DD Form 1354: Transfer and Acceptance of DoD Real Property

DD Form 1354 is a standardized Department of Defense form designed for the acceptance of real property or transfer of assets between DoD Components. This form serves as the official documentation for transferring real property ownership and responsibility from a transferring organization (typically a DoD Component or Construction Agent) to a receiving installation, activity, or service. The form requires completion of transaction details including the type of transfer (acquisition, transfer between services, capital improvement, or inventory adjustment), whether the asset transfer is total or partial, and the version status (draft, interim, or final).

The form captures comprehensive facility and asset information including facility identification numbers, real property unique identifiers (RPUID), category codes that classify designed use, construction type (permanent or semi-permanent), sustainability codes for high-performance buildings, primary and secondary units of measure with corresponding quantities, total project costs, fund sources, funding organizations, and type of legal interest held by DoD. The form requires authorization and acceptance signatures from both the transferring Construction Agent or Installation Management Organization and the receiving Installation Management Organization Real Property Accountable Officer (RPAO), along with associated dates. Additional sections accommodate construction deficiencies identified during contractor turnover and project-level remarks. Detailed instructions reference Unified Facilities Criteria 1-300-08 and the Real Property Information Model (RPIM) for specific data inputs, codes, and pick list values.

View the file

Other files

File Type Posted
Solicitation Amendment FA480326B00100003 SF 30.pdf PDF
Attachment 28-Wells 4 PFAS PFOA site visit sign in sheet.pdf PDF
Amended Solicitation SF 1442-FA480326B00100003.pdf PDF
Amended Solicitation SF 1442-FA480326B00100002.pdf PDF
Amendment-0002 SF 30.pdf PDF
Amended Solicitation SF 1442-FA480326B00100001.pdf PDF
Solicitation Amendment 001-FA480326B00100001 SF 30.pdf PDF
Attachment 01-SOW-VLSB 24-0058 DATE 08-12-2026.pdf PDF
Attachment 02-Blank Pricing Sheet-VLSB 24-0058 Well 4-12 Aug 26.xlsx XLSX spreadsheet
Attachment 25-Ltd. Asb. Survey Report 5-07-2026.pdf PDF
Attachment 26-Soil Sample Base Water Tower 4 6-25-26.pdf PDF
Attachment 27-Wells 4 PFAS PFOA - Site Visit Questions-17 Aug 26.pdf PDF
Solicitation - FA480326B0010.pdf PDF
Attachment 04 - Contractor Memo - 16 Apr 2024.pdf PDF
Attachment 01- SOW-VLSB 24-0058-10 Jul 26.pdf PDF
Attachment 03 - Base Access Request - 14 May 2026.pdf PDF
Attachment 05-Well 4 Site Utilities Overview.pdf PDF
Attachment 07-Additional Site Overview Photo.pdf PDF
Attachment 13-ufc_3_410_01_2025_c1.pdf PDF
Attachment 15-WD-SC2026-0030 Mod 1-18 May 26.pdf PDF
Attachment 06-Well Site Building-Tank Pictures.pdf PDF
Attachment 08-Ltd. Asb. Survey Report 5-07-2026.pdf PDF
Attachment 02-Pricing Sheet-Well 4 VLSB 24-0058 Date 02-20-2026.xlsx XLSX spreadsheet
Attachment 09-A_E_C_CAD Standard.pdf PDF
Attachment 10-Shaw AFB Design Constr Change 2 dated 21 Aug 2018.pdf PDF
Attachment 11-ufc_3_410_04_2017.pdf PDF
Attachment 12-ufc_3_810_01_2025.pdf PDF
Attachment 14-ufc.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PREVIOUS EDITION IS OBSOLETE. Page 1 of 2DD FORM 1354, AUG 2022

TRANSFER AND ACCEPTANCE OF DoD REAL PROPERTY

PAGE

OF

PAGES

1. FROM (Organization Name) 2. DATE PREPARED

(YYYYMMDD)

3. PROJECT/JOB

NUMBER

4. SERIAL NUMBER

5. TO (Organization - Installation Code and Name) 6. RPSUID/SITENAME/

INSTCODE/INSTNAME

7. CONTRACT

NUMBER(S)

7a. RPA PLACED-IN-

SERVICE DATE

(YYYYMMDD)

8. TRANSACTION DETAILS

a. TYPE (X only one box)

ACQUISITION

TRANSFER BETWEEN SERVICES

CAPITAL IMPROVEMENT

INVENTORY ADJUSTMENT

b. WHEN/EVENT (X one)

TOTAL ASSET

PLACED-IN-SERVICE

PARTIAL ASSET

PLACED-IN-SERVICE

c. VERSION (X one)

DRAFT INTERIM FINAL

9.

ITEM

NO.

10a.

FACILITY NO.

10b.

RPUID

11.

CATCODE

12.

CATCODE

DESCRIPTION

13.

CONS

TYPE CODE

14.

SUST

CODE

PRIMARY

15.

UMA

16.

QUANTITY

SECONDARY

17.

UMO

18.

QUANTITY

19.

COST

20.

FUND

SOURCE

21.

FUND

ORG

22.

RPA INT

TYPE

CODE

23.

ITEM

REMARKS

24. STATEMENT OF COMPLETION. The facilities listed hereon are in accordance with maps, drawings, and specifications and change orders approved by the authorized representative of the using agency except for the deficiencies listed on the reverse side.

a. TITLE (Construction Agent/Installation Management Organization Accountable Official/RPAO)

b. TRANSFERRED BY (Typed Name and Signature)

c. DATE

SIGNED

(YYYYMMDD)

25. ACCEPTED BY (Typed Name and Signature)

a. TITLE (Installation Management Organization Accountable Official/RPAO)

b. NAME AND SIGNATURE

c. DATE SIGNED

(YYYYMMDD)

26. PROPERTY

VOUCHER

NUMBER

PREVIOUS EDITION IS OBSOLETE. Page 2 of 2DD FORM 1354, AUG 2022

27. CONSTRUCTION DEFICIENCIES (Attach blank sheet for continuations) 28. PROJECT REMARKS (Attach blank sheet for continuations)

INSTRUCTIONS

GENERAL. This form has been designed and issued for acceptance of real property or transfer between the DoD Components.

For detailed instructions on how to fill out this form, please refer to Unified Facilities Criteria 1-300-08.

Existing instructions issued by the DoD Components relative to the preparation of DD Form 1354 are applicable to this revised form to the extent that the various items and columns on the superseded forms have been retained. The DOD Components may promulgate additional instructions, as appropriate.

For detailed information on data inputs and codes, please refer to the latest version of the Real Property Information Model (RPIM) Report and use the RPIM Pick Lists for Block responses:

https://extranet.acq.osd.mil/ie/

SPECIFIC DATA ITEMS.

1. From. Name of the DoD Component.

2. Date Prepared. Date of actual preparation. Enter all dates in YYYYMMDD format (Example:

March 31, 2010 = 20100331).

3. Project/Job Number. Project number on a DD Form 1391 or Individual Job Order Number.

4. Serial Number. Sequential serial number assigned by the preparing organization (e.g.,Item 17.

2010-0001).

5. To. Name and address of the receiving installation, activity, and Service of the Real Property

Accountable Officer (RPAO).

6. RPSUID/SITENAME/INSTCODE/INSTNAME. Site Unique Identifier and name or installation code and name where the constructed facility is located.

7. Contract Number(s). Contract number(s) for this project.

7a. RPA Placed-In-Service Date. The calendar date the asset is accepted for use by DoD.

8. Transaction Details.

a. Type of Transaction. X only one box.

For Acquisition Type, refer to the Acquisition Method Code pick list in RPIM.

b. When/Event. When or event causing preparation of DD Form 1354. X only one box.

c. Version. Draft, interim, or final DD Form 1354. X only one box.

9. Item Number. Use a separate item number for each facility, no item number for additional usages.

10a. Facility Number. An installation specific asset identification number.

10b. RPUID. A unique non-intelligent code to permanently identify an asset.

11. CATCODE. The real property Category Code (CATCODE) that classifies the designed use of the asset (original or current) and corresponds to the largest quantity of the asset that is utilized for a single purpose (RPA Predominant Design Use CATCODE).

12. CATCODE Description. The CATCODE name corresponding with Item 11.

13. Construction (CONS) Type Code. The code represents the Construction Type Code and valid values can be found in the RPIM pick list by the same name. Type of construction will be PERM for Permanent or SEMI for Semi-permanent.

14. Sustainability (SUST) Code. : This code is also known as the Facility Sustainability Code and valid values can be found in the RPIM pick list by the same name. It indicates whether a facility meets the Guiding Principles of Federal Leadership in High Performance and Sustainable Buildings for buildings greater than 10,000 sq. ft. The list of valid values is: 1, 2, 3, 4.

15. UMA. Enter the primary unit of measure accountability for each design use category code for each item of real property.

16.Quantity. Enter the total quantity in the unit of measure accountability specified for each item of real property.

17. UMO. Enter the appropriate unit of measure operational for capacity/configuration as applicable for the design use category code.

18. Quantity. Enter the total quantity of capacity/configuration in the unit of measure operational specified for each item of real property.

19. Cost. Enter the total project cost for each item of real property. UFC 1-300-08 contains additional guidance.

20. Fund Source. Identify the fund source in this column for each real property asset or item. UFC 1-300-08 contains additional guidance.

21. Funding Organization. Identify the organization(s) responsible for funding the acquisition of this real property asset.

22. RPA Interest Type Code. This code represents the RPA Interest Type Code and valid values can be found in the RPIM pick list by the same name. The code is used to identify the type of legal interest that DoD holds in a real property asset.

23. Item Remarks. Remarks pertaining only to the item number identified in Item 9; show cost sharing.

24. Statement of Completion. Typed name, signature, title, and date of signature by the responsible transferring individual or agent. In the case of a real property acceptance action this is signed by the DoD Construction Agent. In the case of a real property transfer this is signed by the Installation Management Organization.

25. Accepted By. Typed name, signature, title, and date of signature by the Installation Management Organization RPAO or accepting official.

26. Property Voucher Number. Next sequential number assigned by the RPAO in voucher register.

27. Construction Deficiencies. List construction deficiencies in project during contractor turnover inspection.

28. Project Remarks. Project level remarks and continuation of blocks.

https://extranet.acq.osd.mil/ie/

PREVIOUS EDITION IS OBSOLETE.

Page of

DD FORM 1354, AUG 2022

TRANSFER AND ACCEPTANCE OF DoD REAL PROPERTY TRANSFER AND ACCEPTANCE OF DoD REAL PROPERTY

OF

OF

8. TRANSACTION DETAILS

8. TRANSACTION DETALS

a. TYPE (X only one box)

b. WHEN/EVENT (X one) B. WHEN/EVENT (X one)

c. VERSION (X one)

9. ITEM NO.

9. ITEM NO.

10a. FACILITY NO.

10. A. FACILITY NO.

10b. RPUID

10. B. RPUID

11. CATCODE

11. CATEGORY CODE

12. CATCODE DESCRIPTION

12. CATCODE DESCRIPTION

13. CONS TYPE CODE

13. TYPE CODE

14. SUST CODE

14. SUST. CODE

PRIMARY

AREA

15. UMA

15. PRIMARY UM

16. QUANTITY

16. PRIMARY UM QUANTITY

SECONDARY

OTHER

17. UMO

17. SECONDARY UM

18. QUANTITY

18. SECONDARY QUANTITY

19. COST

19. COST

20. FUND SOURCE

20. FUND SOURCE

21. FUND ORG

22. INTEREST CODE

22. RPA INT TYPE CODE

22. INTEREST CODE

23. ITEM REMARKS

23. ITEM REMARKS

24. STATEMENT OF COMPLETION. The facilities listed hereon are in accordance with maps, drawings, and specifications and change orders approved by the authorized representative of the using agency except for the deficiencies listed on the reverse side.

24. STATEMENT OF COMPLETION. The facilities listed hereon are in accordance with maps, drawings, and specifications and change orders approved by the authorized representative of the using agency except for the deficiencies listed on the reverse side.

b. TRANSFERRED BY (Typed Name and Signature) A. TRANSFERRED BY (Typed Name and Signature)

25. ACCEPTED BY (Typed Name and Signature) A. TRANSFERRED BY (Typed Name and Signature) DD1354, "TRANSFER AND ACCEPTANCE OF DoD REAL PROPERTY" 6.2.0.20160331.1.924316.921890

INSTRUCTIONS

INSTRUCTIONS

GENERAL. This form has been designed and issued for acceptance of real property or transfer between the DoD Components.

For detailed instructions on how to fill out this form, please refer to Unified Facilities Criteria 1-300-08.

Existing instructions issued by the DoD Components relative to the preparation of DD Form 1354 are applicable to this revised form to the extent that the various items and columns on the superseded forms have been retained. The DOD Components may promulgate additional instructions, as appropriate.

For detailed information on data inputs and codes, please refer to the latest version of the Real Property Information Model (RPIM) Report and use the RPIM Pick Lists for Block responses: https://extranet.acq.osd.mil/ie/

SPECIFIC DATA ITEMS.

1. From. Name of the DoD Component.

2. Date Prepared. Date of actual preparation. Enter all dates in YYYYMMDD format (Example: March 31, 2010 = 20100331).

3. Project/Job Number. Project number on a DD Form 1391 or Individual Job Order Number.

4. Serial Number. Sequential serial number assigned by the preparing organization (e.g.,Item 17. 2010-0001).

5. To. Name and address of the receiving installation, activity, and Service of the Real Property Accountable Officer (RPAO).

6. RPSUID/SITENAME/INSTCODE/INSTNAME. Site Unique Identifier and name or installation code and name where the constructed facility is located.

7. Contract Number(s). Contract number(s) for this project.

7a. RPA Placed-In-Service Date. The calendar date the asset is accepted for use by DoD.

8. Transaction Details.

a. Type of Transaction. X only one box.

For Acquisition Type, refer to the Acquisition Method Code pick list in RPIM.

b. When/Event. When or event causing preparation of DD Form 1354. X only one box.

c. Version. Draft, interim, or final DD Form 1354. X only one box.

9. Item Number. Use a separate item number for each facility, no item number for additional usages.

10a. Facility Number. An installation specific asset identification number.

10b. RPUID. A unique non-intelligent code to permanently identify an asset.

11. CATCODE. The real property Category Code (CATCODE) that classifies the designed use of the asset (original or current) and corresponds to the largest quantity of the asset that is utilized for a single purpose (RPA Predominant Design Use CATCODE).

12. CATCODE Description. The CATCODE name corresponding with Item 11.

13. Construction (CONS) Type Code. The code represents the Construction Type Code and valid values can be found in the RPIM pick list by the same name. Type of construction will be PERM for Permanent or SEMI for Semi-permanent.

14. Sustainability (SUST) Code. : This code is also known as the Facility Sustainability Code and valid values can be found in the RPIM pick list by the same name. It indicates whether a facility meets the Guiding Principles of Federal Leadership in High Performance and Sustainable Buildings for buildings greater than 10,000 sq. ft. The list of valid values is: 1, 2, 3, 4.

15. UMA. Enter the primary unit of measure accountability for each design use category code for each item of real property.

16.Quantity. Enter the total quantity in the unit of measure accountability specified for each item of real property.

17. UMO. Enter the appropriate unit of measure operational for capacity/configuration as applicable for the design use category code.

18. Quantity. Enter the total quantity of capacity/configuration in the unit of measure operational specified for each item of real property.

19. Cost. Enter the total project cost for each item of real property. UFC 1-300-08 contains additional guidance.

20. Fund Source. Identify the fund source in this column for each real property asset or item. UFC 1-300-08 contains additional guidance.

21. Funding Organization. Identify the organization(s) responsible for funding the acquisition of this real property asset.

22. RPA Interest Type Code. This code represents the RPA Interest Type Code and valid values can be found in the RPIM pick list by the same name. The code is used to identify the type of legal interest that DoD holds in a real property asset.

23. Item Remarks. Remarks pertaining only to the item number identified in Item 9; show cost sharing.

24. Statement of Completion. Typed name, signature, title, and date of signature by the responsible transferring individual or agent. In the case of a real property acceptance action this is signed by the DoD Construction Agent. In the case of a real property transfer this is signed by the Installation Management Organization.

25. Accepted By. Typed name, signature, title, and date of signature by the Installation Management Organization RPAO or accepting official.

26. Property Voucher Number. Next sequential number assigned by the RPAO in voucher register.

27. Construction Deficiencies. List construction deficiencies in project during contractor turnover inspection.

28. Project Remarks. Project level remarks and continuation of blocks.

CurrentPage:
PageCount:
Enter current page number.: 1.00000000
Enter total number of pages.: 1.00000000
1. FROM (Organization Name):
2. DATE PREPARED (YYYYMMDD):
3. PROJECT/JOB NUMBER : VLSB
serialNum: FY
5. TO (Organization - Installation Code and Name): 20 Civil Engineer Squadron

428 Chapin Street Shaw AFB, SC 29152-5123

6. RPSUID/SITENAME/ INSTCODE/INSTNAME: 3269, Shaw Air Force Base Site 1, VLSB0001

7. CONTRACT NUMBER(S): FA
serviceDate:
Select for ACQUISITION BY CONSTRUCTION: 0
Enter Acquisition type.:
Select for TRANSFER BETWEEN SERVICES: 0
Select for CAPITAL IMPROVEMENT: 0
Select for INVENTORY ADJUSTMENT: 0
Select for TOTAL ASSET PLACED-IN-SERVICE: 0
Select for PARTIAL ASSET PLACED-IN-SERVICE: 0
Select for DRAFT: 0
Select for INTERIM: 0
Select for FINAL: 0
9. ITEM NUMBER:
10. A. FACILITY NUMBER:
10. B. RPUID - REAL PROPERTY UNIQUE IDENTIFIER:
11. CATEGORY CODE :
12. CATCODE DESCRIPTION- CODE NAME WHICH DESCRIBES FACILITY USAGE:
13. CONS TYPE CODE - TYPE OF CONSTRUCTION. PERM FOR PERMANENT, SEMI FOR SEMIPERMANENT:
14. SUSTAINABILITY CODE:
15. PRIMARY UMA:
16. PRIMARY QUANTITY:
17. SECONDARY UMO:
18. CONFIGURATION QUANTITY:
19. COST:
20. FUND SOURCE:
21. FUNDING ORGANIZATION:
22. RPA INTEREST CODE:
23. ITEM REMARKS:
A. TITLE (DPW/RPAO):
B. NAME:
B. SIGNATURE:
C. DATE SIGNED (YYYYMMDD):
26. PROPERTY VOUCHER NUMBER:
27. CONSTRUCTION DEFICIENCIES (Attach blank sheet for continuations):
28. PROJECT REMARKS (Attach blank sheet for continuations):