About this file
This is a bid tabulation file from Benton County, Oregon for the Monroe Street Improvements project (BID# 2024-103), which details bid submissions from eight construction companies for a 1.2-mile roadway reconstruction initiative. The project encompasses comprehensive infrastructure improvements including sidewalk installation, landscaping upgrades, storm pipe installations, fire hydrant modifications, and traffic safety enhancements. The bid opening occurred on November 4, 2024, with work to be completed within 12 months and an option for a 12-month renewal. The project includes detailed unit pricing across multiple construction categories including general conditions, temporary features, roadwork, drainage, bridges, bases, wearing surfaces, traffic control, and water supply systems.
Corpac Construction Company emerged as the apparent low bidder at $7,418,501.00, followed by Tapani at $7,497,446.00 and Pacific Excavation at $7,992,000.00. The project is divided into two schedules: Schedule A (Clackamas County) with a low bid of $6,349,257.00 and Schedule B (Clackamas River Water) with a low bid of $973,030.00. The project includes fixed allowances for extra work ($250,000 in Schedule A and $20,000 in Schedule B). The total project budget is $5.2 million, funded through state and local sources. The bid tabulation breaks down 143 individual line items across both schedules, providing detailed unit pricing for various construction elements including earthwork, concrete work, paving, utilities, and landscaping.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Monroe Bid Tabs
| Monroe Street Improvements | |||||||||||||||||||||||||
| Construction Bid Tabs | |||||||||||||||||||||||||
| Bid Opening: November 4, 2024 | |||||||||||||||||||||||||
| Corpac Construction | Tapani | Pacific Excavation | K & E Excavating | Goodfellow Bros. | Kerr Contractors | Westech Construction | Moore Excavation Inc | ||||||||||||||||||
| SCHEDULE A - Clackamas County | Unit Price Comparisons | ||||||||||||||||||||||||
| ITEM | SPEC | DESCRIPTION | UNIT | QUANTITY | UNIT PRICE | TOTAL | UNIT PRICE | TOTAL | UNIT PRICE | TOTAL | UNIT PRICE | TOTAL | UNIT PRICE | TOTAL | UNIT PRICE | TOTAL | UNIT PRICE | TOTAL | UNIT PRICE | TOTAL | High | Low | Average | Low3-Avg | Corpac / Low3 Avg |
| 1 | 00180 | Work Place Harassment Prevention Plan | LS | 1 | $500.00 | $500.00 | $1,000.00 | $1,000.00 | $2,500.00 | $2,500.00 | $5,000.00 | $5,000.00 | $500.00 | $500.00 | $1,500.00 | $1,500.00 | $500.00 | $500.00 | $3,500.00 | $3,500.00 | $5,000.00 | $500.00 | $1,875.00 | $2,833.33 | 0.18 |
| 2 | 00196 | Extra Work as Authorized | FA | 1 | $250,000.00 | $250,000.00 | $250,000.00 | $250,000.00 | $250,000.00 | $250,000.00 | $250,000.00 | $250,000.00 | $250,000.00 | $250,000.00 | $250,000.00 | $250,000.00 | $250,000.00 | $250,000.00 | $250,000.00 | $250,000.00 | $250,000.00 | $250,000.00 | $250,000.00 | $250,000.00 | 1.00 |
| 3 | 00210 | Mobilization | LS | 1 | $634,925.00 | $634,925.00 | $725,000.00 | $725,000.00 | $558,276.00 | $558,276.00 | $695,000.00 | $695,000.00 | $490,000.00 | $490,000.00 | $740,650.00 | $740,650.00 | $586,535.20 | $586,535.20 | $785,000.00 | $785,000.00 | $785,000.00 | $490,000.00 | $651,923.28 | $659,425.33 | 0.96 |
| 4 | 00221 | Temporary Work Zone Traffic Control, Complete | LS | 1 | $350,000.00 | $350,000.00 | $220,000.00 | $220,000.00 | $240,000.00 | $240,000.00 | $240,000.00 | $240,000.00 | $390,000.00 | $390,000.00 | $444,264.00 | $444,264.00 | $250,000.00 | $250,000.00 | $290,000.00 | $290,000.00 | $444,264.00 | $220,000.00 | $303,033.00 | $233,333.33 | 1.50 |
| 5 | 00270 | Temporary Fence, 6 Ft Chain Link Fence with Concrete Blocks | Ft | 1,000 | $25.00 | $25,000.00 | $12.00 | $12,000.00 | $5.00 | $5,000.00 | $14.00 | $14,000.00 | $10.00 | $10,000.00 | $45.00 | $45,000.00 | $7.90 | $7,900.00 | $10.00 | $10,000.00 | $45.00 | $5.00 | $16.11 | $10.33 | 2.42 |
| 6 | 00280 | Erosion Control | LS | 1 | $75,000.00 | $75,000.00 | $50,000.00 | $50,000.00 | $50,000.00 | $50,000.00 | $70,000.00 | $70,000.00 | $75,000.00 | $75,000.00 | $178,570.00 | $178,570.00 | $60,000.00 | $60,000.00 | $50,000.00 | $50,000.00 | $178,570.00 | $50,000.00 | $76,071.25 | $56,666.67 | 1.32 |
| 7 | 00280 | Matting, Type B | SY | 90 | $8.00 | $720.00 | $5.00 | $450.00 | $16.00 | $1,440.00 | $10.00 | $900.00 | $8.00 | $720.00 | $47.00 | $4,230.00 | $4.50 | $405.00 | $8.00 | $720.00 | $47.00 | $4.50 | $13.31 | $10.33 | 0.77 |
| 8 | 00280 | Construction Entrance | Ea | 1 | $1,950.00 | $1,950.00 | $3,500.00 | $3,500.00 | $1,500.00 | $1,500.00 | $3,900.00 | $3,900.00 | $5,500.00 | $5,500.00 | $8,250.00 | $8,250.00 | $6,700.00 | $6,700.00 | $2,500.00 | $2,500.00 | $8,250.00 | $1,500.00 | $4,225.00 | $2,966.67 | 0.66 |
| 9 | 00280 | Inlet Protection, Type 4 (Bio Bag Inlet Protection) | Ea | 5 | $105.00 | $525.00 | $40.00 | $200.00 | $90.00 | $450.00 | $60.00 | $300.00 | $150.00 | $750.00 | $80.00 | $400.00 | $58.00 | $290.00 | $100.00 | $500.00 | $150.00 | $40.00 | $85.38 | $63.33 | 1.66 |
| 10 | 00280 | Inlet Protection, Type 5 (Catch Basin Insert) | Ea | 68 | $75.00 | $5,100.00 | $85.00 | $5,780.00 | $104.00 | $7,072.00 | $75.00 | $5,100.00 | $200.00 | $13,600.00 | $90.00 | $6,120.00 | $213.00 | $14,484.00 | $100.00 | $6,800.00 | $213.00 | $75.00 | $117.75 | $88.00 | 0.85 |
| 11 | 00280 | Sediment Barrier, Type 3 (Straw Wattles Fiber Rolls) | Ft | 5,000 | $4.90 | $24,500.00 | $4.50 | $22,500.00 | $10.00 | $50,000.00 | $5.00 | $25,000.00 | $6.00 | $30,000.00 | $3.50 | $17,500.00 | $9.00 | $45,000.00 | $5.00 | $25,000.00 | $10.00 | $3.50 | $5.99 | $6.50 | 0.75 |
| 12 | 00280 | Concrete Washout Facility | LS | 1 | $5,500.00 | $5,500.00 | $4,500.00 | $4,500.00 | $5,000.00 | $5,000.00 | $5,500.00 | $5,500.00 | $6,000.00 | $6,000.00 | $2,300.00 | $2,300.00 | $8,100.00 | $8,100.00 | $3,000.00 | $3,000.00 | $8,100.00 | $2,300.00 | $4,987.50 | $5,000.00 | 1.10 |
| 13 | 00290 | Pollution Control Plan | LS | 1 | $1,000.00 | $1,000.00 | $500.00 | $500.00 | $250.00 | $250.00 | $1,500.00 | $1,500.00 | $1,000.00 | $1,000.00 | $1,500.00 | $1,500.00 | $20,000.00 | $20,000.00 | $3,500.00 | $3,500.00 | $20,000.00 | $250.00 | $3,656.25 | $750.00 | 1.33 |
| 14 | 00294 | Health and Safety Plan | LS | 1 | $1,000.00 | $1,000.00 | $5,000.00 | $5,000.00 | $600.00 | $600.00 | $2,000.00 | $2,000.00 | $1,000.00 | $1,000.00 | $1,500.00 | $1,500.00 | $20,000.00 | $20,000.00 | $5,000.00 | $5,000.00 | $20,000.00 | $600.00 | $4,512.50 | $2,533.33 | 0.39 |
| 15 | 00294 | Contaminated Soil Removal | Ton | 800 | $95.00 | $76,000.00 | $75.00 | $60,000.00 | $140.00 | $112,000.00 | $110.00 | $88,000.00 | $105.00 | $84,000.00 | $132.00 | $105,600.00 | $133.00 | $106,400.00 | $92.00 | $73,600.00 | $140.00 | $75.00 | $110.25 | $108.33 | 0.88 |
| 16 | 00310 | Removal of Structures and Obstructions | LS | 1 | $227,000.00 | $227,000.00 | $200,000.00 | $200,000.00 | $185,000.00 | $185,000.00 | $90,000.00 | $90,000.00 | $333,600.00 | $333,600.00 | $216,665.00 | $216,665.00 | $219,400.00 | $219,400.00 | $100,000.00 | $100,000.00 | $333,600.00 | $90,000.00 | $196,458.13 | $158,333.33 | 1.43 |
| 17 | 00320 | Clearing and Grubbing | LS | 1 | $110,700.00 | $110,700.00 | $150,000.00 | $150,000.00 | $145,000.00 | $145,000.00 | $95,000.00 | $95,000.00 | $95,950.00 | $95,950.00 | $159,457.00 | $159,457.00 | $115,000.00 | $115,000.00 | $210,000.00 | $210,000.00 | $210,000.00 | $95,000.00 | $135,138.38 | $130,000.00 | 0.85 |
| 18 | 00330 | Earthwork - Excavation and Embankment | LS | 1 | $285,000.00 | $285,000.00 | $150,000.00 | $150,000.00 | $300,000.00 | $300,000.00 | $590,000.00 | $590,000.00 | $405,000.00 | $405,000.00 | $557,843.00 | $557,843.00 | $425,000.00 | $425,000.00 | $522,500.00 | $522,500.00 | $590,000.00 | $150,000.00 | $404,417.88 | $346,666.67 | 0.82 |
| 19 | 00330 | General Rock Excavation | CY | 300 | $95.00 | $28,500.00 | $125.00 | $37,500.00 | $75.00 | $22,500.00 | $230.00 | $69,000.00 | $200.00 | $60,000.00 | $115.00 | $34,500.00 | $88.00 | $26,400.00 | $150.00 | $45,000.00 | $230.00 | $75.00 | $134.75 | $143.33 | 0.66 |
| 20 | 00331 | 12 Inch Subgrade Stabilization | SY | 2,100 | $28.00 | $58,800.00 | $40.00 | $84,000.00 | $40.00 | $84,000.00 | $30.00 | $63,000.00 | $55.00 | $115,500.00 | $35.00 | $73,500.00 | $31.00 | $65,100.00 | $30.00 | $63,000.00 | $55.00 | $28.00 | $36.13 | $36.67 | 0.76 |
| 21 | 00350 | Subgrade Geotextile | SY | 11,000 | $1.15 | $12,650.00 | $2.50 | $27,500.00 | $1.50 | $16,500.00 | $1.00 | $11,000.00 | $2.00 | $22,000.00 | $3.40 | $37,400.00 | $1.30 | $14,300.00 | $1.00 | $11,000.00 | $3.40 | $1.00 | $1.73 | $1.67 | 0.69 |
| 22 | 00390 | Loose Riprap, Class 50 | CY | 20 | $125.00 | $2,500.00 | $300.00 | $6,000.00 | $168.00 | $3,360.00 | $200.00 | $4,000.00 | $200.00 | $4,000.00 | $409.00 | $8,180.00 | $425.00 | $8,500.00 | $300.00 | $6,000.00 | $425.00 | $125.00 | $265.88 | $222.67 | 0.56 |
| 23 | 00430 | 6 Inch Perforated Storm Pipe with Geotextile Sock, Class "B" Backfill | Ft | 710 | $57.50 | $40,825.00 | $30.00 | $21,300.00 | $28.00 | $19,880.00 | $43.00 | $30,530.00 | $40.00 | $28,400.00 | $25.50 | $18,105.00 | $13.40 | $9,514.00 | $23.00 | $16,330.00 | $57.50 | $13.40 | $32.55 | $33.67 | 1.71 |
| 24 | 00445 | 6 Inch Storm Sewer Pipe, Class "B" Backfill | Ft | 222 | $125.00 | $27,750.00 | $100.00 | $22,200.00 | $131.00 | $29,082.00 | $83.00 | $18,426.00 | $105.00 | $23,310.00 | $91.00 | $20,202.00 | $180.00 | $39,960.00 | $150.00 | $33,300.00 | $180.00 | $83.00 | $120.63 | $104.67 | 1.19 |
| 25 | 00445 | 12 Inch Storm Sewer Pipe, Class "B" Backfill | Ft | 2,603 | $135.00 | $351,405.00 | $135.00 | $351,405.00 | $115.00 | $299,345.00 | $121.00 | $314,963.00 | $125.00 | $325,375.00 | $118.00 | $307,154.00 | $190.00 | $494,570.00 | $220.00 | $572,660.00 | $220.00 | $115.00 | $144.88 | $123.67 | 1.09 |
| 26 | 00445 | 12 Inch Ductile Iron Storm Sewer Pipe, Class "B" Backfill | Ft | 546 | $182.00 | $99,372.00 | $190.00 | $103,740.00 | $162.00 | $88,452.00 | $177.00 | $96,642.00 | $160.00 | $87,360.00 | $161.00 | $87,906.00 | $200.00 | $109,200.00 | $250.00 | $136,500.00 | $250.00 | $160.00 | $185.25 | $176.33 | 1.03 |
| 27 | 00445 | 8 Inch Sanitary Sewer Pipe, Class "B" Backfill | Ft | 8 | $95.00 | $760.00 | $550.00 | $4,400.00 | $182.00 | $1,456.00 | $352.00 | $2,816.00 | $375.00 | $3,000.00 | $656.00 | $5,248.00 | $570.00 | $4,560.00 | $500.00 | $4,000.00 | $656.00 | $95.00 | $410.00 | $361.33 | 0.26 |
| 28 | 00445 | 12 Inch Restrained Sanitary Force Main Ductile Iron Pipe, Class "B" Backfill | Ft | 440 | $210.00 | $92,400.00 | $210.00 | $92,400.00 | $221.00 | $97,240.00 | $243.00 | $106,920.00 | $260.00 | $114,400.00 | $238.00 | $104,720.00 | $295.00 | $129,800.00 | $330.00 | $145,200.00 | $330.00 | $210.00 | $250.88 | $224.67 | 0.93 |
| 29 | 00445 | 4 Inch Sanitary Lateral Extension, Class "B" Backfill | Ea | 1 | $3,000.00 | $3,000.00 | $3,700.00 | $3,700.00 | $2,500.00 | $2,500.00 | $2,800.00 | $2,800.00 | $12,500.00 | $12,500.00 | $11,878.00 | $11,878.00 | $3,895.00 | $3,895.00 | $1,700.00 | $1,700.00 | $12,500.00 | $1,700.00 | $5,246.63 | $3,000.00 | 1.00 |
| 30 | 00445 | 6 Inch Sanitary Sewer Force Main Gravity Overflow Pipe, Class B Backfill | Ft | 90 | $186.00 | $16,740.00 | $185.00 | $16,650.00 | $200.00 | $18,000.00 | $171.00 | $15,390.00 | $270.00 | $24,300.00 | $124.00 | $11,160.00 | $300.00 | $27,000.00 | $240.00 | $21,600.00 | $300.00 | $124.00 | $209.50 | $185.33 | 1.00 |
| 31 | 00445 | Gate Valve, 6" MJ Gate Valve with Valve Box for Force Main Drain | Ea | 1 | $1,800.00 | $1,800.00 | $2,300.00 | $2,300.00 | $1,750.00 | $1,750.00 | $1,700.00 | $1,700.00 | $3,300.00 | $3,300.00 | $2,240.00 | $2,240.00 | $2,800.00 | $2,800.00 | $2,000.00 | $2,000.00 | $3,300.00 | $1,700.00 | $2,236.25 | $1,916.67 | 0.94 |
| 32 | 00445 | Gate Valve, 12" MJ Gate Valve for Force Main | Ea | 2 | $4,800.00 | $9,600.00 | $5,200.00 | $10,400.00 | $4,000.00 | $8,000.00 | $4,200.00 | $8,400.00 | $10,000.00 | $20,000.00 | $5,117.00 | $10,234.00 | $5,225.00 | $10,450.00 | $4,200.00 | $8,400.00 | $10,000.00 | $4,000.00 | $5,342.75 | $4,466.67 | 1.07 |
| 33 | 00470 | Concrete Manhole, 48" Flat Top with Air Release/Air Vacuum Assembly | Ea | 1 | $8,000.00 | $8,000.00 | $12,500.00 | $12,500.00 | $9,200.00 | $9,200.00 | $10,500.00 | $10,500.00 | $7,400.00 | $7,400.00 | $9,885.00 | $9,885.00 | $13,815.00 | $13,815.00 | $11,000.00 | $11,000.00 | $13,815.00 | $7,400.00 | $10,287.50 | $10,733.33 | 0.75 |
| 34 | 00470 | Concrete Manholes, 48" Sanitary Sewer Standard Manhole | Ea | 1 | $8,500.00 | $8,500.00 | $9,000.00 | $9,000.00 | $7,500.00 | $7,500.00 | $7,400.00 | $7,400.00 | $7,400.00 | $7,400.00 | $7,669.00 | $7,669.00 | $6,245.00 | $6,245.00 | $12,000.00 | $12,000.00 | $12,000.00 | $6,245.00 | $8,214.25 | $7,966.67 | 1.07 |
| 35 | 00470 | Concrete Manholes, 48" Storm Sewer Standard Manhole | Ea | 21 | $7,500.00 | $157,500.00 | $7,300.00 | $153,300.00 | $5,500.00 | $115,500.00 | $7,500.00 | $157,500.00 | $8,500.00 | $178,500.00 | $5,500.00 | $115,500.00 | $6,245.00 | $131,145.00 | $10,000.00 | $210,000.00 | $10,000.00 | $5,500.00 | $7,255.63 | $6,766.67 | 1.11 |
| 36 | 00470 | Concrete Manholes, 60" Storm Sewer Standard Manhole | Ea | 1 | $9,500.00 | $9,500.00 | $15,000.00 | $15,000.00 | $8,800.00 | $8,800.00 | $11,000.00 | $11,000.00 | $12,200.00 | $12,200.00 | $22,725.00 | $22,725.00 | $11,800.00 | $11,800.00 | $25,000.00 | $25,000.00 | $25,000.00 | $8,800.00 | $14,503.13 | $11,600.00 | 0.82 |
| 37 | 00470 | Catch Basin, Type CG-3 | Ea | 5 | $3,850.00 | $19,250.00 | $5,500.00 | $27,500.00 | $4,200.00 | $21,000.00 | $3,300.00 | $16,500.00 | $5,050.00 | $25,250.00 | $4,400.00 | $22,000.00 | $3,715.00 | $18,575.00 | $4,000.00 | $20,000.00 | $5,500.00 | $3,300.00 | $4,251.88 | $4,333.33 | 0.89 |
| 38 | 00470 | Catch Basin, Type GB-2 | Ea | 16 | $3,250.00 | $52,000.00 | $3,800.00 | $60,800.00 | $4,000.00 | $64,000.00 | $3,100.00 | $49,600.00 | $3,805.00 | $60,880.00 | $4,260.00 | $68,160.00 | $3,850.00 | $61,600.00 | $4,000.00 | $64,000.00 | $4,260.00 | $3,100.00 | $3,758.13 | $3,633.33 | 0.89 |
| 39 | 00470 | Catch Basin, Type Area Drain | Ea | 4 | $4,500.00 | $18,000.00 | $1,200.00 | $4,800.00 | $2,400.00 | $9,600.00 | $1,700.00 | $6,800.00 | $3,835.00 | $15,340.00 | $1,540.00 | $6,160.00 | $1,310.00 | $5,240.00 | $1,500.00 | $6,000.00 | $4,500.00 | $1,200.00 | $2,248.13 | $1,766.67 | 2.55 |
| 40 | 00470 | Catch Basin, Type Ditch Inlet | Ea | 1 | $3,500.00 | $3,500.00 | $3,500.00 | $3,500.00 | $2,500.00 | $2,500.00 | $2,800.00 | $2,800.00 | $4,805.00 | $4,805.00 | $5,205.00 | $5,205.00 | $2,265.00 | $2,265.00 | $4,500.00 | $4,500.00 | $5,205.00 | $2,265.00 | $3,634.38 | $2,933.33 | 1.19 |
| 41 | 00470 | Beehive Inlet Stormwater Planter Overflow | Ea | 23 | $3,500.00 | $80,500.00 | $3,400.00 | $78,200.00 | $4,700.00 | $108,100.00 | $2,500.00 | $57,500.00 | $4,505.00 | $103,615.00 | $3,500.00 | $80,500.00 | $4,165.00 | $95,795.00 | $4,000.00 | $92,000.00 | $4,700.00 | $2,500.00 | $3,783.75 | $3,533.33 | 0.99 |
| 42 | 00470 | Storm Cleanout | Ea | 32 | $550.00 | $17,600.00 | $500.00 | $16,000.00 | $700.00 | $22,400.00 | $950.00 | $30,400.00 | $545.00 | $17,440.00 | $770.00 | $24,640.00 | $755.00 | $24,160.00 | $850.00 | $27,200.00 | $950.00 | $500.00 | $702.50 | $716.67 | 0.77 |
| 43 | 00490 | Minor Adjustments of Manholes | Ea | 32 | $450.00 | $14,400.00 | $1,000.00 | $32,000.00 | $1,100.00 | $35,200.00 | $1,500.00 | $48,000.00 | $1,945.00 | $62,240.00 | $1,140.00 | $36,480.00 | $3,410.00 | $109,120.00 | $1,350.00 | $43,200.00 | $3,410.00 | $450.00 | $1,486.88 | $1,200.00 | 0.38 |
| 44 | 00490 | Major Adjustments of Manholes | Ea | 5 | $3,275.00 | $16,375.00 | $2,800.00 | $14,000.00 | $1,600.00 | $8,000.00 | $2,700.00 | $13,500.00 | $4,245.00 | $21,225.00 | $1,955.00 | $9,775.00 | $3,905.00 | $19,525.00 | $3,800.00 | $19,000.00 | $4,245.00 | $1,600.00 | $3,035.00 | $2,366.67 | 1.38 |
| 45 | 00490 | Adjusting Inlets | Ea | 5 | $200.00 | $1,000.00 | $1,000.00 | $5,000.00 | $1,400.00 | $7,000.00 | $1,600.00 | $8,000.00 | $1,400.00 | $7,000.00 | $1,110.00 | $5,550.00 | $1,400.00 | $7,000.00 | $1,000.00 | $5,000.00 | $1,600.00 | $200.00 | $1,138.75 | $1,333.33 | 0.15 |
| 46 | 00490 | Controlled Low Strength Material | CY | 50 | $125.00 | $6,250.00 | $200.00 | $10,000.00 | $226.00 | $11,300.00 | $360.00 | $18,000.00 | $305.00 | $15,250.00 | $350.00 | $17,500.00 | $765.00 | $38,250.00 | $325.00 | $16,250.00 | $765.00 | $125.00 | $332.00 | $262.00 | 0.48 |
| 47 | 00490 | Filling Abandoned Structures | CY | 50 | $125.00 | $6,250.00 | $250.00 | $12,500.00 | $117.00 | $5,850.00 | $390.00 | $19,500.00 | $450.00 | $22,500.00 | $435.00 | $21,750.00 | $285.00 | $14,250.00 | $350.00 | $17,500.00 | $450.00 | $117.00 | $300.25 | $252.33 | 0.50 |
| 48 | 00596B | Retaining Wall, Segmental Block (As-Directed) | SF | 200 | $75.00 | $15,000.00 | $55.00 | $11,000.00 | $65.00 | $13,000.00 | $75.00 | $15,000.00 | $50.00 | $10,000.00 | $125.00 | $25,000.00 | $95.00 | $19,000.00 | $82.00 | $16,400.00 | $125.00 | $50.00 | $77.75 | $65.00 | 1.15 |
| 49 | 00596C | Retaining Wall, Concrete Gravity with Fence | LS | 1 | $21,500.00 | $21,500.00 | $50,000.00 | $50,000.00 | $50,000.00 | $50,000.00 | $19,000.00 | $19,000.00 | $21,600.00 | $21,600.00 | $39,000.00 | $39,000.00 | $65,000.00 | $65,000.00 | $70,000.00 | $70,000.00 | $70,000.00 | $19,000.00 | $42,012.50 | $39,666.67 | 0.54 |
| 50 | 00620 | Cold Plane Pavement Removal, 0-2" Deep | SY | 5,100 | $7.00 | $35,700.00 | $7.00 | $35,700.00 | $6.00 | $30,600.00 | $7.00 | $35,700.00 | $10.00 | $51,000.00 | $5.75 | $29,325.00 | $7.95 | $40,545.00 | $9.00 | $45,900.00 | $10.00 | $5.75 | $7.46 | $6.67 | 1.05 |
| 51 | 00641 | Aggregate Base | CY | 4,000 | $91.50 | $366,000.00 | $90.00 | $360,000.00 | $90.00 | $360,000.00 | $83.00 | $332,000.00 | $90.00 | $360,000.00 | $110.00 | $440,000.00 | $89.00 | $356,000.00 | $96.00 | $384,000.00 | $110.00 | $83.00 | $92.44 | $87.67 | 1.04 |
| 52 | 00641 | Open Graded Aggregate Base for Pervious Pavement | CY | 900 | $90.00 | $81,000.00 | $100.00 | $90,000.00 | $122.00 | $109,800.00 | $150.00 | $135,000.00 | $125.00 | $112,500.00 | $101.00 | $90,900.00 | $105.00 | $94,500.00 | $128.00 | $115,200.00 | $150.00 | $90.00 | $115.13 | $124.00 | 0.73 |
| 53 | 00641 | Choker Aggregate Base for Pervious Pavement | CY | 270 | $90.00 | $24,300.00 | $125.00 | $33,750.00 | $205.00 | $55,350.00 | $190.00 | $51,300.00 | $250.00 | $67,500.00 | $178.00 | $48,060.00 | $140.00 | $37,800.00 | $180.00 | $48,600.00 | $250.00 | $90.00 | $169.75 | $173.33 | 0.52 |
| 54 | 00743 | 1/2" PAC Mixture | Ton | 800 | $152.00 | $121,600.00 | $200.00 | $160,000.00 | $172.00 | $137,600.00 | $188.00 | $150,400.00 | $160.00 | $128,000.00 | $260.00 | $208,000.00 | $180.00 | $144,000.00 | $230.00 | $184,000.00 | $260.00 | $152.00 | $192.75 | $186.67 | 0.81 |
| 55 | 00744 | Level 3, 1/2" Dense ACP Mixture | Ton | 4,000 | $119.00 | $476,000.00 | $130.00 | $520,000.00 | $135.00 | $540,000.00 | $127.00 | $508,000.00 | $125.00 | $500,000.00 | $145.00 | $580,000.00 | $140.00 | $560,000.00 | $138.00 | $552,000.00 | $145.00 | $119.00 | $132.38 | $130.67 | 0.91 |
| 56 | 00759 | Concrete Curbs, Standard Curb | Ft | 2,589 | $28.00 | $72,492.00 | $34.00 | $88,026.00 | $33.00 | $85,437.00 | $32.00 | $82,848.00 | $33.00 | $85,437.00 | $24.00 | $62,136.00 | $31.00 | $80,259.00 | $27.50 | $71,197.50 | $34.00 | $24.00 | $30.31 | $33.00 | 0.85 |
| 57 | 00759 | Concrete Curbs, Sloped Curb | Ft | 2,106 | $26.00 | $54,756.00 | $26.00 | $54,756.00 | $30.00 | $63,180.00 | $28.00 | $58,968.00 | $30.00 | $63,180.00 | $21.00 | $44,226.00 | $28.00 | $58,968.00 | $24.50 | $51,597.00 | $30.00 | $21.00 | $26.69 | $28.00 | 0.93 |
| 58 | 00759 | Concrete Curbs, Curb and Gutter with 12 Inch Gutter Pan | Ft | 3,878 | $28.00 | $108,584.00 | $30.00 | $116,340.00 | $34.00 | $131,852.00 | $32.00 | $124,096.00 | $36.00 | $139,608.00 | $24.00 | $93,072.00 | $32.00 | $124,096.00 | $28.00 | $108,584.00 | $36.00 | $24.00 | $30.50 | $32.00 | 0.88 |
| 59 | 00759 | Concrete Curbs, Curb and Gutter with 18 Inch Gutter Pan | Ft | 355 | $28.00 | $9,940.00 | $45.00 | $15,975.00 | $40.00 | $14,200.00 | $36.00 | $12,780.00 | $50.00 | $17,750.00 | $30.00 | $10,650.00 | $38.00 | $13,490.00 | $33.50 | $11,892.50 | $50.00 | $28.00 | $37.56 | $40.33 | 0.69 |
| 60 | 00759 | Concrete Curbs, Modified Thickened Curb and Gutter for Stormwater Planters | Ft | 844 | $40.00 | $33,760.00 | $95.00 | $80,180.00 | $107.00 | $90,308.00 | $140.00 | $118,160.00 | $80.00 | $67,520.00 | $87.00 | $73,428.00 | $100.00 | $84,400.00 | $103.00 | $86,932.00 | $140.00 | $40.00 | $94.00 | $114.00 | 0.35 |
| 61 | 00759 | Concrete Curbs, Perimeter Curb Wall for Stormwater Planters | Ft | 1,259 | $38.00 | $47,842.00 | $100.00 | $125,900.00 | $91.00 | $114,569.00 | $115.00 | $144,785.00 | $115.00 | $144,785.00 | $71.50 | $90,018.50 | $110.00 | $138,490.00 | $90.00 | $113,310.00 | $115.00 | $38.00 | $91.31 | $102.00 | 0.37 |
| 62 | 00759 | Concrete Curbs, Low Profile Mountable | Ft | 698 | $22.00 | $15,356.00 | $60.00 | $41,880.00 | $43.00 | $30,014.00 | $35.00 | $24,430.00 | $55.00 | $38,390.00 | $28.00 | $19,544.00 | $35.00 | $24,430.00 | $33.50 | $23,383.00 | $60.00 | $22.00 | $38.94 | $46.00 | 0.48 |
| 63 | 00759 | Concrete Curbs, Mountable Curb and Gutter | Ft | 294 | $22.00 | $6,468.00 | $50.00 | $14,700.00 | $58.00 | $17,052.00 | $36.00 | $10,584.00 | $60.00 | $17,640.00 | $30.00 | $8,820.00 | $40.00 | $11,760.00 | $34.00 | $9,996.00 | $60.00 | $22.00 | $41.25 | $48.00 | 0.46 |
| 64 | 00759 | Concrete Walks | SF | 12,800 | $11.00 | $140,800.00 | $10.00 | $128,000.00 | $13.00 | $166,400.00 | $12.00 | $153,600.00 | $12.00 | $153,600.00 | $10.00 | $128,000.00 | $12.00 | $153,600.00 | $11.50 | $147,200.00 | $13.00 | $10.00 | $11.44 | $11.67 | 0.94 |
| 65 | 00759 | Concrete Driveways | SF | 14,598 | $18.00 | $262,764.00 | $17.00 | $248,166.00 | $16.00 | $233,568.00 | $16.00 | $233,568.00 | $22.00 | $321,156.00 | $12.50 | $182,475.00 | $15.00 | $218,970.00 | $18.00 | $262,764.00 | $22.00 | $12.50 | $16.81 | $16.33 | 1.10 |
| 66 | 00759 | Concrete Driveways, Reinforced | SF | 1,682 | $23.00 | $38,686.00 | $19.00 | $31,958.00 | $22.00 | $37,004.00 | $19.00 | $31,958.00 | $22.00 | $37,004.00 | $16.00 | $26,912.00 | $18.00 | $30,276.00 | $20.00 | $33,640.00 | $23.00 | $16.00 | $19.88 | $20.00 | 1.15 |
| 67 | 00759 | Concrete Driveway Connection | SF | 13,136 | $15.00 | $197,040.00 | $18.00 | $236,448.00 | $17.00 | $223,312.00 | $16.00 | $210,176.00 | $23.00 | $302,128.00 | $13.00 | $170,768.00 | $15.00 | $197,040.00 | $18.00 | $236,448.00 | $23.00 | $13.00 | $16.88 | $17.00 | 0.88 |
| 68 | 00759 | Concrete Driveway Connection, Exposed Aggregate | SF | 254 | $25.00 | $6,350.00 | $28.00 | $7,112.00 | $21.00 | $5,334.00 | $21.00 | $5,334.00 | $25.00 | $6,350.00 | $341.00 | $86,614.00 | $20.00 | $5,080.00 | $22.00 | $5,588.00 | $341.00 | $20.00 | $62.88 | $23.33 | 1.07 |
| 69 | 00759 | 6 Inch Thick Reinforced Concrete Cut-Through Concrete Surfacing | SF | 161 | $25.00 | $4,025.00 | $35.00 | $5,635.00 | $20.00 | $3,220.00 | $23.00 | $3,703.00 | $36.00 | $5,796.00 | $12.50 | $2,012.50 | $20.00 | $3,220.00 | $20.00 | $3,220.00 | $36.00 | $12.50 | $23.94 | $26.00 | 0.96 |
| 70 | 00759 | 8 Inch Thick Reinforced Raised Crosswalk Concrete Surfacing | SF | 816 | $25.00 | $20,400.00 | $20.00 | $16,320.00 | $25.00 | $20,400.00 | $24.00 | $19,584.00 | $29.00 | $23,664.00 | $18.00 | $14,688.00 | $24.00 | $19,584.00 | $25.00 | $20,400.00 | $29.00 | $18.00 | $23.75 | $23.00 | 1.09 |
| 71 | 00759 | 6 Inch Thick Reinforced Truck Apron Concrete Surfacing | SF | 1,660 | $28.00 | $46,480.00 | $15.00 | $24,900.00 | $19.00 | $31,540.00 | $21.00 | $34,860.00 | $25.00 | $41,500.00 | $15.00 | $24,900.00 | $19.00 | $31,540.00 | $19.00 | $31,540.00 | $28.00 | $15.00 | $20.13 | $18.33 | 1.53 |
| 72 | 00759 | 6 Inch Thick Reinforced Stamped Colored Concrete Surfacing | SF | 3,045 | $36.00 | $109,620.00 | $28.00 | $85,260.00 | $28.00 | $85,260.00 | $30.00 | $91,350.00 | $35.00 | $106,575.00 | $23.00 | $70,035.00 | $28.00 | $85,260.00 | $28.00 | $85,260.00 | $36.00 | $23.00 | $29.50 | $28.67 | 1.26 |
| 73 | 00759 | Truncated Domes on New Surfaces | SF | 651 | $65.00 | $42,315.00 | $30.00 | $19,530.00 | $38.00 | $24,738.00 | $40.00 | $26,040.00 | $30.00 | $19,530.00 | $35.00 | $22,785.00 | $39.00 | $25,389.00 | $35.00 | $22,785.00 | $65.00 | $30.00 | $39.00 | $36.00 | 1.81 |
| 74 | 00759 | Extra For New Curb Ramps | Ea | 42 | $700.00 | $29,400.00 | $1,500.00 | $63,000.00 | $1,600.00 | $67,200.00 | $1,900.00 | $79,800.00 | $2,000.00 | $84,000.00 | $1,162.00 | $48,804.00 | $1,900.00 | $79,800.00 | $1,600.00 | $67,200.00 | $2,000.00 | $700.00 | $1,545.25 | $1,666.67 | 0.42 |
| 75 | 00815 | Removable Bollards | Ea | 3 | $1,450.00 | $4,350.00 | $2,000.00 | $6,000.00 | $1,300.00 | $3,900.00 | $1,700.00 | $5,100.00 | $3,500.00 | $10,500.00 | $3,215.00 | $9,645.00 | $2,200.00 | $6,600.00 | $3,200.00 | $9,600.00 | $3,500.00 | $1,300.00 | $2,320.63 | $1,666.67 | 0.87 |
| 76 | 00865 | Thermoplastic, Extruded, Surface, Non-Profiled | Ft | 8,600 | $1.80 | $15,480.00 | $1.50 | $12,900.00 | $1.50 | $12,900.00 | $1.75 | $15,050.00 | $2.00 | $17,200.00 | $1.60 | $13,760.00 | $1.75 | $15,050.00 | $1.00 | $8,600.00 | $2.00 | $1.00 | $1.61 | $1.58 | 1.14 |
| 77 | 00867 | Pavement Legend, Type B-HS: Arrows | Ea | 2 | $290.00 | $580.00 | $400.00 | $800.00 | $380.00 | $760.00 | $320.00 | $640.00 | $300.00 | $600.00 | $290.00 | $580.00 | $325.00 | $650.00 | $400.00 | $800.00 | $400.00 | $290.00 | $338.13 | $366.67 | 0.79 |
| 78 | 00867 | Pavement Bar, Type B-HS | SF | 2,220 | $12.00 | $26,640.00 | $18.00 | $39,960.00 | $18.00 | $39,960.00 | $12.50 | $27,750.00 | $12.00 | $26,640.00 | $11.50 | $25,530.00 | $13.00 | $28,860.00 | $8.00 | $17,760.00 | $18.00 | $8.00 | $13.13 | $16.17 | 0.74 |
| 79 | 00867 | Pavement Legend, Type B-HS: Yield Line Triangle | Ea | 9 | $69.00 | $621.00 | $100.00 | $900.00 | $100.00 | $900.00 | $75.00 | $675.00 | $70.00 | $630.00 | $69.00 | $621.00 | $78.00 | $702.00 | $230.00 | $2,070.00 | $230.00 | $69.00 | $98.88 | $91.67 | 0.75 |
| 80 | 00867 | Pavement Legend, Type B-HS: Shared Lane Marking | Ea | 4 | $320.00 | $1,280.00 | $400.00 | $1,600.00 | $415.00 | $1,660.00 | $350.00 | $1,400.00 | $320.00 | $1,280.00 | $317.00 | $1,268.00 | $358.00 | $1,432.00 | $375.00 | $1,500.00 | $415.00 | $317.00 | $356.88 | $388.33 | 0.82 |
| 81 | 00867 | Pavement Legend, Type B-HS: Speed Hump Arrows | Ea | 4 | $310.00 | $1,240.00 | $425.00 | $1,700.00 | $443.00 | $1,772.00 | $340.00 | $1,360.00 | $310.00 | $1,240.00 | $306.00 | $1,224.00 | $345.00 | $1,380.00 | $500.00 | $2,000.00 | $500.00 | $306.00 | $372.38 | $402.67 | 0.77 |
| 82 | 00902 | Crosswalk Closure Supports | Ea | 13 | $1,500.00 | $19,500.00 | $1,500.00 | $19,500.00 | $1,500.00 | $19,500.00 | $1,500.00 | $19,500.00 | $1,500.00 | $19,500.00 | $1,386.00 | $18,018.00 | $1,900.00 | $24,700.00 | $1,300.00 | $16,900.00 | $1,900.00 | $1,300.00 | $1,510.75 | $1,500.00 | 1.00 |
| 83 | 00905 | Remove Existing Signs | LS | 1 | $2,100.00 | $2,100.00 | $2,500.00 | $2,500.00 | $4,200.00 | $4,200.00 | $4,200.00 | $4,200.00 | $4,000.00 | $4,000.00 | $3,848.00 | $3,848.00 | $1,450.00 | $1,450.00 | $3,800.00 | $3,800.00 | $4,200.00 | $1,450.00 | $3,262.25 | $3,633.33 | 0.58 |
| 84 | 00905 | Remove and Reinstall Existing Signs | LS | 1 | $500.00 | $500.00 | $1,000.00 | $1,000.00 | $1,700.00 | $1,700.00 | $1,700.00 | $1,700.00 | $1,600.00 | $1,600.00 | $1,554.00 | $1,554.00 | $525.00 | $525.00 | $1,500.00 | $1,500.00 | $1,700.00 | $500.00 | $1,259.88 | $1,466.67 | 0.34 |
| 85 | 00910 | Wood Sign Posts | FBM | 124 | $30.00 | $3,720.00 | $20.00 | $2,480.00 | $16.00 | $1,984.00 | $16.00 | $1,984.00 | $15.00 | $1,860.00 | $15.00 | $1,860.00 | $11.00 | $1,364.00 | $14.00 | $1,736.00 | $30.00 | $11.00 | $17.13 | $17.33 | 1.73 |
| 86 | 00920 | Sign Support Footings | LS | 1 | $40,000.00 | $40,000.00 | $10,000.00 | $10,000.00 | $11,000.00 | $11,000.00 | $12,000.00 | $12,000.00 | $11,000.00 | $11,000.00 | $10,550.00 | $10,550.00 | $40,000.00 | $40,000.00 | $10,000.00 | $10,000.00 | $40,000.00 | $10,000.00 | $18,068.75 | $11,000.00 | 3.64 |
| 87 | 00930 | Perforated Steel Square Tube Anchor Sign Supports | LS | 1 | $25,000.00 | $25,000.00 | $20,000.00 | $20,000.00 | $25,000.00 | $25,000.00 | $25,000.00 | $25,000.00 | $24,000.00 | $24,000.00 | $22,670.00 | $22,670.00 | $19,000.00 | $19,000.00 | $22,000.00 | $22,000.00 | $25,000.00 | $19,000.00 | $22,833.75 | $23,333.33 | 1.07 |
| 88 | 00940 | Signs, Standard Sheeting, Sheet Aluminum | SF | 1,025 | $38.00 | $38,950.00 | $25.00 | $25,625.00 | $27.00 | $27,675.00 | $27.00 | $27,675.00 | $25.00 | $25,625.00 | $25.00 | $25,625.00 | $40.00 | $41,000.00 | $25.00 | $25,625.00 | $40.00 | $25.00 | $29.00 | $26.33 | 1.44 |
| 89 | 00970 | Switching, Conduit, and Wiring | LS | 1 | $23,000.00 | $23,000.00 | $15,000.00 | $15,000.00 | $23,000.00 | $23,000.00 | $45,000.00 | $45,000.00 | $21,000.00 | $21,000.00 | $21,000.00 | $21,000.00 | $55,000.00 | $55,000.00 | $21,000.00 | $21,000.00 | $55,000.00 | $15,000.00 | $28,000.00 | $27,666.67 | 0.83 |
| 90 | 00970 | Pole Foundations | LS | 1 | $4,000.00 | $4,000.00 | $2,500.00 | $2,500.00 | $4,500.00 | $4,500.00 | $5,000.00 | $5,000.00 | $4,000.00 | $4,000.00 | $4,000.00 | $4,000.00 | $5,800.00 | $5,800.00 | $4,000.00 | $4,000.00 | $5,800.00 | $2,500.00 | $4,225.00 | $4,000.00 | 1.00 |
| 91 | 00990 | Flashing Beacon Installation, SE Monroe Rd and SE Linwood Ave | LS | 1 | $76,500.00 | $76,500.00 | $50,000.00 | $50,000.00 | $84,000.00 | $84,000.00 | $85,000.00 | $85,000.00 | $80,000.00 | $80,000.00 | $76,500.00 | $76,500.00 | $92,000.00 | $92,000.00 | $76,500.00 | $76,500.00 | $92,000.00 | $50,000.00 | $77,562.50 | $73,000.00 | 1.05 |
| 92 | 01015 | Open Graded Aggregate Base for Stormwater Planters | Ton | 80 | $80.00 | $6,400.00 | $110.00 | $8,800.00 | $85.00 | $6,800.00 | $87.00 | $6,960.00 | $90.00 | $7,200.00 | $79.00 | $6,320.00 | $85.00 | $6,800.00 | $120.00 | $9,600.00 | $120.00 | $79.00 | $92.00 | $94.00 | 0.85 |
| 93 | 01015 | Washed Drain Rock for Stormwater Planters | Ton | 300 | $80.00 | $24,000.00 | $80.00 | $24,000.00 | $85.00 | $25,500.00 | $76.00 | $22,800.00 | $80.00 | $24,000.00 | $59.00 | $17,700.00 | $76.00 | $22,800.00 | $90.00 | $27,000.00 | $90.00 | $59.00 | $78.25 | $80.33 | 1.00 |
| 94 | 01015 | Concrete Check Dams | Ea | 4 | $1,250.00 | $5,000.00 | $3,500.00 | $14,000.00 | $2,000.00 | $8,000.00 | $1,500.00 | $6,000.00 | $1,500.00 | $6,000.00 | $1,275.00 | $5,100.00 | $1,400.00 | $5,600.00 | $1,700.00 | $6,800.00 | $3,500.00 | $1,250.00 | $1,765.63 | $2,333.33 | 0.54 |
| 95 | 01030 | Permanent Seeding | Acre | 1 | $9,000.00 | $9,000.00 | $5,000.00 | $5,000.00 | $10,000.00 | $10,000.00 | $5,500.00 | $5,500.00 | $9,500.00 | $9,500.00 | $4,500.00 | $4,500.00 | $17,000.00 | $17,000.00 | $4,500.00 | $4,500.00 | $17,000.00 | $4,500.00 | $8,125.00 | $6,833.33 | 1.32 |
| 96 | 01040 | Topsoil | CY | 1,100 | $50.00 | $55,000.00 | $50.00 | $55,000.00 | $80.00 | $88,000.00 | $80.00 | $88,000.00 | $45.00 | $49,500.00 | $70.00 | $77,000.00 | $83.00 | $91,300.00 | $70.00 | $77,000.00 | $83.00 | $45.00 | $66.00 | $70.00 | 0.71 |
| 97 | 01040 | Water Quality Mixture | CY | 200 | $55.00 | $11,000.00 | $45.00 | $9,000.00 | $100.00 | $20,000.00 | $100.00 | $20,000.00 | $55.00 | $11,000.00 | $90.00 | $18,000.00 | $70.00 | $14,000.00 | $90.00 | $18,000.00 | $100.00 | $45.00 | $75.63 | $81.67 | 0.67 |
| 98 | 01040 | Bark Mulch, 3 Inch Depth | CY | 500 | $47.00 | $23,500.00 | $60.00 | $30,000.00 | $80.00 | $40,000.00 | $80.00 | $40,000.00 | $50.00 | $25,000.00 | $70.00 | $35,000.00 | $89.00 | $44,500.00 | $70.00 | $35,000.00 | $89.00 | $47.00 | $68.25 | $73.33 | 0.64 |
| 99 | 01040 | Deciduous Trees, 2 Inch Caliper | Ea | 101 | $300.00 | $30,300.00 | $400.00 | $40,400.00 | $850.00 | $85,850.00 | $825.00 | $83,325.00 | $320.00 | $32,320.00 | $750.00 | $75,750.00 | $525.00 | $53,025.00 | $750.00 | $75,750.00 | $850.00 | $300.00 | $590.00 | $691.67 | 0.43 |
| 100 | 01040 | Groundcover, #1 Container | Ea | 1,719 | $10.00 | $17,190.00 | $25.00 | $42,975.00 | $22.00 | $37,818.00 | $22.00 | $37,818.00 | $10.00 | $17,190.00 | $20.00 | $34,380.00 | $17.00 | $29,223.00 | $20.00 | $34,380.00 | $25.00 | $10.00 | $18.25 | $23.00 | 0.43 |
| 101 | 01040 | Groundcover, #SP4 Container | Ea | 3,431 | $6.00 | $20,586.00 | $13.00 | $44,603.00 | $10.00 | $34,310.00 | $10.00 | $34,310.00 | $6.00 | $20,586.00 | $9.00 | $30,879.00 | $11.00 | $37,741.00 | $9.00 | $30,879.00 | $13.00 | $6.00 | $9.25 | $11.00 | 0.55 |
| 102 | 01040 | Wetland Plants, #SP4 Container | Ea | 2,826 | $5.00 | $14,130.00 | $12.00 | $33,912.00 | $15.00 | $42,390.00 | $4.50 | $12,717.00 | $5.00 | $14,130.00 | $4.00 | $11,304.00 | $11.00 | $31,086.00 | $4.00 | $11,304.00 | $15.00 | $4.00 | $7.56 | $10.50 | 0.48 |
| 103 | 01040 | Root Barrier | Ft | 2,020 | $12.00 | $24,240.00 | $20.00 | $40,400.00 | $13.00 | $26,260.00 | $12.00 | $24,240.00 | $12.00 | $24,240.00 | $11.00 | $22,220.00 | $10.00 | $20,200.00 | $10.00 | $20,200.00 | $20.00 | $10.00 | $12.50 | $15.00 | 0.80 |
| 104 | 01044 | 2nd and 3rd Year Plant Establishment | LS | 1 | $48,000.00 | $48,000.00 | $40,000.00 | $40,000.00 | $128,000.00 | $128,000.00 | $50,000.00 | $50,000.00 | $40,000.00 | $40,000.00 | $48,000.00 | $48,000.00 | $40,000.00 |
tc={091F49EC-D499-4E50-84D1-FA4368FDE4B2}: [Threaded comment]
Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924
Comment:
38000 bid increased to 40000 (minimum per SP's) $40,000.00 $40,000.00 tc={F23821F6-CEB0-4650-BDDA-50ACC69FCD6B}: [Threaded comment]
Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924
Comment:
25000 bid increased to 40000 (minimum per SP's) tc={091F49EC-D499-4E50-84D1-FA4368FDE4B2}: [Threaded comment]
Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924
Comment:
| 38000 bid increased to 40000 (minimum per SP's) | $40,000.00 | $128,000.00 | $40,000.00 | $54,250.00 | $72,666.67 | 0.66 | ||||||||||||||||||||
| 105 | 01065 | Monument Boxes | Ea | 20 | $1,250.00 | $25,000.00 | $500.00 | $10,000.00 | $1,000.00 | $20,000.00 | $850.00 | $17,000.00 | $1,805.00 | $36,100.00 | $755.00 | $15,100.00 | $1,325.00 | $26,500.00 | $650.00 | $13,000.00 | $1,805.00 | $500.00 | $1,016.88 | $783.33 | 1.60 | |
| 106 | 01070 | Single Mailbox Supports | Ea | 43 | $550.00 | $23,650.00 | $600.00 | $25,800.00 | $850.00 | $36,550.00 | $750.00 | $32,250.00 | $400.00 | $17,200.00 | $660.00 | $28,380.00 | $1,350.00 | $58,050.00 | $660.00 | $28,380.00 | $1,350.00 | $400.00 | $727.50 | $733.33 | 0.75 | |
| 107 | 01070 | Multiple Mailbox Supports | Ea | 2 | $675.00 | $1,350.00 | $1,500.00 | $3,000.00 | $1,900.00 | $3,800.00 | $725.00 | $1,450.00 | $1,250.00 | $2,500.00 | $1,160.00 | $2,320.00 | $1,650.00 | $3,300.00 | $1,100.00 | $2,200.00 | $1,900.00 | $675.00 | $1,245.00 | $1,375.00 | 0.49 | |
| 108 | 01075 | Private Property Improvements - Property 10 | LS | 1 | $2,040.00 | $2,040.00 | $5,000.00 | $5,000.00 | $6,200.00 | $6,200.00 | $3,900.00 | $3,900.00 | $6,000.00 | $6,000.00 | $7,850.00 | $7,850.00 | $6,000.00 | $6,000.00 | $5,000.00 | $5,000.00 | $7,850.00 | $2,040.00 | $5,248.75 | $5,033.33 | 0.41 | |
| 109 | 01075 | Private Property Improvements - Property 12 | LS | 1 | $2,790.00 | $2,790.00 | $4,000.00 | $4,000.00 | $5,600.00 | $5,600.00 | $3,400.00 | $3,400.00 | $5,000.00 | $5,000.00 | $7,256.00 | $7,256.00 | $5,400.00 | $5,400.00 | $5,000.00 | $5,000.00 | $7,256.00 | $2,790.00 | $4,805.75 | $4,333.33 | 0.64 | |
| 110 | 01075 | Private Property Improvements - Property 15 | LS | 1 | $3,645.00 | $3,645.00 | $9,000.00 | $9,000.00 | $12,000.00 | $12,000.00 | $5,400.00 | $5,400.00 | $11,000.00 | $11,000.00 | $14,165.00 | $14,165.00 | $12,000.00 | $12,000.00 | $11,000.00 | $11,000.00 | $14,165.00 | $3,645.00 | $9,776.25 | $8,800.00 | 0.41 | |
| 111 | 01075 | Private Property Improvements - Property 16 | LS | 1 | $2,880.00 | $2,880.00 | $6,000.00 | $6,000.00 | $8,000.00 | $8,000.00 | $4,900.00 | $4,900.00 | $7,000.00 | $7,000.00 | $9,633.00 | $9,633.00 | $7,500.00 | $7,500.00 | $7,000.00 | $7,000.00 | $9,633.00 | $2,880.00 | $6,614.13 | $6,300.00 | 0.46 | |
| 112 | 01075 | Private Property Improvements - Property 19 | LS | 1 | $8,580.00 | $8,580.00 | $12,000.00 | $12,000.00 | $16,000.00 | $16,000.00 | $16,000.00 | $16,000.00 | $15,000.00 | $15,000.00 | $18,065.00 | $18,065.00 | $16,000.00 | $16,000.00 | $14,000.00 | $14,000.00 | $18,065.00 | $8,580.00 | $14,455.63 | $14,666.67 | 0.59 | |
| 113 | 01075 | Private Property Improvements - Property 20 | LS | 1 | $14,520.00 | $14,520.00 | $15,000.00 | $15,000.00 | $20,000.00 | $20,000.00 | $23,000.00 | $23,000.00 | $20,000.00 | $20,000.00 | $22,985.00 | $22,985.00 | $20,000.00 | $20,000.00 | $15,000.00 | $15,000.00 | $23,000.00 | $14,520.00 | $18,813.13 | $19,333.33 | 0.75 | |
| 114 | 01075 | Private Property Improvements - Property 22 | LS | 1 | $960.00 | $960.00 | $10,000.00 | $10,000.00 | $1,500.00 | $1,500.00 | $1,600.00 | $1,600.00 | $1,330.00 | $1,330.00 | $17,258.00 | $17,258.00 | $2,500.00 | $2,500.00 | $1,600.00 | $1,600.00 | $17,258.00 | $960.00 | $4,593.50 | $4,366.67 | 0.22 | |
| 115 | 01075 | Private Property Improvements - Property 34 | LS | 1 | $1,900.00 | $1,900.00 | $5,000.00 | $5,000.00 | $800.00 | $800.00 | $2,600.00 | $2,600.00 | $3,300.00 | $3,300.00 | $8,825.00 | $8,825.00 | $3,200.00 | $3,200.00 | $3,000.00 | $3,000.00 | $8,825.00 | $800.00 | $3,578.13 | $2,800.00 | 0.68 | |
| 116 | 01075 | Private Property Improvements - Property 55 | LS | 1 | $2,835.00 | $2,835.00 | $4,000.00 | $4,000.00 | $5,400.00 | $5,400.00 | $3,500.00 | $3,500.00 | $5,500.00 | $5,500.00 | $7,200.00 | $7,200.00 | $5,300.00 | $5,300.00 | $5,000.00 | $5,000.00 | $7,200.00 | $2,835.00 | $4,841.88 | $4,300.00 | 0.66 | |
| 117 | 01075 | Private Property Improvements - Property 56 | LS | 1 | $5,400.00 | $5,400.00 | $7,500.00 | $7,500.00 | $9,500.00 | $9,500.00 | $6,800.00 | $6,800.00 | $9,000.00 | $9,000.00 | $11,405.00 | $11,405.00 | $9,400.00 | $9,400.00 | $8,800.00 | $8,800.00 | $11,405.00 | $5,400.00 | $8,475.63 | $7,933.33 | 0.68 | |
| 118 | 01075 | Private Property Improvements - Property 93 | LS | 1 | $25,145.00 | $25,145.00 | $20,000.00 | $20,000.00 | $26,000.00 | $26,000.00 | $24,000.00 | $24,000.00 | $25,000.00 | $25,000.00 | $26,840.00 | $26,840.00 | $27,000.00 | $27,000.00 | $22,000.00 | $22,000.00 | $27,000.00 | $20,000.00 | $24,498.13 | $23,333.33 | 1.08 | |
| 119 | 01075 | Private Property Improvements - Property 94 | LS | 1 | $24,860.00 | $24,860.00 | $20,000.00 | $20,000.00 | $27,000.00 | $27,000.00 | $39,000.00 | $39,000.00 | $25,000.00 | $25,000.00 | $29,687.00 | $29,687.00 | $28,000.00 | $28,000.00 | $25,000.00 | $25,000.00 | $39,000.00 | $20,000.00 | $27,318.38 | $28,666.67 | 0.87 | |
| 120 | 01075 | Private Property Improvements - Property 99 | LS | 1 | $2,070.00 | $2,070.00 | $2,500.00 | $2,500.00 | $3,800.00 | $3,800.00 | $2,900.00 | $2,900.00 | $3,500.00 | $3,500.00 | $5,263.00 | $5,263.00 | $3,600.00 | $3,600.00 | $3,600.00 | $3,600.00 | $5,263.00 | $2,070.00 | $3,404.13 | $3,066.67 | 0.68 | |
| 121 | 01120 | Repair Private Irrigation Systems | LS | 1 | $2,500.00 | $2,500.00 | $2,500.00 | $2,500.00 | $23,000.00 | $23,000.00 | $10,000.00 | $10,000.00 | $19,000.00 | $19,000.00 | $12,500.00 | $12,500.00 | $11,000.00 | $11,000.00 | $10,000.00 | $10,000.00 | $23,000.00 | $2,500.00 | $11,312.50 | $11,833.33 | 0.21 | |
| Schedule A Total | $6,349,257.00 | $6,524,416.00 | $6,825,530.00 | $7,005,215.00 | $7,266,094.00 | $7,436,586.00 | $7,336,583.20 | $7,585,381.00 | $7,585,381.00 | $6,349,257.00 | $7,041,132.78 | $6,566,401.00 | 0.97 |
| SCHEDULE B - Clackamas River Water | Corpac Construction | Tapani | Pacific Excavation | K & E Excavating | Goodfellow Bros. | Kerr Contractors | Westech Construction | Moore Excavation Inc | |||||||||||||||||
| 122 | 00196 | Extra Work as Authorized | LS | 1 | $20,000.00 | $20,000.00 | $20,000.00 | $20,000.00 | $20,000.00 | $20,000.00 | $20,000.00 | $20,000.00 | $20,000.00 | $20,000.00 | $20,000.00 | $20,000.00 | $20,000.00 | $20,000.00 | $20,000.00 | $20,000.00 | $20,000.00 | $20,000.00 | $20,000.00 | $20,000.00 | 1.00 |
| 123 | 00210 | Mobilization | LS | 1 | $106,924.00 | $106,924.00 | $15,000.00 | $15,000.00 | $125,000.00 | $125,000.00 | $75,000.00 | $75,000.00 | $75,000.00 | $75,000.00 | $97,715.00 | $97,715.00 | $104,600.00 | $104,600.00 | $10,000.00 | $10,000.00 | $125,000.00 | $10,000.00 | $76,154.88 | $71,666.67 | 1.49 |
| 124 | 00221 | Temporary Work Zone Traffic Control, Complete | LS | 1 | $65,000.00 | $65,000.00 | $10,000.00 | $10,000.00 | $90,000.00 | $90,000.00 | $40,000.00 | $40,000.00 | $35,000.00 | $35,000.00 | $45,400.00 | $45,400.00 | $37,000.00 | $37,000.00 | $28,000.00 | $28,000.00 | $90,000.00 | $10,000.00 | $43,800.00 | $46,666.67 | 1.39 |
| 125 | 01140 | Blowoff Assembly, Type I | Ea | 10 | $2,875.00 | $28,750.00 | $2,150.00 | $21,500.00 | $2,000.00 | $20,000.00 | $2,900.00 | $29,000.00 | $5,000.00 | $50,000.00 | $3,600.00 | $36,000.00 | $3,216.12 | $32,161.20 | $1,600.00 | $16,000.00 | $5,000.00 | $1,600.00 | $2,917.64 | $2,350.00 | 1.22 |
| 126 | 01140 | Blowoff Assembly, Type II | Ea | 2 | $2,200.00 | $4,400.00 | $1,800.00 | $3,600.00 | $6,000.00 | $12,000.00 | $3,200.00 | $6,400.00 | $6,500.00 | $13,000.00 | $4,523.00 | $9,046.00 | $5,990.55 | $11,981.10 | $2,800.00 | $5,600.00 | $6,500.00 | $1,800.00 | $4,126.69 | $3,666.67 | 0.60 |
| 127 | 01140 | 6 Inch Wet Tap on 8 Inch Existing Main | Ea | 1 | $4,300.00 | $4,300.00 | $8,000.00 | $8,000.00 | $12,000.00 | $12,000.00 | $8,300.00 | $8,300.00 | $10,000.00 | $10,000.00 | $11,290.00 | $11,290.00 | $5,850.73 | $5,850.73 | $6,000.00 | $6,000.00 | $12,000.00 | $4,300.00 | $8,217.59 | $9,433.33 | 0.46 |
| 128 | 01140 | 8 Inch Connection to 4 Inch Existing Main | Ea | 2 | $800.00 | $1,600.00 | $3,500.00 | $7,000.00 | $8,000.00 | $16,000.00 | $3,600.00 | $7,200.00 | $3,000.00 | $6,000.00 | $1,775.00 | $3,550.00 | $7,576.95 | $15,153.90 | $2,800.00 | $5,600.00 | $8,000.00 | $800.00 | $3,881.49 | $5,033.33 | 0.16 |
| 129 | 01140 | 8 Inch Connection to 6 Inch Existing Main | Ea | 7 | $1,200.00 | $8,400.00 | $4,000.00 | $28,000.00 | $8,000.00 | $56,000.00 | $3,600.00 | $25,200.00 | $3,000.00 | $21,000.00 | $2,115.00 | $14,805.00 | $7,593.51 | $53,154.57 | $2,600.00 | $18,200.00 | $8,000.00 | $1,200.00 | $4,013.56 | $5,200.00 | 0.23 |
| 130 | 01140 | 8 Inch Connection to 8 Inch Existing Main | Ea | 5 | $2,000.00 | $10,000.00 | $4,000.00 | $20,000.00 | $8,000.00 | $40,000.00 | $3,600.00 | $18,000.00 | $3,000.00 | $15,000.00 | $2,500.00 | $12,500.00 | $7,576.95 | $37,884.75 | $2,500.00 | $12,500.00 | $8,000.00 | $2,000.00 | $4,147.12 | $5,200.00 | 0.38 |
| 131 | 01140 | 4 Inch Ductile Iron Pipe with Restrained Joints and Class B Backfill | Ft | 30 | $225.00 | $6,750.00 | $135.00 | $4,050.00 | $135.00 | $4,050.00 | $140.00 | $4,200.00 | $90.00 | $2,700.00 | $185.00 | $5,550.00 | $180.71 | $5,421.30 | $150.00 | $4,500.00 | $225.00 | $90.00 | $155.09 | $136.67 | 1.65 |
| 132 | 01140 | 6 Inch Ductile Iron Pipe with Restrained Joints and Class B Backfill | Ft | 80 | $225.00 | $18,000.00 | $200.00 | $16,000.00 | $132.00 | $10,560.00 | $121.00 | $9,680.00 | $160.00 | $12,800.00 | $184.00 | $14,720.00 | $188.06 | $15,044.80 | $115.00 | $9,200.00 | $225.00 | $115.00 | $165.63 | $151.00 | 1.49 |
| 133 | 01140 | 8 Inch Ductile Iron Pipe with Restrained Joints and Class B Backfill | Ft | 3,380 | $140.00 | $473,200.00 | $135.00 | $456,300.00 | $115.00 | $388,700.00 | $132.00 | $446,160.00 | $150.00 | $507,000.00 | $120.00 | $405,600.00 | $149.90 | $506,662.00 | $160.00 | $540,800.00 | $160.00 | $115.00 | $137.74 | $127.33 | 1.10 |
| 134 | 01140 | Ductile Iron Pipe Fittings | Lb | 4,240 | $8.00 | $33,920.00 | $7.00 | $29,680.00 | $11.00 | $46,640.00 | $8.00 | $33,920.00 | $10.00 | $42,400.00 | $5.50 | $23,320.00 | $13.90 | $58,936.00 | $8.00 | $33,920.00 | $13.90 | $5.50 | $8.93 | $8.67 | 0.92 |
| 135 | 01140 | Tracer Wire Terminal Station | Ea | 4 | $250.00 | $1,000.00 | $2,100.00 | $8,400.00 | $530.00 | $2,120.00 | $725.00 | $2,900.00 | $1,960.00 | $7,840.00 | $1,128.00 | $4,512.00 | $1,561.86 | $6,247.44 | $1,150.00 | $4,600.00 | $2,100.00 | $250.00 | $1,175.61 | $1,118.33 | 0.22 |
| 136 | 01150 | 8 Inch Gate Valve | Ea | 20 | $2,500.00 | $50,000.00 | $2,250.00 | $45,000.00 | $2,100.00 | $42,000.00 | $2,200.00 | $44,000.00 | $2,800.00 | $56,000.00 | $2,570.00 | $51,400.00 | $2,480.80 | $49,616.00 | $2,200.00 | $44,000.00 | $2,800.00 | $2,100.00 | $2,387.60 | $2,183.33 | 1.15 |
| 137 | 01150 | 1 Inch Combination Air Release/Air Vacuum Valve Assembly | Ea | 1 | $3,850.00 | $3,850.00 | $6,000.00 | $6,000.00 | $3,600.00 | $3,600.00 | $6,300.00 | $6,300.00 | $5,800.00 | $5,800.00 | $4,161.00 | $4,161.00 | $4,884.09 | $4,884.09 | $5,500.00 | $5,500.00 | $6,300.00 | $3,600.00 | $5,011.89 | $5,300.00 | 0.73 |
| 138 | 01160 | Fire Hydrant Assembly | Ea | 6 | $9,500.00 | $57,000.00 | $9,000.00 | $54,000.00 | $8,500.00 | $51,000.00 | $7,900.00 | $47,400.00 | $7,700.00 | $46,200.00 | $7,465.00 | $44,790.00 | $7,476.92 | $44,861.52 | $7,500.00 | $45,000.00 | $9,500.00 | $7,465.00 | $8,130.24 | $8,466.67 | 1.12 |
| 139 | 01160 | Fire Hydrant Assembly, no Gate Valve | Ea | 2 | $8,500.00 | $17,000.00 | $7,000.00 | $14,000.00 | $7,300.00 | $14,600.00 | $5,900.00 | $11,800.00 | $7,000.00 | $14,000.00 | $5,384.00 | $10,768.00 | $7,476.93 | $14,953.86 | $6,000.00 | $12,000.00 | $8,500.00 | $5,384.00 | $6,820.12 | $6,733.33 | 1.26 |
| 140 | 01170 | 1 Inch Long Side Water Service Assembly | Ea | 21 | $3,500.00 | $73,500.00 | $4,000.00 | $84,000.00 | $3,700.00 | $77,700.00 | $5,400.00 | $113,400.00 | $6,150.00 | $129,150.00 | $5,370.00 | $112,770.00 | $3,550.39 | $74,558.19 | $4,000.00 | $84,000.00 | $6,150.00 | $3,500.00 | $4,458.80 | $4,366.67 | 0.80 |
| 141 | 01170 | 1 Inch Short Side Water Service Assembly | Ea | 34 | $2,125.00 | $72,250.00 | $3,000.00 | $102,000.00 | $3,500.00 | $119,000.00 | $4,600.00 | $156,400.00 | $4,800.00 | $163,200.00 | $4,500.00 | $153,000.00 | $2,877.56 | $97,837.04 | $2,700.00 | $91,800.00 | $4,800.00 | $2,125.00 | $3,512.82 | $3,700.00 | 0.57 |
| 142 | 01170 | 2 Inch Water Service Assembly | Ea | 1 | $7,800.00 | $7,800.00 | $10,000.00 | $10,000.00 | $12,000.00 | $12,000.00 | $16,000.00 | $16,000.00 | $3,000.00 | $3,000.00 | $13,092.00 | $13,092.00 | $9,745.67 | $9,745.67 | $12,000.00 | $12,000.00 | $16,000.00 | $3,000.00 | $10,454.71 | $12,666.67 | 0.62 |
| 143 | 01170 | Water Service Abandonment | Ea | 7 | $800.00 | $5,600.00 | $1,500.00 | $10,500.00 | $500.00 | $3,500.00 | $2,100.00 | $14,700.00 | $1,425.00 | $9,975.00 | $1,360.00 | $9,520.00 | $837.52 | $5,862.64 | $900.00 | $6,300.00 | $2,100.00 | $500.00 | $1,177.82 | $1,366.67 | 0.59 |
| Schedule B Total | $1,069,244.00 | $973,030.00 | $1,166,470.00 | $1,135,960.00 | $1,245,065.00 | $1,103,509.00 | $1,212,416.80 | $1,015,520.00 | $1,245,065.00 | $973,030.00 | $1,115,151.85 | $1,069,581.33 | 1.00 | ||||||||||||
| Corpac Construction | Tapani | Pacific Excavation | K & E Excavating | Goodfellow Bros. | Kerr Contractors | Westech Construction | Moore Excavation Inc | ||||||||||||||||||
| Schedule A - County | $6,349,257.00 | $6,524,416.00 | $6,825,530.00 | $7,005,215.00 | $7,266,094.00 | $7,436,586.00 | $7,336,583.20 | $7,585,381.00 | |||||||||||||||||
| Schedule B - CRW | $1,069,244.00 | $973,030.00 | $1,166,470.00 | $1,135,960.00 | $1,245,065.00 | $1,103,509.00 | $1,212,416.80 | $1,015,520.00 | |||||||||||||||||
| Construction Total | $7,418,501.00 | $7,497,446.00 | $7,992,000.00 | $8,141,175.00 | $8,511,159.00 | $8,540,095.00 | $8,549,000.00 | $8,600,901.00 | |||||||||||||||||
| Submitted Bid | $7,418,501.00 | $7,497,446.00 | $7,992,000.00 | $8,141,175.00 | $8,511,159.00 | $8,540,095.00 | $8,547,000.00 | $8,586,401.00 | |||||||||||||||||
| Correction | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $2,000.00 | $14,500.00 |
38000 bid increased to 40000 (minimum per SP's)
25000 bid increased to 40000 (minimum per SP's)