ATT_05a_Environmental_Contract_Language.pdf

PDF 421 KB Posted

Attached to
Fort Knox, Ky Consolidated Construction Multiple Award Task Order Contract (MATOC)/Job Order Contract (JOC)
Solicitation number
W9124D20R0034
Issued by

About this file

This document provides environmental contract language and requirements for federal contracts at Fort Knox, Kentucky. Contractors must comply with all applicable environmental regulations and permit requirements, appoint an environmental officer, and ensure proper handling and disposal of hazardous materials, waste, and stormwater. Specific provisions include complying with the National Historic Preservation Act and protecting natural and cultural resources, managing asbestos and lead-based paint, preventing pollution and soil erosion, and reporting any spills or unanticipated environmental issues immediately. The document establishes protocols for waste storage, transportation, and disposal as well as penalties for noncompliance.

View the file

Other files

File Type Posted
W9124D20R0034_Amendment_0002.pdf PDF
ATT_00c_Seed_Project_GD_Highway_KY20200038_8-14-20_Amdt_0002.pdf PDF
ATT_00b_Seed_Project_Drawings_Stithton_Traffic_Circle_Rev_8-18-20_Amdt_0002.pdf PDF
ATT_12_JOC_Bid_Form_Templates.pdf PDF
ATT_00_DPW_Construction_JOC-MATOC_SOW_Rev_8-18-20_ Amdt_0002.pdf PDF
ATT_05_FK_EnvironmentaL_Handbook_2020_Edition.pdf PDF
ATT_Pre-Proposal Conference-Site_Visit_Attendees.pdf PDF
ATT_00b_ Seed_Project_Drawings_Stithton_Traffic_Circle_Rev.Amdt_0001.pdf PDF
W9124D20R0034_Amendment_0001.pdf PDF
ATT_00a_Seed_Project_Specifications_Rev.Amdt_0001.pdf PDF
ATT_02a_Division_11_Equipment.pdf PDF
ATT_02d_Fort_Knox_Sprinkler_Systems_Initial_Acceptance_Test_Fm_9 Jul_2009.pdf PDF
ATT_02a_Division_01_General_Requirements.pdf PDF
ATT_11_Performance_Assessment_Questionnaire.pdf PDF
ATT_02a_Division_13_Special_Construction.pdf PDF
ATT_06_Contractor_Row_Map.pdf PDF
ATT_02a_Division_09_Finishes.pdf PDF
ATT_02a_Table_of_Contents.pdf PDF
ATT_00b_ Seed_Project_Drawings__Stithton_Traffic_Circle.pdf PDF
ATT_02a_Division_08_Doors_and_Windows.pdf PDF
W9124D20R0034_Consolidated_JOC_MATOC.pdf PDF
ATT_02a_Division_32_Exterior_Improvements.pdf PDF
ATT_01_JOC_Guide_2003_Version.pdf PDF
ATT_03_JOC_Software_Specifications.pdf PDF
ATT_00_DPW_Construction_JOC-MATOC_SOW.pdf PDF
ATT_00c_Seed_Project_GD_KY20200038.pdf PDF
ATT_04b_Safety_Plan_Checklist_IAW_USACE_EM_385_1_Appendix_A.pdf PDF
ATT_02c_FKFD_Fire_Alarm_Fire_Suppression_Check_List.pdf PDF
ATT_02a_Division_23_HVAC.pdf PDF
ATT_02a_Division_02_Existing_Conditions.pdf PDF
ATT_02a_Division_26_Electrical.pdf PDF
ATT_02a_Division_12_Furnishings.pdf PDF
ATT_02a_Division_10_Specialties.pdf PDF
ATT_02a_Division_31_Earthwork.pdf PDF
ATT_02a_Division_04_Masonry.pdf PDF
ATT_02a_Division_05_Metals.pdf PDF
ATT_02a_Division_03_Concrete.pdf PDF
ATT_07_Sign_Template.pdf PDF
ATT_02a_Division_22_Plumbing.pdf PDF
ATT_09a_Instructions_for_DD_FORM_1354.pdf PDF
ATT_10_FT_Knox_Locates_Revised_25_Mar_2019.pdf PDF
ATT_02a_Division_14_Conveying_Systems.pdf PDF
ATT_00a_Seed_Project_Specifications_21_Jul_2020.pdf PDF
ATT_04a_EM385_1_1_APP_AFINAL.pdf PDF
ATT_02a_Divisioin_00_Procurement_and_Contracting_Requirements.pdf PDF
ATT_02a_Division_06_Woods_and_Plastics.pdf PDF
ATT_02a_Division_33_Utilities.pdf PDF
ATT_02b_Fort_Knox_Fire_Department_Requirements_5_30_19.pdf PDF
ATT_09b_DD1354_Template_May_2014.pdf PDF
ATT_08_Fort_Knox_CADD_Contract_Requirements_(25_Mar_2019)_V1_1.pdf PDF
Show 40 more

Latest 50 of 51 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 July 2020

Fort Knox Environmental Contract Language

EMD Website:

http://www.knox.army.mil/Garrison/dpw/emd/Default.aspx

EMD Information emails: Army.Knox.EMD@Mail.mil

1.0 General

1.1 Environmental Requirements: The contractor shall perform all work in such a manner as to minimize pollution of in accordance with all environmental regulations.

The contractor shall be liable for all enforcement actions, fines, and/or penalties resulting from their failure to comply with applicable environmental requirements.

1.2 Environmental Permits: The contractor shall provide all pertinent information to the Directorate of Public Works (DPW), Environmental Management Division (EMD) for obtaining environmental permits related to work performed under this contract. The EMD will obtain all required environmental permits. The contractor shall adhere to all existing environmental permits and shall submit all documentation to EMD based on timelines outlined in all current and future permits as it pertains to their work.

1.3 Sub-contractors: All general or primary contractors will ensure their respective sub-contractors will have a copy of the Fort Knox Environmental Contract Language and will ensure all sub-contractors comply with all required environmental requirements.

1.4 Environmental Officer Training: The contractor shall appoint a primary Environmental Officer and an alternate. These individuals shall be trained in accordance with Fort Knox’s Environmental Handbook. Environmental Officer training is provided by the EMD. Initial training is three days in length and the annual refresher training is one day. Environmental Officers are the environmental link between the contractor and EMD.

2.0 Air Pollution Control: If the contractor is tasked to demolish, install, and/or construct any type of air pollution emitting unit they shall seek approval from EMD prior to initiating work. An air pollution emitting unit is anything that has a potential to emit a regulated air pollutant, hazardous air pollutant, or toxic air pollutant. This includes, but is not limited too; cyclones to control dust emissions, boilers, water heaters, generators, space heaters, cooling towers, air conditioners, chillers, paint spray booths or operations, and metals parts cleaners or degreasers. The contractor shall provide the necessary equipment specifications and/or emission data needed for all permits prior to ordering the unit. The EMD will obtain all required environmental permits. The contractor shall adhere to all existing environmental permits and shall submit all documentation to EMD based on timelines outlined in all current and future

2 July 2020 permits as it pertains to their work.

2.1 Ozone Depleting Substances (ODS): The contractor shall comply with all applicable requirements of 40 CFR Part 82. The contractor shall be responsible for:

Ensuring all personnel who perform maintenance and repair activities on refrigeration equipment have been trained and certified according to the requirements of 40 CFR

82.161 and have a copy of their certificate(s) available at Fort Knox and available for inspection. All ODS containing equipment must be permitted through EMD and Kentucky Division for Air Quality. All records of maintenance operations on ODS containing equipment shall be submitted to EMD on a monthly basis. The contractor shall maintain proof that all refrigerant recovery and recycling equipment is properly certified and properly labeled according to the requirements specified in 40 CFR

82.158. Retests or inspections of certified equipment shall be completed at least once every three (3) years following initial certification. Documentation of certifications, completion of testing or inspections shall be maintained onsite and available for inspection. All leak repairs must be completed and documented according to the requirements of 40 CFR Part 82 (82.156, 82.157, 82.166). The contractor shall follow the current DoD ODS Turn-In Procedure and EMD Turn-in Procedure which requires the following types of excess refrigerant be turned into the ODS Reserve located in Richmond, VA.: CFCs 11, 12, 114, 500, 502 and HCFC-22.

The Reserve accepts both used and new CFCs and HCFC-22 in a relatively pure state. The contractor shall notify EMD immediately when it determines it has developed an excess quantity of the listed refrigerants no longer needed on post.

The Government will provide government-owned compressed gas cylinders. The contractor shall transfer the refrigerant into the government-owned gas cylinders and transport them to Fort Knox’s base maintenance contractor for turn-in to the ODS Reserve. The contractor shall note that all refrigerant purchased for and installed in military-owned refrigerant unit is the property of the military and shall not be transferred or sold to the private market without prior written approval.

2.2 Dust: Contractors shall abide by the requirements of 401 KAR 63:010 and use industry standard and/or reasonable precautions to control dust generated during all construction activities.

2.3 Refuse and Debris Burning: The contractor shall not burn refuse and debris anywhere on the installation.

3.0 Storm Water Construction Management: Fort Knox Kentucky Pollution Discharge Elimination System (KPDES) Permit. This permit manages all stormwater and construction activities on Fort Knox properties. The contractor is not required to submit a Notice of Intent to the state for construction on post. For construction projects that have the potential for ground disturbance regardless of size, the contractor shall submit to EMD and the Contracting Officer a Notice of Construction Activity for Stormwater Discharges (Enclosure 1). Ground disturbance can include laydown/storage areas and areas where the contractor is operating equipment to access the project site. If it is determined based on the project, the contract may have to submit a Fort Knox Stormwater/Groundwater Protection Plan Construction

3 July 2020

Site Best Management Practice (BMP) Plan for review and approval. The Plan shall include maps/drawings indicating the direction of flow from the area, BMP’s to control the potential release of pollutants and an inspection protocol. The BMP’s are to prevent the pollutants discharging from the activities through: stormwater runoff, spillage, material storage areas, loading and unloading, and construction activities.

The contractor shall use the BMP Plan template at Enclosure 2.

3.1 BMP Authorization: The contractor’s BMP Plan shall be signed by a responsible corporate officer, an authorized manager, a business proprietor or partner, a government executive, or a legal representative authorized (in writing) by one of the above.

3.2 BMP Plan EMD Review: Once the contractor BMP Plan is reviewed by EMD, the contractor shall implement the BMP Plan throughout the execution of the contract.

The contractor shall use Kentucky Erosion Prevention and Sediment Control Field Guide as a guide in developing Best Management Practices. The contractor shall not disturb any wetlands.

3.3 Modification of BMP’S: The contractor will revise the BMP’s whenever storm water controls are modified or when existing controls are “ineffective in eliminating or significantly minimizing pollutants in storm water discharges”. The modifications to the BMP’s shall be made within 7 calendar days after identifying the need for a modification and revisions are to be implemented before the next storm event. All revisions to the BMP Plan will be submitted to EMD for review.

3.4 Current BMP Plan: The contractor BMP Plan will be current and “readily available”. Persons with day-to-day operational control must have a copy of the contractor BMP Plan when on site.

3.5 BMP Plan Closure: Prior the contractor completing the project, the contractor shall resubmit the Notice of Construction Activity for Stormwater Discharges form (Enclosure 1) and complete Section V indicating Notice of Termination. The signed form shall be submitted to the EMD and the Contracting Officer. EMD will approve the termination.

4.0 Drinking Water: The contractor will not perform any work on the installation potable water system until prior approval is obtained from DPW Operation and Maintenance Division. If a permit is required due to construction or proposed chemical feed changes, the contractor shall provide all pertinent information to the DPW EMD for obtaining the required environmental permits. The EMD will obtain all environmental permits. The contractor shall adhere to all existing environmental permits and shall submit all documentation to EMD based on timelines outlined in all current and future permits.

4.1 Fresh Water & Backflow Prevention: The contractor shall have a backflow prevention device installed on all contractor equipment that is connected to the installation’s water distribution system.

4 July 2020

5.0 Waste Water (Sewer): The contractor shall not perform any work on the installation Wastewater System until prior approval is obtained from the DPW Operation and Maintenance Division. The contractor shall advise the Waste Water Plant any project work that will interfere with existing sewer mains, piping, and the collection system or lift stations. The disposal of gray water must have preapproval from EMD and the DPW Operation and Maintenance Division.

6.0 Asbestos:

6.1 Introduction

6.1.1 Work performed shall comply with applicable federal, state, and local laws, ordinances, criteria, rules and regulations regarding handling, storing, transporting, and disposing of asbestos waste materials. Where the requirements of this specification, applicable laws, criteria, ordinances, regulations, and referenced documents vary, the most stringent requirements shall apply. Federal, state and local laws, rules and regulations regarding demolition, removal, encapsulation, construction alteration, repair, maintenance, renovation, spill/emergency cleanup, housekeeping, handling, storing, transporting and disposing of asbestos material shall apply. The contractor shall comply with the provisions of 29 CFR 1910, 40 CFR Part 61 Subpart M and Part 763 Subparts D, E, F, G, and H, and 401 KAR 58.

6.1.2 If the work is in violation of specification requirements or federal, state, or local regulations, the Contracting Officer will stop work until the violation is resolved.

6.1.3 Indemnification: The contractor shall be liable for any and all fines assessed the government as a result of the contractor's failure to comply with any of the Title 401 Kentucky Administrative Regulations (KAR), chapter 58. The contractor shall be liable for any and all fines assessed the government as a result of the contractor's failure to comply with notification procedures as prescribed in 401 KAR 58 and 40 CFR 61, Subpart M.

6.2 Coordination

6.2.1 Contact information for the Fort Knox Asbestos Coordinator

Phone (502) 624-5245 Fax (502) 624-3000 Email: army.knox.emd@mail.mil

6.2.2 All asbestos work in accordance with the Fort Knox Asbestos Management Plan must be coordinated through the Fort Knox Asbestos Coordinator hereafter referred to as the Asbestos Coordinator. This must include a pre-project conference meeting with the Asbestos Coordinator (624-5245).

5 July 2020

6.2.3 Notification Requirements: The Contractor shall notify the Asbestos Coordinator, or designated representative, in accordance with Table 1 listed below and 401 KAR 58 and 40 CFR 61, Subpart M. This notice shall include details listed in Section 4.1 of this specification. The Asbestos Coordinator, or designated representative, will approve and submit ALL Notification of Asbestos Abatement/Demolition/Renovations, DEP Forms 7036 to the Kentucky Division of Air Quality. The Contractor shall notify the Asbestos Coordinator, or designated representative, regarding any revisions to DEP Form 7036 before the project date expires. If the DEP Form 7036 has expired, a new form will need to be submitted in accordance with Table 1 listed below. Work cannot commence on any date other than that stated on the notification.

Table 1

Renovation Notify Asbestos Coordinator

KDAQ Notice Requirements

RACM 15 days prior 10 working days CAT I & II Non-Friable 3 days prior 1 working day* Emergency Abatement 1 day prior 1 working day

Demolition Notify Asbestos Coordinator

KDAQ Notice Requirements

RACM 15 days prior 10 working days CAT I & II Nonfriable 15 days prior 10 working day Emergency Abatement 1 day prior 1 working day

6.2.4 The Contractor shall notify the Asbestos Coordinator 2 days prior to shipping any asbestos waste to an approved and permitted landfill.

6.2.5 The Asbestos Coordinator, or designated representative, will generate and sign ALL Waste Shipment Records for asbestos disposal at an approved and permitted landfill.

6.2.6 The Contractor shall provide Disposal certificates from the designated landfills to the Asbestos Coordinator within 30 days of waste being accepted at the landfill.

6.3 Special Instructions:

6.3.1 The contractor shall provide at least one supervisory person with current certification as specified by 401 KAR 58: Section 3(2). The supervisor shall be in attendance during the execution of each asbestos abatement project, including RACM and Category I or II abatement work.

6 July 2020

6.3.2 The contractor shall provide a site map of the building which identifies all asbestos containing material, and this map shall be posted in a visible area at the work site.

6.3.3 The contractor shall mark and label all asbestos containing material prior to any abatement activity. Labels shall be placed on individual items or signage used to designate a room or area that includes asbestos containing material.

6.3.4 All work must stop if any suspected asbestos containing material is encountered. Notify the Asbestos Coordinator, Contracting Officer and Contracting Inspector immediately.

6.3.5 The Contractor shall post procedures for reporting suspect asbestos containing material encountered, that was not previously identified. These procedures shall include:

6.3.5.1 Stop ALL work

6.3.5.2 Remove personnel from the area

6.3.5.3 Guard the area to prevent unsuspecting personnel from entering

6.3.5.4 Notify the Government Contracting Officer

6.3.5.5 Notify the Asbestos Coordinator

6.3.5.6 Notify the Government Construction Inspector

6.3.5.7 Work cannot proceed until the material is positively identified by a NVLAP lab analysis.

6.3.6 The Contractor must provide the Asbestos Coordinator with the schedule of safety training/meetings. The Contractor must include asbestos awareness and abatement procedures in their training sessions.

6.3.7 All contractors, from all trades, are required to have asbestos awareness training. If needed, this training will be available from the Asbestos Coordinator.

6.3.8 Reference Section 4 for submittals and work plans required to be submitted to the Asbestos Coordinator. These submittals are required to be approved by the Asbestos Coordinator prior to any abatement work being started.

6.3.9 Perform air monitoring in accordance with 401 KAR 58:040 Section 4(1)(s), when conducting friable abatement.

6.3.10 Access Control: The contractor shall control access to the work area. A dual layer barrier fence shall be established and non-asbestos workers shall not be allowed

7 July 2020 within the job site. The barrier fence shall be placed at a nominal height of 30 inches.

These fences must be bilingual in English and Spanish.

6.3.10.1 The outer barrier fence shall consist of yellow plastic tape with black lettering "CAUTION – CUIDADO" continuously printed on the tape. This outer barrier fence shall be used to keep out any personnel not participating in the abatement.

6.3.10.2 An inner barrier fence shall consist of red plastic tape with black lettering “DANGER – PELIGRO” continuously printed on the tape.

Any worker(s) in the confines of the red tape fence must be in proper PPE.

6.3.10.3 The area between the red and yellow tapes shall be for support personnel conducting the abatement and placement of the waste containers. The contractor shall provide and display bilingual warning signs at each regulated area in English and Spanish.

Warning signs shall be posted at all approaches to regulated areas.

6.3.10.4 Throughout the project, the barrier and signs shall be monitored and maintained. Only personnel on official business shall be allowed in the area enclosed by the barrier fence. If unauthorized personnel will not leave the work area, the contractor shall immediately notify the Asbestos Coordinator. The contractor shall ensure that all entrances to the job site except the designated work entrance are locked.

6.3.10.5 The contractor shall pack waste asbestos in accordance with 29 CFR 1926.1101(l)(2). The contractor shall also affix a label with the contractor's name and building number. The warning sign shall be legible and printed with waterproof ink.

6.3.11 The Asbestos Coordinator or designated representative may conduct an inspection of the abatement area at any time.

6.4 Asbestos Submittals

6.4.1 Plan of work: Contractors shall submit a work plan to Contracting Officer in conjunction with the Notification Requirements listed in Section 6.2.3. The Asbestos Coordinator will verify that it is technically sufficient prior to any work being started.

The work plan shall include the following, at a minimum:

6.1.1.1 Prime Contractor and telephone number

6.1.1.2 Detailed listing of asbestos to be removed (Building number, location of ACM, Quantity and category of ACM, etc.)

8 July 2020

6.1.1.3 Detailed map showing decontamination area, abatement area, waste load out, placement of negative pressure HEPA air handler(s), emergency exits, waste collection area, etc.

6.1.1.4 Dates of abatement project

6.1.1.5 List of personnel involved with the abatement, including the supervisor

6.1.1.6 Name of company performing air sampling (if required)

6.1.1.7 Methods of removal

6.1.1.8 Location and type of enclosures and critical barriers

6.1.1.9 Disposal facility and containers to be used

6.1.1.10 Cleaning procedures

6.1.1.11 Decontamination Process

6.4.2 The Contractor shall submit clearance air sample results to the Contracting Officer. The Asbestos Coordinator will approval/disapprove clearance analyticals prior to occupation of personnel.

6.4.3 The Contractor shall submit a detailed list to include container type, types and amounts of asbestos waste being shipped to an approved and permitted landfill 2 days prior to shipping. Asbestos waste bags shall be clear or yellow. The asbestos waste shall be adequately wetted and shall be visible in the sealed bags.

6.4.4 The Contractor shall provide disposal certificates from the designated landfills to the Asbestos Coordinator within 30 days of waste being accepted at the landfill.

7.0 Emergency Planning and Community Right-to-Know Act (EPCRA)

7.1 Hazardous Materials Stored: In Accordance With (IAW) Emergency Planning & Community Right to Know Act (EPCRA), Sections 301-303 (40 CFR Part355) and Hazardous Chemical Storage Report Requirements, EPCRA Section 311-312 (40 CFR Part370), and the Fort Knox Environmental Handbook, contractors shall track all hazardous materials for storage, use, and reporting purposes. Resident prime contractors shall process their hazardous materials through the Hazardous Materials Control Center (HMCC) at Building 2954. For hazardous materials that are not processed through the HMCC, a monthly usage inventory shall be sent to the COR and forwarded to the EMD EPCRA manager by the 5th day of the following month. The report shall include the chemical name, manufacturer, beginning inventory, ending inventory and usage amount for each chemical.

7.2 Safety Data Sheets (SDSs): The contractor shall submit a current SDS for

9 July 2020 all hazardous materials proposed for use including paints, solvents, adhesives, etc.

Copies of the SDSs shall be provided to EMD through the COR prior to material being brought on post. A copy of the SDS must be maintained at the storage location for each hazardous material. When a new hazardous material is added to the inventory, copies of the SDS shall be sent to EMD with the monthly inventory report.

7.3 Hazardous Materials Labeled: Contractors shall ensure all hazardous material at the work site is properly stored and labeled. All secondary containers used for hazardous materials will be labeled properly to prevent misuse, personnel injury, and potential environmental contamination.

7.4 Paints: The contractor shall not use paints containing zinc chromate or strontium chromate pigments, or paints containing lead in excess of 0.06 percent by weight of the total nonvolatile content (calculated as lead metal). Prior to any sanding or chipping of surfaces to be painted, the contractor shall notify EMD for verification of the absence or presence of lead.

8.0 Equipment Contractor Owned: All contractor-owned motorized equipment used in support of implementing the contract shall be maintained in a state of serviceable condition. All safety functions of the equipment shall be operational and the equipment shall be free from leaks of any type of fuel or petroleum type fluids. In the event of equipment developing any type of leaks during use, the contractor shall have on site drip pans or other types of petroleum oil lubricants (POL) containing devices to contain the leak until corrections to the equipment can be made. The use of drip pans/pads does not relieve the contractor of their responsibility to maintain (repair) their equipment.

9.0 Hazardous Waste: The contractor shall ensure that all hazardous waste generated at the work site is properly stored and labeled in a pre-approved location designated by the EMD Hazardous Waste Manager, 502-624-3598. The contractor shall provide copies of any shipping documents, to EMD through their COR, for Hazardous Waste/Universal Waste for waste that is not processed through the Fort Knox Hazardous Waste section for disposal. If the installation EPA number is being used for shipping purposes, only EMD personnel are authorized to sign a manifest and the manifest (or copy) must be supplied prior to the day of shipment for review.

The EMD Hazardous Waste Manager will keep originals

9.1 Universal Waste - Fluorescent and Mercury Bearing Lamps & Switches or Devices: The contractor shall manage fluorescent and mercury bearing lamps or devices in accordance with 40 CFR 273 through collection, containerization, and recycling. The contractor shall make arrangements through the EMD Hazardous Waste Manager for packaging and disposal of mercury and fluorescent lamps through the Fort Knox Hazardous Waste section.

9.2 Hazardous and Universal Waste Training: The contractor shall ensure all contract personnel are properly trained in handling hazardous and universal waste.

Training records shall be maintained at the contract work location and available for

10 July 2020 inspection by EMD.

10.0 POL and Hazardous Material Storage and Transportation:

10.1 Short term contractors, 1 year or less, who intend to have bulk storage containers (55 gallon or larger) are required to have BMPs for their storage site. This document must be on site and available for inspection by EMD and other agencies.

10.2 Long term contractors are required to work with EMD in the development of the applicable Spill Prevention Control and Countermeasures Plan (SPCCP) for their site unless their respective contract requires the respective contractor to provide their own

SPCCP

10.3 The transportation of fuels (gasoline, diesel, etc.) on Fort Knox requires compliance with the Defense Transportation Regulation – Part II, Chapter 204. The contractor shall maintain sufficient spill response materials on all fuel transports to handle any spill. There shall be no fueling of equipment near waterways except for marine equipment. Refueling locations shall be a minimum of 75 yards from the nearest waterway. The contractor shall use spill containment devices during refueling operations to prevent spillage onto the ground surface. Additional spill response materials shall be available for immediate response to a spill during all refueling operations.

11.0 Prohibited Materials/Substances: The contractor will not install any equipment, switches, or devices (including thermostats) that contain mercury or lead.

Lead exceptions (e.g. Lead sheet lining in x-ray rooms) require pre-contract award notification to EMD.

11.1 Polychlorinated Biphenyls (PCB): The contractor shall not bring items containing PCBs onto the installation. Light ballasts that are clearly marked "Contains no PCBs", or that are marked with a manufacture date after 1978 shall be disposed of by the contractor as construction demolition debris. Any light ballast that is not marked as “Containing no PCBs” that has a manufacture date prior to 1978, or that cannot be determined whether it contains PCBs, will be collected and stored onsite or at an adequate location determined by EMD. EMD will provide labels and markings for containers. The contractor is responsible for providing a proper DOT shipping container. EMD is responsible for processing and disposal costs through the Defense Logistics Agency.

11.0 Pesticide and Herbicide Management: The contractor shall coordinate all herbicide and pesticide usage and report all usage through the COR to the DPW EMD Pest Management Coordinator prior to application. All personnel applying pesticides shall be state licensed and provide a copy of the license to EMD Pest Management Coordinator, Building 9297. All products must be approved by the EMD Pest Management Coordinator prior to application or be on the installation’s Pesticide Use Plan.

11 July 2020

12.0 Spill Response and Reporting: Regardless of where a spill or release occurs any individual observing a spill or release of a POL or a hazardous substance shall immediately notify the Fort Knox Fire Department and EMD. All spills are to be reported. Contractors are responsible for cleanup of all spills they generate.

Contractors are required to have spill supplies readily available even for cleanup of spills while in transportation of materials. Spills must be cleaned up as soon as practical, without risk of injury or significant exposure to personnel.

12.1 EMD is responsible for reporting any reportable releases or spills occurring on the installation to state, federal, and local agencies; therefore, it is essential to report timely information involving a spill. EMD personnel are trained in spill reporting and are available for assistance for spill response and other environmental guidance

12.2 Spill Reporting Contacts

Fire Department 911 or 502-624-6016/1876

EMD 502-624-3629

DPW Work Order Section 502-624-1171

13.0 Solid Waste:

13.1 Solid Waste Diversion - Executive Order 13693 mandates that Fort Knox implement a solid waste diversion and qualified recycling program for all agencies, activities, units, and Contractors. The contractor shall contact the EMD Qualified Recycle Branch, 502-624-5026/5673 for additional information on the recycling of materials to ensure compliance.

13.2 During the performance of all construction, renovation, and demolition projects, a minimum of 60 percent of all non-hazardous construction demolition debris will be diverted from the landfill for reuse or recycling. The contractor will provide written certification to the COR and the EMD Solid Waste Manager (502-624-3692) of the type and tonnage of debris reused or recycled from the contract.

13.3 Recyclable Materials - Contractors shall take the following materials to the Qualified Recycle Center, Bldg. 2962, Frazier Road: scrap metals (sheet, heavy, stainless and mixed steel, cast iron), copper (#1&2), brass, aluminum sheet and trim, aluminum extrusions and casting, tin, steel and aluminum cans; cardboard boxes;

lead acid batteries, kitchen appliances (refrigerators must have refrigerant removed), dishwashers, stoves, grills, lawn mowers, wooden & plastic pallets and wooden crates, and 55-gallon drums. Important recycling information can be obtained from the Fort Knox Environmental Handbook, Qualified Recycle Program (QRP), available at EMD or the DPW EMD internet site.

14.0 Cultural Resources:

14.1 The contractor will comply with the requirements of the National Historic

12 July 2020

Preservation Act, the Archaeological Resources Protection Act, Army Regulation (AR) 200-1 (Environmental Protection and Enhancement) and DA PAM 200-4 (Cultural Resources Management). All ground-disturbing activities must be EMD Cultural Resources Management (CRM) office, building 9297.

14.2 A 30-meter (99 yards) buffer must be maintained between ground-disturbing activities and known archaeological resources and historic cemeteries. If archaeological resources or human skeletal remains are encountered, all work in the vicinity of the discovery will cease immediately and EMD/CRM must be notified.

14.3 All projects that affect buildings within the Fort Knox Cantonment Historic District or any building 50 or more years old must be cleared by EMD/CRM. Projects that have the potential to affect historic properties may require consultation with the Kentucky State Historic Preservation Office (SHPO). The consultation process requires at least 30 days, so contractors are encouraged to provide notification to EMD/CRM sufficiently in advance to allow for timely resolution of potential regulatory issues.

15.0 Natural Resources

15.1 Protection of Migratory Birds: The contractor is responsible for meeting requirements of the Migratory Bird Treaty Act of 1918. The contractor shall not disturb any migratory bird, their nest, eggs, or nesting area or offspring during the implementation of this contract.

15.2 Protection of Endangered Species: Due to the potential for harm to the federally endangered Indiana bat and threatened northern long-eared bat, removal of trees 3 inches in diameter at breast height (dbh), or greater, must be conducted between the 15 November and 31 March. The contractor must coordinate with the EMD Natural Resources Branch – Building 9297 prior to removal of trees during any time of the year. If contractor encounters bats, the Natural Resources Branch must be notified at 502-624-7368/7373. Bats are not to be molested or disturbed.

15.3 Protection of Trees and Shrubs: The contractor shall be responsible for the protection of all trees and shrubs on site. The contractor shall not allow any heavy equipment, vehicular traffic, or stockpiling of materials within ten feet from the drip line of any tree. The contractor shall not allow any toxic materials to be stored within 100 feet (35.5 meters) of the drip line of any tree. The contractor shall not nail protective devices, signs, utility boxes, or other objects to trees to be retained on the site. Trees are the property of the government and shall not be disposed of without the prior approval of the EMD Natural Resources Branch.

Enclosure 1 - FORT KNOX Notice of Construction Activity for Stormwater Discharges

Control Number:

Section I – Prime Contractor Information Contractor:

Company POC:

Phone:

Mailing Address:

Email:

City:

State:

Zip Code:

Section II – Project Site/Location Project name: Location:

Government POC (i.e. COR, ESD Engineer, COE Rep):

Section III – Site Activity Information Total number of acres in project:

Total number of acres to be disturbed:

Estimated start date:

Estimated completion date:

General project description:

Section IV – Environmental Management Division Review Stormwater Program Manager: Signature:

Date:

Will a Fort Knox Stormwater/Groundwater Protection Plan Construction Site Best Management Practice (BMP) Plan be required? Yes

No

Notes:

Section V – Contractor Notice of Termination (to be completed at the completion of the construction project) I certify that all storm water discharges associated with industrial activity from the identified facility have been eliminated or that I am no longer the operator of the facility or construction site. Temporary erosion and sediment control measures have been removed or will be removed per request from EMD within 30 days. All stormwater discharges associated with industrial activity from the construction site that are authorized by the KPDES general permit have otherwise been eliminated.

Contractor Representative:

Signature:

Section VI – Environmental Management Division Notice of Termination Approval Stormwater Program Manager:

Signature:

EMD Approval for Termination Yes

No

Notes:

Enclosure 2 - Fort Knox Stormwater/Groundwater Protection Plan Construction Site BMP Plan

1. Project Name/Location: _____________________________________________________

2. Prime Contractor: __________________________________________________________

3. Subcontractors:

a. ________________________________________________________________

b. ________________________________________________________________

c. ________________________________________________________________

d. ________________________________________________________________

4. Project Description:

4.1 The construction activities on this are to:

(1)

(2)

(3)

4.2 The order of construction, after the erosion control devices are in place, will be (1)

(2)

(3)

4.3 The estimated total area is ________ acres.

4.4 The estimated total disturbed area is _________ acres.

4.5 Soil data and conditions are available in the Fort Knox Stormwater/Groundwater

Protection Plan.

4.6 Include a site map indicating the direction of flow form the area, locations of BMPs and any other pertinent information relative to the construction and ground disturbing activities.

5. Sediment and Erosion Control Devices.

5.1. Soil Stabilization Practice: Existing vegetation will be preserved where possible. All disturbed areas will be stabilized.

5.2. Temporary Stabilization: Temporary soil stock piles and disturbed portions of the site where construction activity temporarily ceases for at least 21 days will be stabilized with temporary seed and straw, no later than 14 days from the last construction activity in that area. The straw shall be crimped in place. Silt fencing will be installed on the discharge perimeter side of the project area and around sinkhole areas prior to clearing and grubbing as shown on the BMP plan.

5.3. Permanent Stabilization: Disturbed portions of the site where construction activities permanently cease shall be stabilized with permanent seed within fourteen (14) days after the last construction activity. All disturbed areas shall be fine graded with sufficient topsoil with seed, fertilizer and straw (per ESD directive) to achieve an acceptable stand of grass.

5.4. Perimeter Structural Practices: Drain inlets and outlets shall be protected with rock bags or dams/checks. Silt fences will be used on all down slopes to prevent soil or sediment from leaving the site. If required, all entrances leading to public roads need to be stabilized by removing the vegetation and cutting down about 6 inches, place non-woven geo-textile material, and then place at least 6 inches of #2 aggregate on top. Area must be a minimum of 14 feet wide and 100 feet long.

6. Other Control Measures.

6.1. Waste Material: No solid materials, including building materials, shall be discharged to the waters of the Commonwealth. All waste materials will be collected and stored in a dumpster provided by a licensed solid waste management company. The dumpster shall meet all federal, state, or local regulations. The waste will be hauled to an approved landfill. No construction material shall be buried on site. All personnel will be instructed in the proper procedures for waste disposal. To prevent stormwater contamination from the job-site, the following BMP’s will be implemented.

6.1.1. Good Housekeeping practices will be followed throughout all phases and duration of this project.

6.1.2. Fertilizers shall be applied only in the minimum amounts recommended by the manufacturer. Fertilizers shall be worked into the soil.

6.1.3. All vehicles/equipment onsite will be monitored daily for leaks.

6.1.4. Petroleum products shall be stored in tightly sealed containers, which are clearly labeled.

6.1.5. Spill kits shall be located on the job-site, for fueling activities and maintenance.

6.1.6. All 55 Gal drums will be on covered secondary containment.

6.1.7. All paint containers and curing compounds shall be tightly sealed and stored in an inside storage room when not required for use. Excess paint shall be removed from Fort Knox.

6.1.8. All spills shall be cleaned up immediately upon discovery, report all spills to the Fort Knox Fire Dept. and the Fort Knox Environmental Management Division

(EMD).

6.1.9. Concrete trucks shall be required to clean out in one properly designed containment area by the onsite superintendent or person in responsible charge.

Washout concrete shall be removed from the site at the end of the project and disposed of properly.

6.1.10. Offsite vehicle sediment tracking and dust generation shall be minimized. A stabilized constructions entrance shall be constructed (if required) to reduce vehicle tracking of sediment.

6.1.11. The paved street adjacent to the site shall be swept daily, to remove excess mud, dirt, or rock tracked from the site.

6.2. Hazardous Waste: Fort Knox EMD will be notified for directives on Hazardous Waste disposal.

6.3. Sanitary Waste: Waste disposal methods and sanitary sewer or septic systems shall comply with applicable state and local regulations. All sanitary waste shall be collected from the potable units a minimum of twice per week by a licensed sanitary waste management contractor.

6.4. Hazardous Materials/Products: These practices are used to reduce the risks associated with hazardous material.

6.4.1. Maintain Good Housekeeping practices at all times.

6.4.2. Products shall be kept in original containers unless they cannot be resealed.

6.4.3. Safety Data Sheets (SDS) shall be retained in a file folder of the project labeled

Safety Data Sheets.

6.4.4. If a surplus product must be disposed of, manufacturer's recommended methods for proper disposal shall be used, or in accordance with local and state regulations off the installation.

7. Potential Pollutants The materials or substances listed below are expected to be present onsite during construction.

Please list below.

7.1. ____________________________________________________________________

7.2. ____________________________________________________________________

7.3. ____________________________________________________________________

7.4. ____________________________________________________________________

8. Non-Storm Water Discharges: It is expected that non-storm water discharges may occur form the site during construction as noted below: Please itemize below

8.1. ____________________________________________________________

8.2. ____________________________________________________________

8.3. ____________________________________________________________

8.4. ____________________________________________________________

8.5. ____________________________________________________________

9. Spill Control Practices:

The following practices shall be followed for spill prevention and cleanup.

9.1. Sufficient spill materials will be on site at all time

9.2. All spills will be reported to the Fort Knox Fire Dept. and Fort Knox EMD

9.3. All spills shall be cleaned up immediately after discovery and properly disposed of at the Fort Knox Landfill

9.4. The spill area shall be kept well ventilated, and personnel shall wear appropriate protective clothing to prevent injury by contact with hazardous substance

9.5. Contractor will complete a spill report (Form FK5053 available from EMD) for each incident and submit to EMD

10. Other State and Local Plans.

10.1. This BMP Plan is supplemental and site specific for this project that satisfies the requirements of the Fort Knox Stormwater/Groundwater Protection Plan and the Kentucky Pollution Discharge Elimination System (KPDES) permit KY0002917 for discharge.

11. Maintenance. The contractor who prepared this plan is responsible for the proper installation of all erosion control measures and maintain them in a good and effective operating condition.

11.1. All BMP measures shall be maintained in good working order. If a repair is necessary it shall be initiated within 24 hours of a report.

11.2. Built up sediment on check dams shall be removed when it reaches 10 percent of the design capacity or at the end of the job.

11.3. The job-site superintendent or the person in responsible charge of the work shall be responsible for maintenance and repair activities.

11.4. Personnel assigned to maintenance shall receive training from the on-site superintendent or person in responsible charge in all maintenance practices necessary for keeping the erosion controls used on site in good working order.

11.5. All equipment can only receive minor maintenance onsite. Major repairs will be conducted off the installation.

12. Inspection: The contractor who prepared this plan shall be responsible for the inspection of all erosion control measures in a timely manner.

12.1. All BMP measures shall be inspected by qualified personnel at least once every 7 days and following any storm event of 0.50 inches or greater. The 7-day requirement shall begin anew after the 0.50-inch or greater rain event. Inspections shall include date of inspection, observations made, and corrective measures taken.

12.2. Silt fences shall be inspected to check for depth of sediment, tears and to see (1) if the fabric is securely attached to the fence posts, and (2) that the fence posts are firmly in the ground.

12.3. The sediment check dam will be inspected for depth of sediment. See the second maintenance bullet above.

12.4. Temporary and permanent seeding and planting will be inspected for bare spots, washouts, and healthy growth.

12.5. An inspection report shall be made after each maintenance-inspection.-The job site superintendent or the person in responsible charge shall be responsible for all inspections.

12.6. Personnel assigned to inspection duties shall receive training from the on-site superintendent or person in responsible charge in all inspection practices necessary for keeping the erosion and sediment control measures in a good working order.

12.7. A report summarizing the scope of the inspection, names and qualifications of personnel conducting the inspection, the date of the inspection, major observation relating to the implementation of this BMP Plan, and any corrective actions taken shall be made and kept as a part of this BMP plan for at least three years after the date of inspection, or until, one year after coverage under this permit ends, which ever date is later.

13. Contractor:

The contractor shall implement each control measure identified in this BMP. A copy of this BMP and inspection reports will be made available for review by EMD upon request.

14. Contractor Certification:

I certify under penalty of law that I understand the terms and conditions of the Fort Knox Stormwater/Groundwater Protection Plan and the Kentucky Pollution Discharge Elimination System (KPDES) permit KY0002917 for discharge.

Name Title

Signature Date

Fort Knox, KY Project C&D Waste Management Plan

C&D Waste Management Plan

Project Title:

Project Location:

Project Type: Residential Non-Residential

New Construction Demolition Renovation

New Construction Demolition Renovation

Project Description:

Return to Fort Knox Environmental Management Divison, Solid Waste Manger Bldg. 1110

Waste Management Coordinators:

Name Company Phone Email

Waste Management Plan Guidelines:

1. This project shall target a C&D waste diversion rate of _______%. Work forces shall generate the least amount of waste possible by planning and ordering carefully, following all proper storage and handling procedures to reduce broken and damaged materials, and reusing materials wherever possible. Waste materials generated shall be salvaged or separated for recycling to the extent that is economically feasible.

2. The Waste Management Chart identifies the waste materials expected to be generated on this project, the disposal method for each material, and any handling requirements.

3. Waste diversion activities shall be discussed at each safety meeting. Each contractor and subcontractor shall receive this WMP and be provided a tour of the job site. Each subcontractor is expected to make sure all work crews comply with the WMP. All containers shall be clearly labeled and lists of accepted/unaccepted materials will be posted throughout the site.

4. To the maximum extent possible, all recyclables will be taken to the Fort Knox Recycle Center. Weight of recyclables not sent to the Fort Knox Recycle Center shall be reported to the Fort Knox Solid Waste Manager, Bldg. 1110, room 224 monthly. Reports are due by the 10th of the next month.

Contractor:

Enclosure 3 -file://///knoxdf1/IMCOM/EMD/Compliance/Solid%20Waste/Solid%20Waste%20Management%20Plans/Archives/Solid%20Waste%20Management%20Plan-2008/Appendices%20with%202008%20Update/Project%20C&D%20Waste%20Management%20Plan%20Template%20and%20Worksheets/New%20Residential%20Construction%20C&D%20Waste%20Worksheet.xls file://///knoxdf1/IMCOM/EMD/Compliance/Solid%20Waste/Solid%20Waste%20Management%20Plans/Archives/Solid%20Waste%20Management%20Plan-2008/Appendices%20with%202008%20Update/Project%20C&D%20Waste%20Management%20Plan%20Template%20and%20Worksheets/Residential%20Demolition%20C&D%20Waste%20Worksheet.xls file://///knoxdf1/IMCOM/EMD/Compliance/Solid%20Waste/Solid%20Waste%20Management%20Plans/Archives/Solid%20Waste%20Management%20Plan-2008/Appendices%20with%202008%20Update/Project%20C&D%20Waste%20Management%20Plan%20Template%20and%20Worksheets/Residential%20Renovation%20C&D%20Waste%20Worksheet.xls file://///knoxdf1/IMCOM/EMD/Compliance/Solid%20Waste/Solid%20Waste%20Management%20Plans/Archives/Solid%20Waste%20Management%20Plan-2008/Appendices%20with%202008%20Update/Project%20C&D%20Waste%20Management%20Plan%20Template%20and%20Worksheets/New%20Non-Residential%20Construction%20C&D%20Waste%20Worksheet.xls file://///knoxdf1/IMCOM/EMD/Compliance/Solid%20Waste/Solid%20Waste%20Management%20Plans/Archives/Solid%20Waste%20Management%20Plan-2008/Appendices%20with%202008%20Update/Project%20C&D%20Waste%20Management%20Plan%20Template%20and%20Worksheets/Non-Residential%20Demolition%20C&D%20Waste%20Worksheet.xls file://///knoxdf1/IMCOM/EMD/Compliance/Solid%20Waste/Solid%20Waste%20Management%20Plans/Archives/Solid%20Waste%20Management%20Plan-2008/Appendices%20with%202008%20Update/Project%20C&D%20Waste%20Management%20Plan%20Template%20and%20Worksheets/Non-Residential%20Renovation%20C&D%20Waste%20Worksheet.xls

--- SAMPLE ---

Waste Management Chart

Material Quantity Disposal Method Handling Procedure

Demolition

Asphalt from parking lot

100 tons Ground on-site, Reused as Fill

Wood framing 6 tons Recycled- Wood Recycling NW

Separate clean wood into “clean wood” dumpsters

Decorative wood beams

300 bd. ft. Salvaged-Timber Frame Salvaging

Remove by hand, store on-site, on pallets for pick up.

Remaining wastes 8 tons Garbage-Sound Disposal

Dispose in “trash” dumpster.

New Construction

Concrete 2 tons Recycled-Puget Sound Concrete

Break up any wastes or mistakes and put in “concrete” dumpster.

Rebar OK.

Forming boards Reuse as many times as possible, then recycled- Wood Recycling NW

Stack next to supply of new form boards for reuse. Recycle clean unusable forms in “clean wood” recycling dumpsters.

Clean wood scrap 12 tons Scraps reused for form work, fire-breaks etc. Recycled-Wood Recycling

NW

Stack reusable pieces next to dumpster for reuse. Separate unusable clean wood into “clean wood” recycling dumpsters

Scrap metal 5 tons Recycled-Seattle Metals

Deposit all metals in “metal” Dumpster.

Drywall 10 tons Subcontractor will recycle and submit reports to waste coordinator

Either provide container or collect in vehicle for recycling.

Electric/plumbing subcontractors’ metal and other recyclables

Subcontractor will recycle and submit reports to waste coordinator

Either provide container or collect in vehicle for recycling.

All other waste 14 tons Garbage- Sound Disposal

Dispose in “trash” dumpster.

Waste Management Chart

Material Quantity Disposal Method Handling Procedure

Enclosure 4 – MEMORANDUM FOR Contractors and Government Contracting Representatives

SUBJECT: Application for Landfill Usage Slip

1. Contractor may dispose of Construction Demolition Debris generated on-post, at Baker Road Landfill, provided the contract allows for the use of the Government Landfill, and each vehicle has a current “Landfill Usage Slip”. The Government Contracting Officer Representative (COR) verifies the contract allows for the use of the landfill and signs this application.

2. Complete the information on this form and submit it to the Environmental Management Division (EMD), Directorate of Public Works, located in Bldg. 1110, Room 224.

3. EMD Solid Waste Manager Phone (502) 624-3692

Approval of Government Representative

NAME SIGNATURE PHONE # DATE

Prime Contractor POC Phone #

Sub Contractor POC Phone # Contract # Project Name ______________________________________________________________ Start Date _________________ End Date _______________

1) Vehicle ____________________/_____________________ /______________________

YEAR MAKE MODEL

License Plate # ________________________ State _________ Exp. Date _____________

2) Vehicle ____________________/_____________________ /______________________

3) Vehicle ____________________/_____________________ /______________________

4) Vehicle ____________________/_____________________ /______________________

5) Vehicle ____________________/_____________________ /______________________

6) Vehicle ____________________/_____________________ /______________________

7) Vehicle ____________________/_____________________ /______________________

8) Vehicle ____________________/_____________________ /______________________

9) Vehicle ____________________/_____________________ /______________________

10) Vehicle ____________________/_____________________ /_____________________

11) Vehicle ____________________/_____________________ /_____________________

12) Vehicle…

This is the start of the file's text. The full file is on GovTribe.