W9124D20R0034_Amendment_0001.pdf
PDF 243 KB Posted
- Attached to
- Fort Knox, Ky Consolidated Construction Multiple Award Task Order Contract (MATOC)/Job Order Contract (JOC)
- Solicitation number
- W9124D20R0034
About this file
This document is an amendment to a solicitation for a combined Job Order Contract and Multiple Award Task Order Contract to provide construction services at Fort Knox, Kentucky. The scope of work includes maintenance, repair, and minor construction of buildings, structures, and other real property. The amendment incorporates changes to the seed project specifications and drawings, adds the Fort Knox Environmental Handbook and environmental contract language as attachments, and revises the deadline for questions to August 10, 2020. The solicitation due date is unchanged. The contract will be awarded by the Mission and Installation Contracting Command Fort Knox to support requirements of the Directorate of Public Works at Fort Knox.
View the file
Other files
Show 40 more
Latest 50 of 51 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
x
0011386832-0001
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Combined Construction Job Order Contract (JOC)/Multiple Aw ard Task Order Contract (MATOC) for Directorate of Public Works (DPW), Fort Knox, Kentucky A. Amendment 0001 incorporates changes to Seed Project. Att 00a Seed Project Specifications, Rev. Amdt 0001, and Att 00b Seed Project Draw ings Stithton Traffic Circle Rev. Amdt 0001 are incorporated through this amendment and replace Att 00a and ATT 00b.
B. Amendment 0001 also incorporates additional attachments into the solicitation. Attachments ATT 05 FK Environmental Handbook 2020 Edition, and ATT 05a Environmental Contract Language are incorporated and applicable to this solicitation and subsequent aw ards.
C. Listing of Pre-Proposal Conference/Site Visit attendees is included as an attachment to this amendment.
D. Section L.1.5 is hereby revised as follow s: Questions/inquiries are due no later than 4:00 p.m. Fort Knox Local Time, on 10 August 2020.
There are no other changes to Section L.1.5.
E. The solicitation due date is not extended as a result of the amendment.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 06-Aug-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9124D20R0034
X 9B. DATED (SEE ITEM 11)
22-Jul-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
05-Aug-2020
CODE
MISSION AND INSTALLATION CONTRACTING CMD
MICC FORT KNOX
BLDG 1109B STE 250
199 6TH AVE
FORT KNOX KY 40121-5720
W9124D 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
X 1
W9124D20R0034
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The following have been modified:
BLOCK 10 ADDITIONAL NOTES
Block 10 Additional Notes, Continued
F. Instructions to Offerors and Evaluation Factors for Award are included in Section L, Solicitation/Proposal Requirements, and Section M, Evaluation Factors for Award.
G. The following Attachments to the Scope of Work are incorporated into this solicitation and resultant awards.
The attachments are available on the https://beta.sam.gov web site with the solicitation.
ATT 00 DPW Construction JOC‐MATOC SOW ATT 00a Seed Project – Stithton Traffic Circle ATT 00b Seed Project – Drawings Combined ATT 00c Seed Project General Decision Number KY20200038 ATT 01 JOC Guide 2003 Version ATT 02a Specifications Table of Contents ATT 02a Specifications – Division 00 – Procurement & Contracting Requirements ATT 02a Specifications – Division 01 – General Requirements ATT 02a Specifications – Division 02 – Existing Conditions ATT 02a Specifications – Division 03 – Concrete ATT 02a Specifications – Division 04 – Masonry ATT 02a Specifications – Division 05 – Metals ATT 02a Specifications – Division 06 – Woods and Plastics ATT 02a Specifications – Division 07 – Thermal and Moisture Protection ATT 02a Specifications – Division 08 – Doors and Windows ATT 02a Specifications – Division 09 – Finishes ATT 02a Specifications – Division 10 – Specialties ATT 02a Specifications – Division 11 – Equipment ATT 02a Specifications – Division 12 – Furnishings ATT 02a Specifications – Division 13 – Special Construction ATT 02a Specifications – Division 14 – Conveying Systems ATT 02a Specifications – Division 22 – Plumbing ATT 02a Specifications – Division 23 – HVAC ATT 02a Specifications – Division 26 – Electrical ATT 02a Specifications – Division 31 – Earthwork ATT 02a Specifications – Division 32 – Exterior Improvements ATT 02a Specifications – Division 33 – Utilities ATT 02b Fort Knox Fire Department (FKFD) Requirements 5‐30‐19 ATT 02c FKFD Fire Alarm Fire Suppression Checklist ATT 02d Fort Knox Sprinkler systems Initial Acceptance Test Form
W9124D20R0034
ATT 03 JOC Software Specifications ATT 04a EM 385‐1‐1 APP AFINAL ATT 04b Safety Plan Checklist (IAW USACE EM 385‐1 Appendix A ATT 06 Contractor Row Map ATT 07 Sign Template ATT 08 Fort Knox CADD Contract Requirements ATT 09a Instructions for DD Form 1354 ATT 09b DD 1354 Template May 2014 ATT 10 Fort Knox Locates, Revised 25 March 2019 ATT 11 Performance Assessment Questionnaire
ATTACHMENTS, AMENTMENT 0001:
ATT 05 FK Environmental Handbook 2020 Edition ATT 05a Environmental Contract Language ATT 00a Seed Project Specifications, Rev. Amdt 0001 ATT 00b Seed Project Drawings Stithton Traffic Circle, Rev. Amdt 0001 ATT_Pre‐Proposal_Conference/Site_Visit_Attendees_Sheet
(End of Summary of Changes)