This document provides instructions for preparing DD Form 1354 to transfer military real property. Key details include: DD Form 1354 is used to document the transfer of new construction, existing facilities, or capital improvements from a contractor to the Directorate of Public Works at Fort Knox, Kentucky. Specific items to be addressed on the form are outlined, such as addresses, project numbers, real property numbers, facility numbers, construction codes, quantities, costs, funding sources, remarks, deficiencies, and total project value. Relevant construction items that could be listed include HVAC systems, fire protection and sprinkler systems, electrical and utility infrastructure, paving, structures, equipment, and fixtures.
View the file
Other versions and copies of DD Form 1354
Show all 20
Who attaches DD Form 1354
| State | Files |
|---|---|
| Michigan | 3 |
Other files
Show 40 more
Latest 50 of 51 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUGGESTED INSTRUCTIONS FOR PREPARING DD
FORM 1354 (TRANSFER AND ACCEPTANCE OF
MILITARY REAL PROPERTY)
1. The page number and the total number of pages comprising each transfer shall be shown in the space provided at the top right-hand part of the form.
2. When two or more pages are required, Items 27 through 28 shall be completed only on the final page. In such cases, the bottom portion of the form shall be left blank, except the final page, at the line above
Items 27 and 28.
ITEM 1 – Use address given on template in the attachment.
ITEM 2 – Fill in date.
ITEM 3- DPW’s DA4283 number, given by ESD Engineer or Architect.
ITEM 4 – Leave Blank
ITEM 5 - Use address given on template in the attachment.
ITEM 6 – Use code and info given on template in the attachment.
ITEM 7 – Use the individual contractor task order assigned.
ITEM 7a- Date of final inspection.
ITEM 8a/b/c – Insert an “X” in the appropriate box of block (A) to indicate whether the transfer involves new construction, existing facilities or capital improvements to existing facilities. If the “other” category is used, explain in remarks, Item 31. Additionally, insert an “X” in the appropriate box of block (B) to indicate whether transfer is being made at time of beneficial occupancy, physical completion or financial completion (with respect to new construction). Block (C) insert an “X” indicating type of submission.
ITEM 9 – Insert numbers starting 1-1000 in numerical sequence for each item.
ITEM 10 – Number existing on facility or new number given by DPW
ITEM 10b – Number assigned by DPW Real Properties
ITEM 11 – Code Assigned by contractor from DA Pam 415-28
ITEM 12 – Code chosen by contractor, could be adjusted by DPW Real Properties on final. Code comes from DA
Pam 415-28.
ITEM 13 – Type – enter type of construction; i.e., “P” for permanent, “S” for semi-permanent. “T” is no longer an option.
ITEM 14 – Leave blank.
ITEM 15/17 – Come from DA Pam 415-28, utilize what is shown under CATCODE chosen.
ITEM 16/18 – Enter the quantity appropriate with construction standard calculations.
ITEM 19 – Each single entry will be identified as cost associated with this items total quantity.
ITEM 20 – 21: Funding and interest codes will be entered as shown in form given in attachment.
ITEM 23 – written remarks for item installed.
ITEM 24/25 - fill in as noted on form given on attachment
ITEM 26 - To be completed by DPW Real Properties.
ITEM 27 – Deficiencies that will be fixed after BOD.
ITEM 28 – Put total value of project, including modifications in this block.
Suggested data to be collected for items 9-23. This is not all inclusive but a good starting point.
Heating, ventilation & air conditioning system, fire protection system (fire alarm sys), Automatic sprinkler system, Foam fire sprinkler system, Fire Hydrants, Aboveground-Underground electrical system-include meter, service lines, electrical transformer, pad for transformer, natural gas line to building-include meter, underground telephone, sanitary sewer system, grease interceptor, storm sewer system, domestic water system, landscape irrigation system, dumpster enclosure pad, dumpster enclosure fencing, paving (non-organization vehicle parking), bridges, dams, concrete/asphalt/gravel, total asphalt paving, total concrete paving, concrete walks, slabs & pads, concrete curbs & gutters, exterior site lighting-poles, landscaping, gasoline dispensing systems, underground storage tanks, chain link fencing (fence or walls), mechanical systems, exhaust fans, supply fans, chiller, boiler, heat pump, rooftop a/c units, dock levelers, dock shelters, electrical distribution panels / light fixtures, water heater, water closet, water closet, urinal, lavatory, floor sinks, floor drains, mop sink, roof drains, geo-thermal, airfield/range data and others as noted in DA PAM 415-28.