This document contains an amendment to a solicitation for a consolidated construction multiple award task order contract and job order contract to provide maintenance, repair, and minor construction services at Fort Knox, Kentucky. The amendment revises the response due date from August 20, 2020 to August 31, 2020 at 11:00 AM EST. It also updates the contract period of performance, adds pricing details including delivery order and contract quantities and minimums/maximums, incorporates responses to industry questions, and revises attachments. Eligible offerors are required to demonstrate experience in various construction categories and provide resumes for key personnel, a management approach and quality control plan, and a technical approach for a seed project. They must also verify a minimum $5 million per task order and $10 million aggregate bonding capacity. The Army Materiel Command Mission and Installation Contracting Command at Fort Knox intends to award this requirement to up to seven contractors.
View the file
Other files
Show 40 more
Latest 50 of 51 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0011386832-0001
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Combined Construction Job Order Contract (JOC)/Multiple Award Task Order Contract (MATOC) for Directorate of Public Works (DPW), Fort Knox, Kentucky
A. Solicitation is hereby amended to incorporate changes as indicated in the Summary of Changes.
B. The solicitation due date is extended to 11:00 a.m. local time, on 31 August 2020.
See Summary of Changes
1. CONTRACT ID CODE PAGE OF PAGES
J 1 20
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 21-Aug-2020
16B. UNITED STATES OF AMERICA 15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer) (Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9124D20R0034
X 9B. DATED (SEE ITEM 11)
22-Jul-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
21-Aug-2020
CODE
MISSION AND INSTALLATION CONTRACTING CMD
MICC FORT KNOX
BLDG 1109B STE 250
199 6TH AVE
FORT KNOX KY 40121-5720
W9124D 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL: TEL:
W9124D20R0034
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 20-Aug-2020 11:00 AM to 31-Aug-2020 11:00 AM.
The order period end date has changed from 07-Sep-2025 to 10-Sep-2025.
The order period start date has changed from 08-Sep-2020 to 11-Sep-2020.
The delivery order maximum quantity 2,000,000.00 has been added.
The delivery order minimum quantity 5,000.00 has been added.
The contract maximum quantity 245,000,000.00 has been added.
The contract minimum quantity 5,000.00 has been added.
The following have been added by full text:
AMENDMENT 0002
Amendment 0002 incorporates the following changes and additions to the solicitation:
A. The following is added to Block 10: The Government intends to award up to seven (7) Firm-Fixed Price (FFP) Indifinite Delivery/Indefinite Quantity (IDIQ) contracts for this consolidated JOC/MATOC requirement. The contracts will for a five year ordering period from date of award.
B. The following are added to and made a part of this solicitation and resultant awards:
Responses to Requests for Information from Industry
Revised Attachment 00: ATT 00 DPW Construction JOC-MATOC SOW, Rev. 8-18-20, Amdt 0002 (with changes highlighted)
Attachment 12: ATT 12 JOC Bid Form Templates
Revised/Updated Attachments for the Seed Project, Stithton Traffic Circle:
(1) ATT 00b Seed Project Drawings, Stithton Traffic Circle, Rev. 8-18-20, Amdt 0002
(2) ATT 00c Seed Project GD Highway KY20200038, Mod 1, 8-14-20, Amdt 0002 (Note: There is no change to ATT 00a Seed Project Specifications, Rev. Amdt 0001, as part of Amendment 0002.)
C. Provisions and clauses are added in accordance with Summary of Changes.
D. Change is made to Section L, Instructions to Offerors, to add Paragraph L.6.4. No other changes are made to the document.
Responses to Questions from Industry for Solicitation W9124D-20-R-0034 Consolidated JOC/MATOC:
Q1. Due to the extension on Questions deadline and the amount of outstanding questions, can we please also request an extension to the Due Date as well so that we have an adequate amount of time to understand the contract after answers have been issued and get our proposal put together with this information?
A1. Amendment 0002 revises the proposal due date.
Q2. SOW_ATT_00, page 4, paragraph c references “Attachment 12 for more specific details and bid examples.”
Attachment 12 that was not provided. Please provide the referenced attachment 12.
A2. See Amendment 0002; Attachment 12 has been added.
Q3. Are offerors expected to provide RS Means line item pricing and apply a coefficient for the seed project and if so where is this information supposed to be provided in our proposal since CLIN 0001 only requires a lump sum price be inserted?
A3. The seed project is not a JOC requirement; a lump sum price for MATOC is to be included in proposals.
Q4. Typically coefficients and unit price books are utilized for single award contracts and not multiple award contracts such as this one since in theory, the contractor with the lowest coefficient should win every task order since the qty’s of work should be the same for all bidders. Under multiple award contracts, bidders typically compete amongst other MATOC awardees and the low price offeror is awarded the task order. Please clarify if subsequent task orders under this contract action will require RS Means online line item pricing with a contractor coefficient applied or will task order be awarded based on the low lump sum price as competed amongst MATOC holders?
A4. See Revised SOW, paragraph 1.3. Exact work/task to be performed shall be indicated on individual task orders.
Task Order requests shall be identified as either JOC, or MATOC, as stated in the individual Requests for Task Order Proposals. The contractor shall complete all work and services under this contract in accordance with schedules indicated in individual task orders.
Q5. If a coefficient is to be proposed in response to the solicitation, we assume the contractor’s proposed coefficient is for the life of the contract. Is this correct?
A5. Correct
Q6. Given current circumstances around COVID – 19, would the government consider accepting electronic copies of proposals to be emailed rather than have hard copies hand delivered?
A6. There will be no change to the proposal submission requirement. Please submit proposals as instructed in Solicitation, Sections L and Section M.
Q7. If projects used in our proposal for past experience are federal projects with a completed CPAR’s, can the CPAR’s be utilized in lieu of Past Performance Questionnaires?
A7. That is acceptable.
Q8. Is the seed project to be bid as a JOC or MATOC project? If a MATOC project, where will the coefficient need to be shown?
A8. The seed project is to be proposed as a MATOC; a coefficient is not required for MATOC requirements.
Q9. What distinguishes whether a project will be presented as a JOC or MATOC project? Will it be the dollar amount, size, etc?
A9. See response to Question 4, above.
Q10. According to the seed project drawing Bid Option #1, it states to check three areas to determine the amount of existing stone (minimum of 10” compacted D.G.A is required). How do we determine the thickness of existing D.G.A. subbase prior to bid? Does government have an estimated thickness?
A10. See Amendment 0002, Revised ATT 00b, for revisions to seed project drawings.
Q11. How will the Contractor laydown area lot be determined? General contractors that self-perform will need additional space over a non-performing general contractor.
A11 .Each awardee will be provided a location for set-up and storage of equipment as noted in ATT 06; no additional space will be provided to any awardee.
Q12. Will there be a Seed Project laydown area available for the contractor?
A12. If the awardee needs a laydown area, it will be provided in the smaller parking lot just north of Pershing Drive on the east side of the circle.
Q13. Will the prepping of the contractor laydown area on Queen Street be the responsibility of the MATOC contract holder or the government? Will the contractor be allowed to drop trees in their assigned area?
A13. The Contractor, upon award, will be provided with a laydown area; all site preparations, security and utilities are the responsibility of the contractor. The contractor can limb trees but if a tree needs to be removed, the environmental regulations from SOW, ATT 15 apply.
Q14. During the pre-bid conference it was stated there would be changes to the scope of work for the seed project and an Amendment would be issued within a few days. Will there be additional time given to ask RFI’s?
A14. Additional time for questions was provided in Amendment 0001.
Q15. It states in paragraph L.3.2-b that digital copies on CD-ROM disk shall be provided in Microsoft Word, PowerPoint and/or Excel. Do you want these in PDF format as well?
A.15. Please follow Solicitation, Section L.3.2 Proposal Format for submission instructions.
Q16. Page 64 of the Solicitation, paragraph M.5.1 states contractor shall submit the following documents as part of the Price Proposal. Offerors shall prepare pricing information for the Seed Project, provided in Attachments 00a and 00b however these attachments were not available on beta.sam.gov. Will these attachments be made available?
A16. The attachments were included as attachments to the solicitation. Please see ATT 00a and 00b (updated/revised in Amendment 0001, and further revision to ATT 00b and 00c in Amendment 0002).
Q17. Page 65 of the Solicitation, paragraph M.5.2, refers to L.6.3. On page 55, L.6.3 states the Offeror is required to complete the Price Proposal Breakdown Worksheet, for the Seed Project, included in Attachment 00a however there was no attachment in beta.sam.gov. Will the attachment be made available?
A17. This form is included in ATT 00a Seed Project Specifications, as Section 110, Bid Form.
Q18. In Section 00311 of the seed project specifications states will receive contract no later than 15 June 2020 and will complete all work within 120 calendar days. Is a new date going to be given?
A18. The anticipated date of award was revised in ATT 00a, as revised in Amendment 0001. The date will be finalized with task order award; the number of days for completion of all work will not change.
Q19. Attachment 8 lists AutoDesk AutoCAD V 2017 however version 2017 is no longer available. Will a current version be acceptable?
A19. Yes, files can be saved to an older version so DPW-ESD will be able to open them.
Q20. What is the intent of this contract? A20. Please see ATT 00 Part 1.
Q21. Will there be multiple JOC bidders?
A21. All contracts awarded will include both JOC and MATOC actions; all contract awardees will be afforded the opportunity to provide a proposal/bid for all requests for both JOC and MATOC task order proposals.
Q22. Will MATOC RFPs require an RS Means estimate? A22. No
Q23. Is the intent of the contract to have seven (7) contractors providing RS Means/JOC proposals or seven (7) MATOC shareholders and one (1) JOC Contractor?
A23. See response to Question 21 above.
Q24. The solicitation does not account for applying a coefficient to the UPBs, is MICC requesting for use to provide a coefficient against the UPBs?
A24. See Amendment 0002, revised Section L.6 Volume 3: Factor 3—Price. Offerors shall provide a coefficient to be used throughout the contract period of performance.
Q25. Will there be coefficients for:
a. Each option year?
b. Overtime/off hours work?
A25. See response to Question 24 above.
Q26. Paragraph 1.4.1:
a. What personnel are required on site?
b. Can any have dual roles? E.g. Superintendent/QC or Supt/Safety
A26. See revised SOW, paragraph 1.4.1. Each of the five key roles shall be separate personnel. The Program Manager and Project Superintendent shall be onsite personnel. It is the responsibility of the Contractor to provide the other three key personnel and apply them in use of the contract.
Q27. Para. 1.4.1.1.:
a. Does DPW expect the Program Manager to act as an engineer?
b. If not, will 10 years of related technical experience be accepted?
c. Is always the expectation for the Program Manager to be onsite or only required quarterly?
A27. SOW Paragraph 1.4.1.1 provides the specific requirements for the Program Manager in order to be considered technically acceptable. See response to Question 26 above for 27c.
Q28. Para. 1.4.3 & 1.4.4:
a. We would expect to put our QCs and Superintendents through the CQCM course after award, but before a project begins if there are courses available, is this acceptable?
A28. Per SOW paragraphs 1.4.3 and 1.4.4, certifications shall be completed prior to submission of proposal for this solicitation.
Q29. Para. 2.1.10.1:
a. Please advise what is the standards for ‘Professional Level 4 Personnel’? There is no other reference in the SOW to this standard.
A29. See Amendment 0002, Revised SOW Paragraph 2.1.10.1.
Q30 Para. 4.3:
a. Is there a preferred documentation system? E.g. Procore, RMS, et cetera.
b. For the duration of this contract, will the government provide office space for the selected contractors?
A30a. The government does not have a preferred documentation system. Documents can be provided for comment via email or hard copy.
A30b. The Government does not provide office space for the selected contractors. Contractor will be permitted space as shown on ATT06 for a job site trailer and storage. Then follow 4.6 Phase-Out Plan when the contract is over.
Q31. Is Primavera scheduling software required or can Microsoft Project be used?
A31. ATT00 1.4.1.1 Schedules noted in this section can be done with any program the contractor wishes to use.
However, Fort Knox DPW does not have a documentation system; so documents can be provided for comment via email or hard copy.
Q32. Para. 3 Schedule of Values (SOV)
a. Will a SOV be required on RS Means estimated project?
A32. Para 3: A Schedule of Values will be expected on all projects whether they be bid via JOC or MATOC methods.
Q33. Para. 4 Progress Payments
a. Is the 20% retainage rate negotiable?
A33. Para 4: The Progress Payment's 20% retainage rate is a standard rate for Fort Knox. This rate per project, based on progress and success of project, might be negotiated by the Contracting Officer (KO) at the end of a project.
Q34. Para. 5.1.2, Can we get copies of the RS Means line items that are excluded by this paragraph?
a. Div 01-31 PM and Coordination.
b. Div 01-32 Const Progress Dox.
c. Div 01-41 Regulatory Req’ts.
d. Div 01-52 Construction Facilities.
e. Div 01-54-39 Const Equip.
A34. Para 5.1.2 The listed Subdivisions/Major Classifications, as contained in any of the RSMeans or equivalent bound or electronic databases shall not be used as line items in pricing delivery orders issued under this contract.
These costs shall be covered in the contractor’s coefficients:
Q35. Site Layout Plan Sheet 1 of 1 Typical Construction Note 7 – Based on past projects in the area the contractor shall anticipate existing concrete under the existing asphalt, after the removal of the concrete if there is no DGA then the area shall be excavated to allow for the amount of DGA shown.
Question – Is the Government going to preform random road cores to show the thickness of existing asphalt, concrete, and DAG? If not is it the responsibility of the general contractor to preform road cores prior to bidding project to determine the thickness of asphalt, concrete, and DGA?
A.35. No, the concrete is visible through the asphalt in areas where it has deteriorated and the thickness is minimal.
Similar projects in the past the concrete has been 12” and under with little to no DGA. If DGA is encountered the removal of it will require the same procedure as the removal of earth and will not be considered for a modification to the contract.
Q36. Site Layout Plan Sheet 1 of 1 Typical Note 14 – Contractor shall submit a traffic control plan that includes the use traffic control devices and flag persons to direct traffic around the circle during all construction to help the flow of traffic.
Question – Can the circle be shut down for a period of time during construction and adjacent sides streets be used for traffic with the use of traffic control?
A36. No, the amount of traffic is too great to be diverted around the smaller side streets. The contractor shall submit a traffic plan showing how they intend to complete the project, DPW-ESD can assist with some ideas on how this can be done but not until the contractor is selected. The DPW Director will need to sign off on any detour routes.
Q37. Bid Option 1 Question – Is the Government going to preform random road cores to show the thickness of existing asphalt, concrete, and DGA? If not is it the responsibility of the general contractor to preform road cores prior to bidding the project to determine the thickness of the asphalt, concrete, and DGA to meet the requirements for DGA and asphalt?
A37. No, see response to Question 35, above.
Q38. Seed Project Quote Question - Does the Seed Project require a RS MEANS quote? A38. See response to Question 3 above.
See Summary of Changes
The following have been modified:
SECTION B - SUPPLIES OR SERVICES AND PRICES
Global Changes
CLIN 0001
The minimum quantity 5,000.00 has been added.
The maximum quantity 2,000,000.00 has been added.
The IDIQ minimum order quantity 5,000.00 has been added.
The IDIQ maximum order quantity 2,000,000.00 has been added.
CLIN 0001
The CLIN extended description has changed from:
CONTRACT (JOC/MATOC) THE CONTRACTOR SHALL PROVIDE (AS SPECIFIED IN EACH TASK
ORDER UNDER THE RESULTING CONTRACTS) ALL LABOR, EQUIPMENT, MATERIALS, AND
SUPERVISION NECESSARY TO PERFORM A BROAD RANGE OF SUSTAINMENT, RESTORATION AND
MAINTENANCE (SRM), REPAIR AND CONSTRUCTION, AND MAINTENANCE, ON REAL PROPERTY
AT FORT KNOX, KY. WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE TERMS AND
CONDITIONS OF THIS SOLICITATION AND RESULTING CONTRACTS, AND SCOPE OF WORK,
SPECIFICATIONS AND DRAWINGS AS REQUIRED IN ANY RESULTING INDIVIDUAL TASK ORDERS
ISSUED. SEED PROJECT:PRICING IS REQUIRED ONLY FOR THE SEED PROJECT. THE SEED PROJECT
WILL BE AWARDED ON A SEPARATE TASK ORDER. ADDITIONAL ATTACHMENTS FOR THE SEED
PROJECT ARE PROVIDED AS ATTACHMENTS 00a SEED PROJECT - STITHTON TRAFFIC CIRCLE, AND 00b SEED PROJECT - DRAWINGS COMBINED, AND 00C SEED PROJECT WAGE DECISION, AND ARE
POSTED ON THE BETA.SAM WEBSITE WITH THIS SOLICITATION. OFFEROR SHALL INSERT THE
SEED PROJECT TOTAL PRICE IN CLIN 0001 ABOVE. NO OTHER PRICING IS REQUIRED. THE
CONTRACT ORDERING PERIOD IS FOR A FIVE YEAR PERIOD FROM CONTRACT AWARD DATE.THE
ESTIMATED CEILING OF $245,000,000 IS AN ESTIMATE ONLY AND DOES NOT GUARANTEE THE
AMOUNT OF WORK TO BE AWARDED UNDER EACH CONTRACT. THE GUARANTEED MINIMUM
AMOUNT OF THIS CONSTRUCTION JOC/MATOC CONTRACT IS $5,000.00 PER CONTRACT AWARDED.
THE MINIMUM GUARANTEE IS SUBJECT TO AVAILABILITY OF FUNDS (SAF). AWARD OF THE SEED
PROJECT WILL CONSTITUTE FULL PAYMENT OF THE GUARANTEED MININUM FOR THE
CONTRACTOR TO WHOM THE SEED PROJECT IS AWARDED.MAXIMUM PROGRAM VALUE
(CEILING): $245,000,000.00
To:
CONTRACT (JOC/MATOC) THE CONTRACTOR SHALL PROVIDE (AS SPECIFIED IN EACH TASK
ORDER UNDER THE RESULTING CONTRACTS) ALL LABOR, EQUIPMENT, MATERIALS, AND
SUPERVISION NECESSARY TO PERFORM A BROAD RANGE OF SUSTAINMENT, RESTORATION AND
MAINTENANCE (SRM), REPAIR AND CONSTRUCTION, AND MAINTENANCE, ON REAL PROPERTY
AT FORT KNOX, KY. WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE TERMS AND
CONDITIONS OF THIS SOLICITATION AND RESULTING CONTRACTS, AND SCOPE OF WORK,
SPECIFICATIONS AND DRAWINGS AS REQUIRED IN ANY RESULTING INDIVIDUAL TASK ORDERS
ISSUED. REQUESTS FOR TASK ORDER PROPOSALS WILL SPECIFY WHETHER THE ACTION IS TO BE ISSUED AS A JOC OR MATOC ACTION IN ACCORDANCE WITH THE SOW. SEED PROJECT:PRICING IS
REQUIRED ONLY FOR THE SEED PROJECT. THE SEED PROJECT IS A MATOC REQUIREMENT, AND
WILL BE AWARDED ON A SEPARATE TASK ORDER. ADDITIONAL ATTACHMENTS FOR THE SEED
PROJECT ARE PROVIDED AS ATTACHMENTS 00a SEED PROJECT - STITHTON TRAFFIC CIRCLE, AND 00b SEED PROJECT - DRAWINGS COMBINED, AND 00C SEED PROJECT WAGE DECISION, AND ARE
POSTED ON THE BETA.SAM WEBSITE WITH THIS SOLICITATION. OFFEROR SHALL INSERT THE
SEED PROJECT TOTAL PRICE IN CLIN 0001 ABOVE. THE CONTRACT ORDERING PERIOD IS FOR A FIVE YEAR PERIOD FROM CONTRACT AWARD DATE.THE ESTIMATED MAXIMUM OF $245,000,000 IS
AN ESTIMATE ONLY AND DOES NOT GUARANTEE THE AMOUNT OF WORK TO BE AWARDED
UNDER EACH CONTRACT. THE GUARANTEED MINIMUM AMOUNT OF THIS CONSTRUCTION
JOC/MATOC CONTRACT IS $5,000.00 PER CONTRACT AWARDED. AWARD OF THE SEED PROJECT
WILL CONSTITUTE FULL PAYMENT OF THE GUARANTEED MININUM FOR THE CONTRACTOR TO
WHOM THE SEED PROJECT IS AWARDED.MAXIMUM PROGRAM VALUE: $245,000,000.00
.SECTION F - DELIVERIES OR PERFORMANCE
The following Delivery Schedule item for CLIN 0001 has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
POP 08-SEP-2020 TO
07-SEP-2025
N/A DIRECTORATE OF PUBLIC WORKS
DIRECTORATE OF PUBLIC WORKS
1110A 125 6TH AVENUE
FORT KNOX KY 40121-5719
502-624-5831 FOB: Destination
W22PES
To:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
POP 11-SEP-2020 TO
10-SEP-2025
N/A DIRECTORATE OF PUBLIC WORKS
DIRECTORATE OF PUBLIC WORKS
1110A 125 6TH AVENUE
FORT KNOX KY 40121-5719
502-624-5831 FOB: Destination
W22PES
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to
(a) commence work under this contract as stated on individual task orders, after the date the Contractor receives the notice to proceed,
(b) prosecute the work diligently, and
(c) complete the entire work ready for use not later than as stated on individual task orders.
*The time stated for completion shall include final cleanup of the premises.
(End of clause)
SECTION I - CONTRACT CLAUSES
The following have been added by reference:
52.203-19 Prohibition on Requiring Certain Internal Confidentiality
Agreements or Statements
JAN 2017
52.204-18 Commercial and Government Entity Code Maintenance AUG 2020 52.204-24 Representation Regarding Certain Telecommunications and
Video Surveillance Services or Equipment.
AUG 2020
52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.
AUG 2020
52.219-8 Utilization of Small Business Concerns OCT 2018 52.223-12 Maintenance, Service, Repair, or Disposal of Refrigeration
Equipment and Air Conditioners.
JUN 2016
52.223-20 Aerosols JUN 2016 52.223-21 Foams JUN 2016 52.246-21 Warranty of Construction MAR 1994 252.204-7018 Prohibition on the Acquisition of Covered Defense
Telecommunications Equipment or Services
DEC 2019
The following have been added by full text:
52.228-13 ALTERNATIVE PAYMENT PROTECTIONS (JULY 2000)
(a) The Contractor shall submit one of the following payment protections:
Payment Bonds or Irrevocable Letter of Credit (ILC)
(b) The amount of the payment protection shall be 100 percent of the contract price.
(c) The submission of the payment protection is required within 10 days of contract award.
(d) The payment protection shall provide protection for the full contract performance period plus a one-year period.
(e) Except for escrow agreements and payment bonds, which provide their own protection procedures, the Contracting Officer is authorized to access funds under the payment protection when it has been alleged in writing by a supplier of labor or material that a nonpayment has occurred, and to withhold such funds pending resolution by administrative or judicial proceedings or mutual agreement of the parties.
(f) When a tripartite escrow agreement is used, the Contractor shall utilize only suppliers of labor and material that signed the escrow agreement.
(End of clause)
SECTION K - REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF OFFERORS
52.204-24 Representation Regarding Certain Telecommunications and
Video Surveillance Services or Equipment.
AUG 2020
252.204-7017 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services -- Representation
DEC 2019
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
52.204-22 Alternative Line Item Proposal JAN 2017 252.215-7008 Only One Offer JUL 2019
INSTRUCTIONS TO OFFERORS
SECTION L SOLICITATION/PROPOSAL REQUIREMENTS.
L.1. Introduction and Administration.
L.1.1. Offerors shall demonstrate their capability, understanding, and willingness to satisfactorily perform all requirements as described in the Basic JOC-MATOC Scope of Work (SOW) located in Attachment 00 of this solicitation. Capabilities may be established within either the Offeror’s corporate structure or through contractor teaming arrangements. The proposal shall be valid for one hundred and eighty (180) calendar days from date of initial proposal submission.
L.1.2. The offeror’s written proposal shall be organized as stated in paragraph L.3.below.
L.1.3. Complete proposals are due on or before 31 August 2020, 11:00 a.m. EST. The date and time specified reflects the closing of the solicitation. It is the offeror’s responsibility to ensure that the entire proposal is submitted prior to the proposal due date and time. Failure of an Offeror to submit its proposal by the date and time deadline or in the manner specified in the solicitation may result in a determination that an Offeror is ineligible to be considered for award. Proposals will be handled IAW FAR 15.207. All late proposals will be handled IAW FAR 15.208.
L.1.4. Proposals shall be submitted in hard copy and on CD ROMs, in the formats and quantities noted below, to the address listed below. Email and/or Facsimile submissions will not be accepted.
MICC-Fort Knox Attn: Mr. Matthew Judd Solicitation No.: W9124D-20-R-0034 Bldg 1109B Ste 250 199 6th Ave
Fort Knox KY 40121-5720
L.1.5 The Point of Contact (POC) responsible for supplying additional information and answering all inquiries is the Contracting Officer via the Contract Specialist. Address all questions or concerns the offeror may have to the Contract Specialist, Matthew Judd (matthew.p.judd.civ@mail.mil) and Contracting Officer, Katie Paben (katie.e.paben.civ@mail.mil). All questions regarding this solicitation shall be submitted in writing via email. The email shall contain the solicitation number in the subject line. Questions/inquiries are due no later August 5, 2020.
All questions received before the question due date will be responded to online via beta.sam (https://beta.sam.gov/) as an amendment to the solicitation. Answers shall be posted without Offeror identification. Questions received after the deadline may not be answered. The Government will not provide responses to questions that would reveal a potential Offeror’s confidential business strategy, technical solution, or any information that is considered unique to a particular Offeror.
L.1.6. Offerors are required to meet all solicitation requirements. Proposals shall clearly and convincingly demonstrate that the Offeror has a thorough understanding of the entire requirement and associated risks, have the resources necessary to meet the requirement, and a valid and practical solution for the requirement. Statements that the offeror understands, can, or will comply with the requirements, and statements paraphrasing the requirements or parts thereof without supporting information/narrative are considered inadequate and unsatisfactory. Mere reiteration of the requirement or standard reference material is discouraged and is considered inadequate and unsatisfactory. The Offeror shall include any data necessary to illustrate the adequacy of the various assumptions, approaches, and solutions to problems.
L.1.7. If the offeror finds it necessary to take exception to any of the requirements specified in this solicitation, the offeror shall clearly identify the applicable Volume and exceptions with a complete explanation of why the exception was taken, what benefit accrues to the Government (if any), and its impact, if any, on the performance, schedule, cost, and specific requirements of the solicitation. Each exception shall be specifically related to each paragraph and/or specific part of the solicitation to which the exception is taken. Offerors are cautioned that taking an exception may render the offer ineligible for award. This information shall be provided in the format below.
Solicitation Document Page/Paragraph Requirement/Portion Rationale & Impact Section B, SOW, Section L&M, etc.
Applicable Page and Paragraph Numbers Identify the requirement or portion to which exception is taken Describe the rationale and impact of the exception
L.1.8. If the Offeror’s proposal indicates that: it cannot or will not meet any of the SOW requirements; provides an approach that clearly does not meet any of the SOW requirements; or, includes data which prompts the Government to question the Offeror's compliance with any of the SOW requirements; the Government may determine the proposal is non-responsive, and, therefore, ineligible for award.
L.1.9. Any data previously submitted in response to another solicitation, request for information, or sources sought notice, should be considered as unavailable during this proposal evaluation and source selection process.
L.1.10. Information beyond what is sufficient to present a complete and effective proposal are neither necessary nor desired.
L.1.11. The Offer. The submission of the documentation specified below will constitute the offeror's acceptance of the terms and conditions of the RFP, concurrence with the Performance Work Statement, and contract type.
L.1.12. It is the Government’s intention to award without discussions. Offerors are encouraged to present their best technical proposal and prices in their initial proposal submission. In Accordance With (IAW) FAR 15.306, should discussions become necessary, the Government reserves the right to hold them. If this occurs, a competitive range will be determined and offerors notified. The competitive range may be limited for purposes of efficiency IAW FAR 15.306 (c)(2).
L.1.13. Debriefings. If a competitive range is established, the Contracting Officer will promptly notify offerors of any decision to exclude them from the competitive range, whereupon the offeror may request and receive a debriefing in accordance with FAR 15.505. The Contracting Officer will notify unsuccessful offerors who were included in the competitive range, but not selected for award in accordance with FAR 15.503(b). Upon such notification, unsuccessful offerors may request and receive a debriefing. Offerors desiring debriefing must make their request in accordance with the requirements of FAR 15.505 or 15.506, as applicable.
L.1.14. Proposals shall not contain classified information.
L.1.15. If an offeror believes that the requirements in these instructions contain an error, an ambiguity, omission, or are otherwise unsound, the offeror shall immediately notify the Contracting Officer in writing at the email address identified above and shall provide supporting rationale for its assessment.
L.1.16 All referenced documents for this solicitation are available on the beta.sam web site at https://beta.sam.gov/.
L.1.17. In accordance with FAR Subpart 4.8 (Government Contract Files), the Government will retain one copy of all unsuccessful proposals. Unless the offeror requests otherwise, the Government will destroy extra copies of such unsuccessful proposals.
L.2. Site Visit. The Government will hold a site visit at Fort Knox, KY on July 30, beginning at 9:00 AM local time.
The site visit will be held in the Parking Lot across from the Abound Credit Union, 1175 Pershing Drive, Fort Knox
KY 40121.
Directions as follows: Come through Fort Knox Chaffee Gate (obain Visitor’s pass if necessary in the Visitor’s Center). After passing through the gate, get into the far right lane of Chaffee Avenue; at the first stop light, turn right onto Spearhead Division Avenue; go under the railroad bridge; turn left onto South Knox Street. Parkin in the second parking lot on the left – it is across from the Abound Credit Union.
All interested firms may attend with a limit of two (2) attendees per firm. Please submit, in writing, the names of attendees to Matthew Judd at matthew.p.judd.civ@mail.mil no later than July 29, 2020. When e-mailing about this solicitation, include W9124D-20-R-0034 Fort Knox Construction JOC-MATOC (in this format) in the subject line.
There will be a Pre-Proposal Conference held at the beginning of the site visit; technical questions will not be addressed during the course of the site visit. If the Government responses to technical questions affect the Scope of Work or any other portion of the solicitation, an amendment of solicitation will be issued. The Government requests all questions to be submitted in writing.
L.3. Proposal Preparation Instructions.
L.3.1. The offeror’s proposal shall consist of four (4) separate volumes:
Volume I Technical Acceptability (Factor 1)
* Tab A, Construction Experience/KeyPersonnel Qualifications/Experience (Subfactor 1)
* Tab B, Management Approach (Subfactor 2)
* Tab C, Seed Project Response (Subfactor 3)
* Tab D, Bonding Capacity (Subfactor 4)
Contractors shall keep the pages in this section to a Maximum of 35 pages, provide one CD ROM and three hard copies.
Volume II Past Performance (Factor 2) Contractors shall keep the pages in this section to a Maximum of 15 pages, provide one CD ROM and one hard copy.
Volume III Price (Factor 3) Contractors shall provide one CD ROM and one hard copy.
Volume IV General
* Tab A-Exceptions/Assumptions
* Tab B-Standard Form (SF1442)
* Tab C-Section K (Representations, Certifications, and other Statements of Offerors)
* Tab D OCI
* Tab E-Offeror Points of Contact and Other Information
Contractors shall provide one CD ROM and one hard copy.
L.3.2. Proposal Format.
(a) Offerors shall submit an original of its proposal in the formats and quantities identified herein.
(b) Digital copies on CD-ROM Disk shall be provided in Microsoft Word, PowerPoint and/or Excel and shall adhere to all proposal preparation instructions with the exception of the requirement for three ring binders.
(c) Hard Copies of each volume of the proposal should be separately bound in a three-ring loose leaf binder which shall permit the volume to lie flat when open.
(d) Each volume shall have a cover sheet clearly marked as to volume number, title, solicitation identification and the offeror's name. The same identifying data should be placed on the spine of each binder. All text shall be single spaced. Printing shall be easily readable (12-pitch type or 10 point proportional spacing). File names should be “Company Name – Initial” for the first submission. File name of later submissions (if necessary), shall be “Company Name – Revision X’ with X indicating the number of the revision.
(e) Indexing. Each volume shall contain a detailed table of contents to delineate the subparagraphs within that volume. Tab indexing shall be used to identify sections. This Index is for informational purposes only and will not be evaluated.
(f) Glossary of Abbreviations and Acronyms. Each volume shall contain a glossary of all abbreviations and acronyms used, with a definition for each. This glossary is for informational purposes only and will not be evaluated.
(g) Cross-Reference Matrix. Each volume shall contain a cross-reference matrix to assure that all requirements are addressed and easily accessible to the evaluators. The cross reference matrix shall provide a single integrated index for the entire proposal. This matrix format shall cross-reference the proposal volumes and proposal paragraphs to the applicable Factor/Subfactors and SOW paragraph/RFP requirements. The format of the cross-reference matrix shall be identical for all volumes. This matrix is for informational purposes only and will not be evaluated.
(h) The proposal shall not exceed the page limits stated above. If the page limits are exceeded, the pages in excess of the limit will not be read nor evaluated. If discussions become necessary, page limitations may be placed on responses to Evaluation Notices (ENs). The specified page limits for EN responses will be identified in the letters forwarding the ENs to the offerors.
(i) Page limitations includes all appendices, charts, graphs, diagrams, tables, photographs, drawings, etc.
(j) Page Limits do not include covers for volumes, tables of contents, glossary of abbreviations and acronyms, indices, title pages, cross reference indices, and section dividers/tables if they are inserted solely to provide ease to the reader in locating parts/sections of the proposal. Pages will be counted if they contain any other information, i.e., diagrams, extraneous data, etc. Pages marked “This page intentionally left blank” will not be counted.
(k) A page shall be an 8 ½ X 11” sheet of paper. When both sides of a sheet display printed material, it shall be counted as two pages. Letter size and spacing requirements for illustrations and tables can be at the discretion of the offeror but must be easily readable. The documents will be formatted in a standard business font (Arial, Times New Roman, Courier New) with a 12-pitch type or 10 point proportional spacing font and single spaced. The offeror will not utilize compressed spacing. Use at least 1 inch margins on the top and bottom and ¾ inch side margins. The contractor shall number each page in the standard (1 of 2) format order to eliminate any confusion. In the event contractor creates an ambiguity in their numbering of pages, the Government shall exercise its own discretion relating to the page count.
L.4. VOLUME 1: FACTOR 1 - Technical Acceptability. Construction Experience/Key Personnel Qualifications / Experience (Subfactor 1), Management Approach (Subfactor 2), Seed Project Response (Subfactor 3), and Bonding Capacity (Subfactor 4).
This volume provides Offerors with an opportunity to demonstrate their construction experience, management approach, seed project response, and bonding capacity to meeting the solicitation requirements. It shall be prepared in a format consistent with the SOW and the evaluation criteria in Section M of the solicitation. The offeror’s Technical Approach shall address as specifically as possible the actual methodology it will use. It shall demonstrate the offeror’s understanding of the requirement and ability to successfully perform future task orders. It shall be of sufficient detail to permit evaluation of the Offeror’s Technical Acceptability. The proposal shall cover the entire five year ordering period. This volume shall be organized as follows:
L.4.1. TAB A: SUBFACTOR 1 – Construction Experience/Key Personnel Qualifications/Experience.
The offerors shall describe their ability to meet the requirements of the following general project categories:
Construction, plumbing, electrical, HVAC, architectural, repair and alternation of various facilities, and minor construction and real property maintenance, remodel, and repair which includes the following: (a) Foundation and Site Work, (b) Concrete Construction, (c) Masonry Construction, (d) Metals, (e) Carpentry, (f) Thermal/Moisture Protection, (g) Earthwork, (h) Curtain Walls, Doors, Windows, Glass, (i) Finished Materials, (j) Communications,
(k) Elevators/Conveying Systems, (l) Mechanical/Electrical, (m) Demolition and Removal, and (n) Roads/Paving.
Key Personnel Qualifications/Experience. Offerors shall identify and provide resumes for the following personnel:
Program Manager, Safety/Health Assurance Representative, and Quality Control Manager. NOTE: The identified personnel must be used on the contract. It is not intended for the identified personnel to be named for each specific task order, but to retain overall responsibility for the basic contract. No deviations will be permitted unless approved by the Contracting Officer.
L.4.2. TAB B: SUBFACTOR 2 – Management Approach.
The offeror shall provide their proposed Management Approach to monitor and manage a workforce capable of accomplishing all requirements set forth in the JOC-MATOC SOW efficiently and effectively to ensure timely quality work. The offeror shall also provide a Staffing, Recruitment, and Retention Plan demonstrating the offeror’s ability to provide services for the following: Roads; Bridges; Dams; Railroads; Airfields; Electrical; Water; Heating, Ventilation and Air Conditioning (HVAC); Sprinklers; Fire Alarms – Mass Notification; Roofing; Geothermal; Life- Health-Safety; New and Renovation Construction; Ranges; Food Storage; Security; and Communications. These areas are all identified in the JOC-MATOC SOW. In addition, the offeror shall propose a Quality Control Plan (QCP) that addresses quality control and demonstrates a systematic methodology to how the offeror will manage contract performance and ensure quality services are provided; including services provided by teaming partners, joint venture or subcontractors. The Management Approach shall include:
* An organizational structure, narrative, and summary chart delineating lines of management authority, where decision making authority lies within the organization, supervision, span of control, and accountability for the management and oversight of the JOC-MATOC. The structure shall include subcontractors and/or teaming partners, if applicable.
* Explanation of relationships between corporate and on-site management/administration; between/across technical disciplines; and between the prime and its subcontractors. Describe the management of subcontractors and/or teaming partners, and their integration into the overall structure.
* An approach to managing multiple task orders requirements covering a wide variety of tasking areas, utilizing multiple skill sets, in multiple locations simultaneously. A process to hire, train, and retain a sufficient number of personnel with a wide diversity of experience, education, and qualifications. This process shall include a timeline for hiring, training, and replacement of personnel during performance of the base contract and all task orders (within 30 days of task order award or 5 business days of vacancy). Address methods to reduce personnel turn-over.
* Resumes for the Key Personnel, the rationale for that designation, and the qualifications that will be required of these key positions (i.e., degree, certifications, licenses, and a minimum of five (5) years relevant experience); The contractor shall provide a Program Manager (PM), and an Alternate PM to act when the PM is unavailable, who shall be responsible for the performance of the work and shall have full authority to act for the contractor on all contract matters relating to daily operation of the contract.
* The QCP, as a minimum, shall address continuous process improvement; procedures for scheduling, conducting and documentation of inspection; discrepancy identification and correction; corrective action procedures to include procedures for addressing Government discovered non-conformances; procedures for root cause analysis to identify the root cause and root cause corrective action to prevent re-occurrence of discrepancies; procedures for trend analysis; procedures for collecting and addressing customer feedback/complaints, and a process to monitor personnel compliance with security, training, and qualification requirements.
L.4.3. – TAB C - SUBFACTOR 3 – Seed Project Response The offerors shall provide a technical approach to thoroughly demonstrate an overall understanding of the technical requirements and objectives to successfully execute the Seed Project in accordance with the Seed Scope of Work (Attachments 00a, 00b, and 00c) to include: Description of the scheduling technique and project planning methodology using completing the seed project to include approximate number of days. A narrative demonstrating how the project will be accomplished utilizing the proposed project schedule and rationale for selecting the proposed schedule. Identification of the automated scheduling systems used, a description of events that must be considered in the schedule associated with, but not limited to, submittals, inspections and closeout and procedures, processes and methods for managing the progress of project and interacting with the Government from beginning to end.
L.4.4. – TAB D - SUBFACTOR 4 – Bonding Capacity The offerors shall demonstrate their ability to obtain sufficient bonding of $5 million minimum per task order. The offeror shall submit information showing minimum available bonding capacity of $10 million aggregate with verification from the Securities or Bonding Company (to be completed by Surety Company and submitted by Offeror). The information shall include how long the Surety Company has provided bonding for the Contractor and the bonding limit for a single project, aggregate amount, and current available bonding.
L.4.5. Bid Guarantee. A Bid Guarantee will not be required for this solicitation.
L.4.6. Performance and Payment Bonding Capacity. The Offerors must demonstrate the ability to perform multiple on-going projects simultaneously through sufficient Performance and Payment bonding capacity in accordance with FAR 28.102 and FAR 52.228-15.These capacities are up to $5 million per TO and $10 million aggregate. Aggregate bonding, in this instance, is the minimum amount of bonding capacity that a contractor must have to cover its current Government contracts as well as non- Government contracts. Offerors that cannot obtain a minimum of $5 million per TO and $10 million aggregate bonding are viewed as less likely to be able to allocate resources to the government TOs. Actual bonds will be required at the TO level, in accordance with FAR 28.102.
Successful offerors at the TO level will be required to provide appropriate bonds within 10 days after issuance of a
TO.
L.4.7. Offerors shall provide/address the following: The Offeror shall submit information showing bonding capacity of $5 million per TO and $10 million aggregate with verification from the Surety or Bonding Company (to be completed by Surety Company and submitted by the Offeror). The information shall include how long the Surety Company has provided bonding for the Contractor and the bonding limit for a single project, aggregate amount and currently available bonding. The corporate bonding surety must appear on Department of Treasury Listing of Approved Securities (Department Circular 570).
L.4.8. Responsibility of Offerors. Pursuant to FAR 9.104-1(a) To be determined responsible, a prospective contractor must have adequate financial resources to perform the contract, or ability to obtain them, and (b) have the necessary organization, experience, accounting and operational controls, and technical skills, or ability to obtain them (including, as appropriate, such elements as production control procedures, property control systems, quality assurance measures, and safety programs applicable to materials to be produced or services to be performed by the Government and used to make a responsibility determination.
L.5. VOLUME 2: FACTOR 2 – Past Performance.
L.5.1. The Offeror shall provide documentation outlining the offeror’s past performance with contracts, as a prime or subcontractor, which is the same or similar in nature, size, and complexity to the services being procured under this solicitation. The submittal shall include rationale supporting your assertion of relevance and how it was determined that the work performed previously was the same or similar in nature, size, and complexity to the work specified by this solicitation.
L.5.2. The Past Performance evaluation will be accomplished by reviewing aspects of an Offeror's recent and relevant Past Performance, focusing on and targeting performance which is relevant to the effort as it relates to the services being procured under this solicitation.
L.5.3. Past Performance information described herein is required on the offeror and all subcontractors, teaming partners, and/or joint venture partners proposed. The offeror shall submit, along with the information required in this paragraph, a consent letter, executed by each subcontractor, teaming partner, and/or joint venture partner, authorizing release of adverse past performance information to the offeror so the offeror can respond to such information. For each identified effort for a commercial customer, the offeror shall also submit a client authorization letter, authorizing release to the Government of requested information on the offeror's performance.
L.5.4. The offeror shall include documentation regarding their relevant past performance…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .