WCTA Meter Replacement Project
Solicitation number
US.257570
Issued by
Lancaster County, Pennsylvania

About this file

This is a Wage Determination Schedule document related to the WCTA Meter Replacement Project, a construction initiative by West Cocalico Township Authority in Pennsylvania. The project involves the replacement of approximately 790 water meters with new Automated Meter Infrastructure (AMI) meters across West Cocalico Township. Bids for this project are being received online via PennBid until Thursday, November 5, 2026, at 10:00 AM local time, at which point bids will be opened and results posted publicly. Bidding documents are available for download from https://pennbid.bonfirehub.com/, and prospective bidders are encouraged to register as plan holders on the designated website. All official notifications, addenda, and other bidding documents will be provided exclusively through the PennBid website. Bid security in the form of a Certified Check or Bid Bond must accompany each bid in an amount not less than 10% of the bid value.

The wage determination schedule establishes prevailing wage requirements that contractors and subcontractors must comply with when performing work on this project. All inquiries regarding the meaning or intent of the bidding documents must be submitted through PennBid in accordance with the Instructions to Bidders; telephone inquiries are not acceptable. For comprehensive requirements regarding bid submittal, bidder qualifications, bidding procedures, and contract award criteria, bidders must refer to the Instructions to Bidders included in the complete bidding documents.

View the file

Other files

File Type Posted
01 64 00 - Owner Furnished Products.pdf PDF
00 73 73a Steel Products Procurement Certification.pdf PDF
00 01 01 LA Cover.pdf PDF
01 26 13 - Requests for Interpretation.pdf PDF
4-Bid Summary - EVP Edited .pdf PDF
00 63 36 - Field Order Form.pdf PDF
00 61 13.16 - Payment Bond.pdf PDF
00 45 19 Non Collusion Affidavit.pdf PDF
01 25 00 - Substitution Procedures.pdf PDF
00 21 13 - Instructions to Bidders.pdf PDF
00 63 63 - Change Order Form.pdf PDF
00 62 76 - App for Payment.pdf PDF
01 22 00 - Unit Prices.pdf PDF
00 65 19.16 - Affidavit of Release of Liens.pdf PDF
01 77 00 - Closeout Procedures.pdf PDF
00 73 46a - Wage Determination Schedule.pdf PDF
00 11 13 - Advertisement for Bids.pdf PDF
00 73 43-1 - Certification Form llc-25 PA Dep L&I.pdf PDF
01 61 00 - Product Requirements.pdf PDF
01 31 19 - Project Meetings.pdf PDF
00 73 43 - Wage Rate Requirements.pdf PDF
00 45 36 EEO Certificate.pdf PDF
00 65 16 - Certificate of Substantial Completion.pdf PDF
01 35 13 - Special Project Requirements.pdf PDF
01 32 33 - Photographic Documentation.pdf PDF
00 45 33 Certification of Non-Segregated Facilities and Non-Employment of Illegal Alien Labor.pdf PDF
01 31 13 - Project Coordination.pdf PDF
00 65 19.23 - Notice of Acceptability of Work.pdf PDF
00 52 00 - Agmnt btw Own and Cntr for Const Con Stip Price.pdf PDF
00 65 19.19 - Consent of Surety to Final Payment.pdf PDF
01 33 00 - Submittal Procedures.pdf PDF
00 01 10 - Table of Contents.pdf PDF
00 72 00 - General Conditions 2018.pdf PDF
01 78 39 - Project Record Documents.pdf PDF
01 10 00 - Project Summary.pdf PDF
01 40 00 - Quality Requirements.pdf PDF
3-00 91 13 - Addenda No. 1.pdf PDF
00 45 46 Public Works Employment Verification Form.pdf PDF
00 63 49 - Work Change Directive Form.pdf PDF
01 42 00 - References.pdf PDF
01 32 16 - Construction Progress Schedule - SMALL.pdf PDF
00 60 00 - Project Forms.pdf PDF
00 73 73 - Statutory Requirements.pdf PDF
01 73 00 - Execution Requirements.pdf PDF
00 73 36 - Equal Employment Opportunity Requirements.pdf PDF
00 63 13 - RFI Form.pdf PDF
00 61 13.13 - Performance Bond.pdf PDF
01 26 00 - Contract Modifications.pdf PDF
00 43 13 - Bid Bond PENAL SUM Form.pdf PDF
01 32 26 - Construction Progress Reporting.pdf PDF
Show 40 more

Latest 50 of 51 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Herbert, Rowland & Grubic, Inc. 00 73 46 - 1 25-331-07

WAGE DETERMINATION SCHEDULE

PA Prevailing Wage Rate Determination

WCTA Meter Replacement Project Date of determination: September 25, 2026

Number of pages: 6

Project Name: WCTA Meter Replacement Project

General Description: The replacement of approximately 820 water meters with new AMI meters across West Cocalico Township.

Project Locality West Cocalico Township

Awarding Agency: West Cocalico Township Authority

Contract Award Date: 11/5/2026

Serial Number: 26-08609

Project Classification: Highway

Determination Date: 9/25/2026

Assigned Field Office: Harrisburg

Field Office Phone Number: (717)787-4763

Toll Free Phone Number: (800)932-0665

Project County: Lancaster County

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Commonwealth of Pennsylvania Department of Labor & Industry Report Date: 9/25/2026 Page 1 of 6

Project: 26-08609 - Building Effective Date

Expiration Date

Hourly Rate Fringe Benefits

Total

Asbestos & Insulation Workers 6/30/2025 $41.50 $29.86 $71.36

Asbestos & Insulation Workers 6/29/2026 $43.50 $31.11 $74.61

Boilermaker (Commercial, Institutional, and Minor Repair Work)

3/1/2026 $41.34 $19.23 $60.57

Boilermakers 1/1/2026 $58.00 $36.57 $94.57

Bricklayers, Stone Masons, Pointers, Caulkers, Cleaners

5/3/2026 $40.49 $21.51 $62.00

Carpenters, Drywall Hangers, Framers, Instrument Men, Lathers, Soft Floor Layers

6/1/2026 $36.84 $22.69 $59.53

Carpenters, Drywall Hangers, Framers, Instrument Men, Lathers, Soft Floor Layers

6/1/2027 $36.84 $24.94 $61.78

Cement Finishers & Plasterers 5/3/2026 $34.23 $22.27 $56.50

Cement Finishers & Plasterers 5/3/2027 $33.49 $25.01 $58.50

Cement Masons 5/1/2025 $36.00 $21.30 $57.30

Dockbuilder, Pile Drivers 5/1/2026 $56.98 $37.99 $94.97

Dockbuilder/Pile Driver Diver 5/1/2026 $66.54 $41.74 $108.28

Dockbuilder/pile driver tender 5/1/2026 $56.98 $37.99 $94.97

Drywall Finisher 5/1/2026 $33.02 $24.00 $57.02

Electricians 9/1/2025 $46.02 $28.39 $74.41

Electricians 8/31/2026 $48.02 $29.46 $77.48

Elevator Constructor 1/1/2025 $63.40 $40.03 $103.43

Elevator Constructor 1/1/2026 $61.26 $45.78 $107.04

Floor Coverer 5/1/2025 $37.78 $19.80 $57.58

Floor Coverer 5/1/2026 $38.59 $20.61 $59.20

Glazier 5/1/2024 $32.46 $20.93 $53.39

Glazier 5/1/2026 $34.05 $22.34 $56.39

Iron Workers (Bridge, Structural Steel, Ornamental, Precast, Reinforcing)

7/1/2025 $38.76 $33.38 $72.14

Iron Workers (Bridge, Structural Steel, Ornamental, Precast, Reinforcing)

7/1/2026 $40.51 $33.88 $74.39

Laborers (Class 01 - See notes) 5/1/2026 $28.06 $19.08 $47.14

Laborers (Class 02 - See notes) 5/1/2026 $30.06 $19.08 $49.14

Laborers (Class 03 - See notes) 5/1/2026 $32.06 $19.08 $51.14

Laborers (Class 04 - See notes) 5/1/2026 $33.56 $19.08 $52.64

Laborers (Class 05 - See notes) 5/1/2026 $34.06 $19.08 $53.14

Laborers (Class 06 - See notes) 5/1/2026 $30.06 $19.08 $49.14

Marble Mason 5/1/2025 $37.20 $19.24 $56.44

Marble Mason 5/1/2026 $39.15 $19.24 $58.39

Millwright 6/1/2025 $43.00 $22.95 $65.95

Millwright 6/1/2026 $44.97 $22.95 $67.92

Operators (Building, Class 01 - See Notes) 5/1/2025 $44.89 $30.92 $75.81

Operators (Building, Class 01 - See Notes) 5/1/2026 $46.05 $31.76 $77.81

Operators (Building, Class 01A - See Notes) 5/1/2025 $47.14 $31.58 $78.72

Operators (Building, Class 01A - See Notes) 5/1/2026 $48.30 $32.42 $80.72

Operators (Building, Class 02 - See Notes) 5/1/2025 $44.61 $30.83 $75.44

Operators (Building, Class 02 - See Notes) 5/1/2026 $45.77 $31.67 $77.44

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 9/25/2026 Page 2 of 6

Expiration Date

Hourly Rate Fringe Benefits

Total

Operators (Building, Class 02A - See Notes) 5/1/2025 $46.86 $31.50 $78.36

Operators (Building, Class 02A - See Notes) 5/1/2026 $48.02 $32.34 $80.36

Operators (Building, Class 03 - See Notes) 5/1/2025 $41.88 $30.03 $71.91

Operators (Building, Class 03 - See Notes) 5/1/2026 $43.04 $30.87 $73.91

Operators (Building, Class 04 - See Notes) 5/1/2025 $40.74 $29.70 $70.44

Operators (Building, Class 04 - See Notes) 5/1/2026 $41.90 $30.54 $72.44

Operators (Building, Class 05 - See Notes) 5/1/2025 $40.30 $29.56 $69.86

Operators (Building, Class 05 - See Notes) 5/1/2026 $41.45 $30.41 $71.86

Operators (Building, Class 06 - See Notes) 5/1/2025 $39.42 $29.30 $68.72

Operators (Building, Class 06 - See Notes) 5/1/2026 $40.58 $30.14 $70.72

Operators (Building, Class 07A- See Notes) 5/1/2025 $54.56 $35.21 $89.77

Operators (Building, Class 07A- See Notes) 5/1/2026 $56.03 $36.14 $92.17

Operators (Building, Class 07B- See Notes) 5/1/2025 $54.22 $35.10 $89.32

Operators (Building, Class 07B- See Notes) 5/1/2026 $55.69 $36.03 $91.72

Painters Class 1 (see notes) 5/1/2025 $28.42 $18.36 $46.78

Painters Class 1 (see notes) 5/1/2026 $29.70 $18.78 $48.48

Painters - Line Stripping 12/1/2024 $44.12 $27.91 $72.03

Painters - Line Stripping 12/1/2025 $45.12 $29.41 $74.53

Painters Class 2 (see notes) 5/1/2020 $27.43 $15.99 $43.42

Painters Class 3 (see notes) 5/1/2020 $33.18 $15.99 $49.17

Piledrivers 5/1/2021 $43.73 $37.99 $81.72

Plasterers 5/1/2024 $32.93 $21.08 $54.01

Plasterers 5/1/2025 $34.68 $21.23 $55.91

Plumber/Pipefitter 5/1/2025 $45.30 $29.91 $75.21

Plumber/Pipefitter 5/1/2026 $48.30 $30.66 $78.96

Roofers (Composition) 5/1/2025 $46.03 $34.77 $80.80

Roofers (Composition) 5/1/2026 $47.53 $35.22 $82.75

Roofers (Shingle) 5/1/2024 $34.35 $22.20 $56.55

Roofers (Slate & Tile) 5/1/2024 $37.35 $22.20 $59.55

Sheet Metal Workers 6/1/2025 $45.02 $44.71 $89.73

Sheet Metal Workers 6/1/2026 $46.62 $46.36 $92.98

Sign Makers and Hangars 7/15/2025 $33.48 $26.41 $59.89

Sign Makers and Hangars 7/15/2026 $36.38 $25.01 $61.39

Sprinklerfitters 4/1/2025 $49.75 $29.21 $78.96

Sprinklerfitters 4/1/2026 $52.82 $30.56 $83.38

Terrazzo Finisher 5/1/2025 $36.32 $21.68 $58.00

Terrazzo Finisher 5/1/2026 $37.12 $22.76 $59.88

Terrazzo Grinder 5/1/2025 $37.10 $21.68 $58.78

Terrazzo Grinder 5/1/2026 $37.93 $22.76 $60.69

Terrazzo Mechanics 5/1/2025 $37.17 $23.43 $60.60

Terrazzo Mechanics 5/1/2026 $38.06 $24.51 $62.57

Terrazzo Setter 5/1/2019 $31.81 $19.67 $51.48

Tile & Marble Finisher 5/1/2025 $35.31 $16.99 $52.30

Tile & Marble Finisher 5/1/2026 $37.26 $16.99 $54.25

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 9/25/2026 Page 3 of 6

Expiration Date

Hourly Rate Fringe Benefits

Total

Tile Setter 5/1/2025 $37.20 $19.24 $56.44

Tile Setter 5/1/2026 $39.15 $19.24 $58.39

Truckdriver class 1(see notes) 5/1/2025 $41.87 $0.00 $41.87

Truckdriver class 2 (see notes) 5/1/2025 $41.94 $0.00 $41.94

Truckdriver class 3 (see notes) 5/1/2025 $42.43 $0.00 $42.43

Window Film / Tint Installer 6/1/2025 $27.42 $15.13 $42.55

Window Film / Tint Installer 6/1/2026 $28.35 $15.60 $43.95

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 9/25/2026 Page 4 of 6

Project: 26-08609 - Heavy/Highway Effective

Expiration Date

Hourly Rate Fringe Benefits

Total

Carpenter - Chief of Party (Surveying & Layout) 5/1/2021 $41.42 $15.49 $56.91

Carpenter - Instrument Person (Surveying & Layout) 5/1/2021 $36.02 $15.49 $51.51

Carpenter - Rodman I (Survey & Layout) 5/1/2021 $28.82 $12.39 $41.21

Carpenter 5/1/2026 $37.63 $21.18 $58.81

Carpenter Welder 5/1/2026 $38.38 $21.18 $59.56

Carpenters - Piledriver/Welder 1/1/2026 $38.38 $21.18 $59.56

Cement Finishers 1/1/2017 $27.70 $22.20 $49.90

Dockbuilder, Pile Drivers 5/1/2026 $56.98 $37.99 $94.97

Dockbuilder/Pile Driver Diver 5/1/2026 $61.88 $45.47 $107.35

Dockbuilder/pile driver tender 5/1/2026 $56.98 $37.99 $94.97

Electric Lineman 6/3/2024 $52.80 $30.61 $83.41

Electric Lineman 6/2/2025 $55.42 $31.04 $86.46

Iron Workers (Bridge, Structural Steel, Ornamental, Precast, Reinforcing)

7/1/2024 $37.26 $32.63 $69.89

Laborers (Class 01 - See notes) 5/1/2025 $26.61 $19.99 $46.60

Laborers (Class 01 - See notes) 5/1/2026 $27.61 $20.44 $48.05

Laborers (Class 02 - See notes) 5/1/2025 $33.23 $19.99 $53.22

Laborers (Class 02 - See notes) 5/1/2026 $34.23 $20.44 $54.67

Laborers (Class 03 - See notes) 5/1/2025 $30.22 $19.99 $50.21

Laborers (Class 03 - See notes) 5/1/2026 $31.22 $20.44 $51.66

Laborers (Class 04 - See notes) 5/1/2025 $30.57 $19.99 $50.56

Laborers (Class 04 - See notes) 5/1/2026 $31.57 $20.44 $52.01

Laborers (Class 05 - See notes) 5/1/2025 $31.24 $19.99 $51.23

Laborers (Class 05 - See notes) 5/1/2026 $32.24 $20.44 $52.68

Laborers (Class 06 - See notes) 5/1/2025 $30.66 $19.99 $50.65

Laborers (Class 06 - See notes) 5/1/2026 $31.66 $20.44 $52.10

Laborers (Class 07 - See notes) 5/1/2025 $30.95 $19.99 $50.94

Laborers (Class 07 - See notes) 5/1/2026 $31.95 $20.44 $52.39

Laborers (Class 08 - See notes) 5/1/2025 $31.43 $19.99 $51.42

Laborers (Class 08 - See notes) 5/1/2026 $32.43 $20.44 $52.87

Millwright 6/1/2025 $45.46 $23.33 $68.79

Millwright 6/1/2026 $47.52 $23.33 $70.85

Operators (Heavy, Class 01 - See Notes) 5/1/2025 $43.46 $30.50 $73.96

Operators (Heavy, Class 01 - See Notes) 5/1/2026 $44.61 $31.35 $75.96

Operators (Heavy, Class 01A - See Notes) 5/1/2025 $45.71 $31.16 $76.87

Operators (Heavy, Class 01A - See Notes) 5/1/2026 $46.86 $32.01 $78.87

Operators (Heavy, Class 02 - See Notes) 5/1/2025 $43.18 $30.41 $73.59

Operators (Heavy, Class 02 - See Notes) 5/1/2026 $44.34 $31.25 $75.59

Operators (Heavy, Class 02A - See Notes) 5/1/2025 $45.43 $31.08 $76.51

Operators (Heavy, Class 02A - See Notes) 5/1/2026 $46.59 $31.92 $78.51

Operators (Heavy, Class 03 - See Notes) 5/1/2025 $40.26 $29.55 $69.81

Operators (Heavy, Class 03 - See Notes) 5/1/2026 $41.43 $30.38 $71.81

Operators (Heavy, Class 04 - See Notes) 5/1/2025 $39.12 $29.22 $68.34

Operators (Heavy, Class 04 - See Notes) 5/1/2026 $40.28 $30.06 $70.34

Operators (Heavy, Class 05 - See Notes) 5/1/2025 $38.67 $29.09 $67.76

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 9/25/2026 Page 5 of 6

Project: 26-08609 - Heavy/Highway Effective

Expiration Date

Hourly Rate Fringe Benefits

Total

Operators (Heavy, Class 05 - See Notes) 5/1/2026 $39.83 $29.93 $69.76

Operators (Heavy, Class 06 - See Notes) 5/1/2025 $37.80 $28.82 $66.62

Operators (Heavy, Class 06 - See Notes) 5/1/2026 $38.96 $29.66 $68.62

Operators (Heavy, Class 07A - See Notes) 5/1/2025 $52.85 $34.71 $87.56

Operators (Heavy, Class 07A - See Notes) 5/1/2026 $54.32 $35.64 $89.96

Operators (Heavy, Class 07B - See Notes) 5/1/2025 $52.51 $34.60 $87.11

Operators (Heavy, Class 07B - See Notes) 5/1/2026 $53.97 $35.54 $89.51

Operators (Highway, Class 01 - See Notes) 5/1/2025 $42.56 $30.24 $72.80

Operators (Highway, Class 01 - See Notes) 5/1/2026 $43.72 $31.08 $74.80

Operators (Highway, Class 01a - See Notes) 5/1/2025 $44.81 $30.92 $75.73

Operators (Highway, Class 01a - See Notes) 5/1/2026 $45.97 $31.76 $77.73

Operators (Highway, Class 02 - See Notes) 5/1/2025 $41.39 $29.89 $71.28

Operators (Highway, Class 02 - See Notes) 5/1/2026 $42.55 $30.73 $73.28

Operators (Highway, Class 03 - See Notes) 5/1/2025 $40.70 $29.68 $70.38

Operators (Highway, Class 03 - See Notes) 5/1/2026 $41.87 $30.51 $72.38

Operators (Highway, Class 04 - See Notes) 5/1/2025 $40.26 $29.54 $69.80

Operators (Highway, Class 04 - See Notes) 5/1/2026 $41.41 $30.39 $71.80

Operators (Highway, Class 05 - See Notes) 5/1/2025 $39.73 $29.41 $69.14

Operators (Highway, Class 05 - See Notes) 5/1/2026 $40.89 $30.25 $71.14

Operators (Highway, Class 06 - See Notes) 5/1/2025 $42.80 $30.30 $73.10

Operators (Highway, Class 06 - See Notes) 5/1/2026 $43.95 $31.15 $75.10

Operators (Highway, Class 06/A - See Notes) 5/1/2025 $45.05 $30.96 $76.01

Operators (Highway, Class 06/A - See Notes) 5/1/2026 $46.21 $31.80 $78.01

Operators (Highway, Class 07/A - See Notes) 5/1/2025 $51.79 $34.38 $86.17

Operators (Highway, Class 07/A - See Notes) 5/1/2026 $53.25 $35.32 $88.57

Operators (Highway, Class 07/B - See Notes) 5/1/2025 $50.37 $33.97 $84.34

Operators (Highway, Class 07/B - See Notes) 5/1/2026 $51.84 $34.90 $86.74

Painters Class 1 (see notes) 5/1/2018 $23.92 $14.37 $38.29

Painters - Line Stripping 12/1/2024 $44.12 $27.91 $72.03

Painters - Line Stripping 12/1/2025 $45.12 $29.41 $74.53

Painters Class 2 (see notes) 5/1/2025 $30.55 $18.36 $48.91

Painters Class 2 (see notes) 5/1/2026 $33.13 $18.78 $51.91

Painters Class 3 (see notes) 5/1/2025 $36.30 $18.36 $54.66

Painters Class 3 (see notes) 5/1/2026 $38.88 $18.78 $57.66

Piledrivers 5/1/2025 $36.87 $20.49 $57.36

Piledrivers 5/1/2026 $37.63 $21.18 $58.81

Steamfitters (Heavy and Highway - Gas Distribution) 5/1/2022 $48.43 $40.28 $88.71

Truckdriver class 1(see notes) 5/1/2025 $41.87 $0.00 $41.87

Truckdriver class 2 (see notes) 5/1/2025 $41.94 $0.00 $41.94

Truckdriver class 3 (see notes) 5/1/2025 $42.43 $0.00 $42.43

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 9/25/2026 Page 6 of 6

00 73 46a - Wage Determination Schedule