About this file

This is a specification document for warranty requirements issued by Herbert, Rowland & Grubic, Inc. for use in state and local construction contracts, specifically applicable to the Elizabethtown Area Water Authority's Water Main Replacement Project Phase 4 (Contract No. WR-4) in Pennsylvania. The document establishes mandatory warranty procedures and standards that contractors must follow, requiring submission of product warranty manuals and special warranties within 10 days following the Date of Substantial Completion or Partial Utilization. Warranties must be written in the Owner's name and submitted in bound three-ring binders with plastic covers on 8" x 11" pages, with two copies provided to the Owner. The specification distinguishes between standard product warranties, which are preprinted manufacturer warranties, and special warranties, which extend time limits or provide greater rights to the Owner. All warranties become valid upon issuance of the Certificate of Substantial Completion, and for work delayed beyond that date, contractors must provide updated schedules within 10 days after acceptance.

The warranty requirements impose significant obligations on contractors beyond standard manufacturer disclaimers and limitations. Contractors bear full responsibility for the cost of replacing or rebuilding defective work regardless of whether the Owner has benefited from the work during its anticipated service life. When warranted work fails, contractors must remove and replace not only the defective work but also any other work damaged as a result or requiring removal to provide access for correction. In the event of warranty reinstatement following failure, the reinstated warranty must equal the original warranty with equitable adjustment for depreciation. The specification emphasizes that written warranties do not limit implied warranties or restrict the Owner's other duties, obligations, rights, and remedies available under law, nor do warranty periods constitute limitations on enforcement of such other remedies.

View the file

Other files

File Type Posted
03 30 00 - Cast-in-Place Concrete.pdf PDF
01 78 39 - Tap Card - Project Record Documents.pdf PDF
32 12 16 - Asphalt Paving.pdf PDF
00 45 19 Non Collusion Affidavit.pdf PDF
01 41 26 - Permit Requirements.pdf PDF
03 39 00 - Concrete Curing.pdf PDF
01 33 00 - Submittal Procedures.pdf PDF
01 77 00 - Closeout Procedures.pdf PDF
00 65 19.19 - Consent of Surety to Final Payment.pdf PDF
01 26 13 - Request for Interpretation.pdf PDF
32 11 23 - Aggregate Base Courses.pdf PDF
00 21 13 - Instructions to Bidders.pdf PDF
00 73 73 - Statutory Requirements.pdf PDF
02 31 00 Subsurface Utility Engineering.pdf PDF
00 01 10 - Table of Contents.pdf PDF
00 65 19.16 - Affidavit of Release of Liens.pdf PDF
01 22 00 - Unit Prices.pdf PDF
00 63 36 - Field Order Form.pdf PDF
01 73 00 - Execution Requirements.pdf PDF
00 73 46 - Wage Rate Determination.pdf PDF
00 63 49 - Work Change Directive Form.pdf PDF
01 10 00 - Project Summary.pdf PDF
03 20 00 - Concrete Reinforcing.pdf PDF
00 43 13 - Bid Bond PENAL SUM Form.pdf PDF
00 31 46 - Permits_01 - Phase 4 HOP Application - Sealed.pdf PDF
01 42 00 - References.pdf PDF
32 13 13 - Concrete Paving.pdf PDF
00 11 13 - Advertisement for Bids.pdf PDF
01 74 19 - Construction Waste Management and Disposal.pdf PDF
00 65 19.23 - Notice of Acceptability of Work.pdf PDF
01 32 33 - Photographic Documentation.pdf PDF
31 23 19 - Dewatering.pdf PDF
02 82 33 Removal and Disposal of ACM.pdf PDF
32 91 13 - Soil Preparation.pdf PDF
33 14 17 - Site Water Service Utility Laterals.pdf PDF
01 61 00 - Product Requirements.pdf PDF
00 72 00 - General Conditions 2018.pdf PDF
32 91 19 - Landscape Grading.pdf PDF
00 52 00 - Owner_Contractor Agreement.pdf PDF
33 14 19 - Valves And Hydrants For Water Utility Service.pdf PDF
00 61 13.13 - Performance Bond.pdf PDF
31 23 16.26 - Rock Removal.pdf PDF
01 32 36 - Video Monitoring and Documentation.pdf PDF
01 26 00 - Contract Modifications.pdf PDF
01 40 00 - Quality Requirements.pdf PDF
31 23 23.33 - Flowable Fill.pdf PDF
01 50 00 - Temporary Facilities and Controls.pdf PDF
00 45 36 EEO Certificate.pdf PDF
33 14 13 - Public Water Utility Distribution Piping.pdf PDF
00 73 43 - Wage Rate Requirements.pdf PDF
Show 40 more

Latest 50 of 91 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

01 78 36 – WARRANTIES

Herbert, Rowland & Grubic, Inc. 01 78 36 - 1 009280.0426

SECTION 01 78 36 – WARRANTIES

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes

1. Product warranty manuals.

2. Warranty requirements.

B. Related Sections

1. Section 01 77 00 – Closeout Requirements: general closeout procedures.

2. Individual Sections for specific requirements for Project Record Documents of the Work in those Sections.

1.2 PRODUCT WARRANTIES

A. Warranties specified in individual Sections shall be in addition to, and run concurrent with, other warranties required by the Contract Documents. Manufacturer's disclaimers and limitations on product warranties do not relieve Contractor of obligations under requirements of the Contract Documents. Warranties shall be written in Owner’s name.

1. Standard Product Warranties are preprinted written warranties published by individual manufacturers for particular products and are specifically endorsed by the manufacturer to Owner.

2. Special Warranties are written warranties required by or incorporated into Contract Documents, either to extend time limits provided by standard warranties or to provide greater rights for Owner.

B. Submission requirements:

1. Submit documents to Owner and Engineer within 10 days following Date of Substantial Completion or Partial Utilization. For item accepted after Date of Substantial Completion, submit documents within 10 days following each individual acceptance.

a. When special warranty is required to be executed by Contractor, or

Contractor and a subcontractor, supplier or manufacturer, prepare a written document that contains appropriate terms and identification, ready for execution by required parties. Submit a draft to Owner.

2. Submit information on 8½” x 11" pages, bound in three-ring binders with plastic covers. Prepare binder cover with title WARRANTIES AND BONDS, and title of Project and subject matter when multiple binders are needed.

Herbert, Rowland & Grubic, Inc. 01 78 36 - 2 009280.0426

a. Internally subdivide binder contents with permanent page dividers, logically organized with tabs clearly printed.

b. Quantity: Provide two copies of each volume to Owner.

1.3 WARRANTY REQUIREMENTS

A. Written warranties made to Owner are in addition to implied warranties and shall not limit duties, obligations, right and remedies otherwise available under law, nor shall warranty periods be interpreted as limitations on time in which Owner can enforce such other duties, obligations, rights, or remedies.

B. Manufacturer's disclaimers and limitations on product warranties shall not relieve Contractor of warranty on Work that incorporates products, nor shall it relieve suppliers, manufacturers, and subcontractors required to countersign special warranties with Contractor.

C. Special Warranties: Prepare a written document that contains appropriate terms and identification, ready for execution. Submit a draft for approval before final execution.

1. Manufacturer's Standard Form: Modified to include Project-specific information and properly executed.

2. Specified Form: When specified forms are included with the Specifications, prepare a written document using appropriate form properly executed.

3. Refer to Sections for specific content requirements and particular requirements for submitting special warranties.

D. Warranties shall become valid and operative upon issuance of Certificate of Substantial Completion.

E. For items of Work delayed beyond Date of Substantial Completion, provide an updated schedule within 10 days after acceptance, listing date of acceptance as start of warranty.

F. Related Damages and Losses: When correcting warranted Work that has failed, remove and replace other Work that has been damaged as a result of such failure or that needs to be removed and replaced to provide access for correction of warranted Work.

G. Reinstatement of Warranty: In event of Work covered by warranty has failed, correct by replacement or rebuilding. Reinstate warranty by written endorsement. Reinstated warranty shall be equal to original warranty with an equitable adjustment for depreciation.

H. Replacement Cost:

1. Upon determining that Work covered by a warranty has failed replace or rebuild Work to an acceptable condition in compliance with requirements of Contract Documents.

Herbert, Rowland & Grubic, Inc. 01 78 36 - 3 009280.0426

2. Contractor shall be responsible for cost of replacing or rebuilding defective Work regardless of whether Owner has benefited from use of Work through a portion of its anticipated useful service life.

PART 2 - PRODUCTS – Not Used

PART 3 - EXECUTION – Not Used

END OF SECTION 01 78 36