00 62 76 - App for Payment.pdf

PDF 172 KB Posted

Attached to
Water Main Replacement Project Phase 4 Contract No. WR-4
Solicitation number
Not on record
Issued by
Lancaster County, Pennsylvania

About this file

This is a Contractor's Application for Payment form (EJCDC C-620) used by the Elizabethtown Area Water Authority for the Water Main Replacement Project Phase 4 (Contract No. WR-4). The form serves as a standardized progress payment application document that contractors submit to request compensation for work completed and materials stored during specified application periods. The form accommodates both lump sum and unit price work, allowing contractors to document progress across multiple line items, track work completion percentages, and itemize materials stored on-site or at designated locations. The application requires detailed breakdown of scheduled values, work completed in the current period and cumulatively to date, materials stored not yet incorporated into the work, and calculation of retainage amounts. The form includes sections for the contractor's certification regarding application of previous payments, title transfer of materials and work, and conformance with contract documents, along with signature blocks for approval by the owner, engineer, funding agency, and contractor.

The application form does not specify pricing, bid amounts, or financial thresholds, as it functions as a payment request mechanism rather than a procurement document. No set-asides, incumbent contractors, or specific funding sources are identified within this form. The document is designed to facilitate transparent financial tracking throughout project execution by requiring detailed documentation of work progress, material costs, and payment calculations, with retainage amounts withheld according to contract terms. Contractors must provide supporting documentation such as submittal numbers, supplier invoices, and storage location details for materials claimed in applications. The form's structure ensures compliance with standard construction contracting practices and provides clear audit trails for all payments requested and received throughout the project duration.

View the file

Other files

File Type Posted
03 30 00 - Cast-in-Place Concrete.pdf PDF
01 78 39 - Tap Card - Project Record Documents.pdf PDF
32 12 16 - Asphalt Paving.pdf PDF
00 45 19 Non Collusion Affidavit.pdf PDF
01 41 26 - Permit Requirements.pdf PDF
03 39 00 - Concrete Curing.pdf PDF
01 33 00 - Submittal Procedures.pdf PDF
01 77 00 - Closeout Procedures.pdf PDF
00 65 19.19 - Consent of Surety to Final Payment.pdf PDF
01 26 13 - Request for Interpretation.pdf PDF
32 11 23 - Aggregate Base Courses.pdf PDF
00 21 13 - Instructions to Bidders.pdf PDF
00 73 73 - Statutory Requirements.pdf PDF
02 31 00 Subsurface Utility Engineering.pdf PDF
00 01 10 - Table of Contents.pdf PDF
00 65 19.16 - Affidavit of Release of Liens.pdf PDF
01 22 00 - Unit Prices.pdf PDF
00 63 36 - Field Order Form.pdf PDF
01 73 00 - Execution Requirements.pdf PDF
00 73 46 - Wage Rate Determination.pdf PDF
00 63 49 - Work Change Directive Form.pdf PDF
01 10 00 - Project Summary.pdf PDF
03 20 00 - Concrete Reinforcing.pdf PDF
00 43 13 - Bid Bond PENAL SUM Form.pdf PDF
00 31 46 - Permits_01 - Phase 4 HOP Application - Sealed.pdf PDF
01 42 00 - References.pdf PDF
32 13 13 - Concrete Paving.pdf PDF
00 11 13 - Advertisement for Bids.pdf PDF
01 74 19 - Construction Waste Management and Disposal.pdf PDF
00 65 19.23 - Notice of Acceptability of Work.pdf PDF
01 32 33 - Photographic Documentation.pdf PDF
31 23 19 - Dewatering.pdf PDF
02 82 33 Removal and Disposal of ACM.pdf PDF
32 91 13 - Soil Preparation.pdf PDF
33 14 17 - Site Water Service Utility Laterals.pdf PDF
01 61 00 - Product Requirements.pdf PDF
00 72 00 - General Conditions 2018.pdf PDF
32 91 19 - Landscape Grading.pdf PDF
00 52 00 - Owner_Contractor Agreement.pdf PDF
33 14 19 - Valves And Hydrants For Water Utility Service.pdf PDF
00 61 13.13 - Performance Bond.pdf PDF
31 23 16.26 - Rock Removal.pdf PDF
01 32 36 - Video Monitoring and Documentation.pdf PDF
01 26 00 - Contract Modifications.pdf PDF
01 40 00 - Quality Requirements.pdf PDF
31 23 23.33 - Flowable Fill.pdf PDF
01 50 00 - Temporary Facilities and Controls.pdf PDF
00 45 36 EEO Certificate.pdf PDF
33 14 13 - Public Water Utility Distribution Piping.pdf PDF
00 73 43 - Wage Rate Requirements.pdf PDF
Show 40 more

Latest 50 of 91 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

From

1.

2.

3.

4.

5.

a. X

b. X c.

6.

7.

8.

9.

Current Contract Price (Line 1 + Line 2)

Contractor:

Net change by Change Orders to

Original Contract Price

Total Work completed and materials stored to date

(Sum of Column G Lump Sum Total and Column J Unit Price Total)

Retainage

Work Completed

Stored Materials

Total Retainage (Line 5.a + Line 5.b)

Amount eligible to date (Line 4 - Line 5.c)

Less previous payments (Line 6 from prior application)

Amount due this application

Application Date:

Approved by Funding Agency

By:

Title:

Date:

By:

Title:

Date:

By:

Title:

Date:

By:

Title:

Date:

Signature: Date:

Contractor's Certification

Balance to finish, including retainage (Line 3 - Line 4 + Line 5c)

Approved by Owner

The undersigned Contractor certifies, to the best of its knowledge, the following:

(1) All previous progress payments received from Owner on account of Work done under the Contract have been applied on account to discharge Contractor's legitimate obligations incurred in connection with the Work covered by prior Applications for Payment;

(2) Title to all Work, materials and equipment incorporated in said Work, or otherwise listed in or covered by this

Application for Payment, will pass to Owner at time of payment free and clear of all liens, security interests, and encumbrances (except such as are covered by a bond acceptable to Owner indemnifying Owner against any such liens, security interest, or encumbrances); and

(3) All the Work covered by this Application for Payment is in accordance with the Contract Documents and is not defective.

Recommended by Engineer

Contractor's Application for Payment

Application No.:

Owner's Project No.:

Engineer's Project No.:

Contractor's Project No.:

Application Period:

Contract:

Owner:

Contractor:

Engineer:

Project:

EJCDC C-620 Contractor's Application for Payment

(c) 2018 National Society of Professional Engineers for EJCDC. All rights reserved.

Owner:

Engineer:

Contractor:

Project:

Contract:

Application No.: From to

A C D E F G H I

(D + E) From

Previous

Application

This Period

-$ -$ -$ -$ -$ -$ Original Contract Totals

Work Completed

Item No. Description

Scheduled Value

Application Period: Application Date:

Progress Estimate - Lump Sum Work Contractor's Application for Payment

Owner's Project No.:

B

Original Contract

% of Scheduled

Value (G / C)

Balance to Finish (C

- G)

Materials Currently

Stored (not in D or

E)

Work Completed and Materials

Stored to Date

(D + E + F)

Engineer's Project No.:

Contractor's Project No.:

Lump Sum

(c) 2018 National Society of Professional Engineers for EJCDC. All rights reserved. 2 of 6

Contractor:

Project:

Contract:

Application No.: From to

A C D E F G H I

(D + E) From

Previous

Application

This Period

Work Completed

Item No. Description

Scheduled Value

Application Period: Application Date:

Progress Estimate - Lump Sum Work Contractor's Application for Payment

Owner's Project No.:

B

% of Scheduled

Value (G / C)

Balance to Finish (C

- G)

Materials Currently

Stored (not in D or

E)

Work Completed and Materials

Stored to Date

(D + E + F)

Engineer's Project No.:

Contractor's Project No.:

Change Order Totals

Project Totals

Original Contract and Change Orders

Change Orders

Lump Sum

(c) 2018 National Society of Professional Engineers for EJCDC. All rights reserved. 3 of 6

From to

A C D E F G H I J K L

Item Quantity Units

Unit Price

Value of Bid Item

(C X E)

Estimated

Quantity

Incorporated in the Work

Value of Work

Completed to Date

(E X G)

-$ -$ -$ -$ -$ Original Contract Totals

B

Original Contract

% of

Value of

Item

(J / F)

Balance to Finish (F

- J)

($)Description

Work Completed

Materials Currently

Stored (not in G)

Work Completed and Materials

Stored to Date

(H + I)

Contract Information

Bid Item

No.

Engineer:

Contractor:

Project:

Contract:

Application Date:Application Period:Application No.:

Contractor's Application for PaymentProgress Estimate - Unit Price Work

Owner's Project No.:

Engineer's Project No.:

Contractor's Project No.:

Owner:

Unit Price

(c) 2018 National Society of Professional Engineers for EJCDC. All rights reserved. 4 of 6

From to

A C D E F G H I J K L

Item Quantity Units

Unit Price

Value of Bid Item

(C X E)

Estimated

Quantity

Incorporated in the Work

Value of Work

Completed to Date

(E X G)

B

% of

Value of

Item

(J / F)

Balance to Finish (F

- J)

($)Description

Work Completed

Materials Currently

Stored (not in G)

Work Completed and Materials

Stored to Date

(H + I)

Contract Information

Bid Item

No.

Engineer:

Contractor:

Project:

Contract:

Application Date:Application Period:Application No.:

Contractor's Application for PaymentProgress Estimate - Unit Price Work

Owner's Project No.:

Engineer's Project No.:

Contractor's Project No.:

Owner:

Change Order Totals

Original Contract and Change Orders

Change Orders

Project Totals

Unit Price

(c) 2018 National Society of Professional Engineers for EJCDC. All rights reserved. 5 of 6

Contractor:

Project:

Contract:

Application No.: Application Period: From to

A B C D E F G H I J K L M

Previous Amount

Stored

Amount Stored this

Period

Amount Stored to

Date (G+H)

Amount Previously

Incorporated in the

Work

Amount

Incorporated in the

Work this Period

Total Amount

Incorporated in the

Work

(J+K)

Stored Materials Summary

Totals

Storage Location

Description of Materials or

Equipment Stored

Submittal No.

(with

Specification

Section No.)

Supplier

Invoice No.

Item No.

(Lump Sum Tab) or Bid Item No.

(Unit Price Tab)

Application Date:

Contractor's Application for Payment

Materials Stored Incorporated in Work

Materials

Remaining in

Storage

(I-L)

Application

No. When

Materials

Placed in

Storage

Owner's Project No.:

Engineer's Project No.:

Contractor's Project No.:

Stored Materials

(c) 2018 National Society of Professional Engineers for EJCDC. All rights reserved. 6 of 6

File details come from the government source that posted it. Updated .