ATT_00a_Seed_Project_Specifications_21_Jul_2020.pdf

PDF 1 MB Posted

Attached to
Fort Knox, Ky Consolidated Construction Multiple Award Task Order Contract (MATOC)/Job Order Contract (JOC)
Solicitation number
W9124D20R0034
Issued by

About this file

This document is a pre-solicitation notice for a combined Job Order Contract and Multiple Award Task Order Contract to be awarded by the Mission and Installation Contracting Command Fort Knox in support of the Directorate of Public Works at Fort Knox, Kentucky. The ID/IQ contract will provide for maintenance, repair, and minor construction requirements and is expected to be solicited on June 22, 2020. Offerors will be able to compete for both task orders and job orders for work such as building, structure, and real property maintenance and construction at Fort Knox.

View the file

Other files

File Type Posted
W9124D20R0034_Amendment_0002.pdf PDF
ATT_00c_Seed_Project_GD_Highway_KY20200038_8-14-20_Amdt_0002.pdf PDF
ATT_00b_Seed_Project_Drawings_Stithton_Traffic_Circle_Rev_8-18-20_Amdt_0002.pdf PDF
ATT_12_JOC_Bid_Form_Templates.pdf PDF
ATT_00_DPW_Construction_JOC-MATOC_SOW_Rev_8-18-20_ Amdt_0002.pdf PDF
ATT_05_FK_EnvironmentaL_Handbook_2020_Edition.pdf PDF
ATT_Pre-Proposal Conference-Site_Visit_Attendees.pdf PDF
ATT_05a_Environmental_Contract_Language.pdf PDF
ATT_00b_ Seed_Project_Drawings_Stithton_Traffic_Circle_Rev.Amdt_0001.pdf PDF
W9124D20R0034_Amendment_0001.pdf PDF
ATT_00a_Seed_Project_Specifications_Rev.Amdt_0001.pdf PDF
ATT_02a_Division_11_Equipment.pdf PDF
ATT_02d_Fort_Knox_Sprinkler_Systems_Initial_Acceptance_Test_Fm_9 Jul_2009.pdf PDF
ATT_02a_Division_01_General_Requirements.pdf PDF
ATT_11_Performance_Assessment_Questionnaire.pdf PDF
ATT_02a_Division_13_Special_Construction.pdf PDF
ATT_06_Contractor_Row_Map.pdf PDF
ATT_02a_Division_09_Finishes.pdf PDF
ATT_02a_Table_of_Contents.pdf PDF
ATT_00b_ Seed_Project_Drawings__Stithton_Traffic_Circle.pdf PDF
ATT_02a_Division_08_Doors_and_Windows.pdf PDF
W9124D20R0034_Consolidated_JOC_MATOC.pdf PDF
ATT_02a_Division_32_Exterior_Improvements.pdf PDF
ATT_01_JOC_Guide_2003_Version.pdf PDF
ATT_03_JOC_Software_Specifications.pdf PDF
ATT_00_DPW_Construction_JOC-MATOC_SOW.pdf PDF
ATT_00c_Seed_Project_GD_KY20200038.pdf PDF
ATT_04b_Safety_Plan_Checklist_IAW_USACE_EM_385_1_Appendix_A.pdf PDF
ATT_02c_FKFD_Fire_Alarm_Fire_Suppression_Check_List.pdf PDF
ATT_02a_Division_23_HVAC.pdf PDF
ATT_02a_Division_02_Existing_Conditions.pdf PDF
ATT_02a_Division_26_Electrical.pdf PDF
ATT_02a_Division_12_Furnishings.pdf PDF
ATT_02a_Division_10_Specialties.pdf PDF
ATT_02a_Division_31_Earthwork.pdf PDF
ATT_02a_Division_04_Masonry.pdf PDF
ATT_02a_Division_05_Metals.pdf PDF
ATT_02a_Division_03_Concrete.pdf PDF
ATT_07_Sign_Template.pdf PDF
ATT_02a_Division_22_Plumbing.pdf PDF
ATT_09a_Instructions_for_DD_FORM_1354.pdf PDF
ATT_10_FT_Knox_Locates_Revised_25_Mar_2019.pdf PDF
ATT_02a_Division_14_Conveying_Systems.pdf PDF
ATT_04a_EM385_1_1_APP_AFINAL.pdf PDF
ATT_02a_Divisioin_00_Procurement_and_Contracting_Requirements.pdf PDF
ATT_02a_Division_06_Woods_and_Plastics.pdf PDF
ATT_02a_Division_33_Utilities.pdf PDF
ATT_02b_Fort_Knox_Fire_Department_Requirements_5_30_19.pdf PDF
ATT_09b_DD1354_Template_May_2014.pdf PDF
ATT_08_Fort_Knox_CADD_Contract_Requirements_(25_Mar_2019)_V1_1.pdf PDF
Show 40 more

Latest 50 of 51 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT SPECIFICATION

Stithton Circle Pavement & Drainage Repair and Traffic Pattern Change

Ft. Knox, Kentucky

Prepared By:

Directorate of Public Works

Engineering & Services Division

Bldg. 1110

125 6th Avenue

Ft. Knox, Kentucky 40121

6 May 2020

1 Table of Contents

TABLE OF CONTENTS

DIVISION 00 – PROCUREMENT & CONTRACTING REQUIREMENTS

00100 Instructions to Bidders

00110 Bid Form

00115 List of Drawings

00211 Phasing & Project Description

00251 Pre-Bid, Pre-Construction, and Pre-Installation Meetings

00311 Preliminary Schedule

00312 Existing Conditions Information

DIVISION 1 - GENERAL REQUIREMENTS

01041 Coordination

01200 Project Meetings

01300 Submittals

01310 CPM Schedules

01700 Project Closeout

01720 Project Record Documents

DIVISION 3 - CONCRETE

03300 Cast in Place Concrete

DIVISION 31- EARTHWORK

31050 Demolition and Removal

31110 Site Clearing

31200 Clearing, Grading and Excavation

31210 Earth Moving

31240 Dewatering

DIVISION 32- EXTERIOR IMPROVEMENTS

32120 Crushed Stone

32121 Asphalt Paving

32131 Concrete Paving

32174 Pavement Markings

32222 Subgrade Preparation for Roads, Drives, and Parking Areas

32920 Turf & Grasses

DIVISION 33- UTILITIES

33050 Common Work Results for Utilities

33410 Storm Utility Drainage Piping

ATTACHMENTS:

Attachment No. 1: Scope of Work

END OF TABLE OF CONTENTS

1Section 00100- Instructions to Bidders

SECTION 00100- INSTRUCTION TO BIDDERS

1. Before Starting Construction:

a. Contractor’s Review of Contract Documents: Before undertaking each part of the Work, Contractor shall carefully study and compare the Contract Documents and check and verify pertinent figures therein and all applicable field measurements. Contractor will promptly report in writing to the Project Manager any conflict, error, ambiguity, or discrepancy which the Contractor may discover and shall obtain a written interpretation or clarification from the Project Manager before proceeding with any Work affected thereby.

b. Preliminary Schedule: Within ten calendar days after the Effective Date of the Delivery Order, Contractor will submit to the assigned ESD Inspector for its timely review:

1. A preliminary progress schedule indicating times for starting and completing the various stages of the Work, including Milestones specified in the Contract Documents.

2. A preliminary schedule of values for all of the Work which includes quantities and prices of items which when added together equal the Delivery Order Price and subdivides the Work into component parts in sufficient detail to serve as a basis for progress payments during the performance of the Work. Such prices will include an appropriate amount of overhead and profit applicable to each item of the Work.

2. Initial Acceptance of Schedules:

a. Unless otherwise provided in the Contract Documents, at least ten calendar days before submission of the first Application of Payment a conference attended by the Contractor, Project Manager and ESD Inspector, and others appropriate will be held to review acceptability of the Schedules. Contractor will have an additional ten days to make corrections and adjustments to the Schedules and resubmit the Schedules. No progress payment will be approved by the ESD Inspector until acceptable schedules are submitted to the Inspector.

b. Such acceptance of the Schedules will not impose on the ESD Inspector responsibility for the progress schedule, for sequencing, scheduling, or progress of the Work nor interface with or relieve Contractor from Contractor’s full responsibility therefor.

c. Contractor’s schedule of values will be acceptable to the ESD Inspector as to form and substance if it provides a reasonable allocation of the Delivery Order Price to component parts of the Work.

3. Schedule of Values:

a. The schedule of values established in paragraph 2 will serve as a basis for the progress payments and will be incorporated into a form of Application for Payment acceptable to the ESD Inspector. Progress payments on account of Unit Price Work will be based on the number of units completed.

2Section 00100- Instructions to Bidders

Section 00100- Instructions to Bidders Cont.

4. Progress Payments:

a. Progress payments will be made in accordance with the approved Schedule of Values as established in paragraph 2, with a retainage of 20 percent of the assigned value of the assigned Work.

b. If payment is requested on the basis of material and equipment not incorporated in the Work but delivered and suitably stored at the Site, or at another location agreed to in writing, the Application for Payment shall also be accompanied by a bill of sale, invoice, or other documentation warranting that the material and equipment are free and clear of all Liens and evidence that the materials and equipment are covered by appropriate property insurance or other arrangements to protect the Government’s interest therein, all of which must be satisfactory to the ESD Inspector.

5. Liquidated Damages:

a. The parties recognize that Government will suffer financial loss if the Work is not substantially completed with the Contract Time. They also recognize the delays, expense, and difficulty to both parties involved in proving or contesting the amounts of those losses. Instead of proof of those amounts, it is agreed that Contractor shall be liable for and will pay Government the following amounts under Occupant’s Damages, and DPW/ESD’s (Engineering Services Division) Damages, all as liquidated damages, and not as a penalty:

General Construction:

Occupant’s Damages: $ 0/day DPW/ESD Damages: $ 217/day Total Liquidated Damages: $ 217/day

b. Liquidated Damages will be assessed for the above listed amount(s) for each and every day the Work remains incomplete after the completion date.

c. Completion for the above listed item(s) will be defined as completely installed including all associated appurtenances, tested and ready for the intended service.

6. Daily Reports:

a. Contractor will submit a “Daily Report” to the Project Inspector each work day during the contract execution.

b. This daily report will contain names of Contractor’s Representative and Sub- Contractor’s names on site, site conditions, weather, etc. for each day of Work. A copy of a Daily Report format will be handed out by Inspections at the Pre-Construction meeting.

3Section 00100- Instructions to Bidders

Section 00100- Instructions to Bidders Cont.

7. Environmental Issues:

a. The Contractor will contact the ESD Inspector and coordinate with

DPW/EMD (Environmental Management Division) regarding requirements for separation of materials for trash, recycling, and erosion control, etc.

End of Section- 00100

1 Section 00110- Bid Form

SECTION 00110- Bid Form

FROM: BIDDER _______________________________________________

ADDRESS _______________________________________________

DATE OF BID: _______________________________________, 20_____

The purpose of the Bid Form is to work in conjunction with formal Contract Documents the Contractor may enter into with Mission and Installation Contracting Command, MICC, Fort Knox, KY.

The Bidder hereby signifies that it is _________ (his/their) intention and purpose to enter into a formal Contract with Mission and Installation Contracting Command, MICC, Fort

Knox, KY, to furnish all labor; materials, tools, equipment, apparatus, supplies, etc., required and to do all the Work necessary for and because of the construction, erection, and/or installation of the proposed

Stithton Circle Pavement & Drainage Repair and Traffic Pattern Change work in accordance with the Contract Documents.

Base Bid – Stithton Circle Pavement & Drainage Repair and Traffic Pattern Change:

________________________________________________________for the lump sum of

_________________________________________________________________ Dollars

Bid Option: Remove the remaining areas of asphalt and concrete that have not been removed in the base bid. Check three areas to determine the amount of existing stone

(minimum of 10” compacted D.G.A. is required). If necessary excavate additional material and then place the necessary compacted D.G.A. to meet the required 10”. Place 3” asphalt base and 2” asphalt surface.

We further agree to complete the Work in 120 calendar days after receipt of Notice to

Proceed.

2 Section 00110- Bid Form

NAME OF SIGNER: ______________________________________________________

(Please Print or Type)

TITLE OF SIGNER: ______________________________________________________

SIGNITURE: ____________________________________________________________

DATE: _________________________________________________________________

End of Section- 00110

1 Section 00115- List of Drawings

SECTION 00115- LIST OF DRAWINGS

Cover Sheet: Abbreviations, Sheet Index, General Notes, Drawing Symbols, Material

Legend

Sheet 1: Site Layout Plan with Imagery

End of Section- 00115

1 Section 00211- Phasing and Project Description

SECTION 00211- PHASING & PROJECT DESCRIPTION

General: All work associated with project will be performed in accordance with all applicable Kentucky State Codes and Regulations, and latest edition of Fort Knox and

UFC Standards. Also, workmanship and materials will conform to latest edition of

Kentucky Transportation Cabinet Standard Specifications for Road and Bridge

Construction.

Scope of Work is as Follows:

Stithton Circle Repair & Traffic Pattern Change

Project involves the roadway repair and traffic pattern change of Stithton Circle. Major design features are as follows:

Remove existing concrete sidewalk and curbs and construct new sidewalks and curb and gutter as shown.

Remove existing concrete curb, asphalt and concrete and construct new concrete header curb around the center island. Remove the tank pads and construct new pads as shown. Raise landscape area, pole and monument and regrade area to drain.

Remove existing asphalt and concrete and construct mountable concrete islands as shown.

Concrete test cylinders are required per the specifications.

Mill existing asphalt or remove asphalt and concrete, then place asphalt base/wedging and asphalt surface or construct road according to the pavement design.

Paint all asphalt surfaces as required.

All work to be completed according to all applicable codes and Fort Knox standards

1Section 00251- Pre-Bid and Pre-Construction Meetings

SECTION 00251- PRE-BID, PRE-CONSTRUCTION, AND PRE-INSTALLATION

MEETINGS

1. There will be a Pre-Bid “Discovery” Meeting during the Bidding Phase.

Date to be determined by Contracting Officer

a. There will be a Pre-Construction Meeting, Date, Time and Location to be determined by Contracting Officer after Contract award. In addition to the Initial Pre-Construction meeting, there will be a “Pre-Installation” conference to include, but not limited to the Contractor, Applicable Sub-Contractor, and DPW/ESD PM in attendance before proceeding with the following:

b. Demolition and utilization of existing pavement for road base and backfill, if applicable.

c. Installation of storm sewer and associated drainage structures.

End of Section- 00251

1 Section 00311- Preliminary Schedule

SECTION 00311- PRELIMINARY SCHEDULE

Anticipate that Contractor will receive Contract for Stithton Circle Pavement & Drainage

Repair and Traffic Pattern Change no later than 15 June 2020. Anticipated that Contractor will complete all work within 120 calendar days. Contractor must schedule work hours as necessary to meet the required completion date.

End of Section- 00311

1 Section 00312- Existing Conditions Information

SECTION 00312- EXISTING CONDITIONS INFORMATION

Existing concrete is anticipated under the asphalt pavement and is likely 6-8” thick with little to no rock under it. Contractor shall submit a traffic plan along with schedule on how all work will be completed. The contractor shall coordinate with DPW during construction of all changes to the schedule, this is a heavily traveled area and the movement of traffic during construction is essential. Contractor will provide traffic control devices, signage and flag persons as necessary to meet all KYTC safety regulations for traffic control in construction areas throughout construction.

End of Section- 00312

1Section 01041- Coordination

SECTION 01041- COORDINATION

PART 1 – GENERAL

A. Summary:

1. This Section includes administrative and procedural requirements necessary for coordinating construction operations on the Project to be fulfilled by the Contractor including, but not limited to:

a. General project coordination procedures.

b. Conservation.

c. Coordination drawings.

d. Administrative and supervisory personnel.

e. Cleaning and protection.

B. Related Sections:

1. Division 1, Section “Project Meetings”.

2. Division 1, Section, “Submittals”.

3. Division 1, Section, “Project Record Documents”.

C. Coordination:

1. Coordination: The Contractor will coordinate activities of subcontractors and other entities involved to assure efficient and orderly installation of each part of the Work. The Contractor will coordinate operations included under different Sections of the Specifications that depend on each other for proper installation, connection, and operation.

a. The Contractor will schedule construction operations in the sequence required to maintain the CPM schedule and to obtain the best results where installation of one part of the Work depends on installation of other components, before or after its own installation.

b. Where availability of space is limited, the Contractor will coordinate installation of different components with other subcontractors to assure maximum accessibility for required maintenance, service, and repair.

c. The Contractor will make adequate provisions to accommodate items scheduled for later installation.

2. Where necessary, prepare memoranda for distribution to each party involved, outlining special procedures required for coordination. Include such items as required notices, reports, and attendance at meetings.

a. Prepare similar memoranda for the Government and separate contractors where coordination of their Work is required.

3. Administrative Procedures: The Contractor will coordinate scheduling and timing of required administrative procedures with other construction activities and activities of other subcontractors to avoid conflicts and assure orderly progress of the Work. Such administrative activities include, but not limited to, the following:

a. Preparation of schedules.

b. Installation and removal of temporary facilities.

2Section 01041- Coordination

Section 01041- Coordination Cont.

c. Delivery and processing of submittals.

d. Progress meetings.

e. Project closeout activities.

4. Conservation: The Contractor will coordinate construction activities to assure that operations are carried out with consideration given to conservation of energy, water, and materials.

D. Submittals:

1. Coordination Drawings: Prepare coordination drawings or shop drawings where directed by the contract documents or where careful coordination is needed for the installation of products and materials fabricated by separate entities. Prepare coordination drawings where limited space availability necessitates maximum utilization of spec for efficient installation of different components.

a. Show the relationship of components shown on separate shop drawings.

b. Indicate required installation sequence.

c. Comply with requirements contained in Section “Submittals”.

d. Preparation Responsibility: Preparation of coordination drawings is the responsibility of the Contractor.

1. The Contractor will coordinate the preparation of and provide continual maintenance on a submittal schedule showing all the submittal requirements for all subcontractors. This schedule will be such as to allow for review and approval of each piece of equipment sufficiently in advance of other dependent equipment designs.

2. The Contractor will provide copies of the submittal drawings the PM and MICC for review in accordance with the schedule.

3. Where the Drawings reflect substantial participation by more than one subcontractor or equipment supplier, the Contractor will coordinate preparation of coordination drawings.

2. Staff Names: Within 15 days of commencement of construction operations, the Contractor will submit a list of principal staff assignments, including the Contractor’s and all subcontractor’s superintendents and other personnel in attendance at the Project Site. Identify individuals and their duties and responsibilities.

a. The Contractor will post copies in the field meeting room, temporary field office, to distribute to MICC and ESD Inspector.

4. Administrative and Supervisory Personnel:

1. General: In addition to its Project superintendent, the Contractor will provide other administrative and supervisory personnel, as required for proper performance of the Work. Include special personnel required for coordination of operations with other prime contractors.

3Section 01041- Coordination

Section 01045- Coordination Cont.

2. The Contractor will provide a project coordinator, experienced in administration and supervision of street construction.

a. Construction activities requiring coordination between subcontractors by the Contractor include, but are not limited to, the following:

1. Scheduling and sequencing the Work.

2. Sharing access to the Work.

3. Installations.

4. Protection of each other’s work.

5. Cutting and patching.

6. Selections for compatibility.

7. Preparation of coordination drawings.

8. Inspections and tests.

9. Temporary services and facilities.

10. Tolerances.

PART 2 – PRODUCTS (Not Applicable)

PART 3 – EXECUTION

A. General Coordination Provisions:

1. Inspection of Conditions: Do not proceed with the Work until unsatisfactory conditions have been corrected in a manner acceptable to the COR.

B. Cleaning and Protection:

1. Limiting Exposures: The Contractor will supervise its construction operations to assure that no part of the construction, completed or in progress, is subject to harmful, dangerous, damaging, or otherwise deleterious exposure during the construction period. Where applicable, such exposures include, but not limited to, the following:

a. Air contamination or pollution.

b. Water or ice.

c. Heavy traffic.

d. Soiling, staining, or corrosion.

e. Unusual wear or other misuse.

f. Destructive testing.

g. Misalignment.

h. Excessive weathering.

i. Unprotected storage.

j. Improper shipping or handing.

k. Theft.

l. Vandalism.

End of Section- 01041

1Section 01200- Project Meetings

SECTION 01200- PROJECT MEETINGS

A. Pre-Bid Conference:

1. A pre-bid conference will be held at the time and place specified in the

Invitation to Bid.

2. The Government will be available to discuss the Project and answer pertinent questions. No oral interpretations will be made as to the meaning of the Contract Documents. Interpretation, if deemed necessary by the ESD PM, will be in the form of an Addendum to the Contract Documents.

B. Preconstruction Conference:

1. A Preconstruction Conference will be held and administered by MICC no later than 15 days after the date of Notice to Proceed, but before starting Work at the Project Site.

2. Attendance:

a. MICC

b. ESD PM and Inspector

c. Contractor

d. Major subcontractors

e. Safety representative(s)

f. NEC (if applicable)

3. Minimum Agenda:

a. Tentative construction schedule

b. Critical work sequencing

c. Designation of responsible personnel

d. Procedures and processing of Requests for Clarification (RFCs), Requests for Proposals (RFPs), Work Change Directives (WCDs), and Change Orders (Cos)

e. Adequacy of distribution of Contract Documents

f. Procedures for submission of shop drawings and samples

g. Procedures for maintaining record documents

h. Use of site and Governments requirements

i. Major equipment deliveries and priorities

j. Safety and first aid procedures

k. Housekeeping procedures

l. Processing of Payment Requirements

m. Community Relations

n. Waste Management

2Section 01200- Project Meetings

Section 01200- Project Meetings Cont.

C. Progress Meetings:

1. Progress meetings will be held monthly, at a minimum, on Site during the performance of the Work of the Contract. The first meeting will be within 30 days after the Preconstruction Conference and within 30 days after the date of the Notice to Proceed. Additional meetings may be called as progress of Work dictates.

2. The Contractor will preside at the meetings and record minutes of proceedings and decisions. The Contractor will distribute copies of minutes to participants.

3. Attendance:

a. MICC

b. ESD PM and Inspector

c. Contractor

d. Subcontractors, only with Contractor’s approval or request, as pertinent to the agenda.

4. Minimum Agenda:

a. Review progress (CPM Schedule) of Work since last meeting.

b. Review proposed 30-60 day construction schedule.

c. Review problems that impede the construction schedule.

d. Contractor presentation of corrective measures and procedures to regain planned schedule.

e. Review status of open contract change items (RFPs, WCDs, and COs).

f. Review status of overdue and/or outstanding submittals.

g. Review coordination issues between Contractor Work and Government operations.

D. Weekly Coordination Meetings:

1. Meetings will be scheduled with the first meeting held after the date of the

Contractor’s Notice to Proceed is issued but before the Contractor initiating his mobilization to the Project Site.

2. The location of the meetings will be on Site.

3. Attendance:

a. ESD Inspector

b. Contractor

c. Subcontractors, only with Contractor’s approval or request, as pertinent to the agenda.

4. Minimum Agenda:

a. Short term schedule status (2 week look ahead).

b. Coordination requirements.

c. Equipment delivery schedule.

d. Field observations, problems, and conflicts.

e. Status of pending issues.

f. Inspection issues.

3Section 01200- Project Meetings

Section 01200- Project Meetings Cont.

5. The Contractor will attend the weekly meetings and will be fully prepared to discuss pertinent topics. The Contractor will have studied the meeting agenda items and the previous meeting minutes before the scheduled meeting. The Contractor will submit to the ESD Inspector his two-week look ahead schedule, at least 24 hours before the weekly coordination meeting.

1. Staff Names: Within 15 days of commencement of construction operations, the Contractor will submit a list of principal staff assignments, including the Contractor’s and all subcontractor’s superintendents and other personnel in attendance at the Project Site. Identify individuals and their duties and responsibilities.

a. The Contractor will post copies in the field meeting room, temporary field office, to deliver to MICC and ESD Inspector.

PART 3 – EXECUTION (Not Applicable)

End of Section- 01200

1Section 01300- Submittals

SECTION 01300- SUBMITTALS

A. Work Included:

1. Submit for review such shop drawings, product data, working drawings, layout and installation drawings, operation and maintenance manuals, certifications, test reports, samples, and test procedures (herein referenced in this Section as “Submittals”) on materials and equipment, as are required for the proper control of the Work and as specified elsewhere in the Specifications and in the Drawings.

B. Submittal Requirements:

1. The MICC will provide Contractor a standard “Submittal Transmission” form for the transmission of each submittal.

2. At the sole discretion of the ESD Project Manager, a determination of paper or electronic submittals will be used for each individual submittal.

3. Paper Submittals: Submit three (3) sets of all submittals directly to the MICC office. MICC will return one (1) set of marked-up submittals with appropriate review comments to Contractor.

4. Identify each item submitted using applicable specification section number and paragraph reference or drawing or detail reference.

5. Submission by Contractor of any submittal items will be deemed to confer their approval of such submittal, as being in conformance with the Contract Documents, unless an exception is specifically noted on the Submittal Transmittal.

6. A 10-character submittal identification numbering system will be used:

a. The first character, known as the Submittal Package number, will be an alpha character as follows:

1. D-Shop Drawings and other data.

2. O-Operation and Maintenance Manual.

b. The next five digits will be the applicable specification section number.

c. The next three digits will be the numbers 001-999 to sequentially number each separate item or drawing submitted under each specification section.

d. The last character will be a letter, A-Z, indicating the submission, or resubmission of the same item, i.e., A-1st submission, B-2nd submission, c- 3rd submission, etc. A typical submittal number would be as follows:

D-15260-008-B

D: Shop Drawing and other data 07210: Specification Section for Building Insulation 008: The eight sequential submittal under this specification Section.

B: The second submission (first resubmission) of that particular Shop Drawing.

2Section 01300- Submittals

Section 01300- Submittals Cont.

e. Note: The grouping of data under a general specification Section rather than the specific Section in which it is referenced is prohibited. (Such as including all electrical submittals in one package with a common submittal number D-26000-001-A). If data from more than one Section is submitted simultaneously, one submittal number will be assigned for each relevant specification Section.

7. If submittals show variations from Contract requirements, because of standard shop practice, or for other reasons, such variations will be described and justified on the Submittal Transmittal. If acceptable, proper adjustment in the Contract will be implemented where appropriate. If Contractor fails to describe such variations, he will not be relieved of the responsibility for executing the Work in accordance with the Contract, even though such submission has been reviewed.

8. Do not use any color other than “black” in marking submittals.

C. Contractor’s Responsibility:

1. Contractor will review, approve and submit, with reasonable promptness and in such sequence as to cause no delay in the Work, or in the work of ESD’s customer, all submittals required by the Contract Documents.

2. Contractor’s review of submittals prior to submission will verify the following:

a. Field Measurements.

b. Field Construction Criteria.

c. Catalog Numbers and Similar Data, if applicable.

d. Conformance with Specifications.

3. In accordance with the requirements in Specification Section 01310, “CPM”, furnish a Submittal Schedule fixing the respective dates for the delivery of all submittals, the beginning of manufacture, testing and installation of materials, suppliers and equipment. This schedule will indicated those that are critical to the progress schedule.

4. Do not begin any of the Work covered by a submittal that has been returned for correction until a revision or correction thereof has been reviewed and approved.

5. Deliver all submittals sufficiently in advance of construction requirements to provide no less than twenty (20) working days for checking and appropriate action.

6. Be responsible for, and bear all cost of damages, which may result from the ordering of any material, or from proceeding with any part of Work, before the review of the necessary submittals.

7. All submittals produced by subcontractors will be sent to Contractor for preliminary checking. Contractor will verify measurements, size of members, materials and details to verify conformance with the intent of the Contract Documents. Submittals found to be inaccurate or otherwise in error, will be returned to subcontractors for correction before submission to the MICC.

Contractor will be responsible for their submission at the proper time to prevent delays in delivery of materials.

3Section 01300- Submittals

8. Prepare and transmit each submittal sufficiently in advance of performing the related Work, or within the time specified in the individual Work Sections of the Specifications. Submittals will be delivered so that the Work will not be delayed by processing times including disapproval and resubmittal (if required), coordination with other submittals, testing, purchasing, fabrication, delivery and similar sequenced activities. No extension of time will be authorized due to failure to transmit submittals sufficiently in advance of the Work.

D. Review of Submittals:

1. The review of submittals will cover only general conformity to the Contract Documents. Contractor remains responsible for details and accuracy, for coordinating the Work with other associated work and trades, for selecting fabrication processes, for techniques of assembly and for performing work in a safe manner.

2. Review of submittals will be general, and will not be construed to:

a. Permit any departure from the Contract Documents.

b. Relieve Contractor of responsibility for any errors, including details, dimensions, quantities, and details of the material, equipment, device, or item shown.

3. If submittals describe variations and show a departure from the Contract Requirements, which are determined to be in the interest of the Government and to be so minor as not to involve a modification in the Contract Price or Contract Time, the Submittals may be returned to Contractor without noting an exception.

4. Submittals will be annotated by ESD Project Manager in one of the following ways:

APP Approved No exceptions are taken AAN Approved as Noted Minor corrections are noted and will be made AAN-C Approved as Noted Confirm Minor corrections are noted and will be made and a submittal confirming these corrections is required RAR Revise and Resubmit Major corrections noted and a resubmittal is required REJ Nor approved- Based on the information received, the Rejected submission is not in conformance with the Contract Documents. The deviations from

The Contract Documents are too numerous to list and a completely revised submission of the proposed equipment or material or a submission of other equipment or material is required.

REC Record Copy No review performed- record copy only

4Section 01300- Submittals

5. Resubmittals will be handled in the same manner as the first submittals. On resubmittals, Contractor will direct specific attention, in writing, or on resubmitted Shop Drawings, to revisions other than the corrections requested on previous submissions. Any such revisions, not clearly identified, will be made at the risk of Contractor. Contractor will make any corrections required.

6. If the Contractor considers any correction indicated on the submittal to constitute a change to the Drawings, Specifications, or Scope of Work, Contractor will give written notice.

7. Contractor will carry out the construction in accordance with approved submittals.

8. No partial submittals will be reviewed. ESD Project Manager will return all incomplete submittals to MICC, who will return the submittals to Contractor, and they will not be reviewed until resubmitted.

PART 3 – EXECUTION (Not applicable)

End of Section- 01300

1Section 01310- CPM Schedules

SECTION 01310- CPM SCHEDULES

A. Work Included:

1. This Section specifies requirements and procedures in preparing and updating construction schedules and reports for planning, coordinating, executing, and monitoring the progress of the Work. The construction work will be scheduled using the Critical Path Method (CPM) of network analysis.

B. Form of Schedules:

1. Prepare schedules in the form of critical path method (CPM), as described herein:

a. Provide separate CPM networks (Sub-networks) of activities for each process or facility.

b. Each sub-network will be assigned a code and separate activity numbering series.

c. Interrelationships between sub-networks and any individual activities will be identified.

C. Scheduling Responsibility:

1. The Critical Path Method type construction schedule will be used to monitor job progress and as a means to make monthly payments to Contractor.

Contractor will be responsible for providing all information concerning the sequencing, logic and durations of all activities as well as providing the initial logic network diagram. Once the schedule is accepted, Contractor will be responsible for providing monthly update information on logic, percent complete, actual start and finish dates and duration changes. Contractor will be required to produce the computerized printout of the schedule updates. Copies of the updated schedule will be distributed at the progress meetings.

2. From Contractor’s initial schedule and from information received at the monthly schedule update meetings, computerized and dated tabular schedule reports, or updated network diagrams, or bar charts will be produced by Contractor which will be reviewed by Contractor and ESD Project Manager for accuracy and integrity. It will at all times remain Contractor’s responsibility to schedule and direct his forces in a manner that will allow for the completion of the Work within the contractual period.

3. It should be clearly understood that the initial schedule and all update information must be provided by Contractor and that this information is a representation of the best efforts of Contractor and his subcontractors as to how they envision the work to be accomplished. Similarly, all progress information to be provided by and through Contractor must be an accurate representation of subcontractors or suppliers actual performance. The schedule will at all times remain an accurate reflection of Contractor’s actual or projected sequencing of Work.

2Section 01310- CPM Schedules

Section 01310- CPM Cont.

Once accepted, adherence to the established CPM schedule will be obligatory upon Contractor and his subcontractors for the Work under this Contract. ESD Inspector may require Contractor to revise the schedule if, in his judgement, the schedule does not accurately reflect that actual execution of the Work, or is in violation of any provision of the CPM scheduling specification. Contractor will revise the schedule as often as is necessary during the course of performance of the Work without additional cost to the Government.

D. Progress of the work:

1. The Work will be started on the date indicated in the Notice to Proceed and will be executed with such progress as may be required to prevent delay to other Contractors or to the general completion of the Project. The work will be executed at such times and in or on such parts of the Project, and with such forces, material and equipment, as to assure completion of the Work in the time established by the Contract. Additionally, Contractor will, at times, schedule and direct his Work so that it provides an orderly progression of the Work to completion within the specified Contract Time.

2. Contractor agrees that whenever it becomes apparent from the current monthly CPM Schedule update that delays to the critical path have occurred, and these delays are through no fault of the Government, or Government’s representatives, and hence, that the Contract completion date will not be met, or when so directed by Government, he will take some or all of the following actions at no cost to Government:

a. Increase construction manpower in such quantities and crafts as will substantially eliminate the backlog of Work.

b. Increase the number of working hours per shift; shifts per working day, or days per week; the amount of construction equipment; etc., or any combination of the foregoing to substantially eliminate the backlog of Work.

c. Schedule activities to achieve maximum practical concurrence of accomplishment of activities, and comply with the revised schedule.

d. Contractor will submit for review a written statement of the steps ne intends to take, to remove or arrest the delay to the schedule.

PART 2 – CPM CONSTRUCTION SCHEDULE

A. Network Requirements:

1. The network diagram will show the order and interdependence of activities and the sequence in which the Work is to be accomplished as planned by Contractor.

The basic concept of the network analysis diagram is to show how the start of a given activity is dependent on the completion of preceding activities and its completion restricts the start of succeeding activities. A time scaled precedence format will be followed. The detailed network diagram will be time scaled showing a continuous flow from left to right.

3Section 01310- CPM Schedules

2. The Schedule Activities will be developed into four major groups:

a. Procurement Activities (as applicable).

1. Permits

2. Easements

3. Submittal Items

4. Approval of Submittal Items

5. Fabrication and Delivery (F&D) of Submittal Items

b. Each of the following procurement activities should be tied logically to the correct construction activity in the overall CPM construction schedule.

1. Permit Activities

2. Easement Activities

3. F&D Activities

c. Construction Activities: Construction activities will be physical work activities that describe how the job will be constructed.

d. Testing, Startup, Training, and Closeout: CPM activities for this group will include all work required to satisfy appropriate specification sections and meet the requirements of Substantial and Final Completion.

3. Contractor will break the work into activity duration of one to twenty (1to20) working days each, except for non-construction activities (such as procurement of materials and delivery of equipment) and other activities that may require longer durations. To the extent feasible, activities related to a specific physical area of the Project should be grouped on the network for ease of understanding and simplification. The selection and number of activities will be subject to the review and agreement of Contractor and ESD.

4. Each activity on the network indicated will have the following:

a. A single duration, no longer than 20 days (i.e., the single best estimate of the expected elapsed time, considering the scope of work involved in the activity) expressed in working days. Normal holidays and weather delays will be included. One critical path will be shown for the schedule.

b. An activity identification number will be assigned to each activity. The identification number will be in a format acceptable to ESD.

c. A brief description of the activity will be included. If this description is not definitive, a separate listing of each activity and a descriptive narrative may be required.

d. Each activity will be loaded to include the total estimated budget of the activity.

e. Each activity (except for procurement activities) will be man-hour loaded with the estimated man-hors to be expended on each day.

5. The CPM schedule will include a weather calendar that contains non-working days in addition to weekend and holidays to account for anticipated inclement weather days. The number of anticipated inclement weather days per month will be based on average weather fir the immediate area. The weather calendar will be applied to all activities, which may be affected by inclement weather.

4Section 01310- CPM Schedules

6. Failure to include in the CPM schedule any element of the Work required under the performance of this Contract will not excuse Contractor from completing all the Work required within the applicable completion time, notwithstanding Government’s network review.

7. A CPM schedule with shows a completion of any portion of the Work prior to the Contractual completion date may be accepted but in no event will be acceptable as a basis for a claim for delay against Government by Contractor.

The period time between the Contractor’s baselines accepted CPM schedule’s projected completion dates and the contractual stipulated completion, of any, will be treated as Project Float.

B. Schedule of Values:

1. Each activity on the construction schedule will be assigned a dollar value. Each activity’s assigned cost will consist of labor, equipment, and materials costs, and a pro rata contribution of overhead and profit. The sum of activities costs will be equal to the Total Contract Price. In submitting cost data, each activity represents Contractor’s estimate of the actual costs of performing that activity.

2. The accepted schedule of values will represent a fair, reasonable and equitable dollar cost allocated for each activity on Contractor’s construction schedule.

3. If it is determined that the cost data does not meet the requirements for a balanced bid breakdown in the opinion of ESD, Contractor will present documentation substantiating the cost allocation. Cost allocations will be considered unbalanced if activity on the construction schedule has been assigned a disproportionate allocation of direct costs, overhead and profit.

PART 3 – SCHEDULE SUBMITTALS

A. CPM Schedule Implementation:

1. Within ten (10) calendar days after the Notice to Proceed, Contractor will submit six (6) prints of his proposed CPM network diagram and tabular reports for the first ninety (90) calendar days of the Work. This initial logic diagram will be drawn as described herein and submitted on sheets 24 inches by 36 inches and will include both procurement and construction activities. The schedule will be the subject of the schedule review meeting with the Contractor, Government, Government’s representatives, within two (2) weeks of its submission. Contractor will revise and resubmit the ninety (90) day schedule until it is acceptable.

2. Within thirty (30) days after Notice to Proceed, Contractor will submit six (6) prints of his proposed CPM network diagram and tabular reports for the entire Contract duration and will include both procurement and construction activities.

These tabular reports will be sorted by total float and activity number. They will also contain a predecessor/successor resource loading report, and project calendar. This logic diagram will be drawn as described herein and will be the subject of a schedule review meeting with Contractor, Government, and Government’s representatives with two (2) weeks of its submission.

5Section 01310- CPM Schedules

3. In lieu of submitting network diagrams and report, Contractor may submit

Primavera schedules on discs.

4. If a review of the submitting network diagrams a work plan which will not complete the Work within the time requirements stated in the Contract, it will be the responsibility of Contractor to revise the CPM schedule as required and resubmit it until it is acceptable.

5. Acceptance of the schedule will not constitute a representation by Government that the Work can be completed as shown on the schedule.

B. Submittals:

1. In addition to the above scheduling requirements, Contractor will be required to submit a complete and detailed listing of anticipated submittals during the course of the Contract. Contractor will coordinate his submittals with those of his subcontractors and suppliers and will identify each submittal as specified.

The anticipated submission due date for each submittal must be indicated along with the data on which its return is anticipated. For planning purposes, shop drawings submittals will usually be returned twenty (20) working days after receipt. However, longer durations for review will not be considered a basis for a claim unless the Project critical path is delayed thereby. Durations shown for review will be understood to share available float. Submissions, the review of which is on the critical path, shall be clearly marked in red with words “Critical Path” by Contractor at the time of submission.

2. The Submittal Schedule must be submitted within twenty (20) working days from the Notice to Proceed. The Submittal Schedule will then be accepted or revised as required and Contractor will incorporate the dates and review durations into his CPM Schedule.

C. Schedule Updates:

1. A monthly Schedule Update Meeting will be held one (1) week prior to the progress meeting, at the Project site, to review and update the CPM Schedule.

The Schedule Update Meeting will be attended by ESD Representatives, and Contractor. Actual progress of the previous month will be recorded and scheduling of future work activities will be reviewed. The duration of activities and their logical connections may be revisited as needed. Decisions made at these meetings and agreed to by all parties are binding with the exception that no contractual completion dates or contractual requirements will be modified.

Contractor must provide the following information for each update at a minimum:

a. Actual start and finish dates for all activities.

b. Actual restart dates for all started but incomplete activities and estimated remaining durations.

2. Provide a Monthly Progress Status Report, which provides a narrative explanation of progress identified in the revised construction schedule. The report will indicate the following items:

6Section 01310- CPM Schedules

a. Summarize revisions made to the Construction Schedule since the previous submittal.

b. Work completed during the reporting period.

c. Work anticipated to be started and continued during the next period, including those activities already in progress.

d. Problem areas, anticipated delays, and their impact on the schedule.

e. Corrective action recommended, and its effect.

f. The effect of changes on schedules of other Prime Contractors, if applicable.

g. Updated Tabulation of Contract Time.

h. An evaluation of the overall status of the schedule for the Project.

End of Section- 01310

1Section 01700- Project Closeout

SECTION 01700 – PROJECT CLOSEOUT

project closeout including, but not limited to, the following:

a. Inspection procedures.

b. Project record document submittal.

c. Operation and maintenance submittal.

d. Submittal of warranties.

e. Final cleaning.

f. Training of end Users and Staff.

2. Closeout requirements for specific construction activities are included in the appropriate Sections in Divisions 2 through 33.

B. Substantial Completion:

1. Preliminary Procedures: Before requesting inspection for certification of

Substantial Completion, complete the following. List exceptions in the request.

a. In the Application for Payment that coincides with, or first follows, the date of Substantial Completion is claimed, show 100 percent completion for the portion of the Work claimed as substantially complete.

1. Include supporting documentation for completion as indicated in these

Contract Documents and a statement showing an accounting of changes to the Contract Sum.

2. If 100 percent completion cannot be shown, include a list of incomplete items, the value of incomplete construction, and reasons the Work is not complete.

b. Advise MICC of pending bonds or insurance changeover requirements.

c. Submit specific warranties, workmanship bonds, maintenance agreements, final certificates, and similar releases.

d. Obtain and submit releases enabling the Government unrestricted use of the

Work and access to services and utilities. Include operating certificates, and similar releases.

e. Submit record drawings, maintenance manuals, final project photographs, damage or settlement surveys, property surveys, and similar final record information.

f. Deliver tools, spare parts, extra stock, and similar items.

g. Notify ESD Inspector to request changeover of permanent locks and transit keys. Advise the appropriate Government personnel of changeover in security provisions.

h. Complete startup testing of systems. Discontinue and remove temporary facilities from the Site, along with mockups, construction tools, and similar elements.

i. Complete final cleanup requirements, including touchup painting.

j. Touchup and otherwise repair and restore marred, exposed finishes.

2Section 01700- Project Closeout

Section 01700- Project Closeout Cont.

2. Inspection Procedures: On receipt of a request for inspection, the ESD Inspector will either proceed with inspection or advise the Contractor of unfulfilled requirements. The Inspector will prepare an approval of Substantial Completion following inspection or advise the Contractor of construction that must be completed or corrected before the final approval will be issued.

1. Results of the completed inspection will form the basis of requirements for final acceptance.

C. Final Acceptance:

1. Preliminary Procedures: Before requesting final inspection for certification of final acceptance and final payment, complete the following. List exceptions in the request.

a. Submit the final payment request with revised Schedule of Values.

b. Submit ESD Inspector’s final inspection list of items to be completed or corrected. The copy of the list will state each item has been completed or otherwise resolved for acceptance and will be endorsed and dated by the ESD Inspector.

c. Submit a final liquidated damages settlement statement.

2. Re-Inspection Procedure: The ESD Inspector will re-inspect the Work upon receipt of notice that the Work, including inspection items from earlier inspections, has been completed, except for items whose completion is delayed under circumstances acceptable to the Inspector.

a. Upon completion of the re-inspection, the ESD Inspector will prepare a notification of final acceptance. If the Work is completed, the Inspector will advise the Contractor of Work that is incomplete or of obligations that have not been fulfilled but are required for final acceptance.

b. The ESD Inspector will repeat the inspection when requested. The Contractor is advised that excessive re-inspections are not acceptable.

D. Record Document Submittals:

1. General: Do not use record documents for construction purposes. Protect record documents from deterioration and loss. Store in a secure, fire-resistant location.

Provide access to record documents for the ESD Inspector and PM’s reference during normal working hours.

2. Record Drawings: Maintain a clean, undamaged set of blue or black line whiteprints of Contract Drawings and Shop Drawings. Mark the set to show the actual installation where the installation varies substantially from the Work as originally shown. Mark drawing that is most capable of showing conditions fully and accurately. Where Shop Drawings are used, record a cross-reference at the corresponding location on the Contract Drawings. Give particular attention to concealed elements that would be difficult to measure and record at a later date.

a. Mark record sets with red erasable pencil. Use other colors to distinguish between variations in separate categories of the Work.

3Section 01700- Project Closeout

b. Mark new…

This is the start of the file's text. The full file is on GovTribe.