It was pointed out on the end of the canopy a series of screws, closely spaced, 6” o.c. that were used to retain the end screen fabric. Will the government require all of the existing fasteners be removed and discarded before new sunscreen is applied?
A: Yes, they will need to be removed in order to place a new fabric canopy. After installation, fasteners will need to be replaced as required.
Q: Along the lines of question #10, will all of the screws remaining in the tops of each purlin be required to be removed before the new sunscreen fabricate is applied?
A: If they are in the way of installing the new fabric, they will need to be removed and replaced after installation.
Removal of screws will leave a tremendous amount of open holes within tube steel members, thus providing opportunity for collection of watering and corrosion. In lieu of removing screws will the government accept cutting heads off of screws and grinding flush?
Yes, that’s sufficient.
The following question was included in the original Q&A Amendment
Q: Shepherd’s Crook – without existing drawings please specify how many new static grounding units the Contractor is required to install?
A: Needs to be new material. Number of rods depends on how many aircraft go in each bay and how many tie downs are required per aircraft. Should be 48 total
The original Statement of Work did not include any requirements for aircraft grounding points. The scope was to install sunshades. Does the scope of this project now include to install 48 grounding points for aircraft that will have to be installed in the existing concrete?
Although not explicitly stated, the contractor is required to reinstall grounding points as part of aicraft relocation in accordance with aircraft clearances.
The following question was included in the original Q&A Amendment:
Q: During the site visit we were shown a drawing with a layout of the canopies, will this document be added to the solicitation?
A: The shop drawings for the canopies are attached with this amendment.
This question was requesting a document that government contacts at the Laughlin Air Force base had in their possession that showed where the canopies will be specifically located at Laughlin Air Force base. Currently we have no document that actually shows this. This information is needed to verify no conflict with the existing CASS system, existing pavement markings at the actual location, etc. During the site visit it was indicated that this image could be provided. Please provide.
During the initial Q&A, as‐builts were requested to show the striping that would be required. Responses indicate striping will be required at Laughlin AFB. Specification for striping are in UFC 3‐260‐01. Since the government is not providing specific diagrams for required striping is the contractor required to provide engineered drawings as part of our design showing striping? Yes. Also include tie‐downs and grounding points.
The following question was included in the original Q&A Amendment:
Q: Is all concrete on the airfield required to meet 650 psi flexural strength or will the government accept compressive strength test data? Please note there is no current test data for 650 flexural strength concrete in the Laughlin or San Antonio areas. If required to submit 650 psi flex test data, then contract will incur significant cost and schedule impacts to prepare an acceptable mix design. Please confirm that 650 psi flexural strength concrete will not be required for sunshade column foundations as these will not be subject to airfield wheel loading?
A: Please provide the test data.
The current response does not address the question at hand. As noted, there currently is not test data for 650 flex strength concrete in this area. Therefore, we are recommending the use of a compressive strength mix which will be more readily available. Please confirm that a compressive strength mix will be acceptable since there will be no aircraft wheel loads on the foundation?
Since it assumed that there will be no aircraft loads impacting the concrete footing to be placed below each structural column, a compressive strength mix should be acceptable as long as it meets structural design requirements as specified by a licensed Structural Engineer. (UFC 3‐301‐01 Structural Engineering)
The following question was included in the original Q&A Amendment:
Q: During the site visit at Laughlin electrical was discussed. Please confirm that the only electrical required is for the obstruction lighting. If not, what other electrical requirements are included in the project?
A: Electrical will also be required for the GPUs
Please clarify what is being referenced by the acronym GPU and indicate where these are located? Ground Power Unit. I apologize, the only electrical is required for lighting on the sunshades. The GPUs do not pertain to this project.
The following question was included in the original Q&A Amendment:
Q: During the site visit at Laughlin the government discussed an electrical panel in Building 219 that would feed the project. There was an electrical manhole located near the future sunshade’s location. Is there a spare conduit running from this manhole to the electrical panel that can be used for obstruction lighting power or will trenching all the way back to the electrical building be required? If trenching is required, this will result in significant additional cost to the project.
A: Since the government does not have the as-builts, this is something that will have to have eyes-on. A small amount of trenching may be required.
This response was not adequate for contractors to price this scope of work. At a minimum, the government will need to either A.) Indicate that the contractors should assume that a spare conduit is present, and that trenching will not be required or B.) Indicate that an electrical trench will be required from the manhole back to Building 219 and identify the location of this building so adequate pricing can be included. Please confirm whether we should assume Option A (Spare Conduit and No Trenching) or Option B (Trench and Conduit will be required and identify the location of the electrical panel). This is the only way to accurately bid this scope.
Contractors should assume that there is spare conduit and that no trenching will be required.
The following question was included in the original Q&A Amendment:
Q: During the site visit at Laughlin the government discussed an electrical panel in Building 219 that would feed the project. This building was not visited during the site walk. Has the government confirmed that this panel has available capacity to accommodate the new lighting load?
A: The government will need to get eyes on the panel to verify that it is large enough/has the capacity.
This response would indicate that the government is not clear whether existing capacity is available. Should the bidding contractor assume there is existing capacity within this panel and that should a different panel be required the government will issue a change order? (Note: We still need the location of this panel to price the scope) The power origin for lighting is from B219; panel is disconnect panel T (attached picture); breaker is 200A, there is more space available for lighting.
We request a minimum of 10 work days for submission of proposals after receipt of Q&A responses. Unfortunately at this time, no further extensions will be granted.
What is the current thickness of the flight line concrete at Rows X & Y? Eight (8) inches Is there any steel reinforcement in the existing flight line concrete at Rows X & Y? If yes, can you describe if its rebar or welded wire mesh? There should be rebar.
What type of subgrade preparation can we anticipate under the existing flight line concrete at Rows X & Y? Compacted limestone is expected It is our understanding the Government has constructed aircraft canopies to the south of the proposed located at Rows X & Y? Can the Government provide copies of the geotechnical soil reports from the past projects? We do not have copies of this.
The current scope of work requires the Contractor to extend the existing CASS system for the relocated sunshades located at Row X & Y. Please provide information on the existing CASS system, pipe size, type and under routing? The contractor will not be required to extend the CASS. It should be sufficient as it currently is.
The current scope of work requires the Contractor to extend power to the two flight line Rows X & Y.