This document contains two sections related to a federal construction project. The first section provides specifications for storm sewage system work including materials, excavation requirements, trench preparation, pipe installation procedures, backfilling, and applicable codes. Reinforced concrete and HDPE pipes are to be used along with drainage structures. The second section describes a forthcoming solicitation for a combined Job Order Contract and Multiple Award Task Order Contract to provide maintenance, repair, and minor construction services at Fort Knox, Kentucky in support of the Directorate of Public Works. The solicitation will be issued on June 22, 2020 to support real property requirements.
View the file
Other files
Show 40 more
Latest 50 of 51 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 Division 33 - Utilities
DIVISION 33 - UTILITIES
Section 33050- Common Work Results for Utilities
A. General:
1. Tracer wire will be installed on all non-ferrous underground piping (plumbing supply & waste lines, sprinkler lines, site drainage lines, etc.)
B. Execution:
1. Contact Hardin County Water District Number 1 (HCWD1) for all Storm
Sewer, Sanitary Sewer, and Potable Water before beginning any utilities Work.
2. Contact Nolin Electric for all Electrical utilities before beginning any utilities
Work.
End of Section- 33050
2 Division 33 - Utilities
SECTION 33410 - STORM SEWAGE SYSTEM
1. SCOPE
The work covered by this section of the specifications consists of furnishing all plant, labor, equipment and materials and in performing all operations in connection with the construction of storm sewer and structures in accordance with the drawings and specifications.
2. MATERIAL
a. Culverts and Storm Sewer: Reinforced concrete pipe smaller than 18" shall conform to ASTM C-14, Class III. Reinforced concrete pipe 18" and larger shall conform to
ASTM C-76 or AASHTO M 170, Class III. High density polyethylene (HDPE) drainage pipe shall meet ASTM F2648 and have smooth interior and annular exterior corrugations.
HDPE drainage pipe joints shall meet ASTM F477 and fittings shall conform to ASTM
F2306.
b. Drainage Structures
1. Concrete and reinforced concrete shall conform to the requirements of Section
32131.
2. Structures shall conform to the details shown on the contract drawings.
c. Sewer Pipe (Type to be as shown on the Construction Drawings.)
(1) Reinforced Concrete Pipe - ASTM C76 (Class III unless otherwise on
Drawings)
(a) Compression - Type joints shall conform to ASTM C443
B. Cast-in-Place Concrete - 3500 psi permitted below grade.
C. Concrete Reinforcement - Section 32131.
3. EXCAVATION FOR PIPE CULVERTS, STORM DRAINS AND DRAINAGE
STRUCTURES
Excavation shall conform to applicable parts of Sections 33050.
4. TRENCH PREPARATION AND BEDDING
a. Bottom Preparation
The bottoms of trenches shall be accurately graded to provide uniform bearing
3 Division 33 - Utilities and support. Stones of 3" or greater shall be removed to avoid point bearing. The bottom of the trench shall be undercut a minimum of 4" so that at least the bottom quadrant of the pipe shall rest firmly on stone bedding for as nearly the full length of the barrel as proper jointing operations will permit.
33410-01
b. Bedding
The bedding surface for the pipe shall provide a firm foundation of uniform density throughout the entire length of the pipe. The pipe shall be bedded carefully in crushed stone foundation accurately shaped and rounded to conform to the lowest one-fourth of the outside portion of circular pipe or to the lower curved portion of pipe arch for the entire length of pipe or arch. Bell holes and depressions for joints shall be only of such length, depth and width as required for properly making the particular type joint.
5. PLACING PIPE
Each pipe shall be carefully examined before being placed, and defective or damaged pipe shall not be used. Pipelines shall be laid to the grades and alignment indicated.
Proper facilities shall be provided for lowering sections of pipe into trenches. Lifting lugs in vertically elongated metal pipe shall be placed in the same vertical plane as the major axis of the pipe. Under no circumstances shall pipe be laid in water, and no pipe shall be laid when trench conditions or weather are unsuitable for such work. Diversion of drainage or dewatering of trenches during construction shall be provided as necessary.
All pipe in-place shall be inspected before backfilling, and those damaged during placement shall be removed and replaced at no additional cost to the owner.
a. Concrete Pipe: Laying shall proceed upgrade with spigot ends of bell and spigot pipe and tongue ends of tongue-and-groove pipe pointing in the direction of the flow.
a. Polyethylene Pipe: Installation shall be in accordance with ASTM D2321 and ADS recommended installation guidelines (available at www.ads-pipe.com) with minimum compacted crushed stone bedding cover of one-foot in traffic areas.
6. BACKFILLING: All culverts and storm drains shall be backfilled with selected earth backfill and tamped in place. Storm drains placed in proposed or existing pavements shall be full depth DGA backfill.
7. APPLICABLE CODES: The intent of this section of the specification is that the contractor's bid on the work covered herein shall be based upon the drawings and specifications but that the work shall comply with all applicable codes and regulations as amended by any waivers.
8. EXISTING IMPROVEMENTS: Maintain in operating condition all active drains encountered in the utility installation. Repair to the satisfaction of the COR any surface or subsurface improvement damaged during the course of the work (unless such
4 Division 33 - Utilities improvement is shown to be abandoned or removed), whether or not such improvement is shown on the drawings. Any street cuts shall be replaced in kind to conform with Fort
Knox standards.
9. INSTALLATION
a. Workmanship to conform to all local, state and national codes and be approved by all local and state agencies having jurisdiction.
b. Sewer Construction
1. Excavation and construction - Excavation shall be made to the required depth and to the dimensions as shown on the plans.
2. Setting castings - Frames for castings shall be set in full mortar beds composed of one (1) part cement and two (2) parts fine aggregate. Set the grates of drainage openings level and two (2) inches below finished grade.
3. Connections – Make or have made all required connections to headwalls, inlets, etc. Carry out such work in accordance with local standards and requirements.
4. Sewers in street – Construct sewers and appurtenances in public rights-of-way, including rights-of-way to be dedicated to conform to local standards and requirements. Elsewhere perform such work in accordance with these specifications.
5. Sewer pipe laying – Commence at the lowest point in the system and lay the pipe with bell or groove end upgrade. Test pipe for soundness and clean interior and joint surfaces before lowering the pipe into the trench. Lay pipe on uniform grades between points where changes in alignment or grade are shown. Bed the pipe barrel firmly and uniformly as indicated on the detailed drawings. Check line and invert grade of each pipe by a method acceptable to the COR. Fit the pipes to form close concentric joints. Perform pumping or bailing as necessary to avoid laying the pipe in water and to protect joints. Keep a stopper in the pipe mouth when pipe laying is not in progress.
6. Provide rip rap or channel lining as indicated on drawings.
7. Sewer Pipe Jointing
(a) Mortar joints in storm sewers shall as nearly as possible fill the joint space providing a smooth finish surface.
5 Division 33 - Utilities
(b) Factory made compression type joints shall be shall conform to manufacturer's instructions.
End of Section - 33410