BID 2024-103 Clarifying Questions 3.pdf
PDF 155 KB Posted
- Attached to
- BID# 2024-103 Monroe Street Improvements
- Solicitation number
- S-C01010-00011990
- Issued by
- Benton County, Mission CDP, Oregon
About this file
This document is a response to clarifying questions submitted by interested firms for Invitation to Bid #2024-103 SE Monroe Street Improvements, which is a project by the City of Monroe Public Works Department in Benton County, Oregon. The project involves 1.2 miles of roadway reconstruction, sidewalk installation, and landscaping upgrades along Monroe Street, with a 12-month timeline. A mandatory pre-bid conference will be held on November 15, 2024, and bids are due on December 4, 2024, with the contract to be awarded by December 18, 2024.
The response to the clarifying questions provides details on the electrical work, use of horizontal directional drilling, work hours, and road closure requirements. There are no set-asides or preferences identified, and the contract is open to any qualified bidder. The project is funded through state and local sources with a total budget of $5.2 million, and the contract term is 12 months with an option to renew for an additional 12 months.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BID 2024-103 Monroe Street Improvements Final.pdf | ||
| Monroe Bid Tabs.xlsx | XLSX spreadsheet | |
| RFB Part 3 Bid Submital Pricing Form.xlsx | XLSX spreadsheet | |
| BID 2024-103 Clarifying Questions 4.pdf | ||
| BID 2024-103 Clarifying Questions 2.pdf | ||
| BID 2024-103 Clarifying Questions1.pdf | ||
| Addendum No 1.pdf | ||
| 2024-103 Notice of Intent to Award.pdf | ||
| BID 2024-103 Clarifying Questions 5.pdf | ||
| BID 2024-103 Submittal Sheet Apparent Low.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INVITATION TO BID #2024-103
SE Monroe Street Improvements (“BID”)
RESPONSE TO CLARIFYING QUESTIONS #3
November 13, 2024
Note that these are questions submitted by interested firms to the above referenced solicitation.
The below answers are for clarification purposes only and in no way alter or amend the BID as published.
1. The intersection of SE Monroe and SE Linwood will have electrical work including the wiring, Pedestal, J-boxes ect. - outside of this intersection, the scope shown in the plans for electrical includes trenching, conduit, junction boxes and Pull tape - please confirm there are no conductors outside of the intersection mentioned above. Assumed PGE will be pulling all wire and installing all light poles.
Answer: Electrical work required at Linwood Ave intersection is for installation of RRFB. Electrical work required for new street lights shown on sheets 13.4 and 13.5.
PGE to pull wires and install lighting fixture on contractor installed foundation for new street lights. All other street lights in project limits will be installed by PGE on wood poles. Refer to Sheet 13.0 General Notes for explanation of PGE work vs Contractor work as well as Special Provisions 00970.
2. HDD is noted on Sheet 13.4 pointing to electrical conduit and is not in the Legend - what does "HDD" denote?
Answer: HDD denotes “Install Conduit by Horizontal Directional Drilling”.
3. Per the special provisions 00220.40E work times end at 8:00PM, can local traffic be ran on aggregate until the following morning?
Answer: In work areas not part of an approved road closure, temporary asphalt (cold or hot mix) will be in place overnight in all locations that are not subject to local access only.
4. Section (5) - if a closure is applied for - can it extend overnight (excluding local traffic)?
Answer: Approved road closures may include non-work hours (nights and weekends).
The road will need to remain traversable for local and emergency traffic (i.e. trenches must be filled or plated), but will not require asphalt resurfacing during the closure.
Note, the Monroe West road closure identified in 00220.40(e)(5), bullet 3, will not be allowed concurrently with the 60-day roundabout closure described in 00220.40(e)(5), bullet 5 as Monroe West is part of the detour route for the roundabout closure.
End of Clarifying Questions #3