This is a Commonwealth of Pennsylvania Public Works Employment Verification Form completed by Herbert, Rowland & Grubic, Inc. for the Elizabethtown Area Water Authority's Water Main Replacement Project Phase 4 (Contract No. WR-4), a general construction water main replacement project located in Elizabethtown, Pennsylvania. The project encompasses the relocation of approximately 13,860 feet of 4-inch, 6-inch, and 8-inch ductile iron pipe (DIP) water main with replacement using new 12-inch DIP, replacement of approximately fifteen fire hydrants, and the transfer of approximately 180 existing water services from the existing water main to the new 12-inch DIP water main. Bids were received online through PennBid (https://pennbid.bonfirehub.com/) until Thursday, August 6, 2026, at 10:00 AM local time, with public bid opening following. The project requires furnishing all necessary materials, equipment, labor, and miscellaneous items as specified in the contract documents.

The form attests that the contractor is in compliance with Pennsylvania's Public Works Employment Verification Act through enrollment and utilization of the federal E-Verify Program (EVP) operated by the United States Department of Homeland Security. As of the date of enrollment in E-Verify, the company affirms that all employees hired are authorized to work in the United States and commits to verifying employment eligibility of each new hire within five business days of the employee start date throughout the duration of the public works contract. Documentation confirming E-Verify usage for each new hire must be maintained for investigation or audit purposes. The authorized representative attests that all information contained in the verification form is true and correct, with understanding that submission of false or misleading information subjects the company to sanctions provided by law.

View the file

Other files

File Type Posted
03 30 00 - Cast-in-Place Concrete.pdf PDF
01 78 39 - Tap Card - Project Record Documents.pdf PDF
32 12 16 - Asphalt Paving.pdf PDF
00 45 19 Non Collusion Affidavit.pdf PDF
01 41 26 - Permit Requirements.pdf PDF
03 39 00 - Concrete Curing.pdf PDF
01 33 00 - Submittal Procedures.pdf PDF
01 77 00 - Closeout Procedures.pdf PDF
00 65 19.19 - Consent of Surety to Final Payment.pdf PDF
01 26 13 - Request for Interpretation.pdf PDF
32 11 23 - Aggregate Base Courses.pdf PDF
00 21 13 - Instructions to Bidders.pdf PDF
00 73 73 - Statutory Requirements.pdf PDF
02 31 00 Subsurface Utility Engineering.pdf PDF
00 01 10 - Table of Contents.pdf PDF
00 65 19.16 - Affidavit of Release of Liens.pdf PDF
01 22 00 - Unit Prices.pdf PDF
00 63 36 - Field Order Form.pdf PDF
01 73 00 - Execution Requirements.pdf PDF
00 73 46 - Wage Rate Determination.pdf PDF
00 63 49 - Work Change Directive Form.pdf PDF
01 10 00 - Project Summary.pdf PDF
03 20 00 - Concrete Reinforcing.pdf PDF
00 43 13 - Bid Bond PENAL SUM Form.pdf PDF
00 31 46 - Permits_01 - Phase 4 HOP Application - Sealed.pdf PDF
01 42 00 - References.pdf PDF
32 13 13 - Concrete Paving.pdf PDF
00 11 13 - Advertisement for Bids.pdf PDF
01 74 19 - Construction Waste Management and Disposal.pdf PDF
00 65 19.23 - Notice of Acceptability of Work.pdf PDF
01 32 33 - Photographic Documentation.pdf PDF
31 23 19 - Dewatering.pdf PDF
02 82 33 Removal and Disposal of ACM.pdf PDF
32 91 13 - Soil Preparation.pdf PDF
33 14 17 - Site Water Service Utility Laterals.pdf PDF
01 61 00 - Product Requirements.pdf PDF
00 72 00 - General Conditions 2018.pdf PDF
32 91 19 - Landscape Grading.pdf PDF
00 52 00 - Owner_Contractor Agreement.pdf PDF
33 14 19 - Valves And Hydrants For Water Utility Service.pdf PDF
00 61 13.13 - Performance Bond.pdf PDF
31 23 16.26 - Rock Removal.pdf PDF
01 32 36 - Video Monitoring and Documentation.pdf PDF
01 26 00 - Contract Modifications.pdf PDF
01 40 00 - Quality Requirements.pdf PDF
31 23 23.33 - Flowable Fill.pdf PDF
01 50 00 - Temporary Facilities and Controls.pdf PDF
00 45 36 EEO Certificate.pdf PDF
33 14 13 - Public Water Utility Distribution Piping.pdf PDF
00 73 43 - Wage Rate Requirements.pdf PDF
Show 40 more

Latest 50 of 91 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Street Address 2

City State Zip Code

Doing Business As:

(if different from Legal Name)

Commonwealth of Pennsylvania

Public Works Employment Verification Form Complete and return the form to the contracting Public Body prior to the award of the contract.

Company Legal Name: ___________________________________________________________

Mailing Address: ______________________________________________________

Check one: Contractor Subcontractor

Contracting Public Body: _________________________________________________________

Contract/Project Number: ________________________________________________________

Project Description: _____________________________________________________________

Project Location: _______________________________________________________________

Date Enrolled in E-Verify (MM/DD/YYYY): ___________________________________________

As a contractor/subcontractor for the above referenced public works contract, I hereby affirm that as of the above date, our company is in compliance with the Public Works Employment Verification Act (‘the Act’) through utilization of the federal E-Verify Program (EVP) operated by the United States Department of Homeland Security. To the best of my/our knowledge, all employees hired are authorized to work in the United States.

It is also agreed to that all public works contractors/subcontractors will utilize the federal EVP to verify the employment eligibility of each new hire within five (5) business days of the employee start date throughout the duration of the public works contract. Documentation confirming the use of the federal EVP upon each new hire shall be maintained in the event of an investigation or audit.

I,____________________________________________, authorized representative of the company above, attest that the information contained in this verification form is true and correct and understand that the submission of false or misleading information in connection with the above verification shall be subject to sanctions provided by law.

Authorized Representative Signature Date of Signature

Printed Name: _________________________________________________________________

Phone Number: ______________________ Email: ____________________________________

Street Address 1

Herbert, Rowland & Grubic, Inc. 00 45 46 - 1 009280.0426

WR-4: General Construction

Water Main Replacement Project Phase 4

Elizabethtown, PA

Elizabethtown Area Water Authority (EAWA)

File details come from the government source that posted it. Updated .