ATT_02d_Fort_Knox_Sprinkler_Systems_Initial_Acceptance_Test_Fm_9 Jul_2009.pdf

PDF 147 KB Posted

Attached to
Fort Knox, Ky Consolidated Construction Multiple Award Task Order Contract (MATOC)/Job Order Contract (JOC)
Solicitation number
W9124D20R0034
Issued by

About this file

This document contains an initial acceptance test report for sprinkler systems at Fort Knox, Kentucky. The report details inspection criteria for wet, dry, pre-action and deluge sprinkler systems, including checks of sprinkler heads, piping, hangers and bracing as well as functional tests of valves, alarms, water pressures and quick opening devices. Test procedures are provided for main drain tests, partial flow trip tests, full flow trip tests and deluge discharge tests. Inspection results and comments are to be recorded on the report. Also described is a forthcoming solicitation from the Mission and Installation Contracting Command at Fort Knox for a consolidated construction multiple award task order contract to provide maintenance, repair and minor construction services for buildings and structures at Fort Knox.

View the file

Other files

File Type Posted
W9124D20R0034_Amendment_0002.pdf PDF
ATT_00c_Seed_Project_GD_Highway_KY20200038_8-14-20_Amdt_0002.pdf PDF
ATT_00b_Seed_Project_Drawings_Stithton_Traffic_Circle_Rev_8-18-20_Amdt_0002.pdf PDF
ATT_12_JOC_Bid_Form_Templates.pdf PDF
ATT_00_DPW_Construction_JOC-MATOC_SOW_Rev_8-18-20_ Amdt_0002.pdf PDF
ATT_05_FK_EnvironmentaL_Handbook_2020_Edition.pdf PDF
ATT_Pre-Proposal Conference-Site_Visit_Attendees.pdf PDF
ATT_05a_Environmental_Contract_Language.pdf PDF
ATT_00b_ Seed_Project_Drawings_Stithton_Traffic_Circle_Rev.Amdt_0001.pdf PDF
W9124D20R0034_Amendment_0001.pdf PDF
ATT_00a_Seed_Project_Specifications_Rev.Amdt_0001.pdf PDF
ATT_02a_Division_11_Equipment.pdf PDF
ATT_02a_Division_01_General_Requirements.pdf PDF
ATT_11_Performance_Assessment_Questionnaire.pdf PDF
ATT_02a_Division_13_Special_Construction.pdf PDF
ATT_06_Contractor_Row_Map.pdf PDF
ATT_02a_Division_09_Finishes.pdf PDF
ATT_02a_Table_of_Contents.pdf PDF
ATT_00b_ Seed_Project_Drawings__Stithton_Traffic_Circle.pdf PDF
ATT_02a_Division_08_Doors_and_Windows.pdf PDF
W9124D20R0034_Consolidated_JOC_MATOC.pdf PDF
ATT_02a_Division_32_Exterior_Improvements.pdf PDF
ATT_01_JOC_Guide_2003_Version.pdf PDF
ATT_03_JOC_Software_Specifications.pdf PDF
ATT_00_DPW_Construction_JOC-MATOC_SOW.pdf PDF
ATT_00c_Seed_Project_GD_KY20200038.pdf PDF
ATT_04b_Safety_Plan_Checklist_IAW_USACE_EM_385_1_Appendix_A.pdf PDF
ATT_02c_FKFD_Fire_Alarm_Fire_Suppression_Check_List.pdf PDF
ATT_02a_Division_23_HVAC.pdf PDF
ATT_02a_Division_02_Existing_Conditions.pdf PDF
ATT_02a_Division_26_Electrical.pdf PDF
ATT_02a_Division_12_Furnishings.pdf PDF
ATT_02a_Division_10_Specialties.pdf PDF
ATT_02a_Division_31_Earthwork.pdf PDF
ATT_02a_Division_04_Masonry.pdf PDF
ATT_02a_Division_05_Metals.pdf PDF
ATT_02a_Division_03_Concrete.pdf PDF
ATT_07_Sign_Template.pdf PDF
ATT_02a_Division_22_Plumbing.pdf PDF
ATT_09a_Instructions_for_DD_FORM_1354.pdf PDF
ATT_10_FT_Knox_Locates_Revised_25_Mar_2019.pdf PDF
ATT_02a_Division_14_Conveying_Systems.pdf PDF
ATT_00a_Seed_Project_Specifications_21_Jul_2020.pdf PDF
ATT_04a_EM385_1_1_APP_AFINAL.pdf PDF
ATT_02a_Divisioin_00_Procurement_and_Contracting_Requirements.pdf PDF
ATT_02a_Division_06_Woods_and_Plastics.pdf PDF
ATT_02a_Division_33_Utilities.pdf PDF
ATT_02b_Fort_Knox_Fire_Department_Requirements_5_30_19.pdf PDF
ATT_09b_DD1354_Template_May_2014.pdf PDF
ATT_08_Fort_Knox_CADD_Contract_Requirements_(25_Mar_2019)_V1_1.pdf PDF
Show 40 more

Latest 50 of 51 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contract No. Buildings and Structures Maintenance

ATTACHMENT 2d PAGE ____ of ____

Technical Exhibit C-5.2-030-1 Fort Knox

FORT KNOX SPRINKLER SYSTEMS

Initial Acceptance Test and Inspection

Contact Central Dispatch before and after inspection.

Date __________________ System Number _____________

Building Number _____________ Sprinkler Model _____________

Sprinkler Location __________________________________________________

Sprinkler Type: □ Dry □ Wet □ Pre-action □ Deluge

Location of inspector test: ________________________________________________________

Lower Gauge Reading: _________________ Upper Gauge Reading: ___________________

The following applies to all sprinkler systems:

Sprinklers free of: (Y/N) Sprinkler piping: (Y/N) Hangers/Bracing are: (Y/N)

Corrosion Is in good condition Not loose

Obstructions of spray pattern

Has no mechanical damage

Not damaged

Is clearance ≥ 18” from obstruction

Is not leaking Not corroded

Foreign materials Is not corroded

Physical damage Is not misaligned

Proper Orientation Is not being used as a support

Is building fully sprinklered?

Is entire sprinkler in service?

Hangers, Sway Bracing, and Restraints are installed IAW NFPA 13 chapter 9?

All portions of water filled piping free from potential exposure to freezing temperatures?

System has a backflow preventer?

Valves are identified with proper signs?

Escutcheon bases in place?

Fire department connections in good condition, unobstructed, and covers provided?

Correct type and quantity spare sprinkler heads on site?

*(< 300 = ≥ 6, 300 to 1000 = ≥ 12, > 1000 = ≥ 24)

Proper wrenches provided on site?

Backflow preventer test connection unobstructed, identified with signage, and covers?

Are control valves supervised? □ unsupervised □ locked □ tamper switch

Is the sprinkler system connected to:

□ fire alarm system

□ transmitter □ not monitored

*Pipe hangers located in concealed spaces (above drop ceiling) do not require annual inspection.

Comments:____________________________________________________________________

PAGE ____ of ____

Technical Exhibit C-5.2-030-2 Fort Knox

Main drain test:

Record the static water or air pressure (upper): __________psi Record the static water pressure (lower): ______________psi

Open main drain and allow water flow to stabilize and purge all debris. □ Record the residual water pressure (upper) or air pressure (lower) :__________ psi

Turn water off using PI valve. Does water flow completely stop (< ½ gpm)? □ yes □ no Turn PI valve back on - Back ¼ turn □ Slowly close the main drain □ Record the static water or air pressure (upper): ___________ psi Record the static water pressure (lower): ___________ psi Date on gauges _________________________________________________________

Is the system equipped with a temperature monitor? □ yes □ no

If yes, then perform functional test of the temperature monitor. Pass test? □ yes □ no

□ Wet sprinkler systems only:

Is the building adequately heated? □ yes □ no Is system hydraulically calculated? □ yes □ no Is hydraulically calculated sign available? □ yes □ no

Trip test the system by opening inspector’s test valve. □

Does alarm sound within 60 seconds of waterflow? □ yes □ no Did Central Station receive alarm within 90 seconds of waterflow? □ yes □ no

Is there any foreign debris at inspector test discharge during testing? □ yes □ no Close inspectors test valve. □

Operate OS&Y valve throughout entire travel & lubricate the valve stem. □

□ Dry sprinkler systems only:

Inspect trim valves for good seat and in correct position. □ Inspect valve exterior to verify good condition and no leakage. □

Is dry pipe valve & riser in a heated room? □ yes □ no

Test waterflow alarm by opening the alarm bypass. □

Did local alarm sound? □ yes □ no □ N/A Did Central Station receive alarm? □ yes □ no □ N/A

Quick-opening device test (accelerators only, if provided):

Close the water supply valve. □ Open the main drain valve and leave it open. □ Verify that the quick-opening device control valve is open. □ Open inspector’s test valve and verify operation of the quick opening device, a burst of air from the quick opening device indicates that it has tripped. □ Close inspector’s test valve. □ Close the quick-opening device’s control valve. □ Return the quick-opening device to service in accordance with the manufacturer’s instructions. □

Comments: ______________________________________________________

PAGE ____ of ____

Technical Exhibit C-5.2-030-3 Fort Knox

Dry pipe partial flow trip test:

Open main drain, close supply control valve so water doesn’t fully fill the drain output. □ Close the main drain valve. □ Close the valve controlling the quick opening device if installed. □ Record initial air pressure _____psi and water pressure ____psi Relive the system air pressure by opening the priming water level test valve. □ Record air maintenance system or device activation pressure _______ psi Record low air alarm trip pressure _______psi Record tripping air pressure _____psi Quickly close the water supply control valve and open the main drain valve to minimize the amount of water entering the dry pipe system. □ Above results comparable to previous tests? □ yes □ no Open all low point drains and completely drain the system. □ Open valve, visually inspect and perform required maintenance to interior before resetting system.

Begin recharging system with air. □ Verify correct priming level by adding water until it is present at priming drain and leave priming drain open until it releases only air. □ Operate OS&Y valves throughout entire travel & lubricate the valve stem. □ Record air maintenance system or device deactivation pressure_______ psi Return the dry pipe sprinkler to service.

Full Flow Trip Test:

Record initial air pressure _____ psi and water pressure ____ psi Open inspectors test □ Record air maintenance system or device activation pressure _______ psi Record low air alarm pressure _______ psi Record valve tripping air pressure _____ psi and tripping time ____(sec.)

Record water delivery time:_____ (min.) _____ (sec.)

Quick opening devices pass test? □ yes □ no □ N/A Did local alarm sound? □ yes □ no □ N/A Did Central Station receive alarm? □ yes □ no Above results comparable to previous tests? □ yes □ no Open all low point drains and completely drain the system. □ Open valve, visually inspect and perform required maintenance to interior before resetting system.

Begin recharging system with air. □ Record system recharge time: ___________ minutes __________ seconds Verify correct priming level by adding water until it is present at priming drain and leave priming drain open until it releases only air. □ Operate OS&Y valves throughout entire travel & lubricate the valve stem. □ Record air maintenance system or device deactivation pressure_______ psi Adjust system to correct air pressure according to valve differential ________ psi (((Lower gauge reading)/6) +5 = Low air alarm trip)+15 = air maintenance system or device normal operating pressure.

Verify that the relief valve is ≥ 10 psi above normal operating pressure. □, N/A □ Return the dry pipe sprinkler system to service. □

PAGE ____ of ____

Technical Exhibit C-5.2-030-4 Fort Knox

□ Pre-action systems only:

Is pre-action valve & riser in a heated room? □ yes □ no

By-pass testing:

Open alarm by-pass. □ Did alarm activate? □ yes □ no Did Central Station receive an alarm? □ yes □ no Close alarm by-pass. □

Low-air-pressure alarm testing:

Shut off air supply. □ Slowly release pressure from system until low air alarm activates and record pressure. □

________ psi Allow air maintenance system to recharge system to normal operating pressure. □

Verify proper automatic fire alarm activation of the pre-action system. □, N/A. □

Trip test pre-action system accordance with manufacturer’s instructions:

Record initial air pressure _____ psi and water pressure ____ psi Operate the manual activation discharge handle □ Record air maintenance system or device activation pressure _______ psi Record low air alarm pressure _______ psi Record valve tripping air pressure _____ psi and tripping time ____(sec.)

Record the time from activation of the detector until the water is discharged form the system. _____min _____sec Quick opening devices pass test? □ yes □ no □ n/a Did local alarm sound? □ yes □ no □ N/A Did Central Station receive alarm? □ yes □ no Above results comparable to previous tests? □ yes □ no Open valve, visually inspect and perform required maintenance to interior before resetting system. □ (Internal inspection of valves that can be reset without removal of the faceplate may be conducted every 5 years.)

Last date valve was internally inspected ___________________, □ N/A Operate OS&Y valves throughout entire travel & lubricate the valve stem. □ Record air maintenance system or device deactivation pressure_______ psi Adjust system to correct air pressure according to valve differential ________ psi (((Lower gauge reading)/6) +5 = Low air alarm trip)+15 = air maintenance system or device normal operating pressure.

Verify that the relief valve is ≥ 10 psi above normal operating pressure. □, N/A □ Return the preaction sprinkler system to service. □

Comments: ___________________________________________________________________

Test priming water level in supervised preaction system in accordance with manufacture’s instructions. □, N/A □

PAGE ____ of ____

Technical Exhibit C-5.2-030-5 Fort Knox

□ Deluge systems only:

By-pass testing:

Open alarm by-pass. □ Did alarm activate? □ yes □ no Did Central Station receive an alarm? □ yes □ no Close alarm by-pass. □

Is deluge valve & riser in a heated room? □ yes □ no

Verify proper automatic fire alarm activation of the deluge system. □, N/A. □

Deluge trip test:

(Not required where water can’t be discharged. Not to exceed 2 years.)

(Test all systems together that will operate simultaneously.)

Discharge from all nozzles unimpeded? □ yes □ no □ N/A Pressure reading at hydraulically most remote nozzle _____ psi Residual pressure reading at valve _____psi Record the time from activation of the detector until the water is discharged form the system. _____min _____sec Manual activation devices passed test? □ yes □ no □ N/A Pressure operating valves passed test? □ yes □ no □ N/A Did local alarm sound? □ yes □ no □ N/A Did Central Station receive an alarm? □ yes □ no Open valve, visually inspect and perform required maintenance to interior before resetting system. □ (Internal inspection of valves that can be reset without removal of the faceplate may be conducted every 5 years.)

Last date valve was internally inspected ___________________, □ N/A Operate OS&Y valves throughout entire travel & lubricate the valve stem. □ Return deluge system to service. □

Return all valves to normal operating positions, prime system where required, recharge system air pressure to normal levels (if applicable) and reopen PIV until spring tension is felt—back 1/4 turn. □

Comments:____________________________________________________________________

Inspection completed by: _________________________________________________________