00 01 10 - Table of Contents.pdf
PDF 260 KB Posted
- Attached to
- WCTA Meter Replacement Project
- Solicitation number
- US.257570
- Issued by
- Lancaster County, Pennsylvania
About this file
This is a Table of Contents document for the WCTA Meter Replacement Project (GovTribe ID: 011364.0448) issued by Herbert, Rowland & Grubic, Inc. on behalf of West Cocalico Township Authority in Pennsylvania. The project involves the replacement of approximately 790 water meters with new AMI (Advanced Metering Infrastructure) meters across West Cocalico Township. Bids are being received online via PennBid until Thursday, November 5, 2026 at 10:00 AM local time, at which point bids will be opened and results posted for public review. Bid security in the form of a Certified Check or Bid Bond is required in an amount not less than 10%. All bidder inquiries regarding the meaning or intent of the Bidding Documents must be submitted via PennBid in accordance with the Instructions to Bidders; telephone inquiries are not acceptable.
The document serves as a comprehensive index to the complete bidding package, which includes Division 00 (Procurement and Contracting Requirements) containing procurement documents, bid bonds, affidavits, bonding requirements, general conditions, EEO requirements, wage rate requirements, and statutory requirements, as well as Division 01 (General Requirements) containing specifications for project coordination, quality requirements, submittal procedures, execution requirements, and closeout procedures. Prospective bidders must register with the PennBid website to access all official bidding documents, addenda, and notifications; the owner and engineer assume no responsibility for documents obtained from sources other than the designated website. All further requirements regarding bid submittal, qualifications, procedures, and contract award are detailed in the Instructions to Bidders included within the complete Bidding Documents package.
View the file
Other files
Show 40 more
Latest 50 of 51 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Herbert, Rowland & Grubic, Inc. 00 01 10 - 1 011364.0448
WCTA METER REPLACEMENT PROJECT
WEST COCALICO TOWNSHIP AUTHORITY
DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS SECTION: PAGES
Procurement Requirements ADVERTISEMENT FOR BIDS ............................................................................................................... 00 11 13: 2 INSTRUCTIONS TO BIDDERS .............................................................................................................. 00 21 13: 11 BID BOND .......................................................................................................................................... 00 43 13: 2 NON-COLLUSION AFFIDAVIT ............................................................................................................. 00 45 19: 1 CERTIFICATION OF NON-SEGREGATED FACILITIES AND NON-EMPLOYMENT OF ILLEGAL ............... 00 45 33: 1
ALIEN LABOR
EEO CERTIFICATE .............................................................................................................................. 00 45 36: 1
PUBLIC WORKS EMPLOYMENT VERIFICATION FORM ....................................................................... 00 45 46: 1
Contracting Requirements AGREEMENT BETWEEN OWNER and CONTRACTOR for CONSTRUCTION CONTRACT ..................... 00 52 00: 7 PROJECT FORMS ............................................................................................................................... 00 60 00: 1 PERFORMANCE BOND ...................................................................................................................... 00 61 13.13: 4 PAYMENT BOND ............................................................................................................................... 00 61 13.16: 5 APPLICATION FOR PAYMENT ............................................................................................................ 00 62 76: 4 REQUEST FOR INFORMATION FORM ................................................................................................ 00 63 13: 1 SUBSTITUTION REQUEST (AFTER BIDDING PHASE)........................................................................... 00 63 25: 2 FIELD ORDER FORM .......................................................................................................................... 00 63 36: 1 WORK CHANGE DIRECTIVE FORM .................................................................................................... 00 63 49: 1 CHANGE ORDER FORM ..................................................................................................................... 00 63 63: 1 CERTIFICATE OF SUBSTANTIAL COMPLETION FORM ........................................................................ 00 65 16: 1 AFFIDAVIT OF RELEASE OF LIENS FORM ........................................................................................... 00 65 19.16: 1 CONSENT OF SURETY FOR FINAL PAYMENT FORM .......................................................................... 00 65 19.19: 1 NOTICE OF ACCEPTABILITY OF WORK ............................................................................................... 00 65 19.23: 1 GENERAL CONDITIONS ...................................................................................................................... 00 72 00: 78 EQUAL EMPLOYMENT OPPORTUNITY REQUIREMENTS.................................................................... 00 73 36: 1 WAGE RATE REQUIREMENTS ............................................................................................................ 00 73 43: 4 WAGE DETERMINATION SCHEDULE ................................................................................................. 00 73 46: 7 STATUTORY REQUIREMENTS ............................................................................................................ 00 73 73: 6
Specifications
DIVISION 01 – GENERAL REQUIREMENTS PAGES
01 10 00 PROJECT SUMMARY
01 22 00 UNIT PRICES
01 25 00 SUBSTITUTION PROCEDURES
01 26 00 CONTRACT MODIFICATION PROCEDURES
01 26 13 REQUESTS FOR INTERPRETATION
01 31 13 PROJECT COORDINATION
01 31 19 PROJECT MEETINGS
01 32 16 CONSTRUCTION PROGRESS SCHEDULE
01 32 26 CONSTRUCTION PROGRESS REPORTING
01 32 33 PHOTOGRAPHIC DOCUMENTATION
01 33 00 SUBMITTAL PROCEDURES
01 35 13 SPECIAL PROJECT REQUIREMENTS
01 40 00 QUALITY REQUIREMENTS
01 42 00 REFERENCES
01 61 00 PRODUCT REQUIREMENTS
01 64 00 OWNER FURNISHED PRODUCTS
01 73 00 EXECUTION REQUIREMENTS
TABLE OF CONTENTS
Herbert, Rowland & Grubic, Inc. 00 01 10 - 2 011364.0448
01 77 00 CLOSEOUT PROCEDURES
01 78 39 PROJECT RECORD DOCUMENTS
File details come from the government source that posted it. Updated .