BID# 2024-103 Monroe Street Improvements
Closed State & local contract opportunity Posted
- Solicitation number
- S-C01010-00011990
- State
- Oregon
- Responses due
Opportunity facts
- Jurisdictions
- NIGP codes
- 91223 Construction, General (Backfill Services, Digging, Ditching, Road Grading, Rock Stabilization, Etc.)
- 913 Construction Services, Heavy, Including Maintenance And Repair Services
- 91327 Construction, Highway And Road
- 91350 Construction, Street (Major And Residential)(Includes Reconstruction)
- 91371 Maintenance And Repair, Highway And Road (To Include The Removal Of Asphalt, Concrete, Bitumens, Etc)
- 91384 Maintenance And Repair, Street (Major And Residential)
- 91395 Paving/Resurfacing, Highway And Road
- 91396 Paving/Resurfacing, Street (Major And Residential)
- UNSPSC codes
- 72141511 Digging services
- 72141002 Highway and road sign or guardrail construction and repair service
- 72141004 Highway reflector installation service
- 72141509 Trenching service
- 95111614 Single carriageway
- 95111502 Right of way
- 95121647 Elevated roadway or highway
- 72140000 Heavy construction services
- 72101512 Hoist construction service
- 72101513 Offsite construction service
Show all 36
- 72101514 Refuse area construction service
- 72141507 Pile driving service
- 95110000 Thoroughfares
- 95111615 Road junction
- 95111609 Crossroad
- 95111501 Easement
- 95111603 Interstate highway or freeway or turnpike
- 95111610 Ring road
- 72141127 Seal coating of roads, highways and parking lots
- 72141003 Highway and road maintenance service
- 73151502 Joint sealing services
- 72141000 Highway and road construction services
- 72141100 Infrastructure building and surfacing and paving services
- 72141106 Gravel or dirt road construction service
- 72141001 Highway and road new construction service
- 95111504 Highway ramp or slip road
- 95111612 Secondary road
- 95111613 Dual carriageway
- 95111602 Intrastate highway or freeway or turnpike
- 72101515 Subsidence service work
- 72141130 Ornamental fountain construction and or remodelling service
- 95111500 Limited traffic thoroughfares
- 95111600 Open traffic thoroughfares
- 95111503 Access roads
- 95111601 Street or avenue or road or boulevard
- 95111611 Trunk road
Opportunity details come from oregonbuys.gov. Updated .
About this opportunity
The Benton County and Mission CDP are procuring a comprehensive Monroe Street Improvements project through Bid #2024-103, which involves a 1.2-mile roadway reconstruction initiative. The project encompasses extensive infrastructure upgrades including roadway reconstruction, sidewalk installation, landscaping enhancements, storm pipe installations, fire hydrant modifications, and traffic safety improvements. Key deliverables include full roadway reconstruction, installation of new sidewalks, utility system upgrades, and comprehensive traffic control measures. A mandatory pre-bid conference was held on November 15, 2024, with bid submissions due on December 4, 2024, and contract award anticipated by December 18, 2024. The procurement process involves a detailed bid submission requiring unit pricing across multiple construction categories, with bidders required to provide certification sheets and bid bonds. Evaluation appears to be primarily based on lowest responsive and responsible bid, with Corpac Construction Company emerging as the apparent low bidder at $7,418,501.00.
No specific set-aside designations or restrictions for disadvantaged enterprises were identified in the procurement documents. The project is open to any qualified bidder, with no incumbent contractor mentioned. The total project budget is $5.2 million, funded through state and local sources, with the contract term structured for 12 months and an option to renew for an additional 12 months. Eight construction companies submitted bids, with bid amounts ranging from $7,418,501.00 to $8,586,401.00. The project is divided into two schedules: Schedule A (Clackamas County) with a low bid of $6,349,257.00 and Schedule B (Clackamas River Water) with a low bid of $973,030.00. Fixed allowances for extra work are included, with $250,000 allocated in Schedule A and $20,000 in Schedule B. The procurement includes provisions for a seven-calendar-day protest period for unsuccessful bidders, with specific submission requirements for any protests.
Files
Show all 11
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity