This document outlines requirements for fire alarm, sprinkler, and mass notification system drawings for a federal construction project. Key details include a checklist of required drawing elements covering topics such as cover sheets, information sheets, floor plans, riser diagrams, internal panel wiring, calculations, device installation details, and preliminary test results. Drawings must be placed in a binder and submitted to the Directorate of Public Works at Fort Knox, Kentucky for review and scheduling of acceptance testing within 10 working days. The related federal contract opportunity is a pre-solicitation notice for a combined Job Order Contract and Multiple Award Task Order Contract to be awarded on 22 June 2020 in support of maintenance, repair, and minor construction requirements at Fort Knox, Kentucky. The solicitation will be issued by the Mission and Installation Contracting Command Fort Sam Houston on behalf of the Fort Knox DPW.

View the file

Other files

File Type Posted
W9124D20R0034_Amendment_0002.pdf PDF
ATT_00c_Seed_Project_GD_Highway_KY20200038_8-14-20_Amdt_0002.pdf PDF
ATT_00b_Seed_Project_Drawings_Stithton_Traffic_Circle_Rev_8-18-20_Amdt_0002.pdf PDF
ATT_12_JOC_Bid_Form_Templates.pdf PDF
ATT_00_DPW_Construction_JOC-MATOC_SOW_Rev_8-18-20_ Amdt_0002.pdf PDF
ATT_05_FK_EnvironmentaL_Handbook_2020_Edition.pdf PDF
ATT_Pre-Proposal Conference-Site_Visit_Attendees.pdf PDF
ATT_05a_Environmental_Contract_Language.pdf PDF
ATT_00b_ Seed_Project_Drawings_Stithton_Traffic_Circle_Rev.Amdt_0001.pdf PDF
W9124D20R0034_Amendment_0001.pdf PDF
ATT_00a_Seed_Project_Specifications_Rev.Amdt_0001.pdf PDF
ATT_02a_Division_11_Equipment.pdf PDF
ATT_02d_Fort_Knox_Sprinkler_Systems_Initial_Acceptance_Test_Fm_9 Jul_2009.pdf PDF
ATT_02a_Division_01_General_Requirements.pdf PDF
ATT_11_Performance_Assessment_Questionnaire.pdf PDF
ATT_02a_Division_13_Special_Construction.pdf PDF
ATT_06_Contractor_Row_Map.pdf PDF
ATT_02a_Division_09_Finishes.pdf PDF
ATT_02a_Table_of_Contents.pdf PDF
ATT_00b_ Seed_Project_Drawings__Stithton_Traffic_Circle.pdf PDF
ATT_02a_Division_08_Doors_and_Windows.pdf PDF
W9124D20R0034_Consolidated_JOC_MATOC.pdf PDF
ATT_02a_Division_32_Exterior_Improvements.pdf PDF
ATT_01_JOC_Guide_2003_Version.pdf PDF
ATT_03_JOC_Software_Specifications.pdf PDF
ATT_00_DPW_Construction_JOC-MATOC_SOW.pdf PDF
ATT_00c_Seed_Project_GD_KY20200038.pdf PDF
ATT_04b_Safety_Plan_Checklist_IAW_USACE_EM_385_1_Appendix_A.pdf PDF
ATT_02a_Division_23_HVAC.pdf PDF
ATT_02a_Division_02_Existing_Conditions.pdf PDF
ATT_02a_Division_26_Electrical.pdf PDF
ATT_02a_Division_12_Furnishings.pdf PDF
ATT_02a_Division_10_Specialties.pdf PDF
ATT_02a_Division_31_Earthwork.pdf PDF
ATT_02a_Division_04_Masonry.pdf PDF
ATT_02a_Division_05_Metals.pdf PDF
ATT_02a_Division_03_Concrete.pdf PDF
ATT_07_Sign_Template.pdf PDF
ATT_02a_Division_22_Plumbing.pdf PDF
ATT_09a_Instructions_for_DD_FORM_1354.pdf PDF
ATT_10_FT_Knox_Locates_Revised_25_Mar_2019.pdf PDF
ATT_02a_Division_14_Conveying_Systems.pdf PDF
ATT_00a_Seed_Project_Specifications_21_Jul_2020.pdf PDF
ATT_04a_EM385_1_1_APP_AFINAL.pdf PDF
ATT_02a_Divisioin_00_Procurement_and_Contracting_Requirements.pdf PDF
ATT_02a_Division_06_Woods_and_Plastics.pdf PDF
ATT_02a_Division_33_Utilities.pdf PDF
ATT_02b_Fort_Knox_Fire_Department_Requirements_5_30_19.pdf PDF
ATT_09b_DD1354_Template_May_2014.pdf PDF
ATT_08_Fort_Knox_CADD_Contract_Requirements_(25_Mar_2019)_V1_1.pdf PDF
Show 40 more

Latest 50 of 51 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 2c

PRELIMINARY TEST AND DRAWING SUBMITTAL

AS-BUILT DRAWINGS, FIRE ALARM, SPRINKLER AND MASS NOTIFICATION SYSTEM DRAWINGS WILL BE

SUBMITTED TO DPW IAW UFGS 28-31-76 PROPOSED

All documents must be placed in a binder, labeled, dated and given to DPW PM. DPW PM will review all submittals for accuracy and completeness. Once verified DPW PM will forward all submittals to Fire Prevention for scheduling of acceptance testing. Fire Prevention has 10 work days to review the submittal, identify deficiencies and if indicated schedule the final or recommend correction of noted deficiencies.

FRONT COVER SHEET:

1) Building number and mailing address

2) General Contractor name, address and contact information

3) Electrical Contractor name, address and contact information

4) Fire alarm company name, address and contact information

5) Fire Protection Engineer name, Signature, contact information and copy of their plan review report

6) Fire Alarm and Mass Notification Designer, Installer and Final Testing Technician name, contact information, Certifications and or License’s Number

7) Table of Content with page number and description of each page

8) The original drawing date, date of each version and description of changes

INFORMATION SHEET:

1) General and Specific information regarding the design and code requirements

2) Wiring Schedule to include wiring identification and markings

3) Fire Alarm Matrix

4) Mass Notification Matrix (NOTE: Fire Alarm and Mass Notification Matrix may be combined into one)

5) Device addressing legend

6) Legend of fire alarm devices and appliance symbols in accordance with NFPA 170

7) Legend of each type of circuit listed on the drawings identified with unique symbol or letter for each circuit

FLOOR PLAN DRAWINGS:

1) All drawings shall be to an indicated scale with 1/8-inch to 1-foot scale the smallest acceptable scale

2) Illustrate all rooms, corridors, stairs, walls and description of their intended use and number for each when numbering system is used

3) All conduits, MC cables, junction and pull boxes, detection and initiating devices, notification appliances, all control panels, Monaco transmitter, Notification appliance power supplies, remote annunciator, Local Operating Consoles, relay and monitor modules, Knox Box, PIV and anything associated with the system shall be illustrated on floor plan drawing for each floor or level.

RISER DRAWINGS:

1) Each circuit shall have its own riser drawing illustrating the type and order they are connected starting with the output side through entire circuit to the returning side. Each symbol shall have its own unique address or label as identified on floor plan drawing. Circuits shall include but not limited to Signal Line Circuits, Visual Notification Appliance Circuits, Audible Notification Appliance Circuits, Remote Annunciator, Local Operating Console Circuits, etc...

INTERNAL PANEL WIRING:

1) All external field wiring connected to any panel or circuit associated with the system shall be illustrated on drawing to include but not limited to: fire alarm panel, audio amplifier, mass notification panel, visual and audible panels, notification appliance power supply, transmitter, remote annunciator, local operating console and any other panel where external field wiring enters into and terminates within that panel that is associated with the installed system. Connections of all electrical wiring that carries AC or DC power shall be shown on drawings.

CALCULATIONS:

1) Battery calculations for each panel that provide supporting information that secondary power source shall be capable to furnish adequate power for the panel circuits for the entire duration required by code. In most cases secondary power shall be capable to furnish adequate power for 72-hours plus additional 15-minutes during maximum power requirement such as when fire alarm is in alarm and all notification appliances are operating.

2) Voltage calculations for each device or appliance within each circuit demonstrating adequate voltage at each device or appliance with adequate voltage at the last device or appliance on that circuit.

3) Wire resistance readings for each circuit with all devices and or appliances connected to illustrate adequate gauge wire were used and wire length meets manufacture specifications.

INSTALLATION OF DEVICES, APPLIANCES AND BACK BOXES:

1) Wiring illustration of each device, appliance and back box installed in the system to include remote annunciator, local operating console and circuit terminations.

PRELIMINARY TEST RESULTS:

Preliminary test results and documentation shall be presented for review prior to scheduling acceptance testing. The following information is required:

1) Fire Alarm and Emergency Communication System Record of Completion

2) Fire Alarm and Emergency Communication System Inspection and Testing Form

3) Loop resistance measurement of each circuit

4) Tests of DBA and intelligibility of mass notification system speakers

5) Complete program printout including input and output addresses, type of device, narrative description of each device and device location.

6) Battery calculations, voltage drop calculations, spare capacity for each circuit, megger test results, check for shorts or current leakage to ground on all ungrounded conductors of all field wiring prior to installation of devices or appliances . Some of all of these test results may be part of as-built drawings.

7) Report of all transmission of signals to Central Station via Monaco transmitter to include device or condition used to create the signal, description of activated transmitter zone, description of zone received at Central Station with date and time stamped. DPW contractor (Ginn Group) shall provide part or all of off premises transmission signals report to include wattage output and standing to wave ratio.