00 63 25 - Substitution Request Form (During Construction).pdf

PDF 403 KB Posted

Attached to
WCTA Meter Replacement Project
Solicitation number
US.257570
Issued by
Lancaster County, Pennsylvania

About this file

This is a Substitution Request Form (During Construction) developed by Herbert, Rowland & Grubic, Inc. for the WCTA Meter Replacement Project (HRG Project No. 011364.0448) in West Cocalico Township, Pennsylvania. The form is designed to be completed after the bidding phase and allows contractors to request approval to substitute materials or products from those originally specified in the contract documents. The form requires submission of detailed comparative data between the specified product and the proposed substitution, including product information, manufacturer details, installation history, and supporting documentation such as drawings, product data, samples, tests, and reports. The contractor must certify that the proposed substitution is equal or superior to the specified product, maintains equivalent warranties and maintenance services, does not affect other trades or project schedules, and will not create additional costs or design impacts.

The substitution request form includes multiple certification requirements that place responsibility on the submitting contractor to demonstrate equivalency and compatibility with existing work. The form provides four possible approval outcomes: approval to proceed with submittals in accordance with Specification Section 01 33 00, conditional approval with noted requirements, rejection requiring use of specified materials, or late submission rejection. The form requires documentation of any cost savings to the owner and identification of whether the substitution affects contract time, dimensions, or functional clearances. Signatories are identified by role (Contractor, Subcontractor, Supplier, Manufacturer, or Engineer) with space for date and additional comments from the approving authority.

View the file

Other files

File Type Posted
01 64 00 - Owner Furnished Products.pdf PDF
00 73 73a Steel Products Procurement Certification.pdf PDF
00 01 01 LA Cover.pdf PDF
01 26 13 - Requests for Interpretation.pdf PDF
4-Bid Summary - EVP Edited .pdf PDF
00 63 36 - Field Order Form.pdf PDF
00 61 13.16 - Payment Bond.pdf PDF
00 45 19 Non Collusion Affidavit.pdf PDF
01 25 00 - Substitution Procedures.pdf PDF
00 21 13 - Instructions to Bidders.pdf PDF
00 63 63 - Change Order Form.pdf PDF
00 62 76 - App for Payment.pdf PDF
01 22 00 - Unit Prices.pdf PDF
00 65 19.16 - Affidavit of Release of Liens.pdf PDF
01 77 00 - Closeout Procedures.pdf PDF
00 73 46a - Wage Determination Schedule.pdf PDF
00 11 13 - Advertisement for Bids.pdf PDF
00 73 43-1 - Certification Form llc-25 PA Dep L&I.pdf PDF
00 73 46 - Wage Determination Schedule.pdf PDF
01 61 00 - Product Requirements.pdf PDF
01 31 19 - Project Meetings.pdf PDF
00 73 43 - Wage Rate Requirements.pdf PDF
00 45 36 EEO Certificate.pdf PDF
00 65 16 - Certificate of Substantial Completion.pdf PDF
01 35 13 - Special Project Requirements.pdf PDF
01 32 33 - Photographic Documentation.pdf PDF
00 45 33 Certification of Non-Segregated Facilities and Non-Employment of Illegal Alien Labor.pdf PDF
01 31 13 - Project Coordination.pdf PDF
00 65 19.23 - Notice of Acceptability of Work.pdf PDF
00 52 00 - Agmnt btw Own and Cntr for Const Con Stip Price.pdf PDF
00 65 19.19 - Consent of Surety to Final Payment.pdf PDF
01 33 00 - Submittal Procedures.pdf PDF
00 01 10 - Table of Contents.pdf PDF
00 72 00 - General Conditions 2018.pdf PDF
01 78 39 - Project Record Documents.pdf PDF
01 10 00 - Project Summary.pdf PDF
01 40 00 - Quality Requirements.pdf PDF
3-00 91 13 - Addenda No. 1.pdf PDF
00 45 46 Public Works Employment Verification Form.pdf PDF
00 63 49 - Work Change Directive Form.pdf PDF
01 42 00 - References.pdf PDF
01 32 16 - Construction Progress Schedule - SMALL.pdf PDF
00 60 00 - Project Forms.pdf PDF
00 73 73 - Statutory Requirements.pdf PDF
01 73 00 - Execution Requirements.pdf PDF
00 73 36 - Equal Employment Opportunity Requirements.pdf PDF
00 63 13 - RFI Form.pdf PDF
00 61 13.13 - Performance Bond.pdf PDF
01 26 00 - Contract Modifications.pdf PDF
00 43 13 - Bid Bond PENAL SUM Form.pdf PDF
Show 40 more

Latest 50 of 51 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Herbert, Rowland & Grubic, Inc. 00 63 25-1 011364.0448

SUBSTITUTION REQUEST

(After Bidding Phase)

Project: Sub. Req. No.:

Contractor: Contract:

To: Date:

From: HRG Project No.:

Re:

Specification Section

Paragraph Drawing Detail

Description:

Proposed Substitution:

Manufacturer: Address: Phone:

Trade Name: Model No.:

Installer: Address: Phone:

History: New Product 2-5 years old 5-10 years old More than 10 years old

Difference between specified product and proposed product:

Point-by-point comparative data attached [REQUIRED]

Reason for not providing specified item:

Similar Installation(s):

Project: Engineer:

Address: Owner:

Date

Installed:

Proposed substitution affects other parts of Work: No Yes, Explain:

Savings to Owner for accepting substitution: ($

Proposed substitution changes Contract Time: No Yes [Add] [Deduct]: days

Supporting Data Attached: Drawings Product Data Samples Tests Reports

Herbert, Rowland & Grubic, Inc. 00 63 25-2 011364.0448

SUBSTITUTION REQUEST

(Continued)

The Undersigned certifies:

− Proposed substitution has been fully investigated and determined to be equal or superior in all respects to specified product.

− Same warranty will be furnished for proposed substitution as for specified product.

− Same maintenance service and source of replacement parts, as applicable, is available.

− Proposed substitution will have no adverse effect on other trades and will not affect or delay progress schedule.

− Cost data as stated above is complete. Claims for additional costs related to accepted substitution which may subsequently become apparent are to be waived.

− Proposed substitution does not affect dimensions and functional clearances.

− Payment will be made for changes to building design, including A/E design, detailing, and construction costs caused by the substitution.

− Coordination, installation, and changes in the Work as necessary for accepted substitution will be complete in all respects.

Submitted by:

Signed by:

Firm:

Address:

Telephone: e-mail:

Attachments:

Substitution approved - Make submittals in accordance with Specification Section 01 33 00.

Substitution approved as noted - Make submittals in accordance with Specification Section 01 33 00.

Substitution rejected - Use specified materials.

Substitution Request received too late - Use specified materials.

Signed by: Date:

Additional Comments: Contractor Subcontractor Supplier Manufacturer Engineer