Attachment 0001_SOW Attachment 1.1 - DD1354.pdf

DoD Form PDF 283 KB Posted

Attached to
SOLICITATION - National Capital Region (NCR) Multiple Award Task Order Contract (MATOC)
Solicitation number
W51EW7-26-R-A002
Issued by

About this file

DD Form 1354 (August 2022) is a federal document used for the transfer and acceptance of Department of Defense (DoD) real property between DoD Components or for the acceptance of real property following construction completion. The form serves as the official record documenting the transfer of facilities from a construction agent or transferring organization to an Installation Management Organization Accountable Official or Real Property Accountable Officer (RPAO).

The form captures comprehensive facility information including project/job numbers, serial numbers, facility identification codes, real property unique identifiers (RPUID), category codes describing the designed use of assets, construction type (permanent or semi-permanent), sustainability codes for high-performance buildings, primary and secondary units of measure with corresponding quantities, total project costs, fund sources, funding organizations, and the type of legal interest held in the property. Transaction details specify whether the action constitutes an acquisition, transfer between services, capital improvement, or inventory adjustment, and whether the asset or partial asset is being placed in service. The form requires statement of completion certification from the transferring agent and acceptance signature from the receiving RPAO, with construction deficiencies and project remarks documented in designated sections. Detailed instructions reference Unified Facilities Criteria 1-300-08 and the Real Property Information Model (RPIM) for code values and data input requirements.

View the file

Other versions and copies of DD Form 1354

File Revision Posted Attached to
P-1555U WCSR DD1354 27FEB2026.pdf Feb 27, 2026 P1555U Wallace Creek Service Road
DD Form 1354 - AUG 2022.pdf Aug 2022 Demo Mini mute sites
Attachment 16-DD Form 1354 - AUG 2022.pdf Aug 2022 Well 4 PFAS/PFOA Upgrade
DD Form 1354 - AUG 2022.pdf Aug 2022 B1130 ROOF REPLACEMENT
DD Form 1354 - AUG 2022.pdf Aug 2022 New Poinsett Tower Installation
DD Form 1354 - AUG 2022.pdf Aug 2022 B1921 Repair Power
Attachment 07-DD Form 1354 - AUG 2022.pdf Aug 2022 B611 HVAC Repair
017800_Attch2_DD1354 Checklist.docx Revision not stated WWYK250063 - INSTALL REACT VII FACILITY, B9001, POST V19
017800_Attch1_DD1354.pdf Revision not stated WWYK250063 - INSTALL REACT VII FACILITY, B9001, POST V19
Attachment 04 - DD Form 1354.pdf Revision not stated Bldg 1947 Repair Drop Arms
Attachment E - DD1354 Form.pdf Revision not stated New Fort Bliss Paving IDIQ Contract
Attachment E - DD1354 Form.pdf Revision not stated New Fort Bliss Paving IDIQ Contract
017800_Attch1_DD1354.pdf Revision not stated Tinker AFB MAC BOA - WWYK240176 - Replace Industrial Waste Lift Stations 6N & 6S, B62501
017800_Attch2_DD1354 Checklist.docx Revision not stated Tinker AFB MAC BOA - WWYK240176 - Replace Industrial Waste Lift Stations 6N & 6S, B62501
Attachment H - BLANK SAMPLE DD Form 1354 Transfer and Acceptance of DoD Real Property.pdf Revision not stated Robins AFB Paving Multi-Award IDIQ
DD Form 1354.pdf Revision not stated Repair Oil Water Separators - Stratton ANGB
CDRL A014 DD Form 1354 (Draft and Final).pdf Revision not stated AMARG Large Component Bead Blast Booth
SOW App 005 DD Form 1354.pdf Revision not stated Amendment 002***Multiple Award Construction Contract (MACC), Joint Base Elmendorf-Richardson (JBER), AK – Solicitation
6 - Attachment 0001 - DRAFT SOW Attachment 1.1 - DD1354.pdf Revision not stated DRAFT SOLICITATION - National Capital Region (NCR) Multiple Award Task Order Contract (MATOC)
DD1354 Equipment Warranty.xlsx Revision not stated B1921 Repair Power
Show all 20

Who attaches DD Form 1354

State Files
Michigan 3

Other files

File Type Posted
Attachment 0001 - NCR MATOC SOW 1JUL2026.pdf PDF
Solicitation Amendment W51EW726RA0020009 SF30.pdf PDF
Attachment 0008 - NCR MATOC Section L v8.pdf PDF
Attachment 0009 - NCR MATOC Section M v6.pdf PDF
Solicitation Amendment W51EW726RA0020008 SF30.pdf PDF
Attachment 0015 - NCR MATOC QA A0008 v2.pdf PDF
Attachment 0001 - NCR MATOC SOW 8JUN2026.pdf PDF
Solicitation Amendment W51EW726RA0020007 SF30.pdf PDF
Solicitation Amendment W51EW726RA0020006 SF30.pdf PDF
Soicitation Amendment W51EW726RA0020005 SF 30.pdf PDF
Attachment 0003 - Past Performance Questionnaire v2.docx DOCX document
Attachment 0012 - Seed Project SOW Floor Plan Layout.pptx PPTX presentation
Attachment 0006 - Contractor Bid Sheet v2.xlsx XLSX spreadsheet
Solicitation Amendment W51EW726RA0020004 SF 30.pdf PDF
Attachment 0002 - NCR MATOC Rate Sheet- NTE v2.xlsx XLSX spreadsheet
Attachment 0001 - NCR MATOC SOW 24APR2026 v2.pdf PDF
Attachment 0014 - Hazardous Material Survey Report 04MAY2026.pdf PDF
Attachment 0013 - NCR MATOC SITE VISIT SIGN IN SHEET 23MAR2026.pdf PDF
Attachment 0004 - Seed Project SOW 15APR2026 v2.pdf PDF
Attachment 0008 - NCR MATOC Section L v6.pdf PDF
Attachment 0011 - NCR MATOC QA A0003 Rev1.pdf PDF
Solicitation Amendment W51EW726RA0020003 SF 30.pdf PDF
Solicitation Amendment W51EW726RA0020002 SF 30.pdf PDF
Attachment 0009 - NCR MATOC Section M v4.pdf PDF
Solicitation Amendment W51EW726RA0020001 SF 30.pdf PDF
Attachment 0008 - NCR MATOC Section L v5.pdf PDF
Attachment 0010 - NCR MATOC QA A0001.pdf PDF
19 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 1st FLR LHTG 041883.pdf PDF
Attachment 0001_SOW Attachment 1.3 - Daily Report Template.pdf PDF
46 - Attachment 0004 SEED PROJ SOW 2007 MECH PLN UPGD 054886.pdf PDF
Attachment 0001_SOW APPENDIX 2.7.1 JBMHH Color Map.pdf PDF
27 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 LEGD 041881.pdf PDF
59 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 2nd FLR DOM 041860.pdf PDF
63 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 PLUMB PLN 041872.pdf PDF
30 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 PWR RISR SIG 041891.pdf PDF
Attachment 0002 - NCR MATOC Rate Sheet - NTE.xlsx XLSX spreadsheet
67 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 ROOF FRM PLN 041805.pdf PDF
7 - Attachment 0004 - SEED PROJ SOW Attach 1991 ENL BRKS PH 4 RM SCHED 041792.pdf PDF
58 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 1st FLR DRN 041855.pdf PDF
22 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 1st FLR SIG 041888.pdf PDF
57 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 1ST FLR DOM 041859.pdf PDF
45 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 SITE PLN CW MTW 041851.pdf PDF
65 - Attachment 0004 - SEED PROJ SOW 1991 ENL BRKS PH 4 2nd 3rd FLR FR PLN 041806.pdf PDF
18 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 2nd 3rd FLR LHTG 041884.pdf PDF
Attachment 0001_SOW APPENDIX 2.7.3 JBMHH DPW Fillable Excavation Permit.pdf PDF
2 - Attachment 0004 SEED PROJ SOW Attach 1991 ENL BRKS PH 4 ELEV SECTS 041758.pdf PDF
39 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 EQP SCHD 041833.pdf PDF
49 - Attachment 0004 SEED PROJ SOW 2016 WTR BFLW DEVICE 079605.pdf PDF
Attachment 0001_SOW APPENDIX 2.7.9 MYER Example Service Request Ticket.pdf PDF
21 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 1st FLR RECEPT 041885.pdf PDF
Show 40 more

Latest 50 of 127 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PREVIOUS EDITION IS OBSOLETE. Page 1 of 2DD FORM 1354, AUG 2022

TRANSFER AND ACCEPTANCE OF DoD REAL PROPERTY

PAGE

OF

PAGES

1. FROM (Organization Name) 2. DATE PREPARED

(YYYYMMDD)

3. PROJECT/JOB

NUMBER

4. SERIAL NUMBER

5. TO (Organization - Installation Code and Name) 6. RPSUID/SITENAME/

INSTCODE/INSTNAME

7. CONTRACT

NUMBER(S)

7a. RPA PLACED-IN-

SERVICE DATE

(YYYYMMDD)

8. TRANSACTION DETAILS

a. TYPE (X only one box)

ACQUISITION

TRANSFER BETWEEN SERVICES

CAPITAL IMPROVEMENT

INVENTORY ADJUSTMENT

b. WHEN/EVENT (X one)

TOTAL ASSET

PLACED-IN-SERVICE

PARTIAL ASSET

PLACED-IN-SERVICE

c. VERSION (X one)

DRAFT INTERIM FINAL

9.

ITEM

NO.

10a.

FACILITY NO.

10b.

RPUID

11.

CATCODE

12.

CATCODE

DESCRIPTION

13.

CONS

TYPE CODE

14.

SUST

CODE

PRIMARY

15.

UMA

16.

QUANTITY

SECONDARY

17.

UMO

18.

QUANTITY

19.

COST

20.

FUND

SOURCE

21.

FUND

ORG

22.

RPA INT

TYPE

CODE

23.

ITEM

REMARKS

24. STATEMENT OF COMPLETION. The facilities listed hereon are in accordance with maps, drawings, and specifications and change orders approved by the authorized representative of the using agency except for the deficiencies listed on the reverse side.

a. TITLE (Construction Agent/Installation Management Organization Accountable Official/RPAO)

b. TRANSFERRED BY (Typed Name and Signature)

c. DATE

SIGNED

(YYYYMMDD)

25. ACCEPTED BY (Typed Name and Signature)

a. TITLE (Installation Management Organization Accountable Official/RPAO)

b. NAME AND SIGNATURE

c. DATE SIGNED

(YYYYMMDD)

26. PROPERTY

VOUCHER

NUMBER

PREVIOUS EDITION IS OBSOLETE. Page 2 of 2DD FORM 1354, AUG 2022

27. CONSTRUCTION DEFICIENCIES (Attach blank sheet for continuations) 28. PROJECT REMARKS (Attach blank sheet for continuations)

INSTRUCTIONS

GENERAL. This form has been designed and issued for acceptance of real property or transfer between the DoD Components.

For detailed instructions on how to fill out this form, please refer to Unified Facilities Criteria 1-300-08.

Existing instructions issued by the DoD Components relative to the preparation of DD Form 1354 are applicable to this revised form to the extent that the various items and columns on the superseded forms have been retained. The DOD Components may promulgate additional instructions, as appropriate.

For detailed information on data inputs and codes, please refer to the latest version of the Real Property Information Model (RPIM) Report and use the RPIM Pick Lists for Block responses:

https://extranet.acq.osd.mil/ie/

SPECIFIC DATA ITEMS.

1. From. Name of the DoD Component.

2. Date Prepared. Date of actual preparation. Enter all dates in YYYYMMDD format (Example:

March 31, 2010 = 20100331).

3. Project/Job Number. Project number on a DD Form 1391 or Individual Job Order Number.

4. Serial Number. Sequential serial number assigned by the preparing organization (e.g.,Item 17.

2010-0001).

5. To. Name and address of the receiving installation, activity, and Service of the Real Property

Accountable Officer (RPAO).

6. RPSUID/SITENAME/INSTCODE/INSTNAME. Site Unique Identifier and name or installation code and name where the constructed facility is located.

7. Contract Number(s). Contract number(s) for this project.

7a. RPA Placed-In-Service Date. The calendar date the asset is accepted for use by DoD.

8. Transaction Details.

a. Type of Transaction. X only one box.

For Acquisition Type, refer to the Acquisition Method Code pick list in RPIM.

b. When/Event. When or event causing preparation of DD Form 1354. X only one box.

c. Version. Draft, interim, or final DD Form 1354. X only one box.

9. Item Number. Use a separate item number for each facility, no item number for additional usages.

10a. Facility Number. An installation specific asset identification number.

10b. RPUID. A unique non-intelligent code to permanently identify an asset.

11. CATCODE. The real property Category Code (CATCODE) that classifies the designed use of the asset (original or current) and corresponds to the largest quantity of the asset that is utilized for a single purpose (RPA Predominant Design Use CATCODE).

12. CATCODE Description. The CATCODE name corresponding with Item 11.

13. Construction (CONS) Type Code. The code represents the Construction Type Code and valid values can be found in the RPIM pick list by the same name. Type of construction will be PERM for Permanent or SEMI for Semi-permanent.

14. Sustainability (SUST) Code. : This code is also known as the Facility Sustainability Code and valid values can be found in the RPIM pick list by the same name. It indicates whether a facility meets the Guiding Principles of Federal Leadership in High Performance and Sustainable Buildings for buildings greater than 10,000 sq. ft. The list of valid values is: 1, 2, 3, 4.

15. UMA. Enter the primary unit of measure accountability for each design use category code for each item of real property.

16.Quantity. Enter the total quantity in the unit of measure accountability specified for each item of real property.

17. UMO. Enter the appropriate unit of measure operational for capacity/configuration as applicable for the design use category code.

18. Quantity. Enter the total quantity of capacity/configuration in the unit of measure operational specified for each item of real property.

19. Cost. Enter the total project cost for each item of real property. UFC 1-300-08 contains additional guidance.

20. Fund Source. Identify the fund source in this column for each real property asset or item. UFC 1-300-08 contains additional guidance.

21. Funding Organization. Identify the organization(s) responsible for funding the acquisition of this real property asset.

22. RPA Interest Type Code. This code represents the RPA Interest Type Code and valid values can be found in the RPIM pick list by the same name. The code is used to identify the type of legal interest that DoD holds in a real property asset.

23. Item Remarks. Remarks pertaining only to the item number identified in Item 9; show cost sharing.

24. Statement of Completion. Typed name, signature, title, and date of signature by the responsible transferring individual or agent. In the case of a real property acceptance action this is signed by the DoD Construction Agent. In the case of a real property transfer this is signed by the Installation Management Organization.

25. Accepted By. Typed name, signature, title, and date of signature by the Installation Management Organization RPAO or accepting official.

26. Property Voucher Number. Next sequential number assigned by the RPAO in voucher register.

27. Construction Deficiencies. List construction deficiencies in project during contractor turnover inspection.

28. Project Remarks. Project level remarks and continuation of blocks.

https://extranet.acq.osd.mil/ie/

PREVIOUS EDITION IS OBSOLETE.

Page of

DD FORM 1354, AUG 2022

TRANSFER AND ACCEPTANCE OF DoD REAL PROPERTY TRANSFER AND ACCEPTANCE OF DoD REAL PROPERTY

OF

OF

8. TRANSACTION DETAILS

8. TRANSACTION DETALS

a. TYPE (X only one box)

b. WHEN/EVENT (X one) B. WHEN/EVENT (X one)

c. VERSION (X one)

9. ITEM NO.

9. ITEM NO.

10a. FACILITY NO.

10. A. FACILITY NO.

10b. RPUID

10. B. RPUID

11. CATCODE

11. CATEGORY CODE

12. CATCODE DESCRIPTION

12. CATCODE DESCRIPTION

13. CONS TYPE CODE

13. TYPE CODE

14. SUST CODE

14. SUST. CODE

PRIMARY

AREA

15. UMA

15. PRIMARY UM

16. QUANTITY

16. PRIMARY UM QUANTITY

SECONDARY

OTHER

17. UMO

17. SECONDARY UM

18. QUANTITY

18. SECONDARY QUANTITY

19. COST

19. COST

20. FUND SOURCE

20. FUND SOURCE

21. FUND ORG

22. INTEREST CODE

22. RPA INT TYPE CODE

22. INTEREST CODE

23. ITEM REMARKS

23. ITEM REMARKS

24. STATEMENT OF COMPLETION. The facilities listed hereon are in accordance with maps, drawings, and specifications and change orders approved by the authorized representative of the using agency except for the deficiencies listed on the reverse side.

24. STATEMENT OF COMPLETION. The facilities listed hereon are in accordance with maps, drawings, and specifications and change orders approved by the authorized representative of the using agency except for the deficiencies listed on the reverse side.

b. TRANSFERRED BY (Typed Name and Signature) A. TRANSFERRED BY (Typed Name and Signature)

25. ACCEPTED BY (Typed Name and Signature) A. TRANSFERRED BY (Typed Name and Signature) DD Form 1354, "TRANSFER AND ACCEPTANCE OF DoD REAL PROPERTY" 6.2.0.20160331.1.924316.921890

INSTRUCTIONS

INSTRUCTIONS

GENERAL. This form has been designed and issued for acceptance of real property or transfer between the DoD Components.

For detailed instructions on how to fill out this form, please refer to Unified Facilities Criteria 1-300-08.

Existing instructions issued by the DoD Components relative to the preparation of DD Form 1354 are applicable to this revised form to the extent that the various items and columns on the superseded forms have been retained. The DOD Components may promulgate additional instructions, as appropriate.

For detailed information on data inputs and codes, please refer to the latest version of the Real Property Information Model (RPIM) Report and use the RPIM Pick Lists for Block responses: https://extranet.acq.osd.mil/ie/

SPECIFIC DATA ITEMS.

1. From. Name of the DoD Component.

2. Date Prepared. Date of actual preparation. Enter all dates in YYYYMMDD format (Example: March 31, 2010 = 20100331).

3. Project/Job Number. Project number on a DD Form 1391 or Individual Job Order Number.

4. Serial Number. Sequential serial number assigned by the preparing organization (e.g.,Item 17. 2010-0001).

5. To. Name and address of the receiving installation, activity, and Service of the Real Property Accountable Officer (RPAO).

6. RPSUID/SITENAME/INSTCODE/INSTNAME. Site Unique Identifier and name or installation code and name where the constructed facility is located.

7. Contract Number(s). Contract number(s) for this project.

7a. RPA Placed-In-Service Date. The calendar date the asset is accepted for use by DoD.

8. Transaction Details.

a. Type of Transaction. X only one box.

For Acquisition Type, refer to the Acquisition Method Code pick list in RPIM.

b. When/Event. When or event causing preparation of DD Form 1354. X only one box.

c. Version. Draft, interim, or final DD Form 1354. X only one box.

9. Item Number. Use a separate item number for each facility, no item number for additional usages.

10a. Facility Number. An installation specific asset identification number.

10b. RPUID. A unique non-intelligent code to permanently identify an asset.

11. CATCODE. The real property Category Code (CATCODE) that classifies the designed use of the asset (original or current) and corresponds to the largest quantity of the asset that is utilized for a single purpose (RPA Predominant Design Use CATCODE).

12. CATCODE Description. The CATCODE name corresponding with Item 11.

13. Construction (CONS) Type Code. The code represents the Construction Type Code and valid values can be found in the RPIM pick list by the same name. Type of construction will be PERM for Permanent or SEMI for Semi-permanent.

14. Sustainability (SUST) Code. : This code is also known as the Facility Sustainability Code and valid values can be found in the RPIM pick list by the same name. It indicates whether a facility meets the Guiding Principles of Federal Leadership in High Performance and Sustainable Buildings for buildings greater than 10,000 sq. ft. The list of valid values is: 1, 2, 3, 4.

15. UMA. Enter the primary unit of measure accountability for each design use category code for each item of real property.

16.Quantity. Enter the total quantity in the unit of measure accountability specified for each item of real property.

17. UMO. Enter the appropriate unit of measure operational for capacity/configuration as applicable for the design use category code.

18. Quantity. Enter the total quantity of capacity/configuration in the unit of measure operational specified for each item of real property.

19. Cost. Enter the total project cost for each item of real property. UFC 1-300-08 contains additional guidance.

20. Fund Source. Identify the fund source in this column for each real property asset or item. UFC 1-300-08 contains additional guidance.

21. Funding Organization. Identify the organization(s) responsible for funding the acquisition of this real property asset.

22. RPA Interest Type Code. This code represents the RPA Interest Type Code and valid values can be found in the RPIM pick list by the same name. The code is used to identify the type of legal interest that DoD holds in a real property asset.

23. Item Remarks. Remarks pertaining only to the item number identified in Item 9; show cost sharing.

24. Statement of Completion. Typed name, signature, title, and date of signature by the responsible transferring individual or agent. In the case of a real property acceptance action this is signed by the DoD Construction Agent. In the case of a real property transfer this is signed by the Installation Management Organization.

25. Accepted By. Typed name, signature, title, and date of signature by the Installation Management Organization RPAO or accepting official.

26. Property Voucher Number. Next sequential number assigned by the RPAO in voucher register.

27. Construction Deficiencies. List construction deficiencies in project during contractor turnover inspection.

28. Project Remarks. Project level remarks and continuation of blocks.

CurrentPage:
PageCount:
Enter current page number.:
Enter total number of pages.:
1. FROM (Organization Name):
2. DATE PREPARED (YYYYMMDD):
3. PROJECT/JOB NUMBER :
serialNum:
5. TO (Organization - Installation Code and Name):
6. RPSUID/SITENAME/ INSTCODE/INSTNAME:
7. CONTRACT NUMBER(S):
serviceDate:
8. TRANSACTION DETAILS - a. TYPE (X only one box) - Select for "ACQUISITION": 0
8. TRANSACTION DETAILS - a. TYPE (X only one box) - Specify "ACQUISITION," if applicable:
8. TRANSACTION DETAILS - a. TYPE (X only one box) - Select for "TRANSFER BETWEEN SERVICES": 0
8. TRANSACTION DETAILS - a. TYPE (X only one box) - Select for "CAPITAL IMPROVEMENT": 0
8. TRANSACTION DETAILS - a. TYPE (X only one box) - Select for "INVENTORY ADJUSTMENT": 0
8. TRANSACTION DETAILS - b. WHEN/EVENT (X one) - Select for "TOTAL ASSET PLACED-IN-SERVICE": 0
8. TRANSACTION DETAILS - b. WHEN/EVENT (X one) - Select for "PARTIAL ASSET PLACED-IN-SERVICE": 0
8. TRANSACTION DETAILS - c. VERSION (X one) - Select for "DRAFT": 0
8. TRANSACTION DETAILS - c. VERSION (X one) - Select for "INTERIM": 0
8. TRANSACTION DETAILS - c. VERSION (X one) - Select for "FINAL": 0
9. ITEM NUMBER, line 10:
10. A. FACILITY NUMBER, line 10:
10. B. RPUID - REAL PROPERTY UNIQUE IDENTIFIER, line 10:
11. CATEGORY CODE, line 10:
12. CATCODE DESCRIPTION- CODE NAME WHICH DESCRIBES FACILITY USAGE, line 10:
13. CONS TYPE CODE - TYPE OF CONSTRUCTION. PERM FOR PERMANENT, SEMI FOR SEMIPERMANENT, line 10:
14. SUSTAINABILITY CODE, line 10:
15. PRIMARY UMA, line 10:
16. PRIMARY QUANTITY, line 10:
17. SECONDARY UMO, line 10:
18. CONFIGURATION QUANTITY, line 10:
19. COST, line 10:
20. FUND SOURCE, line 10:
21. FUNDING ORGANIZATION, line 10:
22. RPA INTEREST TYPE CODE, line 10:
23. ITEM REMARKS, line 10:
25. ACCEPTED BY (Typed Name and Signature) - a. TITLE (Installation Management Organization Accountable Official/RPAO):
25. ACCEPTED BY (Typed Name and Signature) - b. NAME:
25. ACCEPTED BY (Typed Name and Signature) - b. SIGNATURE:
24. STATEMENT OF COMPLETION. - c. DATE SIGNED (YYYYMMDD):
25. ACCEPTED BY (Typed Name and Signature) - c. DATE SIGNED (YYYYMMDD):
26. PROPERTY VOUCHER NUMBER:
27. CONSTRUCTION DEFICIENCIES (Attach blank sheet for continuations):
28. PROJECT REMARKS (Attach blank sheet for continuations):

File details come from the government source that posted it. Updated .