This document package outlines specifications for a roadway repair and traffic pattern change project at Fort Knox, Kentucky. The project involves removing and replacing concrete sidewalks, curbs, and gutters; constructing concrete header curbs and mountable islands; removing and replacing asphalt and concrete surfaces; reconfiguring South Knox Street; and regrading areas for drainage at Stithton Circle and South Knox Street. Bids are due by 24 July 2020 for work to be completed within 120 calendar days of notice to proceed. The contractor will coordinate traffic control and maintain access for base users throughout construction. The Mission and Installation Contracting Command at Fort Knox intends to solicit offers for a combined Job Order Contract and Multiple Award Task Order Contract to support maintenance, repair, and minor construction requirements at the base, with an anticipated solicitation date of 22 June 2020.
View the file
Other files
Show 40 more
Latest 50 of 51 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT SPECIFICATION
Stithton Circle & South Knox Street
Pavement & Drainage Repair and Traffic Pattern Change
Ft. Knox, Kentucky
Prepared By:
Directorate of Public Works
Engineering & Services Division
Bldg. 1110
125 6th Avenue
Ft. Knox, Kentucky 40121
24 July 2020
1 Section 00110- Bid Form
SECTION 00110- Bid Form
FROM: BIDDER _______________________________________________
ADDRESS _______________________________________________
DATE OF BID: _______________________________________, 20_____
The purpose of the Bid Form is to work in conjunction with formal Contract Documents the Contractor may enter into with Mission and Installation Contracting Command, MICC, Fort Knox, KY.
The Bidder hereby signifies that it is _________ (his/their) intention and purpose to enter into a formal Contract with Mission and Installation Contracting Command, MICC, Fort
Knox, KY, to furnish all labor; materials, tools, equipment, apparatus, supplies, etc., required and to do all the Work necessary for and because of the construction, erection, and/or installation of the proposed
Stithton Circle Pavement & Drainage Repair and Traffic Pattern Change work in accordance with the Contract Documents.
Base Bid with Addendum– Stithton Circle & South Knox Street Pavement & Drainage
Repair and Traffic Pattern Change:
________________________________________________________for the lump sum of
_________________________________________________________________ Dollars
($______________). We further agree to complete the Work in 120 calendar days after receipt of Notice to Proceed.
2 Section 00110- Bid Form
NAME OF SIGNER: ______________________________________________________
(Please Print or Type)
TITLE OF SIGNER: ______________________________________________________
SIGNITURE: ____________________________________________________________
DATE: _________________________________________________________________
End of Section- 00100
ATTACHMENT 1
SCOPE OF WORK
STITHTON CIRCLE & SOUTH KNOX STREET
PAVEMENT & DRAINAGE REPAIR
AND TRAFFIC PATTERN CHANGE
FORT KNOX, KENTUCKY
Stithton Circle & South Knox Street
Pavement & Drainage Repair and Traffic Pattern Change
Scope of Work
PRELIMINARY SCOPE OF WORK
Stithton Circle & South Knox Street Repair & Traffic Pattern Change
All work associated with project will be performed in accordance with all applicable Kentucky State Codes and
Regulations, and latest edition of Fort Knox and UFC Standards. Also, workmanship and materials will conform to latest edition of Kentucky Transportation Cabinet Standard Specifications for Road and Bridge Construction.
Project involves the roadway repair and traffic pattern change of Stithton Circle and South Knox Street. Major design features are as follows:
Remove existing concrete sidewalk and curbs and construct new sidewalks and curb and gutter as shown.
Remove existing concrete curb, asphalt and concrete and construct new concrete header curb around the center island. Remove the tank pads and construct new pads as shown. Raise landscape area, pole and monument and regrade area to drain.
Remove existing asphalt and concrete and construct mountable concrete islands as shown.
Concrete test cylinders are required per the specifications.
Mill existing asphalt or remove asphalt and concrete, then place asphalt base/wedging and asphalt surface or construct road according to the pavement design.
Remove South Knox Street from Stithton Traffic Circle to Pershing Drive and restore the area as shown on the plans.
Re-align South Knox Street at Pershing Drive to Dixie Street to meet the street profile and grading shown on the plans along with the proposed storm drainage shown.
Re-construct the entrance to Abound from the new South Knox Street.
Re-construct the entrance to Pershing Drive to the west from the new South Knox Street.
Paint all asphalt surfaces as required.
All work to be completed according to all applicable codes and Fort Knox standards
1 Section 00115- List of Drawings
SECTION 00115- LIST OF DRAWINGS
Cover Sheet: Abbreviations, Sheet Index, General Notes, Drawing Symbols, Material
Legend
Sheet 1: Stithton Circle Site Layout Plan with Imagery
Sheet 2: South Knox Street Site Layout Plan with Imagery
End of Section- 00115
1 Section 00211- Phasing and Project Description
SECTION 00211- PHASING & PROJECT DESCRIPTION
General: All work associated with project will be performed in accordance with all applicable Kentucky State Codes and Regulations, and latest edition of Fort Knox and
UFC Standards. Also, workmanship and materials will conform to latest edition of
Kentucky Transportation Cabinet Standard Specifications for Road and Bridge
Construction.
Scope of Work is as Follows:
Stithton Circle & South Knox Street Repair & Traffic Pattern Change
Project involves the roadway repair and traffic pattern change of Stithton Circle and
South Knox Street. Major design features are as follows:
Remove existing concrete sidewalk and curbs and construct new sidewalks and curb and gutter as shown.
Remove existing concrete curb, asphalt and concrete and construct new concrete header curb around the center island. Remove the tank pads and construct new pads as shown. Raise landscape area, pole and monument and regrade area to drain.
Remove existing asphalt and concrete and construct mountable concrete islands as shown.
Concrete test cylinders are required per the specifications.
Mill existing asphalt or remove asphalt and concrete, then place asphalt base/wedging and asphalt surface or construct road according to the pavement design.
Remove South Knox Street from Stithton Traffic Circle to Pershing Drive and restore the area as shown on the plans.
Re-align South Knox Street at Pershing Drive to Dixie Street to meet the street profile and grading shown on the plans along with the proposed storm drainage shown.
Re-construct the entrance to Abound from the new South Knox Street.
Re-construct the entrance to Pershing Drive to the west from the new South Knox
Street.
Paint all asphalt surfaces as required.
All work to be completed according to all applicable codes and Fort Knox standards
1 Section 00311- Preliminary Schedule
SECTION 00311- PRELIMINARY SCHEDULE
Anticipate that Contractor will receive Contract for Stithton Circle & South Knox Street
Pavement & Drainage Repair and Traffic Pattern Change no later than 30 August 2020.
Anticipated that Contractor will complete all work within 120 calendar days. Contractor must schedule work hours as necessary to meet the required completion date.
End of Section- 00311
1 Section 00312- Existing Conditions Information
SECTION 00312- EXISTING CONDITIONS INFORMATION
Existing concrete is anticipated under the asphalt pavement and is likely 6-8” thick with little to no rock under it. Contractor shall submit a traffic plan along with schedule on how all work will be completed. The contractor shall coordinate with DPW during construction of all changes to the schedule, this is a heavily traveled area and the movement of traffic during construction is essential. Contract will coordinate with Abound to ensure the entrance is accessible for users and employees throughout construction. Contractor will provide traffic control devices, signage and flag persons as necessary to meet all KYTC safety regulations for traffic control in construction areas throughout construction.
End of Section- 00312
| ATT_00a_Seed_Project_Specifications_Revised,Amdt_0001.pdf |
| Cover Page 24 July 2020.pdf |
| Section 00110- Bid Form 24 July 2020.pdf |
| ATTACHMENT 1 Cover Sheet 24 July 2020.pdf |
| ATTACHMENT 1 Stithton Circle Repair - SOW 24 July 2020.pdf |
| Section 00115- List of Drawings 24 July 2020.pdf |
| Section 00211- Phasing and Project Description 24 July 2020.pdf |
| Section 00311- Preliminary Schedule 24 July 2020.pdf |
| Section 00312- Existing Conditions Information 24 July 2020.pdf |
Section 00110- Bid Form 4 Aug 2020.pdf