Project 9_Attachment 0013 Scopes_11 May 2026.pdf
PDF 10 MB Posted
- Solicitation number
- W51EW7-26-R-A007
About this file
This is a Statement of Work (SOW) for a federal construction project involving the repair of Taxiway 'H' (South Package) at McChord Field, Joint Base Lewis-McChord, Washington.
The contractor must furnish all labor, materials, equipment, and supervision to complete the repair work as specified in construction drawings and technical specifications. Key work scope includes: demolition and removal of existing Portland Cement Concrete (PCC) pavement and Asphalt Concrete (AC) shoulders; excavation and removal of base course material; earthwork and grading to specified elevations and profiles; installation of a 6-inch Aggregate Base Course compacted to 100%; placement of 14.5-inch thick PCC pavement; placement of 3-inch thick AC shoulders and 6.5-inch thick AC pavement for the E Ramp Taxiway connection; construction of all pavement joints including doweled contraction, construction, expansion, and thickened edge joints; crack sealing and PCC panel replacement on remaining pavement; and application of pavement markings including taxiway centerlines, edge stripes, and deceptive shoulder striping. The project must be completed in phases to minimize disruption to airfield operations. The contractor is solely responsible for construction means, methods, sequences, safety of all personnel, field verification of existing conditions, protection of utilities and taxiway edge lights, Foreign Object Debris (FOD) control, and restoration of the staging area upon completion. Contractor access is through Gate 63V with a designated staging area for material stockpiling and vehicle parking. All work must comply with applicable building codes, regulations, UFC 3-260-01 airfield operations standards, and OSHA excavation safety requirements.
View the file
Other files
Show 40 more
Latest 50 of 66 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1.0 Project Overview
The work under this contract consists of the repair of Taxiway 'H' (South Package) at McChord
Field, Joint Base Lewis-McChord, WA. The Contractor shall furnish all labor, materials, equipment, and supervision necessary to perform the work as detailed in the construcƟon drawings and technical specificaƟons. The project is to be completed in phases to minimize disrupƟon to airfield operaƟons.
2.0 General Requirements & CoordinaƟon
• Compliance: All work shall conform to applicable building codes, regulaƟons, and ordinances, including UFC 3-260-01 for airfield operaƟons. The Contractor is responsible for obtaining all required permits.
• Field VerificaƟon: The Contractor is responsible for field verifying all exisƟng condiƟons and dimensions prior to the start of work.
• Safety & Security: The Contractor is solely responsible for construcƟon means, methods, sequences, and the safety of all personnel. This includes adherence to all airfield safety, security, and vehicle/equipment marking requirements as detailed in the drawings
(Sheets CI001-CI005, GI003).
• Access & Staging:
• Contractor access to the site will be through Gate 63V and along the route specified in the drawings.
• A designated staging area is provided for material stockpiling and vehicle parking.
The Contractor must maintain this area and restore it to its original condiƟon upon project compleƟon.
• FOD Control: The Contractor shall be responsible for the prevenƟon and conƟnuous removal of any Foreign Object Debris (FOD) from all acƟve and construcƟon pavement areas.
3.0 DemoliƟon and Removals
Pavement Removal: Saw-cut, demolish, and remove exisƟng Portland Cement Concrete
(PCC) pavement and Asphalt Concrete (AC) shoulders within the limits defined on
DemoliƟon Plans (Sheets CD101-CD107).
Base Course Removal: Excavate and remove the exisƟng base course material to the depths specified in the Pavement Removal Details (Sheet CD501).
ProtecƟon: The Contractor must protect all exisƟng uƟliƟes, taxiway edge lights, and other airfield appurtenances from damage during construcƟon. Any damage shall be repaired at the Contractor's expense.
Disposal: All demoliƟon rubble, debris, and excess excavated material shall be removed from government property and disposed of at an approved off-site locaƟon.
4.0 Earthwork and Grading
Grading: Grade the site to the lines, elevaƟons, and profiles indicated on the Grading
Plans (Sheets CG101-CG107) and Taxiway Profiles (Sheets CG201-CG209).
Subgrade PreparaƟon: Prepare and compact the subgrade in preparaƟon for the new base course and pavement. Subgrade must be compacted to 95% or 100% of ASTM
D1557, as specified in the typical secƟons (Sheet CP501).
5.0 Paving and Surfacing
Aggregate Base Course: Install a 6-inch layer of Aggregate Base Course (ABC), compacted to 100%, as the foundaƟon for new pavement secƟons.
PCC Pavement: Place new 14.5-inch thick PCC pavement as shown on the Paving Plans
(Sheets CP101-CP107).
Asphalt Pavement: Place new 3-inch thick AC shoulders and 6.5-inch thick AC pavement for the E Ramp Taxiway connecƟon as detailed.
Joints: Construct all pavement joints (doweled contracƟon, construcƟon, expansion, and thickened edge joints) in strict accordance with the Pavement JoinƟng Details on Sheet
CP502. This includes drilling and grouƟng dowel bars into exisƟng adjacent pavement.
6.0 Pavement Maintenance and Repair
Crack Sealing: Clean and seal all designated cracks in exisƟng asphalt and concrete pavements that are to remain, as shown on the Pavement Maintenance Plans (Sheets
CP201-CP208).
PCC Panel Replacement: Perform full-depth replacement of specified PCC panels, including installaƟon of dowel bars on all sides as per details on Sheet CP503.
ParƟal-Depth Patching: Execute parƟal-depth PCC patch repairs for spalls and other surface distresses as directed by the COR and detailed on Sheet CP503.
7.0 Pavement Markings
Re-stripe all pavement markings that were removed or damaged during construcƟon to match their original configuraƟon, color, and width.
New markings include, but are not limited to, the taxiway centerline, taxiway edge stripes, and decepƟve shoulder striping, as per details on Sheets CP504-CP506.
8.0 Site RestoraƟon and DemobilizaƟon
Upon compleƟon of all construcƟon acƟviƟes, remove all contractor equipment, temporary faciliƟes, and trash from the site.
Restore the contractor staging area and any other disturbed areas to their original condiƟon or beƩer.
WASHINGTON
SPOKANE
SEATTLE
OLYMPIA
TACOMA
JOINT BASE
LEWIS-MCCHORD
US Army Corps of Engineers ®
SOLICITATION NO.:
CONTRACT NO.:
ISSUE DATE.:
IJO: MBA160186J
SEATTLE DISTRICT
JOINT BASE LEWIS-MCCHORD, WA
REPAIR TAXIWAY 'H' (PHASE 2) MCCHORD FIELD
DESIGN PKG NO: CE0740
TAXIWAY "H"
(SOUTH PACAKGE)
MCCHORD AFB
FT. LEWIS
JOINT BASE
LEWIS-MCCHORD
MAIN GATE
PLAN NORTH
8655 PENROSE LANE, SUITE 300
LENEXA, KS 66219
913-742-8000
303 S. TOPEKA STREET
WICHITA, KS 67202
316-262-2691
PRIME DESIGN CONTRACTOR CIVIL
14710 NE 87TH STREET
REDMOND, WA 98502
425-636-7900
GEOTECHNICAL
GI001
C O
VE
R
S H
EE
T
TAXIWAY "D"
R U
N W
AY
6-
TA
XI
W
AY
"H
TAXIWAY "C"
TAXIW
AY "B
J R
AM
P
E R
AM
P
SOUTH PACKAGE
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
JO
IN
T
BA
SE
L
EW
IS
-M C
C H
O R
D , W
A
SE
AT
TL
E D
IS
TR
IC
T
E . M
AR
G
IN
AL
W
AY
S O
U
TH
, B
LD
G
SE
AT
TL
E, W A
4-
D . C
R O
N K
D . B
IL
LI
N G
SL
EY
R . F
IS
H
M . B
IL
LI
N G
SL
EA
J
U
LY
READY FOR CONSTRUCTION
R
EP
AI
R
T
AX
IW
AY
'H
PH
AS
E 2)
M C
C H
O R
D F
IE
LD
D
ES
IG
N
P
KG
N O
: C E0
PR
O
FE
SS
IO
N
AL
E
N G
IN
EE
R
IN
G C
O N
SU
LT
AN
TS
, P .A
S.
T O
PE
KA
S
TR
EE
T
W
IC
H
IT
A, K
S
SO
U
TH
P
AC
KA
G E
TASK ORDER: W912DW-20-F-2041
07/16/2021
INDEX OF DRAWINGS
NUMBERING SYSTEM:
XX100
DISCIPLINE:
C - CIVIL
L - LANDSCAPE
A - ARCHITECTURE
M - MECHANICAL
E - ELECTRICAL
P - PLUMBING
S - STRUCTURAL
K - FOOD SERVICE
DISCIPLINE MODIFIER
SHEET NUMBER WITHIN
SERIES
REFER TO AEC CAD
STANDARDS FOR PROPER
SHEET NUMBERING
GI002
IN
D
EX
O
F D
R
AW
IN
G
S
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
JO
IN
T
BA
SE
L
EW
IS
-M C
C H
O R
D , W
A
SE
AT
TL
E D
IS
TR
IC
T
E . M
AR
G
IN
AL
W
AY
S O
U
TH
, B
LD
G
SE
AT
TL
E, W A
4-
D . C
R O
N K
D . B
IL
LI
N G
SL
EY
R . F
IS
H
M . B
IL
LI
N G
SL
EA
J
U
LY
READY FOR CONSTRUCTION
R
EP
AI
R
T
AX
IW
AY
'H
PH
AS
E 2)
M C
C H
O R
D F
IE
LD
D
ES
IG
N
P
KG
N O
: C E0
PR
O
FE
SS
IO
N
AL
E
N G
IN
EE
R
IN
G C
O N
SU
LT
AN
TS
, P .A
S.
T O
PE
KA
S
TR
EE
T
W
IC
H
IT
A, K
S
SO
U
TH
P
AC
KA
G E
Sheet List Table Sheet Number Sheet Title 35% 60% 100%
GI001 COVER SHEET X X X
GI002 INDEX OF DRAWINGS X X X
GI003 ABBREVIATIONS AND GENERAL NOTES X X X
GI004 PROJECT SCOPE AND PROJECT CONTROL X X X
CI001 TAXIWAY H ACCESS AND SAFETY PLAN (SOUTH) X X X
CI002 PHASE 1 TAXIWAY H ACCESS AND SAFETY PLAN X X X
CI003 PHASE 2 TAXIWAY H ACCESS AND SAFETY PLAN X X X
CI004 CONSTRUCTION PHASING AND SAFETY NOTES X X X
CI005 TRAFFIC CONTROL DETAILS X X X
B100 BORING & TEST PIT LOCATION PLAN X X X
B101 BORING LOGS X X X
B102 BORING LOGS X X X
B103 BORING LOGS X X X
VF101 EXISTING CONDITIONS 1 X X X
VF102 EXISTING CONDITIONS 2 X X X
VF103 EXISTING CONDITIONS 3 X X X
VF104 EXISTING CONDITIONS 4 X X X
CD101 DEMOLITION PLAN 1 X X X
CD102 DEMOLITION PLAN 2 X X X
CD103 DEMOLITION PLAN 3 X X X
CD104 DEMOLITION PLAN 4 X X X
CD105 DEMOLITION PLAN 5 X X X
CD106 DEMOLITION PLAN 6 X X X
CD107 DEMOLITION PLAN 7 X X X
CD501 PAVEMENT REMOVAL DETAILS 1 X X X
CG101 GRADING PLAN 1 X X
CG102 GRADING PLAN 2 X X
CG103 GRADING PLAN 3 X X
CG104 GRADING PLAN 4 X X
CG105 GRADING PLAN 5 X X
CG106 GRADING PLAN 6 X X
CG107 GRADING PLAN 7 X X
CG201 TAXIWAY PROFILES - STA. 62+40 - STA. 67+40 X X X
CG202 TAXIWAY PROFILES - STA. 62+40 - STA. 67+40 X X X
CG203 TAXIWAY PROFILES - STA. 67+40 - STA. 72+40 X X X
CG204 TAXIWAY PROFILES - STA. 67+40 - STA. 72+40 X X X
CG205 TAXIWAY PROFILES - STA. 72+40 - STA. 77+40 X X X
CG206 TAXIWAY PROFILES - STA. 77+40 - STA. 82+40 X X X
CG207 TAXIWAY PROFILES - STA. 82+40 - STA. 85+40 X X X
CG208 TAXIWAY PROFILES - STA. 87+40 - STA. 92+40 X X X
CG209 TAXIWAY PROFILES - STA. 92+40 - STA. 97+70 X X X
CP101 PAVING PLAN 1 X X X
CP102 PAVING PLAN 2 X X X
CP103 PAVING PLAN 3 X X X
CP104 PAVING PLAN 4 X X X
CP105 PAVING PLAN 5 X X X
CP106 PAVING PLAN 6 X X X
CP107 PAVING PLAN 7 X X X
CP201 PAVEMENT MAINTENANCE PLAN 1 X X
CP202 PAVEMENT MAINTENANCE PLAN 2 X X
CP203 PAVEMENT MAINTENANCE PLAN 3 X X
CP204 PAVEMENT MAINTENANCE PLAN 4 X X
CP205 PAVEMENT MAINTENANCE PLAN 5 X X
CP206 PAVEMENT MAINTENANCE PLAN 6 X X
CP207 PAVEMENT MAINTENANCE PLAN 7 X X
CP208 PAVEMENT MAINTENANCE PLAN 8 X X
CP501 PAVEMENT TYPICAL SECTIONS 1 X X X
CP502 PAVEMENT JOINTING DETAILS X X X
CP503 PAVEMENT REPAIR DETAILS X X X
CP504 PAVEMENT MARKING PLAN 1 X X X
CP505 PAVEMENT MARKING PLAN 2 X X X
CP506 PAVEMENT MARKING DETAILS X X X
DRAWING ABBREVIATIONS GENERAL NOTES
A ---------------------
A/C AIR CONDITION
A/C UNIT AIR CONDITIONING UNIT
A/E ARCHITECT/ENGINEER
AB ANCHOR BOLT
ACC ACCESSIBLE
ACS AUTOMATIC CONTROL SYSTEM
ACS DR ACCESS DOOR
ACS PNL ACCESS PANEL
ACT ACOUSTICAL CEILING TILE
ADA AMERICANS WITH DISABILITIES ACT
ADMIN ADMINISTRATION
AFC ABOVE FINISHED COUNTER
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AFS ABOVE FINISHED SLAB
AGGR AGGREGATE
AHU AIR HANDLING UNIT
AIB AIR INFILTRATION BARRIER
ALT ALTERNATE
ALUM ALUMINUM
ANOD ANODIZE
APC ACOUSTICAL PANEL CEILING
APPROX APPROXIMATE
ARCH ARCHITECT
ASSY ASSEMBLY
ATC ACOUSTICAL TILE CEILING
AVG AVERAGE
AW ARCHITECTURAL WOODWORK
B ---------------------
BB BASEBOARD
BC BOOKCASE
BD BOARD
BDRY BOUNDARY
BFF BELOW FINISH FLOOR
BHMA BUILDER'S HARDWARE
MANUFACTURER'S ASSOCIATION
BLDG BUILDING
BLKG BLOCKING
BLT IN BUILT-IN
BN BULLNOSE
BOS BOTTOM OF STEEL
BOT BOTTOM
BP BUILDING PAPER
BRKT BRACKET
BSMT BASEMENT
BTWN BETWEEN
BUR BUILT-UP ROOFING
C ---------------------
C CONC CAST CONCRETE
C LABEL CLASS C DOOR
CAB CABINET
CATW CATWALK
CAV CAVITY
CBB CEMENTITIOUS (BACKER) BOARD
CD CONSTRUCTION DOCUMENTS
CDW CHILLED DRINKING WATER
CEM PLAS CEMENT PLASTER
CER CERAMIC
CF CONTRACTOR FURNISHED
CF/CI CONTRACTOR
FURNISHED/CONTRACTOR INSTALLED
CFE CONTRACTOR FURNISHED EQUIPMENT
CFLG COUNTERFLASHING
CFM CUBIC FEET PER MINUTE
CFMF COLD-FORMED METAL FRAMING
CFS CUBIC FEET PER SECOND
CG CORNER GUARD
CI CAST IRON
CIP CAST-IN-PLACE
CJ CONTROL JOINT
CL CENTER LINE
CLG CEILING
CLG DIFF CEILING DIFFUSER
CLG HT CEILING HEIGHT
CLL COLUMN LINE
CLO CLOSET
CLR COLOR
CLRM CLASSROOM
CMU CONCRETE MASONRY UNIT
CNDS CONDENSATE
CDR CARD READER
CO CLEANOUT
COL COLUMN
COMM COMMUNICATION
CONC CONCRETE
CONC FLR CONCRETE FLOOR
CONF CONFERENCE
CONT CONTINUE
COORDCOORDINATE
COR CONTRACTING OFFICER'S
REPRESENTATIVE
CORR CORRIDOR
CP CONCRETE PIPE
CPT CARPET
CR CONTROL ROOM
CS CAST STONE
CSWK CASEWORK
CT CERAMIC TILE
CTB CERAMIC TILE BASE
CTF CERAMIC TILE FLOOR
CTR CENTER
CU FT CUBIC FEET
CW CASEMENT WINDOW
D ---------------------
D DEPTH
D LABEL CLASS D DOOR
DBL DOUBLE
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DIA DIAMETER
DIR DIRECTION
DIST DISTANCE
DOC DOCUMENT
DR DOOR
DS DOWNSPOUT
E ---------------------
EA EACH
EF EACH FACE
EIFS EXTERIOR INSULATION AND FINISH
SYSTEM
EJ EXPANSION JOINT
ES EACH SIDE
EL ELEVATION
ELEV ELEVATOR
ENTR ENTRANCE
EPS EXPANDED POLYSTYRENE BOARD
(INSULATION)
EQ EQUAL
EWC ELECTRIC WATER COOLER
EXP EXPOSED
EXT EXTERIOR
EXT EXTINGUISHER
EXT GREXTERIOR GRADE
F ---------------------
FA FIRE ALARM
FAAP FIRE ALARM ANNUNCIATOR PANEL
FAS BD FASCIA BOARD
FC BRK FACE BRICK
FCO FLOOR CLEANOUT
FD FLOOR DRAIN
FDTN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FED FEDERAL
FF FINISH FACE
FF EL FINISH FLOOR ELEVATION
FF INSUL FOIL BACKED INSULATION
FGL FIBERGLASS
FH FIRE HOSE
FHP FULL HEIGHT PARTITION
FIN FINISH
FIN BS FINISH BOTH SIDES
FIN FLRFINISH FLOOR
FIN GR FINISH GRADE
FIXT FIXTURE
FLDG FOLDING
FLEX FLEXIBLE
FLG FLOORING
FLMT FLUSH MOUNT
FLR FLOOR
FM FACTORY MUTUAL
FOC FACE OF CONCRETE
FOM FACE OF MASONRY
FR FIRE RESISTANT
FRG FIBER REINFORCED GYPSUM
FRMG FRAMING
FRP FIBERGLASS REINFORCED PLASTIC
FRTW FIRE RETARDANT TREATED WOOD
FS FEDERAL SPECIFICATION
FSTNR FASTENER
FT FEET
FTG FOOTING
FWC FABRIC WALLCOVERING
G ---------------------
G NATURAL GAS
GALV GALVANIZED
GB GRAB BAR
GFCI GOVERNMENT FURNISHED
CONTRACTOR INSTALLED
GFGI GOVERNMENT INSTALLED FURNISHED
INSTALLED BY GOVERNMENT
GFRG GLASS-FIBER-REINFORCED GYPSUM
GLZ GLAZING
GR FL GROUND FLOOR
GUT GUTTER
GYP BD GYPSUM BOARD
GYP PLAS GYPSUM PLASTER
H ---------------------
HB HOSE BIBB
HDPE HIGH DENSITY POLYETHYLENE
HDW HARDWARE
HDWD HARDWOOD
HEPA HIGH EFFICIENCY PARTICULATE AIR
(FILTER)
HM HOLLOW METAL
HMD HOLLOW METAL DOOR
HORIZ HORIZONTAL
HT HEIGHT
HYDR HYDRAULIC
I ---------------------
IBC INTERNATIONAL BUILDING CODE
INSUL INSULATION
INT INTERIOR
ILO IN LIEU OF
J ---------------------
JAN JANITOR
K ---------------------
KPD KEYPAD
KIT KITCHEN
KPL KICKPLATE
L ---------------------
LAM LAMINATE
LAV LAVATORY
LBR LUMBER
LBS POUND
LDG LANDING
LF LINEAR FEET (FOOT)
LIB LIBRARY
LIN LINEAR
LKR LOCKER
LOC LOCATION
LT LIGHT
LVDR LOUVER DOOR
LVR LOUVER
M ---------------------
MACH RM MACHINE ROOM
MATL MATERIAL
MAX MAXIMUM
MC MOISTURE CONTENT
MD METAL DECK
MECH MECHANICAL
MECH RM MECHANICAL ROOM
MEMB MEMBRANE
MF MILL FINISH
MFR MANUFACTURER
MID MIDDLE
MIL STD MILITARY STANDARD
MIN MINIMUM, MINUTE
MIRR MIRROR
MISC MISCELLANEOUS
MLDG MOLDING (MOULDING)
MO MASONRY OPENING
MOD MODIFY
MB MOISTURE BARRIER
MTG MOUNTING
MTL METAL
MVBL MOVABLE
MWP MEMBRANE WATERPROOFING
N ---------------------
N NORTH
NA NOT APPLICABLE
NFPA NATIONAL FIRE PROTECTION
ASSOCIATION
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NP NO PAINT
NRC NOISE REDUCTION COEFFICIENT
NTS NOT TO SCALE
O -------------------
OA OVERALL
OC ON CENTER
OD OUTSIDE DIAMETER
OFD OVERFLOW DRAIN
OFF OFFICE
OGL OBSCURE GLASS
OPH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
OPQ OPAQUE
OWSJ OPEN WEB STEEL JOIST
OPR OPERABLE
ORD OVERFLOW ROOF DRAIN
ORIG ORIGINAL
P --------------------
PA PUBLIC ADDRESS
PAR PARAPET
PAT PATTERN
PB PULL BOX
PBD PARTICLEBOARD
PCC PRECAST CONCRETE
PCF POUNDS PER CUBIC FOOT
PCT PERCENT
PERF PERFORATED
PERIM PERIMETER
PH PHASE
PIL PILASTER
PL PROPERTY LINE
PL GL PLATE GLASS
PLAM PLASTIC LAMINATE
PLAS PLASTER
PLBG PLUMBING
PLG PILING
PLYWD PLYWOOD
PNL PANEL
PP PL PUSH/PULL PLATE
PR PAIR
PRCST PRECAST
PRKG PARKING
PS CONC PRESTRESSED CONCRETE
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PRESSURE TREATED
PTD PAPER TOWEL DISPENSER
PTDR PAPER TOWEL DISPENSER AND
RECEPTACLE
PTN PARTITION
PVC POLYVINYL CHLORIDE (PLASTIC)
PWR POWER
Q --------------------
QT QUARRY TILE
QTY QUANTITY
R --------------------
RB RESILIENT BASE
RBM REINFORCED BRICK MASONRY
RBR RUBBER
RC REINFORCED CONCRETE
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
RDG INS RIGID INSULATION, SOLID
REC RECESSED
REC ROOM RECREATION ROOM
REF REFERENCE
REM REMOVABLE
REP REPAIR
REPL REPLACE
REQ REQUIRE
REQD REQUIRED
RESIL RESILIENT
REST RESTROOM
RF RESILIENT FLOORING
RFG ROOFING
RH ROOF HATCH
RHR RIGHT HAND REVERSE
RL ROOF LEADER
RLG RAILING
RM ROOM
RO ROUGH OPENING
RSD ROLLING STEEL DOOR
RV ROOF VENT
RVL REVEAL
ANNOTATION CALLOUTS/DRAWING
SYMBOLS
REVISION
TAG
NORTH ARROW
SECTION
EXTERIOR ELEVATION
ENLARGEMENT,
DETAIL
SPOT ELEVATION
SHEET NUMBER
SHEET NUMBER
SHEET KEYNOTE
SHEET NUMBER
A1 A101
SIM
A1 A101
SIM
A-101
A1
S --------------------
SB SPLASH BLOCK
SCHED SCHEDULE
SD SMOKE DETECTOR
SF SQUARE FOOT (FEET)
SFTWD SOFTWOOD
SGL SINGLE
SHT MTL FLASH SHEET METAL (FLASHING)
SHTHG SHEATHING
SHV SHELVING
SIM SIMILAR
SJ SCORED JOINT
SKLT SKYLIGHT
SLNT SEALANT
SMK SMOKE
SMLS SEAMLESS
SP EL SPOT ELEVATION
SPEC SPECIFICATION
SQ SQUARE
SQ IN SQUARE INCH
SQ YD SQUARE YARD
SST STAINLESS STEEL
ST STAIRS
STD STANDARD
STL JST STEEL JOIST
STL RF DK STEEL ROOF DECK
STOR STORAGE
STR STRINGERS
STRB/HRN STROBE/HORN
SUB FL SUBFLOOR
SV SHEET VINYL
SW SIDEWALK
T --------------------
T TREAD
T/S TUB/SHOWER
TC TERRA COTTA
TD TRENCH DRAIN
TEL TELEPHONE
TEMP TEMPORARY
TER TERRAZZO
TFF TOP OF FINISH FLOOR
THK THICKNESS
TK BD TACKBOARD
TMPD GL TEMPERED GLASS
TN TRUE NORTH
TOF TOP OF FOOTING
TOM TOP OF MASONRY
TOP TOP OF PARAPET
TOPO TOPOGRAPHY
TOS TOP OF SLAB
TRANS TRANSOM
TRTD TREATED
TV TELEVISION
TYP TYPICAL
U --------------------
UL UNDERWRITER'S LABORATORY
UNO UNLESS NOTED OTHERWISE
UTIL UTILITY
V --------------------
VERT VERTICAL
VENT VENTILATION
VIF VERIFY IN FIELD
VOC VOLATILE ORGANIC COMPOUND
VOL VOLUME
W --------------------
WB WOOD BASE
WC WATER CLOSET
WD WOOD
WF WIDE FLANGE
WT WEIGHT
WWF WELDED WIRE FABRIC
WWM WELDED WIRE MESH
GENERAL PROJECT NOTES
NOTE
NUMBER DESCRIPTION
1 ALL WORK SHALL CONFORM WITH APPLICABLE BUILDING CODES, REGULATIONS, AND ORDINANCES. CONTRACTOR SHALL OBTAIN ALL REQUIRED
BUILDING AND OCCUPANCY PERMITS.
2 INFORMATION ON THE DRAWINGS REGARDING EXISTING CONDITIONS IS BASED UPON DRAWINGS FURNISHED BY THE OWNER. THE INFORMATION IS BELIEVED TO BE AN ACCURATE REFLECTION OF THE EXISTING CONDITIONS, BUT IS IN NO WAY INTENDED TO GUARANTEE EXACT CONDITIONS
3 THE CONTRACTOR IS RESPONSIBLE TO PERFORM A COMPLETE ANALYSIS PRIOR TO COMMENCEMENT OF WORK. REPORT ALL DISCREPANCIES TO THE CONTRACTING OFFICER'S REPRESENTATIVE (COR) IMMEDIATELY. FAILURE OF THE CONTRACTOR TO PERFORM SURVEY, FIELD VERIFY CONDITIONS, AND COORDINATE WORK DOES NOT RELIEVE CONTRACTOR OF RESPONSIBLITY FOR WORK.
4 CONTRACTOR SHALL TAKE PRECAUTIONS TO MAINTAIN AND PROTECT EXISTING SYSTEMS WHICH ARE TO REMAIN. ANY DAMAGES TO SUCH SYSTEMS SHALL BE REPAIRED IN A MANNER ACCEPTABLE TO THE CONTRACTING OFFICER'S REPRESENTATIVE (COR) AT THE CONTRACTORS
EXPENSE.
5 DRAWINGS CONTAINED IN THIS SET SHALL NOT BE REPRODUCED FOR SHOP DRAWINGS. COPIES OF THESE DRAWINGS SUBMITTED AS SHOP
DRAWINGS WILL BE REJECTED AND RETURNED TO THE CONTRACTOR.
6 CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR THE MEANS, METHODS, AND SEQUENCES OF CONSTRUCTION AND THE SAFETY OF ALL
CONSTRUCTION PERSONNEL AND VISITORS.
7 DO NOT SCALE DRAWINGS. FOLLOW WRITTEN DIMENSIONS OR KEYED NOTES ONLY. CONTACT THE CONTRACTING OFFICER'S REPRESENTATIVE
(COR) FOR CLARIFICATIONS IF REQUIRED.
8 EACH INSTALLER MUST EXAMINE SUBSTRATE AND/OR CONDITIONS UNDER WHICH THE WORK WILL BE INSTALLED AND REPORT TO THE CONTRACTOR IN WRITING ANY CONDITIONS DETRIMENTAL TO THE PROPER AND TIMELY EXECUTION OF THE INSTALLER'S WORK. DO NOT PROCEED UNTIL UNSATISFACTORY CONDITIONS ARE CORRECTED. INSTALLATION SHALL CONSTITUTE ACCEPTANCE OF THE SUBSTRATE AND/OR CONDITIONS.
9 "TYPICAL" AS USED IN THESE DOCUMENTS SHALL MEAN THAT THE CONDITIONS OR DIMENSION IS THE SAME OR REPRESENTATIVE FOR SIMILAR
CONDITIONS THROUGHOUT.
GI003
AB
BR
EV
IA
TI
O
N S
AN
D
G
EN
ER
AL
N O
TE
S
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
JO
IN
T
BA
SE
L
EW
IS
-M C
C H
O R
D , W
A
SE
AT
TL
E D
IS
TR
IC
T
E . M
AR
G
IN
AL
W
AY
S O
U
TH
, B
LD
G
SE
AT
TL
E, W A
4-
D . C
R O
N K
D . B
IL
LI
N G
SL
EY
R . F
IS
H
M . B
IL
LI
N G
SL
EA
J
U
LY
READY FOR CONSTRUCTION
R
EP
AI
R
T
AX
IW
AY
'H
PH
AS
E 2)
M C
C H
O R
D F
IE
LD
D
ES
IG
N
P
KG
N O
: C E0
PR
O
FE
SS
IO
N
AL
E
N G
IN
EE
R
IN
G C
O N
SU
LT
AN
TS
, P .A
S.
T O
PE
KA
S
TR
EE
T
W
IC
H
IT
A, K
S
SO
U
TH
P
AC
KA
G E
TAXIWAY "H"
TAXIW
AY "D"
TA
XIW
AY "C
RUNWAY 16-34
TAXIW
AY "B"
TA
XI
W
AY
"A
J - RAMP
E - RAMP
TA
XI
W
AY
"E
WORK AREA
CP: AHBL#112
NAIL & WASHER
N: 668638.0290 E: 1148084.0160
EL: 288.02
CP: AHBL#111
NAIL & WASHER
N: 668038.8030 E: 1148071.6970
EL: 287.52
CP: AHBL#100
NAIL & WASHER
N: 662757.2110 E: 1147508.6970
EL: 290.56
CP: AHBL#101
REBAR AND CAP
N: 662830.4270 E: 1147960.880
EL: 298.39
CP: AHBL#117
NAIL & WASHER
N: 660020.0900 E: 1147760.3930
EL: 322.29
CP: AHBL#118
NAIL & WASHER
N: 659423.0110 E: 1147631.9100
EL: 321.96
GI004
PR
O
JE
C
T
SC
O
PE
A N
D P
R O
JE
C
T C
O N
TR
O
L
1" = 400'-0"A1 PROJECT SCOPE AND PROJECT CONTROL
PLAN NORTH
LEGEND
WORK AREA
SEE SHEET VF101 FOR CONTROL
POINT AND BENCHMARK DATUM
INFORMATION.
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
JO
IN
T
BA
SE
L
EW
IS
-M C
C H
O R
D , W
A
SE
AT
TL
E D
IS
TR
IC
T
E . M
AR
G
IN
AL
W
AY
S O
U
TH
, B
LD
G
SE
AT
TL
E, W A
4-
D . C
R O
N K
D . B
IL
LI
N G
SL
EY
R . F
IS
H
M . B
IL
LI
N G
SL
EA
J
U
LY
READY FOR CONSTRUCTION
R
EP
AI
R
T
AX
IW
AY
'H
PH
AS
E 2)
M C
C H
O R
D F
IE
LD
D
ES
IG
N
P
KG
N O
: C E0
PR
O
FE
SS
IO
N
AL
E
N G
IN
EE
R
IN
G C
O N
SU
LT
AN
TS
, P .A
S.
T O
PE
KA
S
TR
EE
T
W
IC
H
IT
A, K
S
SO
U
TH
P
AC
KA
G
CONTRACTOR
ACCESS ROUTE
LI
N
C O
LN
B
LV
D
S W
PE
R
IM
ET
ER
R
O
AD
BARNES BLVD.
ACCESS TO BASE
THROUGH GATE 63V.
GATE TO BE
CONTROLLED BY
CONTRACTOR
THROUGH DES.
1S T
ST
R
EE
T
STAGING AREA
AND BATCH
PLANT.
SEE SHEET CI003 FOR
AIRFIELD ACCESS.
OUTER DR.
O U
TE
R
D R
PROJECT LIMITS.
LEGEND
WORK AREA
CI001
TA
XI
W
AY
H A
C C
ES
S
AN
D
S
AF
ET
Y
PL
AN
(S O
U
TH
1" = 500'-0"A1 TAXIWAY H ACCESS AND SAFETY PLAN (SOUTH)
1200'0 600'
NOTES
1. COORDINATION: THE CONTRACTOR SHALL
COORDINATE WITH THE C.O.R. TO SCHEDULE
PROGRESS MEETINGS. THE MEETING SHALL BE USED
TO DISCUSS UPCOMING WORK, REVIEW COMPLETED
WORK, ADDRESS SAFETY ISSUES, AND TO REVIEW
CHANGES TO THE PROJECT SCOPE OR SCHEDULE, IF
APPLICABLE.
2. PHASING: THE CONTRACTOR SHALL COMPLETE THE
PROJECT WORK IN PHASES IN ACCORDANCE WITH
THE PHASING PLANS INCLUDED IN THESE PLANS.
3. THE GOVERNMENT WILL ISSUE ANY NECESSARY
NOTAMS.
4. CONTRACTOR ACCESS:
A. STOCKPILED CONSTRUCTION MATERIALS: THE
CONTRACTOR SHALL STAGE HIS OPERATIONS AND
STORE ALL MATERIALS AT THE LOCATION SHOWN ON
THE HAUL ROUTE AND STAGING AREA PLAN.
AT COMPLETION OF THE PROJECT, THE CONTRACTOR
SHALL REMOVE ALL EQUIPMENT AND PROJECT
GENERATED TRASH FROM THE STAGING AREA AND
RESTORE THE GROUNDS TO EXISTING CONDITIONS.
THE CONTRACTOR SHALL HAVE POSTED ALL
REQUIRED FEDERAL EMPLOYMENT NOTICES IN A
PROMINENT, ACCESSIBLE LOCATION AT THE PROJECT
BEFORE HE WILL BE PERMITTED TO OCCUPY THE
STAGING AREA OR BEGIN CONSTRUCTION.
B. VEHICLE AND PEDESTRIAN OPERATIONS: THE
CONTRACTOR AND ALL SUBCONTRACTORS SHALL
CONDUCT THEIR OPERATIONS IN ACCORDANCE WITH
THE PROCEDURES AND REQUIREMENTS ESTABLISHED
HEREIN AND IN ACCORDANCE WITH APP. B, SECTION
14 OF UFC 3-260-01.
THE CONTRACTOR SHALL LIMIT HIS EQUIPMENT,
OPERATIONS, PARKING, STOCKPILING,
CONSTRUCTION OPERATIONS, ETC. TO WITHIN ACTIVE
WORK AREAS, OUTSIDE AIR OPERATIONS AREAS, OR
THE CONTRACTOR'S STAGING AREA, UNLESS
OTHERWISE APPROVED BY THE C.O.R.
THE CONTRACTOR SHALL COORDINATE WITH THE
C.O.R FOR SPECIFIC SUB-AREAS WITHIN THE STAGING
AREA FOR CONSTRUCTION OFFICE AND EMPLOYEE
PARKING.
WORK MAY ONLY BE UNDERTAKEN ON THE AIR FIELD
WITH C.O. APPROVAL AFTER PLACEMENT OF LOW
BARRICADES IN ACCORDANCE WITH THE APPROVED
SAFETY PLANS. CONTRACTOR IS RESPONSIBLE FOR
PLACEMENT AND ALL MAINTENANCE OF THE
BARRICADES THROUGHOUT CONSTRUCTION.
BARRICADES SHALL NOT BE PLACED WITHIN ACTIVE
TAXIWAY OR RUNWAY SAFETY AREAS.
CONTRACTOR PERSONNEL AND EQUIPMENT WILL BE
REQUIRED TO GIVE WAY TO TAXIING AIRCRAFT AT ALL
TIMES ANYTIME WORK ADJACENT TO AN ACTIVE
TAXIWAY OR APRON IS UNDERWAY.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE
ACTIVITIES AND SAFETY OF HIS PERSONNEL.
PERSONNEL SHALL BE ADVISED AS TO THE SAFETY
AREAS, THE CONSTRUCTION LIMITS, AND SHALL BE
INSTRUCTED AS TO THE RESTRICTION OF THEIR
MOVEMENTS ON THE AIRPORT. CONTRACTOR
PERSONNEL OPERATING ON THE AIRPORT WILL BE
REQUIRED TO UNDERGO TRAINING DIRECTED BY THE
GOVERNMENT BEFORE BEING ALLOWED ONTO THE
AIRFIELD. CONTRACTOR PERSONNEL INVOLVED IN
AIRCRAFT DAMAGE INCIDENTS OR VIOLATIONS OF
AIRPORT SECURITY WILL BE SUBJECT TO
DISCIPLINARY ACTION INCLUDING EVICTION FROM
AIRPORT PROPERTY.
SEE SHEET CI005 FOR TRAFFIC CONTROL DETAILS.
C. AIRPORT SECURITY: THE CONTRACTOR SHALL
OBTAIN PROPER SECURITY CLEARANCE FOR HIS
PERSONNEL, INCLUDING BADGING FOR SELECT
INDIVIDUALS; AND CAREFUL CONTROL OF VEHICULAR
TRAFFIC ENTERING THE BASE WILL BE REQUIRED.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR
KEEPING THE SURFACES OF AIRFIELD PAVEMENTS
CLEAN AT ALL TIMES. POWER BROOMS WITH PICK-UP
CAPABILITY, PROVIDED BY THE CONTRACTOR, SHALL
BE AVAILABLE AT ALL ACTIVE CROSSINGS AT ALL
TIMES TO FACILITATE CLEANING THE PAVEMENT.
ONLY BROOMS WITH FIBER TYPE BRISTLES WILL BE
PERMITTED.
A VACUUM-TYPE SWEEPER WILL BE USED TO CLEAN
ALL AIRFIELD PAVEMENTS TO THE SATISFACTION OF
AIRPORT OPERATIONS PRIOR TO OPENING OR
REOPENING THE PAVEMENT.
INSPECTIONS: THE CONTRACTOR SHALL PERFORM
DAILY INSPECTIONS AT THE END OF EACH WORK
SHIFT TO ENSURE THAT ALL PAVEMENTS ARE CLEAN
AND ALL ELECTRICAL SYSTEMS REQUIRED TO BE IN
OPERATION ARE FUNCTIONING PROPERLY.
UNDERGROUND UTILITIES: BEFORE ANY EXCAVATION,
THE CONTRACTOR SHALL CONTACT UULC AT
1-800-424-5555 TO HAVE UTILITIES LOCATED.
EXCAVATION WITHIN THREE (3) FEET OF A MARKED
UTILITY LINE SHALL BE HAND-EXCAVATED TO ENSURE
PROTECTION OF THE BURIED LINE. DAMAGE TO
EXISTING UTILITY LINES SHALL BE REPAIRED AT THE
CONTRACTOR'S EXPENSE.
CONTRACTOR SHALL INSTALL ALL BARRICADES
SHOWN ON THE SAFETY PLANS PRIOR TO BEING
PERMITTED TO CLOSE TAXIWAYS. C.O.R WILL ESCORT
CONTRACTOR TO INSTALL BARRICADES.
5. THE CONTRACTOR SHALL PROVIDE TWO PHONE
NUMBERS OF PERSONNEL THAT ARE AVAILABLE 24
HOURS A DAY TO RESPOND TO AN INCIDENT ON THE
AIRFIELD THAT RESULTS IN A SAFETY HAZARD OR
LIMITS OPERATION OF THE AIRFIELD.
6. CONSTRUCTION EQUIPMENT WITH METAL TRACKS
ARE NOT PERMITTED TO TRAFFIC ON EXISTING
AIRFIELD PAVEMENT TO REMAIN AND NEWLY
CONSTRUCTED PAVEMENTS UNLESS THERE IS
ADEQUATE PROTECTION. METAL BUCKETS ARE NOT
PERMITTED TO BE USED ON NEW OR EXISTING TO
REMAIN AIRFIELD PAVEMENT.
7. TEMPORARY AIRFIELD MARKINGS, IF DIRECTED TO BE
INSTALLED, SHALL BE APPLIED AT HALF THE
APPLICATION RATE OF 32 17 23.
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
JO
IN
T
BA
SE
L
EW
IS
-M C
C H
O R
D , W
A
SE
AT
TL
E D
IS
TR
IC
T
E . M
AR
G
IN
AL
W
AY
S O
U
TH
, B
LD
G
SE
AT
TL
E, W A
4-
D . C
R O
N K
D . B
IL
LI
N G
SL
EY
R . F
IS
H
M . B
IL
LI
N G
SL
EA
J
U
LY
READY FOR CONSTRUCTION
R
EP
AI
R
T
AX
IW
AY
'H
PH
AS
E 2)
M C
C H
O R
D F
IE
LD
D
ES
IG
N
P
KG
N O
: C E0
PR
O
FE
SS
IO
N
AL
E
N G
IN
EE
R
IN
G C
O N
SU
LT
AN
TS
, P .A
S.
T O
PE
KA
S
TR
EE
T
W
IC
H
IT
A, K
S
SO
U
TH
P
AC
KA
G
F STREET
OUTER
DR.
TAXIWAY "H"
RUNWAY 16-34
TA
XI
W
AY
"E
E - RAMP
135.00'
135.00'
CONTRACTOR
ACCESS ROUTE.
TO STAGING AREA,
SEE SHEET CI001
350'
CI002
PH
AS
E
TA
XI
W
AY
H A
C C
ES
S
AN
D
SA
FE
TY
P
LA
N
1" = 500'-0"A1 PHASE 1 TAXIWAY H ACCESS AND SAFETY PLAN
LEGEND
400'0 200'
LOW PROFILE BARRICADE
WORK AREA
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
JO
IN
T
BA
SE
L
EW
IS
-M C
C H
O R
D , W
A
SE
AT
TL
E D
IS
TR
IC
T
E . M
AR
G
IN
AL
W
AY
S O
U
TH
, B
LD
G
SE
AT
TL
E, W A
4-
D . C
R O
N K
D . B
IL
LI
N G
SL
EY
R . F
IS
H
M . B
IL
LI
N G
SL
EA
J
U
LY
READY FOR CONSTRUCTION
R
EP
AI
R
T
AX
IW
AY
'H
PH
AS
E 2)
M C
C H
O R
D F
IE
LD
D
ES
IG
N
P
KG
N O
: C E0
PR
O
FE
SS
IO
N
AL
E
N G
IN
EE
R
IN
G C
O N
SU
LT
AN
TS
, P .A
S.
T O
PE
KA
S
TR
EE
T
W
IC
H
IT
A, K
S
SO
U
TH
P
AC
KA
G
F STREET
OUTER
DR.
TAXIWAY "H"
RUNWAY 16-34
TA
XI
W
AY
"E
E - RAMP
135.00'
5.
135.00' CONTRACTOR
ACCESS ROUTE.
TO STAGING AREA,
SEE SHEET CI001
135.00'
CI003
PH
AS
E
TA
XI
W
AY
H A
C C
ES
S
AN
D
SA
FE
TY
P
LA
N
1" = 500'-0"A1 PHASE 2 TAXIWAY H ACCESS AND SAFETY PLAN
LEGEND
400'0 200'
LOW PROFILE BARRICADE
WORK AREA
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
JO
IN
T
BA
SE
L
EW
IS
-M C
C H
O R
D , W
A
SE
AT
TL
E D
IS
TR
IC
T
E . M
AR
G
IN
AL
W
AY
S O
U
TH
, B
LD
G
SE
AT
TL
E, W A
4-
D . C
R O
N K
D . B
IL
LI
N G
SL
EY
R . F
IS
H
M . B
IL
LI
N G
SL
EA
J
U
LY
READY FOR CONSTRUCTION
R
EP
AI
R
T
AX
IW
AY
'H
PH
AS
E 2)
M C
C H
O R
D F
IE
LD
D
ES
IG
N
P
KG
N O
: C E0
PR
O
FE
SS
IO
N
AL
E
N G
IN
EE
R
IN
G C
O N
SU
LT
AN
TS
, P .A
S.
T O
PE
KA
S
TR
EE
T
W
IC
H
IT
A, K
S
SO
U
TH
P
AC
KA
G
CONTRACTOR'S SAFETY AND SECURITY REQUIREMENTS:
1. IT IS THE INTENT TO MINIMIZE INTERFERENCE OR CONFLICT WITH AIRCRAFT AIR AND GROUND OPERATIONS. THE CONTRACTOR SHALL COORDINATE ACTIVITIES WITH THE CONTRACTING OFFICER WHILE WORKING NEAR AIRCRAFT OPERATIONAL AREAS, TO MINIMIZE INTERFERENCE WITH AIRCRAFT GROUND MOVEMENTS. BEFORE STARTING ANY WORK OPERATIONS, THE CONTRACTOR SHALL ASSURE THAT PROPER SAFETY PRECAUTIONS ARE TAKEN AND THAT PROPER SEPARATIONS TO AIRCRAFT ARE MAINTAINED. THE CONTRACTOR SHALL ACQUAINT HIS SUPERVISORS AND EMPLOYEES OF THE AIRFIELD ACTIVITY AND OPERATIONS AND SHALL CONDUCT THE CONSTRUCTION ACTIVITIES TO CONFORM TO ALL ROUTINE AIR TRAFFIC REQUIREMENTS AND GUIDELINES ON SAFETY AS SPECIFIED IN PARAGRAPH
NO. 10 BELOW.
2. ALL CONTRACTOR VEHICLES THAT ARE AUTHORIZED TO OPERATE ON THE AIRFIELD IN OR NEAR THE ACTIVE AIRCRAFT OPERATIONS AREA (AOA) WILL BE MARKED AND LIGHTED IN ACCORDANCE WITH THE REQUIREMENTS OF FAA AC 150/5210 (MOST RECENT VERSION). THESE VEHICLES SHALL DISPLAY IN FULL VIEW A FLASHING YELLOW DOME-TYPE LIGHT OR ABOVE THE VEHICLE. A 3' X 3' OR LARGER, ORANGE AND WHITE CHECKERBOARD FLAG, EACH CHECKERBOARD COLOR BEING 1-FOOT SQUARE (SEE CONSTRUCTION SAFETY FLAG DETAIL, SHEET CI006 ) ANY VEHICLE OPERATING IN OR NEAR THE ACTIVE AOA DURING THE HOURS OF DARKNESS SHALL BE EQUIPPED WITH A FLASHING YELLOW DOME LIGHT, MOUNTED ON TOP OF THE VEHICLE AND BE OF SUCH INTENSITY TO CONFORM TO AC
REQUIREMENTS.
3. CONTRACTOR VEHICLES THAT ARE REQUIRED TO OPERATE ON, OR ACROSS ACTIVE TAXIWAYS AND APRONS
SHALL DO SO UNDER THE DIRECT CONTROL OF FLAGGER.
4. NO TAXIWAY, APRON OR AIRFIELD ROADWAY SHALL BE CLOSED WITHOUT WRITTEN APPROVAL OF CONTRACTING OFFICER. TO ENABLE NECESSARY "NOTICES TO AIRMEN" (NOTAM) OR ADVISORIES TO AIRFIELD SERVICES OR TENANTS, A MINIMUM OF 10 WORKING DAYS WRITTEN NOTICE REQUESTING CLOSING SHALL BE DIRECTED TO THE CONTRACTING
OFFICER.
5. WORK OUTSIDE THE CONSTRUCTION ACTIVITY AREA LIMITS MAY NOT PROCEED, NOR MAY VEHICLES ENCROACH WITHIN THIS AREA, UNTIL THE APPROPRIATE NOTAMS HAVE BEEN ISSUED. CONSTRUCTION VEHICLE ACTIVITY ADJACENT TO OR OUTSIDE THE CONSTRUCTION AREA WILL BE CONTROLLED BY FLAG MEN (WITH RADIOS) APPROVED
AND CERTIFIED BY THE CONTRACTING OFFICER.
6. OPEN FLAME WELDING OR TORCH CUTTING OPERATIONS ARE PROHIBITED UNLESS ADEQUATE FIRE AND SAFETY PRECAUTIONS HAVE BEEN TAKEN AND THE CONTRACTING OFFICER HAS BEEN NOTIFIED. THESE OPERATIONS SHALL
BE IN COMPLIANCE WITH NFPA 241 CRITERIA.
7. STOCKPILED MATERIAL SHALL BE CONSTRAINED IN A MANNER TO PREVENT MOVEMENT RESULTING FROM WIND CONDITIONS IN EXCESS OF TEN MILES PER HOUR. STOCKPILE HEIGHT SHALL BE LESS THAN 15 FEET. IN ADDITION, STOCKPILED MATERIAL SHALL HAVE SILT FENCE LOCATED AROUND THE MATERIAL TO PREVENT POLLUTING
WATERCOURSES. TEMPORARY EROSION CONTROL FOR STOCKPILES SHALL BE INCIDENTAL.
8. OPEN TRENCHES, EXCAVATIONS AND STOCKPILED MATERIAL LOCATED IN OR NEAR THE AOA SHALL BE PROMINENTLY MARKED WITH FLAGS AND LIGHTED BY APPROVED LIGHT UNITS DURING HOURS OF RESTRICTED
VISIBILITY AND DARKNESS.
9. DEBRIS, WASTE AND LOOSE MATERIAL CAPABLE OF CAUSING DAMAGE TO AIRCRAFT LANDING GEARS, PROPELLERS OR BEING INGESTED IN JET ENGINES SHALL NOT BE ALLOWED ON OR NEAR ACTIVE AIRCRAFT MOVEMENT AREAS. IF THESE MATERIALS ARE OBSERVED TO BE ON OR NEAR ACTIVE AIRCRAFT MOVEMENT AREAS, THEY WILL BE
REMOVED IMMEDIATELY AND CONTINUOUSLY BY THE CONTRACTOR DURING CONSTRUCTION.
10. THE CONTRACTOR IS DIRECTED TO COMPLY WITH AND BRIEF ALL OF THE SUBCONTRACTOR'S AND CONTRACTOR'S EMPLOYEES WITH THE MOST CURRENT VERSION OF THE FOLLOWING SAFETY GUIDELINES, RELATED
MATERIALS AND FAA ADVISORY CIRCULARS:
150/5200-18 "AIRFIELD SAFETY-SELF INSPECTION"
150/5210-5 "PAINTING, MARKING & LIGHTING OF VEHICLES USED ON AN AIRPORT"
150/5370-2 "OPERATIONAL SAFETY ON AIRPORTS DURING CONSTRUCTION"
COPIES OF THESE DOCUMENTS CAN BE FOUND ON THE FAA'S WEBSITE AT
HTTP://WWW.FAA.GOV/REGULATIONS_POLICIES/ADVISORY_CIRCULARS/
11. THE CONTRACTOR SHALL TAKE NECESSARY ACTION AT ALL TIMES TO PROTECT THE PUBLIC, AND MAINTAIN AIRCRAFT AND VEHICULAR TRAFFIC. CONSTRUCTION DURING THE PROJECT MAY BE HALTED AT ANY TIME BY THE CONTRACTING OFFICER IF IT IS DETERMINED TO BE IN THE BEST INTEREST OF AIRFIELD OPERATIONS OR SAFETY. THE CONTRACTOR MAY BE DIRECTED TO REMOVE EQUIPMENT AND/OR EVACUATE THE SITE IN ORDER TO ENABLE
AIRCRAFT OPERATIONS.
12. THE TERM CONTRACTOR MEANS THE PRIME CONTRACTOR, HIS/HER SUBCONTRACTORS, SUPPLIERS, MATERIALMEN, EMPLOYEES, AND OTHERS WHO WILL PERFORM SERVICES FOR OR IN CONJUNCTION WITH THE PRIME
CONTRACTOR.
13. TRUCK HAUL ROUTES ON THE AIRFIELD SHALL BE DELINEATED WITH LIGHTED BARRICADES. OTHER MEANS TO CLEARLY MARK THE ROUTES TO THE WORK SITE MAY BE APPROVED ONLY BY THE CONTRACTING OFFICER.
14. THE CONTRACTOR SHALL PROVIDE A VACUUM TRUCK AT THE STARTUP OF CONSTRUCTION TO DAILY VACUUM ALL PAVEMENTS AFFECTED BY CONSTRUCTION. THE VACUUM TRUCK SHALL REMAIN ON-SITE FOR THE DURATION OF THE PROJECT AND SHALL BE AVAILABLE AT THE DISCRETION OF THE CONTRACTING OFFICER TO VACUUM PAVEMENT AREAS ADJACENT TO THE CONSTRUCTION AREAS TO ENSURE NO FOD IS PRESENT ON PAVEMENTS WITHIN 500 FEET OF ANY CONSTRUCTION AREA. THE COST OF THE VACUUM TRUCK SHALL BE INCLUDED IN THE BID.
15. THE CONTRACTOR SHALL COORDINATE DAILY CONSTRUCTION OPERATION WITH THE CONTRACTING OFFICER EACH DAY PRIOR TO BEGINNING WORK AND RESPOND IMMEDIATELY TO DIRECTION REGARDING AIRSIDE OPERATIONS.
16. NO EQUIPMENT OR MATERIALS SHALL BE LEFT UNATTENDED ON THE AIRFIELD UNLESS WITHIN DESIGNATED STAGING AREAS OR THE CONTRACTOR RECEIVES PRIOR WRITTEN APPROVAL FROM THE CONTRACTING OFFICER. NO PIPE AND BACKFILL MATERIALS AND STOCKPILES SHALL BE STORED OUTSIDE THE CONSTRUCTION AREA. NO MATERIALS MAY BE STORED ALONG THE PROPOSED TRENCH ALIGNMENT UNTIL THE DAY IT IS TO BE INSTALLED. AT NO
TIME SHALL ANY EXCAVATED AREAS BE LEFT UNATTENDED.
17. THE CONTRACTOR SHALL INSTALL ALL REQUIRED BARRICADES AT DESIGNATED PLAN LOCATIONS, AND HAVE ALL EQUIPMENT EITHER FLAGGED OR FITTED WITH FLASHING YELLOW DOME-TYPE LIGHTS ON TOP OF THE VEHICLES. ALL THESE ITEMS SHALL CONSIST OF THE SAFETY AND SECURITY SYSTEM. THE CONTRACTOR SHALL INSTALL THE COMPONENTS OF THE SYSTEM AT THE APPROPRIATE TIMES AS SPECIFIED IN THE CONTRACT DOCUMENTS. THE CONTRACTOR SHALL INSPECT EVERY ASPECT OF THE SAFETY AND SECURITY SYSTEM ON A DAILY BASIS AND ENSURE ALL COMPONENTS ARE FUNCTIONING PROPERLY. THE SYSTEM ELEMENTS TO BE INSPECTED ARE AS FOLLOWS:
*BARRICADES SET PROPERLY AND ALL FLASHING WARNING LIGHTS OPERATING PROPERLY.
*ALL EQUIPMENT FLAGGED OR OUTFITTED WITH FLASHING YELLOW DOME-TYPE LIGHTS.
18. DURING TIMES WHEN SAFETY OF FLIGHT OPERATIONS COULD BE IMPAIRED, OR WHEN EQUIPMENT IS IDLE, ALL CONTRACTOR'S BOOMS, TOWERS, AND OTHER MOVABLE APPENDAGES WILL BE LOWERED TO THE MINIMUM EXTENT
AND PARKED IN THE DESIGNATED STAGING AREA AND OUTSIDE THE OFA.
19. THE CSSO SHALL BE RESPONSIBLE FOR BRIEFING ALL CONTRACTOR PERSONNEL ON THESE REQUIREMENTS AND ANY ADDITIONAL DIRECTIVES GIVEN BY THE AIRFIELD SECURITY. ALL NEW CONTRACTOR EMPLOYEES SHALL BE
BRIEFED ON THESE REQUIREMENTS PRIOR TO WORKING ON THE AIRFIELD.
20. THE CONTRACTOR SHALL EXERCISE EXTREME CAUTION WORKING AROUND POTENTIALLY ENERGIZED UNDERGROUND OR ABOVEGROUND ELECTRICAL UTILITIES. THE CONTRACTOR IS RESPONSIBLE FOR SITE SAFETY AT ALL TIMES AND WILL CONFORM TO ALL OSHA, FAA, AND OTHER FEDERAL, STATE, AND LOCAL SAFETY REGULATIONS.
SAFETY PLAN NARRATIVE
1. GENERAL: THE SAFETY PLAN SHALL CONSIST OF THE REQUIREMENTS ESTABLISHED IN THE CONTRACT DOCUMENTS AND AS SET FORTH IN AC 150/5370-2E, "OPERATIONAL SAFETY ON AIRPORTS DURING CONSTRUCTION."
2. THERE ARE NO EMERGENCY SERVICES AVAILABLE TO THE CONTRACTOR ON JBLM. THE NEAREST HOSPITAL/EMERGENCY SERVICES FACILITY IS ST.CLARE HOSPITAL, 11315 BRIDGEPORT WAY SW, LAKEWOOD WA 98499 (253-985-1711). FOR ANY NON-LIFE THREATENING INJURIES, PERSONNEL SHOULD BE TRANSPORTED TO THIS, OR ANY
OTHER CONTRACTOR APPROVED FACILITY FOR TREATMENT.
3. CONTRACTOR SHOULD CALL 911 FOR ANY LIFE THREATENING EMERGENCIES (INCLUDING THOSE REQUIRING POLICE RESPONSE) WHILE ON JBLM. CONTRACTOR & EMPLOYEES SHALL BE AWARE THAT SEVERAL E911 DISPATCH CENTERS MAY ANSWER 911 CALL PLACED FROM A PHONE (INCLUDING MOBILE PHONES) ON JBLM. WHEN DIALING 911 FROM ANY PHONE (INCLUDING MOBILE) ON JBLM, CONTRACTOR SHALL FIRST INFORM DISPATCHER ANSWERING CALL THAT THEY ARE LOCATED ON JBLM-McCHORD FIELD (GIVING APPROXIMATE LOCATION/ADDRESS AS APPROPRIATE, E.G.
MCCHORD FIELD AIRFIELD, ETC) SO THAT ANSWERING DISPATCHER CAN ROUTE THE CALL TO THE NEAREST
APPROPRIATE FIRST RESPONDER(S).
4. THE CONTRACTOR SHALL FOLLOW ALL GUIDELINES AND REQUIREMENTS ESTABLISHED BY AUTHORITIES HAVING JURISDICTION (EITHER LOCAL, STATE, OR FEDERAL) RELATING TO HAZARDOUS MATERIALS (HAZMAT) DURING THE LIFE
OF THE CONSTRUCTION.
5. AIRCRAFT OPERATIONS WILL CONTINUE DURING CONSTRUCTION.
6. CONTRACTOR SHALL COMPLY WITH OSHA EXCAVATION SAFETY STANDARDS, 29 CRF PART 1926, SUBPART P.
7. TYPE AND HEIGHT (NOT-TO-EXCEED) OF CONSTRUCTION EQUIPMENT:
TRUCKS (DUMP, FLATBED, PANEL PICKUP, CONCRETE) - 20 FEET
FRONT END LOADERS - 20 FEET
DOZERS - 20 FEET
EXCAVATOR - 20 FEET
CRANE - 20 FEET
ROLLERS AND COMPACTORS - 20 FEET
SLIPFORM CONCRETE PAVER - 20 FEET
SECURITY
1. GENERAL INTENT: IT IS INTENDED THAT THE CONTRACTOR SHALL COMPLY WITH ALL REQUIREMENTS OF THE AIRFIELD SECURITY PLAN AND WITH THE SECURITY REQUIREMENTS SPECIFIED HEREIN BY CONTRACTING OFFICER.
THE CONTRACTOR SHALL DESIGNATE TO THE CONTRACTING OFFICER AND CONTRACTING OFFICER, IN WRITING, THE NAME OF HIS "CONTRACTOR SECURITY & SAFETY OFFICER (CSSO)." THE CSSO SHALL REPRESENT THE CONTRACTOR ON THE SECURITY REQUIREMENTS FOR THE CONTRACT. THE CSSO SHALL PROVIDE TELEPHONE NUMBERS WHICH ALLOW THE CONTRACTING OFFICER AND/OR CONTRACTING OFFICER THE ABILITY TO CONTACT THE CSSO 24 HOURS A
DAY.
2. ACCESS TO THE SITE: CONTRACTOR'S ACCESS TO THE SITE SHALL BE AS SHOWN ON THE PLANS. NO OTHER ACCESS POINTS SHALL BE ALLOWED UNLESS APPROVED BY CONTRACTING OFFICER. ALL CONTRACTOR TRAFFIC AUTHORIZED TO ENTER THE SITE SHALL BE EXPERIENCED IN THE ROUTE OR GUIDED BY AUTHORIZED CONTRACTOR PERSONNEL. THE CONTRACTOR SHALL BE RESPONSIBLE FOR TRAFFIC CONTROL TO AND FROM THE VARIOUS CONSTRUCTION AREAS ON THE SITE, AND FOR THE OPERATION AND SECURITY OF THE ACCESS TO THE SITE. A CONTRACTOR'S FLAGMAN OR TRAFFIC CONTROL PERSON SHALL MONITOR AND COORDINATE ALL CONTRACTOR TRAFFIC AT THE THE CONTRACTOR SHALL NOT PERMIT ANY UNAUTHORIZED CONSTRUCTION PERSONNEL OR TRAFFIC ON THE SITE. THE CONTRACTOR IS RESPONSIBLE FOR THE IMMEDIATE CLEANUP OF ANY DEBRIS DEPOSITED ALONG THE ACCESS ROUTE AS A RESULT OF HIS CONSTRUCTION TRAFFIC. DIRECTIONAL SIGNING FROM THE ACCESS GATE ALONG THE DELIVERY ROUTE TO THE STORAGE AREA, PLANT SITE OR WORK SITE SHALL BE AS DIRECTED BY
CONTRACTING OFFICER.
3. THE CONTRACTOR SHALL ESTABLISH AND MAINTAIN A LIST OF CONTRACTOR AND SUBCONTRACTOR VEHICLES AUTHORIZED TO OPERATE ON SITE. ALL VEHICLES SHALL BE MARKED WITH THE NAME AND LOGO OF THE CONTRACTOR. THE CONTRACTOR WILL PROVIDE, THROUGH THE CONTRACTING OFFICER, A CURRENT LIST OF
COMPANIES AUTHORIZED TO ENTER AND CONDUCT WORK ON THE AIRFIELD.
4. THE CONTRACTOR SHALL MAINTAIN A LIST OF ALL AUTHORIZED PROJECT PERSONNEL AND IT SHALL BE
AVAILABLE FOR CONTRACTING OFFICER EXAMINATION DURING CONSTRUCTION HOURS.
5. MATERIALS DELIVERY TO THE SITE: ALL CONTRACTOR'S MATERIAL ORDERS FOR DELIVERY TO THE WORK SITE WILL USE AS A DELIVERY ADDRESS THE STREET NAME ASSIGNED TO THE ACCESS POINT AT THE CONTRACTOR'S
STAGING SITE AT THE AIRFIELD.
6. CONSTRUCTION AREA LIMITS: THE LIMITS OF CONSTRUCTION, MATERIAL STORAGE AREAS, PLANT SITE, EQUIPMENT STORAGE AREA, PARKING AREA AND OTHER AREAS DEFINED AS REQUIRED FOR THE CONTRACTOR'S EXCLUSIVE USE DURING CONSTRUCTION SHALL BE MARKED BY THE CONTRACTOR. THE CONTRACTOR SHALL ERECT AND MAINTAIN AROUND THE PERIMETER OF THESE AREAS SUITABLE FENCING, MARKING AND WARNING DEVICES VISIBLE FOR DAY/NIGHT USE. TEMPORARY BARRICADES, FLAGGING AND FLASHING WARNING LIGHTS WILL BE REQUIRED AT CRITICAL ACCESS POINTS. TYPE OF MARKING AND WARNING DEVICES SHALL BE APPROVED BY
CONTRACTING OFFICER.
7. IDENTIFICATION--PERSONNEL: ALL EMPLOYEES, AGENTS, VENDORS, INVITEES, ETC., OF THE CONTRACTOR OR SUBCONTRACTORS REQUIRING ACCESS TO THE CONSTRUCTION SITE SHALL, IN ACCORDANCE WITH JBLM OPERATIONS SECURITY PROGRAM, BE REQUIRED TO DISPLAY AIRFIELD ISSUED IDENTIFICATION OR BE UNDER
ESCORT BY PROPERLY BADGED PERSONNEL.
GENERAL CONTRACT NOTES:
1. HAUL ROUTES: LOCATION OF HAUL ROUTES ON THE AIRFIELD SITE SHALL BE AS SPECIFIED ON THE PLANS OR AS APPROVED BY THE CONTRACTING OFFICER. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE OFF-SITE HAUL ROUTES (STATE HIGHWAYS, COUNTY ROADS OR CITY STREETS) WITH THE APPROPRIATE OWNER WHO HAS JURISDICTION OVER THE AFFECTED ROUTE AND OBTAIN HAUL PERMITS NECESSARY AS REQUIRED BY THE LOCAL JURISDICTION. ON-SITE HAUL ROUTES SHALL BE MAINTAINED BY THE CONTRACTOR AND SHALL BE RESTORED TO THEIR ORIGINAL CONDITION UPON COMPLETION OF BEING USED AS A HAUL ROUTE. THE PRE- AND POST-CONSTRUCTION CONDITION OF ON-SITE HAUL ROUTES SHALL BE JOINTLY INSPECTED AND DETERMINED BY THE CONTRACTOR, AND THE CONTRACTING OFFICER. FENCING, DRAINAGE, GRADING AND OTHER MISCELLANEOUS CONSTRUCTION REQUIRED TO CONSTRUCT TEMPORARY HAUL ROUTES OR ACCESS POINTS ON THE AIRFIELD WILL BE THE CONTRACTOR'S TOTAL RESPONSIBILITY AND SHALL BE APPROVED BY THE CONTRACTING OFFICER PRIOR TO THE WORK. ALL ON-SITE ACCESS ROADS TO FACILITIES SHALL REMAIN OPEN AND MAINTAINED AT ALL TIMES.
PHOTOGRAPHS OF THE HAUL ROUTES SPECIFIED BY THE PLANS MUST BE PROVIDED BY THE CONTRACTOR BEFORE AND AFTER CONSTRUCTION TO THE CONTRACTING OFFICER. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRING ANY DAMAGE TO HAUL ROUTES RESULTING FROM CONSTRUCTION TRAFFIC. ANY SERVICE, ACCESS OR ROADWAY CROSSED BY CONSTRUCTION TRAFFIC SHALL BE PROTECTED AGAINST DAMAGE AND ALL DAMAGE OCCURRING WILL BE REPAIRED AT THE CONTRACTOR'S EXPENSE WITH NO ADDITIONAL COMPENSATION OR CONTRACT TIME.
2. WASTE DISPOSAL AND BORROW AREAS: CONCRETE AND ASPHALT RUBBLE AND EXCAVATION WASTE MATERIAL REMOVED FROM THE CONSTRUCTION AREA SHALL BE DISPOSED OF OFF SITE. NO MATERIAL SHALL BE WASTED ON THE AIRFIELD SITE UNLESS APPROVED BY THE CONTRACTING OFFICER. ANY ON-AIRFIELD APPROVED WASTE AND DISPOSAL AREA SHALL BE SEEDED AND RESTORED IN A SMOOTH, GRADED AND DRAINABLE CONDITION.
3. CONTRACTOR UTILITIES: ANY UTILITIES REQUIRED BY THE CONTRACTOR SHALL BE COORDINATED WITH THE
CONTRACTING OFFICER.
4. PROTECTION AND REPAIR OF DAMAGE TO EXISTING CABLES: ALL UNDERGROUND CABLES SHALL BE PROTECTED AND DAMAGES REPAIRED EXPEDITIOUSLY AT THE CONTRACTOR'S EXPENSE AT NO ADDITIONAL COST TO THE OWNER.
5. CONSTRUCTION LIMITS AND FLAGMEN: ALL CONTRACTOR VEHICLES AND TRAFFIC SHALL REMAIN WITHIN THE CONSTRUCTION AREA OR HAUL ABSOLUTELY NO CONTRACTOR VEHICLES WILL BE ALLOWED ON ACTIVE AIRFIELD OPERATIONS AREAS. FLAGMEN SHALL BE PROVIDED AT ALL TIMES WHENEVER CONSTRUCTION ACCESS IS REQUIRED
ACROSS AN ACTIVE TAXI AREA.
6. PERMITS: IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN AND PAY FOR ALL APPLICABLE
PERMITS FOR CONSTRUCTION, EQUIPMENT, AND BATCH PLANT OPERATIONS..
7. COORDINATION OF CONSTRUCTION ACTIVITIES: THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR MAINTAINING CONSTANT COORDINATION BETWEEN THE SUBCONTRACTORS AND THE CONTRACTING OFFICER. ALL CONSTRUCTION ACTIVITIES PLANNED BY THE CONTRACTOR SHALL BE REVIEWED AND APPROVED BY THE
CONTRACTING OFFICER.
8. EXCESS CONSTRUCTION MATERIALS: ALL ON SITE EXCESS AND/OR STORED MATERIAL SHALL BE REMOVED FROM
AIRFIELD PROPERTY AND DISPOSED OF.
9. UTILITIES: IT WILL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO LOCATE AND PROTECT ANY UTILITIES
THAT ARE IN OR ADJACENT TO THE WORK AREA.
10. EMPLOYEE PARKING: NO CONTRACTOR EMPLOYEE VEHICLES WILL BE ALLOWED WITHIN THE AIRFIELD.
CONTRACTOR EMPLOYEE PARKING SHALL BE IN THE STAGING AREAS OR IN ANOTHER AREA DESIGNATED BY THE CONTRACTING OFFICER. ANY CONTRACTOR EMPLOYEE VEHICLE NOT PARKED IN THE DESIGNATED CONTRACTOR EMPLOYEE PARKING AREA IS SUBJECT TO BEING TOWED FROM THE AREA AT THE EXPENSE OF THE EMPLOYEE.
11. TEMPORARY DRAINAGE: THROUGHOUT THE COURSE OF CONSTRUCTION, THE CONTRACTOR SHALL PROVIDE AND INSTALL ANY DRAINAGE PROVISIONS NECESSARY TO MAINTAIN POSITIVE (CONTINUOUS AND FLOWING) DRAINAGE AND NOT RESTRICT THE EXISTING DRAINAGE FLOW PATTERN. AT END OF PROJECT, CONTRACTOR SHALL RESTORE ALL
EXISTING GRADES, AS INDICATED ON PLANS.
CI004
C O
N
ST
R U
C
TI
O N
P H
AS
IN
G A
N D
SA
FE
TY
N
O
TE
S
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
JO
IN
T
BA
SE
L
EW
IS
-M C
C H
O R
D , W
A
SE
AT
TL
E D
IS
TR
IC
T
E . M
AR
G
IN
AL
W
AY
S O
U
TH
, B
LD
G
SE
AT
TL
E, W A
4-
D . C
R O
N K
D . B
IL
LI
N G
SL
EY
R . F
IS
H
M . B
IL
LI
N G
SL
EA
J
U
LY
READY FOR CONSTRUCTION
R
EP
AI
R
T
AX
IW
AY
'H
PH
AS
E 2)
M C
C H
O R
D F
IE
LD
D
ES
IG
N
P
KG
N O
: C E0
PR
O
FE
SS
IO
N
AL
E
N G
IN
EE
R
IN
G C
O N
SU
LT
AN
TS
, P .A
S.
T O
PE
KA
S
TR
EE
T
W
IC
H
IT
A, K
S
SO
U
TH
P
AC
KA
G
NOT TO SCALE
LOW PROFILE BARRICADE DETAIL
NOTES
1. BARRICADES MAY NOT EXCEED 18" IN HEIGHT (EXCLUSIVE OF
SUPPLEMENTARY LIGHTS AND FLAGS) AND SHOULD BE SPACED TO
PREVENT BREACH, BUT IN NO CASE GREATER THAN 10' APART. THEY
MUST BE OF LOW MASS; EASILY COLLAPSIBLE UPON CONTACT WITH AN
AIRCRAFT; AND WEIGHTED OR STURDILY ATTACHED TO THE SURFACE
TO PREVENT DISPLACEMENT FROM JET BLAST OR OTHER WIND
DISTURBANCE.
2. INTENSITIES AND LUMINANCE OF LIGHTS MUST BE AT LEAST 5
CANDELAS EFFECTIVE INTENSITY AND FLASH AT A RATE OF FROM 55 TO
160 FLASHES PER MINUTE. ALL LIGHTS SHALL FLASH AT THE SAME
RATE.
3. HAZARD LIGHTS MAY NOT BE SPACED GREATER THAN 10' APART.
4. LIGHTS MUST BE OPERATED BETWEEN SUNSET AND SUNRISE AND
DURING PERIODS OF LOW VISIBLITY WHENEVER THE AIRPORT IS OPEN
FOR OPERATIONS.
5. BARRICADES MAY BE SUPPLEMENTED WITH ALTERNATING ORANGE
AND WHITE FLAGS AT LEAST 20" BY 20" SQUARE.
M
AX
FLASHING RED WARNING LIGHT
(SOLAR POWERED) SECURELY
MOUNTED TO THE TOP OF THE
BARRICADESAND BAG AS NEEDED TO
HOLD BARRICADE IN
PLACE AND IN UPRIGHT
POSITION
ORANGE COLORED STRIPES
ON WHITE BACKGROUND
D6
NOT TO SCALE
CONSTRUCTION SAFETY FLAG
AVIATION WHITE
AVIATION ORANGE
3'-0"
3' -0
B3
CI005
TR
AF
FI
C
C O
N
TR
O L
D
ET
AI
LS
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
JO
IN
T
BA
SE
L
EW
IS
-M C
C H
O R
D , W
A
SE
AT
TL
E D
IS
TR
IC
T
E . M
AR
G
IN
AL
W
AY
S O
U
TH
, B
LD
G
SE
AT
TL
E, W A
4-
D . C
R O
N K
D . B
IL
LI
N G
SL
EY
R . F
IS
H
M . B
IL
LI
N G
SL
EA
J
U
LY
READY FOR CONSTRUCTION
R
EP
AI
R
T
AX
IW
AY
'H
PH
AS
E 2)
M C
C H
O R
D F
IE
LD
D
ES
IG
N
P
KG
N O
: C E0
PR
O
FE
SS
IO
N
AL
E
N G
IN
EE
R
IN
G C
O N
SU
LT
AN
TS
, P .A
S.
T O
PE
KA
S
TR
EE
T
W
IC
H
IT
A, K
S
SO
U
TH
P
AC
KA
G
TH-S-01 TH-S-02
TH-S-03
TH-S-04 TH-S-05 TH-S-06 TH-S-07
TH-S-08
TH-S-09 TH-S-10 TH-S-11 TH-S-12 TH-S-13
TH-S-14
PIT-S-01
PIT-S-02
TAXIWAY "H"
TA
XI
W
AY
"E
E - RAMP
B-100
BO
R
IN
G
T
ES
T
PI
T
LO
C
AT
IO
N P
LA
N
1" = 100'-0"A1 BORING & TEST PIT LOCATION PLAN
300'0 150'
LEGEND
BORE HOLE LOCATION
TH-N-03
TEST PIT LOCATION
TH-N-03
PIT-S-02
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
JO
IN
T
BA
SE
L
EW
IS
-M C
C H
O R
D , W
A
SE
AT
TL
E D
IS
TR
IC
T
E . M
AR
G
IN
AL
W
AY
S O
U
TH
, B
LD
G
SE
AT
TL
E, W A
4-
D . C
R O
N K
D . B
IL
LI
N G
SL
EY
R . F
IS
H
M . B
IL
LI
N G
SL
EA
J
U
LY
READY FOR CONSTRUCTION
R
EP
AI
R
T
AX
IW
AY
'H
PH
AS
E 2)
M C
C H
O R
D F
IE
LD
D
ES
IG
N
P
KG
N O
: C E0
PR
O
FE
SS
IO
N
AL
E
N G
IN
EE
R
IN
G C
O N
SU
LT
AN
TS
, P .A
S.
T O
PE
KA
S
TR
EE
T
W
IC
H
IT
A, K
S
SO
U
TH
P
AC
KA
G
B-101
BO
R
IN
G
L O
G S
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
JO
IN
T
BA
SE
L
EW
IS
-M C
C H
O R
D , W
A
SE
AT
TL
E D
IS
TR
IC
T
E . M
AR
G
IN
AL
W
AY
S O
U
TH
, B
LD
G
SE
AT
TL
E, W A
4-
D . C
R O
N K
D . B
IL
LI
N G
SL
EY
R . F
IS
H
M . B
IL
LI
N G
SL
EA
J
U
LY
READY FOR CONSTRUCTION
R
EP
AI
R
T
AX
IW
AY
'H
PH
AS
E 2)
M C
C H
O R
D F
IE
LD
D
ES
IG
N
P
KG
N O
: C E0
PR
O
FE
SS
IO
N
AL
E
N G
IN
EE
R
IN
G C
O N
SU
LT
AN
TS
, P .A
S.
T O
PE
KA
S
TR
EE
T
W
IC
H
IT
A, K
S
SO
U
TH
P
AC
KA
G
B-102
R
IN
G
L O
G S
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
JO
IN
T
BA
SE
L
EW
IS
-M C
C H
O R
D , W
A
SE
AT
TL
E D
IS
TR
IC
T
E . M
AR
G
IN
AL
W
AY
S O
U
TH
, B
LD
G
SE
AT
TL
E, W A
4-
D . C
R O
N K
D . B
IL
LI
N G
SL
EY
R . F
IS
H
M . B
IL
LI
N G
SL
EA
J
U
LY
READY FOR CONSTRUCTION
R
EP
AI
R
T
AX
IW
AY
'H
PH
AS
E 2)
M C
C H
O R
D F
IE
LD
D
ES
IG
N
P
KG
N O
: C E0
PR
O
FE
SS
IO
N
AL
E
N G
IN
EE
R
IN
G C
O N
SU
LT
AN
TS
, P .A
S.
T O
PE
KA
S
TR
EE
T
W
IC
H
IT
A, K
S
SO
U
TH
P
AC
KA
B-103
R
IN
G
L O
G S
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
JO
IN
T
BA
SE
L
EW
IS
-M C
C H
O R
D , W
A
SE
AT
TL
E D
IS
TR
IC
T
E . M
AR
G
IN
AL
W
AY
S O
U
TH
, B
LD
G
SE
AT
TL
E, W A
4-
D . C
R O
N K
D . B
IL
LI
N G
SL
EY
R . F
IS
H
M . B
IL
LI
N G
SL
EA
J
U
LY
READY FOR CONSTRUCTION
R
EP
AI
R
T
AX
IW
AY
'H
PH
AS
E 2)
M C
C H
O R
D F
IE
LD
D
ES
IG
N
P
KG
N O
: C E0
PR
O
FE
SS
IO
N
AL
E
N G
IN
EE
R
IN
G C
O N
SU
LT
AN
TS
, P .A
S.
T O
PE
KA
S
TR
EE
T
W
IC
H
IT
A, K
S
SO
U
TH
P
AC
KA
M
AT
C H
L
IN
E
- S
EE
S
H
EE
T
VF
M
AT
C H
L
IN
E
- S
EE
S
H
EE
T
VF
T
T
6" AC
3" AC
14.5" PCC
6" AC
3" AC
14.5" PCC
6" AC
3" AC
6" AC
3" AC
" P
C C
14.5" PCC 14.5" PCC
6362 64 65 66 67 68 69 70 71 72
D D
W W
P P
LEGEND
UTILITY NOTES
EQUIPMENT USED
SURVEYOR'S CERTIFICATE
VERTICAL DATUM
BASIS OF BEARING
VF101
EX
IS
TI
N
G C
O N
D
IT
IO
N
S
1" = 40'-0"A1 EXISTING CONDITIONS 1
PLAN NORTH
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
JO
IN
T
BA
SE
L
EW
IS
-M C
C H
O R
D , W
A
SE
AT
TL
E D
IS
TR
IC
T
E . M
AR
G
IN
AL
W
AY
S O
U
TH
, B
LD
G
SE
AT
TL
E, W A
4-
D . C
R O
N K
D . B
IL
LI
N G
SL
EY
R . F
IS
H
M . B
IL
LI
N G
SL
EA
J
U
LY
READY FOR CONSTRUCTION
R
EP
AI
R
T
AX
IW
AY
'H
PH
AS
E 2)
M C
C H
O R
D F
IE
LD
D
ES
IG
N
P
KG
N O
: C E0
PR
O
FE
SS
IO
N
AL
E
N G
IN
EE
R
IN
G C
O N
SU
LT
AN
TS
, P .A
S.
T O
PE
KA
S
TR
EE
T
W
IC
H
IT
A, K
S
SO
U
TH
P
AC
KA
G E
5804 Road 90, Suite H Pasco, WA 99301 253.383.2572TEL FAX www.ahbl.comWEB
TACOMA SEATTLE SPOKANE TRI-CITIES
509.380.5883
SURVEY PROVIDED BY:
NOVEMBER 2020
KEY MAP
C H
L
IN
E
- S
EE
S
H
EE
T
VF
M
AT
C H
L
IN
E
- S
EE
S
H
EE
T
VF
M
AT
C H
L
IN
E
- S
EE
S
H
EE
T
VF
M
AT
C H
L
IN
E
- S
EE
S
H
EE
T
VF
14.5" PCC
14.5" PCC 14.5" PCC
14.5" PCC 14.5" PCC
72 73 74 75 76 77 78 79 80 81
D D
W W
P P
LEGEND
VF102
EX
IS
TI
N
G C
O N
D
IT
IO
N
S
1" = 40'-0"A1 EXISTING CONDITIONS 2
PLAN NORTH
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
JO
IN
T
BA
SE
L
EW
IS
-M C
C H
O R
D , W
A
SE
AT
TL
E D
IS
TR
IC
T
E . M
AR
G
IN
AL
W
AY
S O
U
TH
, B
LD
G
SE
AT
TL
E, W A
4-
D . C
R O
N K
D . B
IL
LI
N G
SL
EY
R . F
IS
H
M . B
IL
LI
N G
SL
EA
J
U
LY
READY FOR CONSTRUCTION
R
EP
AI
R
T
AX
IW
AY
'H
PH
AS
E 2)
M C
C H
O R
D F
IE
LD
D
ES
IG
N
P
KG
N O
: C E0
PR
O
FE
SS
IO
N
AL
E
N G
IN
EE
R
IN
G C
O N
SU
LT
AN
TS
, P .A
S.
T O
PE
KA
S
TR
EE
T
W
IC
H
IT
A, K
S
SO
U
TH
P
AC
KA
G
C H
L
IN
E
- S
EE
S
H
EE
T
VF
M
AT
C H
L
IN
E
- S
EE
S
H
EE
T
VF
M
AT
C H
L
IN
E
- S
EE
S
H
EE
T
VF
M
AT
C H
L
IN
E
- S
EE
S
H
EE
T
VF
14.5" PCC
6" AC
3" AC
6" AC
3" AC
6.5" AC
14.5" PCC
6" AC
3" AC
6" AC
3" AC
E R
AM
P
TA
XI
W
AY
14.5" PCC
14.5" PCC 14.5" PCC
81 82 83 84 85 86 87 88 89
D D
W W
P P
LEGEND
VF103
EX
IS
TI
N
G C
O N
D
IT
IO
N
S
1" = 40'-0"A1 EXISTING CONDITIONS 3
PLAN NORTH
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
JO
IN
T
BA
SE
L
EW
IS
-M C
C H
O R
D , W
A
SE
AT
TL
E D
IS
TR
IC
T
E . M
AR
G
IN
AL
W
AY
S O
U
TH
, B
LD
G
SE
AT
TL
E, W A
4-
D . C
R O
N K
D . B
IL
LI
N G
SL
EY
R . F
IS
H
M . B
IL
LI
N G
SL
EA
J
U
LY
READY FOR CONSTRUCTION
R
EP
AI
R
T
AX
IW
AY
'H
PH
AS
E 2)
M C
C H
O R
D F
IE
LD
D
ES
IG
N
P
KG
N O
: C E0
PR
O
FE
SS
IO
N
AL
E
N G
IN
EE
R
IN
G C
O N
SU
LT
AN
TS
, P .A
S.
T O
PE
KA
S
TR
EE
T
W
IC
H
IT
A, K
S
SO
U
TH
P
AC
KA
G
C H
L
IN
E
- S
EE
S
H
EE
T
VF
M
AT
C H
L
IN
E
- S
EE
S
H
EE
T
VF
.5
"…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .