01 31 23 - Project Documentation Website.pdf

PDF 466 KB Posted

Attached to
West Pump Station Replacement Project
Solicitation number
Not on record
Issued by
Chester County, Pennsylvania

About this file

This is a Project Documentation Website specification document prepared for the West Pump Station Replacement Project, a construction initiative by the Northwestern Chester County Municipal Authority in Pennsylvania. The specification outlines requirements for implementing a web-based project documentation system to be administered by the Engineer, who bears all costs during the contract period. The website must accommodate minimum user access levels across multiple stakeholders: two users each for the Owner and Prime Contractors, six users for the Engineer, and two users each for two additional contractors (Contract Nos. 2 and 3). The platform must provide comprehensive functionality including project team directory, correspondence management, meeting minutes, photo documentation, contract modifications (change orders, change proposals, work change directives, and field orders), RFIs, task and issue management, schedule and calendar management, shop drawings and submittal forms, various reports (daily observation reports, contractor daily reports, material testing reports, and inspection reports), drawing and specification document hosting with viewing and updating capabilities, item-specific logs, notification and tracking functions, archiving capabilities, and payment processing. All users must execute a data licensing agreement acceptable to the Owner, and the software provider must deliver comprehensive training and continuous product support throughout the project duration via web-based help desk and tutorials.

The specification designates Submittal Exchange as the required website software package provider and requires that all project documentation be provided in searchable HTML format upon project closeout in three complete archive copies. The document references related specification sections including Project Meetings (01 31 19), Construction Progress Schedule (01 32 16), Construction Progress Reporting (01 32 26), Photographic Documentation (01 33 33), and Submittal Procedures (01 33 00). No pricing terms, set-asides, incumbent information, or funding details are specified within this documentation specification section.

View the file

Other files

File Type Posted
40 05 53 - Identification For Process Piping.pdf PDF
44 42 56 - Base Mounted Pumping System.pdf PDF
32 31 13 - chain link fences and gates.pdf PDF
32 05 13 - Soils For Exterior Improvements.pdf PDF
00 73 73 - Statutory Requirements.pdf PDF
01 78 39 - Project Record Documents.pdf PDF
00 73 46 - Wage Determination Schedule Cover.pdf PDF
40 05 19 - Ductile Iron Process Pipe.pdf PDF
04 05 13 - Masonry Mortaring.pdf PDF
31 23 23.33 - Flowable Fill.pdf PDF
00 45 19 Non Collusion Affidavit.pdf PDF
07 31 13 - asphalt shingles.pdf PDF
00 65 16 - Certificate of Substantial Completion.pdf PDF
01 57 28 - Temporary Flow Control.pdf PDF
26 27 16 - Electrical Panels & Enclosures.pdf PDF
01 31 19 - Project Meetings.pdf PDF
01 33 00 - Submittal Procedures.pdf PDF
01 32 16 - Construction Progress Schedule - SMALL.pdf PDF
00 63 49 - Work Change Directive Form.pdf PDF
40 66 16 - Firewall Hardware.pdf PDF
33 31 11 - Public Sanitary Sewerage Gravity Piping.pdf PDF
04 20 00 - Unit Masonry.pdf PDF
01 77 00 - Closeout Procedures.pdf PDF
07 71 23 - Manufactured Gutters and Downspouts.pdf PDF
32 91 19 - Landscape Grading.pdf PDF
41 22 23.19 - Monorail Electric Chain Hoists with Manual Geared Trolley.pdf PDF
00 41 16.b - Bid Frm for Const Contract 2018 - EC.pdf PDF
26 05 26 - Grounding.pdf PDF
01 29 00 - Payment Procedures.pdf PDF
40 05 78.29 - Combination Air Valves For Wastewater Service.pdf PDF
01 40 00 - Quality Requirements.pdf PDF
00 65 19.19 - Consent of Surety to Final Payment.pdf PDF
00 45 46 Public Works Employment Verification Form.pdf PDF
40 05 61 - Gate Valves.pdf PDF
31 05 16 - aggregates for earthwork.pdf PDF
09 91 00 Painting.pdf PDF
08 13 13 - Standard Hollow Metal Doors.pdf PDF
00 61 13.13 - Performance Bond.pdf PDF
40 05 51 - Common Requirements For Process Valves..pdf PDF
00 73 43-1 - Certification Form llc-25 PA Dep L&I.pdf PDF
01 74 19 - Construction Waste Management and Disposal.pdf PDF
34 71 13 - Vehicle Barriers.pdf PDF
04 01 20 - Masonry Cleaning.pdf PDF
00 73 36 - Equal Employment Opportunity Requirements.pdf PDF
00 21 13 - Instructions to Bidders.pdf PDF
00 61 13.16 - Payment Bond.pdf PDF
00 11 13 - Advertisement for Bids.pdf PDF
08 90 00 - LOUVERS AND VENTS.pdf PDF
40 05 63 - Ball Valves.pdf PDF
26 05 00 - Electrical General.pdf PDF
Show 40 more

Latest 50 of 171 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

01 31 23 – PROJECT DOCUMENTATION WEBSITE

Herbert, Rowland & Grubic, Inc. 01 31 23 - 1 000483.0450

SECTION 01 31 23 – PROJECT DOCUMENTATION WEBSITE

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes

1. Project documentation website.

B. Related Sections

1. Section 01 31 19 – Project Meetings.

2. Section 01 32 16 – Construction Progress Schedule.

3. Section 01 32 26 – Construction Progress Reporting.

4. Section 01 32 33 – Photographic Documentation.

5. Section 01 33 00 – Submittals Procedures.

1.2 SUBMITTALS

A. Section 01 33 00 – Submittal Procedures: Requirements for submittals.

B. Product Data: Submit information, data, and brochures prior to any submittals required.

1.3 CLOSEOUT SUBMITTALS

A. Section 01 77 00 – Closeout Procedures: Requirements for submittals.

B. Project Record Documents: Provide 3 complete archive copies of all data on the Project Document Website in searchable HTML format.

PART 2 - PRODUCTS

2.1 WEBSITE

A. Website software package provider:

1. Submittal Exchange

B. The project Website will be administered by Engineer. The Engineer is responsible for all costs during the Contract Time.

C. The minimum user access shall be provided, as follows:

1. Owner: 2 users

2. Engineer: 6 users

3. Prime Contractors: 2 users

4. Other Contractors:

a. Contract No. 2 -2 users.

b. Contract No. 3 – 2 users.

5. No other users shall be granted access.

D. License: All users shall execute a data licensing agreement in a form acceptable to the

01 31 23 – PROJECT DOCUMENTATION WEBSITE

Herbert, Rowland & Grubic, Inc. 01 31 23 - 2 000483.0450

Owner.

E. Training: Software training shall be provided for Project Web Site Users. In addition, product support shall be provided continuously by the provider throughout the project through web-based help desk and tutorials as well as support.

F. Functionality: The project documentation website shall provide the following functionality, at a minimum:

1. Project team directory.

2. Project correspondence.

3. Meeting minutes.

4. Photo documentation.

5. Contract modifications

a. Change Orders

b. Change Proposals

c. Work Change Directives

d. Field Orders

6. RFI

7. Task and issue management.

a. Defective Work notice

8. Schedule and calendar management

9. Shop Drawings and all Submittals forms and logs as referenced in this Section, Section 01 33 00 – Submittal Procedures and in individual specification sections.

10. Reports

a. RPR Daily Observation Reports

b. Contractors Daily Reports

c. Material Testing Reports

d. Inspection Reports

11. Drawing and specification document hosting, viewing, and updating.

12. Logs for each separate item.

13. Notification, reminder and tracking functions.

14. Archiving functions.

15. Payment

PART 3 - EXECUTION - Not Used

END OF SECTION 01 31 23