Relocate Kirtland Sunshades
Solicitation number
FA3099-22-R-0001
Issued by

About this file

This document consists of an amendment to a federal solicitation and the original solicitation. The amendment extends the response due date from June 17 to June 24, 2022. It adds line items to allow for pricing to be broken out by state where work occurs. The solicitation seeks a firm-fixed price contract for removal of sunshades at Kirtland Air Force Base in New Mexico, transport to Laughlin Air Force Base in Texas, and installation with footers and lighting. The NAICS code is 236220 for construction of commercial and institutional buildings, and the size standard is $39.5 million. The Department of the Air Force's Air Education and Training Command is the issuing agency. The acquisition is set aside for small businesses.

View the file

Other files

File Type Posted
Attach 37 - B219 Information.pdf PDF
FA309922R0001 Amendment 004.pdf PDF
Attach 36 - CASS Sys As-built.pdf PDF
Attach 35 - Questions and Answers Revised 30 June.pdf PDF
Attach 38 - Rows V and W.pdf PDF
Attach 39 - Disconnect Panel.jpg JPG image
Solicitation Amendment FA309922R00010003 SF 30.pdf PDF
Attach 32 - Past Performance Questionnaire.pdf PDF
Attach 30 - NM20220044 New Mexico Wage Rate.pdf PDF
Attch 33 - Bays 4 and 5 sheet 1 sun shade canopies elevation.pdf PDF
Attach 34 - Bays 4 and 5 sheet 2 sun shade canopies details.pdf PDF
Attach 35 - Solicitation Questions and Answers.pdf PDF
Attach 31 - TX20220186 Texas Wage Rate.pdf PDF
Solicitation Amendment FA309922R00010001 SF 30 (1).pdf PDF
Solicitation - FA309922R0001.pdf PDF
10 - Schedule of Material Submittals.pdf PDF
25 - UFC 3-575-01 Lightning And Static Electricity Protection Systems.pdf PDF
15 - UFC 3-250-01 Pavement Design For Roads And Parking Areas.pdf PDF
13 - UFC 3-201-01 Civil Engineering.pdf PDF
22 - UFC 3-260-16 O-M Manual Standard Practice For Airfield Pavement Condition Surveys.pdf PDF
12 - UFC 1-200-01 DoD Building Code.pdf PDF
07 - EQ Contractor Tech Specs March 2021.pdf PDF
23 - UFC 3-301-01 Structural Engineering.pdf PDF
16 - UFC 3-250-04 Standard Practice For Concrete Pavements With Change 2.pdf PDF
14 - UFC 3-220-01 Geotechnical Engineering.pdf PDF
28 - Entry Authority List (EAL).pdf PDF
01 - AETC Installation Excellence Guide.pdf PDF
18 - UFC 3-260-01 Airfield And Heliport Planning And Design With Change 1.pdf PDF
17 - UFC 3-250-11 Soil Stabilization And Modifications For Pavements.pdf PDF
29 - Progress Schedule and Progress Report.pdf PDF
20 - UFC 3-260-03 Airfield Pavement Evaluation.pdf PDF
09 - LAFB_Architectural_Compatibility_Guide.pdf PDF
11 - Security Requirements for SOW.pdf PDF
06 - DD 1354 - Transfer and Acceptance of DoD Real Property.pdf PDF
27 - Division 01 Specifications.pdf PDF
21 - UFC 3-260-04 Airfield And Heliport Marking.pdf PDF
08 - FAA_Form_7460-1.pdf PDF
19 - UFC 3-260-02 Pavement Design For Airfields.pdf PDF
24 - UFC 3-535-01 Visual Air Navigation Facilities With Change 3.pdf PDF
26 - Contractor Fire Prevention Briefing Guide 3.0.pdf PDF
03 - AF IMT 3000 Material Approval Submittal.pdf PDF
04 - C-D Debris Disposal Report Tracker.pdf PDF
02 - AF IMT 103 Base Civil Engineering Work Clearance Request.pdf PDF
05 - C-D Debris Monthly Disposal Report.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

Created On: 14 Jun 2022, 11:18 PM Central Standard Time

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Purpose of Amendment to FA3099-22-R-0001, Relocate Kirtland Sunshades is to:Block 14 (Description of Amendment/Modification):

1. Extend the due date from 17 June 22 to 24 June 22.

2. Attach solicitation questions and answers.

3. Add additional informational attachments.

4. Create a second line item to allow for pricing to be broken up by state the work is occurring in.

No additional questions will be accepted by the Government.

Section A - Solicitation/Contract Form

The following changes have been made:

INFORMATION FROM TO

Response Due Date 17 Jun 2022 24 Jun 2022

Section B - Supplies or Services & Prices or Costs

The following CLIN(s) / SLIN(s) / ELIN(s) were added:

Item Supplies / Services Quantity Unit Unit Price Amount

PLANNING: MXDP 21-1040 Relocate Kirtland Sunshades Remove Sunshades and repair apron at Kirtland AFB. Deliver sunshades and install at Laughlin AFB.

CLIN Specific for work done at Laughlin

AFB.

Purchase Requisition Line Item Number:

Product Service Code: Y1BZ Firm Fixed Price

1 Lot

The following CLIN(s) / SLIN(s) / ELIN(s) were modified:

INFORMATION FROM TO

Description

PLANNING: MXDP 21-1040 Relocate Kirtland Sunshades Remove Sunshades and repair apron at Kirtland AFB. Deliver sunshades and install at Laughlin

AFB.

PLANNING: MXDP 21-1040 Relocate Kirtland Sunshades Remove Sunshades and repair apron at Kirtland AFB. Deliver sunshades and install at Laughlin

AFB.

CLIN Specific for work done at Kirtland AFB.

Section E - Inspection and Acceptance

The inspection and acceptance locations for the following CLIN(s) / SLIN(s) / ELIN(s) were added:

Inspection and Acceptance Location - F2R3C1 - F2R3C1 47 CES CER

INFORMATION VALUE

Action Both

FA309922R00010002

Location Destination

Acceptance Location

F2R3C1

F2R3C1 47 CES CER

251 4TH ST BLDG 100

AF NO MILSBILLS PROC CP 8302985232

LAUGHLIN AFB, TX 78843-5126

UNITED STATES

Instructions For all questions and concerns please contact the POC.

POC Name Lt. Tabatha Herzig POC Email tabatha.herzig@us.af.mil POC Telephone (830)298-5029

Section F - Deliveries or Performance

The delivery information for the following CLIN(s) / SLIN(s) / ELIN(s) were added:

Ship To - F2R3C1 - F2R3C1 47 CES CER

INFORMATION VALUE

Address

Ship To F2R3C1

F2R3C1 47 CES CER

251 4TH ST BLDG 100

AF NO MILSBILLS PROC CP 8302985232

LAUGHLIN AFB, TX 78843-5126

UNITED STATES

POC Name Lt. Tabatha Herzig POC Email tabatha.herzig@us.af.mil POC Telephone (830)298-5029

Delivery 150 Calendar Days, From Date of Notice to Proceed Receipt to completion of performance 75 Calendar Days, From Date of Notice to Proceed Receipt to completion of performance

Section J - List of Attachments

Miscellaneous text in this section has been modified to:

01 - AETC Installation Excellence Guide 02 - AF IMT 103 Base Civil Engineering Work Clearance Request 03 - AF IMT 3000 Material Approval Submittal 04 - C&D Debris Disposal Report Tracker 05 - C&D Debris Monthly Disposal Report 06 - DD 1354 - Transfer and Acceptance of DoD Real Property 07 - EQ Contractor Tech Specs March 2021 08 - FAA_Form_7460-1 09 - LARB_Architectural_Compatibility_Guide 10 - Schedule of Material Submittals 11 - Security Requirements for SOW 12 - UFC 1-200-01 DoD Building Code 13 - UFC 3-201-01 Civil Engineering 14 - UFC 3-220-01 Geotechnical Engineering 15 - UFC 3-250-01 Pavement Design For Roads And Parking Areas 16 - UFC 3-250-04 Standard Practice For Concrete Pavements, With Change 2 17 - UFC 3-250-11 Soil Stabilization And Modifications For Pavements 18 - UFC 3-260-01 Airfield And Heliport Planning And Design, With Change 1

19 - UFC 3-260-02 Pavement Design For Airfields 20 - UFC 3-260-03 Airfield Pavement Evaluation 21 - UFC 3-260-04 Airfield And Heliport Marking 22 - UFC 3-260-16 O&M Manual: Standard Practice For Airfield Pavement Condition Surveys 23 - UFC 3-301-01 Structural Engineering 24 - UFC 3-535-01 Visual Air Navigation Facilities, With Change 3 25 - UFC 3-575-01 Lightning And Static Electricity Protection Systems 26 - Contractor Fire Prevention Briefing Guide 3.0 27 - Division 01 Specifications 28 - Entry Authority List (EAL) 29 - Progress Schedule and Progress Report 30 - NM20220044 New Mexico Wage Rate 31 - TX20220186 Texas Wage Rate 32 - Past Performance Questionnaire 33 - Bays 4&5 sheet 1 Shop Drawings 34 - Bays 4&5 sheet 2 Shop Drawings 35 - Solicitation Questions and Answers

IDCode:
Page: 1
Pages: 4
AmendNo: 0002
EffDate: 14 Jun 2022
ReqNo:
ProjNo: MXDP 21-1040
IssCode: FA3099
AdmCode:
IssuedBy: FA3099 47 CONS-CC

171 ALABAMA AVE STE 03

ADMINISTRATIVE ONLY NO REQUISITIONS

LAUGHLIN AFB, TX 78843-5102

UNITED STATES

Rebecca PELAYO RUELAS, Email: rebecca.pelayo_ruelas@us.af.mil Telephone: 732-4629

AdminBy:
ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: FA309922R0001
SolDate: 29 Apr 2022
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: 1
OffrNoEx: Off
NoCopies: 1
ApprData: See Section G - Contract Administration Data
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: See Schedule
ContNameTitle:
CoNameTitle:
ContDate:
CODate:

File details come from the government source that posted it. Updated .