This document is a Statement of Work (SOW) for Project #3: Range 76, 30mm Gunnery at Joint Base Lewis-McChord (JBLM), Washington. The project encompasses three major work components: demolition activities, installation of new work, and repair of existing systems.

Part 1 addresses demolition activities, requiring the contractor to demolish four existing range buildings (U074B, U074C, U074E, and U074F), remove all associated foundations and slabs, and dispose of resulting debris. The work includes removal of approximately 14,250 feet of #4 ACSR overhead primary conductor, twenty-five 45-foot Class 2 wood poles, one 35-foot Class 2 wood guy pole, one 50kVA pole-mounted transformer with two associated cut-outs, and installation of new dead-end insulators and guy wire assembly to safely terminate the remaining active line. All electrical and communication system demolition must be coordinated and completed by City Light and Power (JBLM privatized utility service) at contractor expense. Additionally, contractors must bulldoze and remove one existing earth berm and grade excavated material to match surrounding terrain.

Part 2 requires installation of new work including tree clearing and oak mitigation within the designated gunnery lane footprint, construction of four new Reverse Slope Battle Positions (BP #1-#4) adhering strictly to standard design drawings BP-04 and BP-05, installation of concrete structures with minimum 28-day compressive strength of 4,000 PSI, installation of reinforcing steel per ASTM A615 Grade 60 specifications, placement and compaction of gravel surfacing, installation of rip-rap for erosion control, and revegetation of disturbed areas. The contractor must also construct a new range viewing area on Cherry Hill requiring level space for parking and observation with clearing, leveling, and grading.

Part 3 addresses repair of existing systems, including repair of weathered and deteriorated range roads through grading, removal of ruts and potholes, re-establishment of proper road cross-section, removal of encroaching vegetation, and application of new crushed stone or gravel. The work also requires comprehensive repair and realignment of the existing Moving Armor Target (MAT) track system, including full replacement of existing rail, ballast material, and deteriorated ties, realignment of track geometry, and provision of adequate drainage. The project includes detailed site plans, electrical demolition plans, and tree removal guides specifying work requirements for designated areas (RG76_01 through RG76_07 and Salines_01, 02, 09, 10) with specific environmental and wildlife mitigation requirements, including coordination with DPW Fish & Wildlife, avoidance of nesting season (April 1 – August 31), and protection of sensitive habitat areas.

View the file

Other files

File Type Posted
Project 4_Attachment 0008 Scopes_14 May 2026.pdf PDF
QA_JBLM FORGE_20260518.pdf PDF
Project 17_Attachment 0021 Scopes_15 May 2026.pdf PDF
JBLM_FORGE_RPP_Amendment 3.pdf PDF
Project 14_Attachment 0018 Scopes_11 May 2026.pdf PDF
ATTACH0003 MICC_CONSTRUCTION_OTA_TC_FORGE ver05122026.pdf PDF
Project 15_Attachment 0019 Scopes_11 May 2026.pdf PDF
Project 1_Attachment 0005 D Scopes_11 May 2026.pdf PDF
Project 9_Attachment 0013 Scopes_11 May 2026.pdf PDF
Project 2_Attachment 0006 Scopes_10 May 2026.pdf PDF
Project 3_Attachment 0007 Scopes_10 May 2026.pdf PDF
JBLM_FORGE_RPP_Amendment 2.pdf PDF
Project 6_Attachment 0010 Scopes_11 May 2026.pdf PDF
JBLM_FORGE_RPP_Amendment_1.pdf PDF
QA_JBLM FORGE_20260428.pdf PDF
Project 1_Attachment 0005 A Scopes_07 Apr 2026.pdf PDF
FORGE Site Visits.pdf PDF
Special Notice JBLM Site Visit.pdf PDF
JBLM FORGE Site Visit Registration 20260422.xlsx XLSX spreadsheet
Project 1_Attachment 0005 B Scopes_07 Apr 2026.pdf PDF
Project 1_Attachment 0005 C Scopes_07 Apr 2026.pdf PDF
Project 4_Attachment 0008 Scopes_07 Apr 2026.pdf PDF
Project 17_Attachment 0021 Scopes_07 Apr 2026.pdf PDF
Project 10_Attachment 0014 Scopes_07 Apr 2026.pdf PDF
JBLM_FORGE_RPP_04172026.pdf PDF
Project 12_ Attachment 0016 Scopes_07 Apr 2026.pdf PDF
ATTACH0004 JBLM FORGE CLIN STRUCTURE.xlsx XLSX spreadsheet
Project 13_ Attachment 0017 Scopes_07 Apr 2026.pdf PDF
Project 1_Attachment 0005 A Scopes_07 Apr 2026.pdf PDF
Project 8_ Attachment 0012 Scopes_07 Apr 2026.pdf PDF
Project 5_Attachment 0009 Scopes_07 Apr 2026.pdf PDF
Project 16_ Attachment 0020 Scopes_07 Apr 2026.pdf PDF
Project 18_Attachment 0022 Scopes_07 Apr 2026.pdf PDF
Project 15_Attachment 0019 Scopes_07 Apr 2026.pdf PDF
Project 1_Attachment 0005 B Scopes_07 Apr 2026.pdf PDF
Project 19_Attachment 0023 Scopes_07 Apr 2026.pdf PDF
Project 1_Attachment 0005 C Scopes_07 Apr 2026.pdf PDF
Project 6_ Attachment 0010 Scopes_07 Apr 2026.pdf PDF
ATTACH0003 MICC_CONSTRUCTION_OTA_TC_FORGE ver04082026.pdf PDF
Project 2_ Attachment 0006 Scopes_07 Apr 2026.pdf PDF
ATTACH0002_Contract 01 Specifications_JBLMFORGE_RPP.pdf PDF
Project 7_ Attachment 0011 Scopes_07 Apr 2026.pdf PDF
Project 11_ Attachment 0015 Scopes_07 Apr 2026.pdf PDF
ATTACH0001_FY26 JBLM FORGE - Project List 20260414.xlsx XLSX spreadsheet
Project 9_ Attachment 0013 Scopes_07 Apr 2026.pdf PDF
Project 14_Attachment 0018 Scopes_07 Apr 2026.pdf PDF
MICC_JBLM_FORGE_INDUSTRYDAY_SAM.GOV NONCUI.pdf PDF
Pages 601-700 from Attachment 004 Project Scopes.pdf PDF
Pages 1-500 from Attachment 004 Project Scopes.pdf PDF
Pages 701-900 from Attachment 004 Project Scopes.pdf PDF
Show 40 more

Latest 50 of 66 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project #3: Range 76, 30mm Gunnery

Part 1: Demoli on Ac vi es

Building Demoli on:

Demolish and remove four (4) exis ng range buildings, iden fied as U074B, U074C, U074E, and

U074F.

This work includes the removal of all associated founda ons and slabs, and the disposal of all resul ng debris.

Electrical & Communica on System Demoli on:

Remove and dispose of exis ng overhead power and communica on lines along the specified route. The electrical demoli on includes:

Approximately 14,250 feet of #4 ACSR overhead primary conductor.

Twenty-five (25) 45-foot Class 2 wood poles.

One (1) 35-foot Class 2 wood guy pole.

One (1) 50kVA pole-mounted transformer and two (2) associated cut-outs.

Work includes the installa on of new dead-end insulators and a guy wire assembly to safely terminate the remaining ac ve line.

All work in this sec on must be coordinated and completed by City Light and Power (JBLM priva zed u lity service). It is expected to be a cost incurred by the Contractor.

Site Demoli on:

Bulldoze and remove one (1) exis ng earth berm iden fied as an obstruc on on the Range 76

Site Plan. The excavated material shall be graded to match the surrounding terrain or disposed of as needed.

Part 2: Installa on of New Work

Site Prepara on:

Perform tree clearing and oak mi ga on within the designated footprint of the new gunnery lane, as indicated on the Tree Removal site plan.

Ba le Posi ons:

Construct four (4) new Reverse Slope Ba le Posi ons (BP #1, BP #2, BP #3, and BP #4) at the loca ons specified on the site plan.

Construc on shall adhere strictly to the standard design drawings BP-04 and BP-05.

Work includes:

Excava on, grading, and site prepara on for each posi on.

Installa on of concrete structures, including turning pads and retaining walls, using concrete with a minimum 28-day compressive strength of 4,000 PSI.

Installa on of all reinforcing steel per ASTM A615, Grade 60 specifica ons.

Placement and compac on of gravel surfacing on access roads and pads.

Installa on of rip-rap for erosion control on designated slopes.

All areas disturbed by construc on shall be revegetated to match the natural surroundings without impeding target visibility.

Observa on Posi on:

Construct a new range viewing area on Cherry Hill.

New observa on posi on requires level space for parking and observa on. Area must be cleared, leveled, and graded.

Part 3: Repair of Exis ng Systems

Range Roads:

Repair exis ng range roads that are weathered and deteriorated.

Work includes grading to remove ruts and potholes, re-establishing the proper road cross-sec on, removing encroaching vegeta on, and applying new crushed stone or gravel to create a stable, all-weather driving surface.

Moving Armor Target (MAT) Track System:

Perform a comprehensive repair and realignment of the exis ng MAT track system.

Work includes:

Full replacement of the exis ng rail, ballast material, and deteriorated es.

Realigning the track system geometry to ensure safe and proper opera on of the targets.

Providing adequate drainage around the track system to prevent future water damage and ballast degrada on.

Gunnery Range 76 – Project Loca ons

Gunnery 30mm Range 76 – Electrical Demoli on Plan

Gunnery Range 76 – Tree Removal Guide

RG76_01

Remove 100% of tall trees. Leave dead standing trees and any oaks or small firs that don't obstruct view. Coordinate with DPW - Fish & Wildlife on which specific live and dead trees to leave. Staging and yarding must occur outside of MPG-occupied areas. Work must occur outside of nesting season (1 Apr - 31 Aug). Equipment must avoid kinnickinnick patches.

RG76_02

Remove 100% of tall trees. Leave dead standing trees and any oaks or small firs that don't obstruct view. Coordinate with DPW - Fish & Wildlife on which specific live and dead trees to leave. Staging and yarding must occur outside of MPG-occupied areas. Work must occur outside of nesting season (1 Apr - 31 Aug). Equipment must avoid kinnickinnick patches.

RG76_03

Remove 100% of tall trees. Leave dead standing trees and any oaks or small firs that don't obstruct view. Coordinate with DPW - Fish & Wildlife on which specific live and dead trees to leave. Staging and yarding must occur outside of MPG-occupied areas. Work must occur outside of nesting season (1 Apr - 31 Aug). Equipment must avoid kinnickinnick patches.

RG76_04

Remove 100% of tall trees. Leave dead standing trees and any oaks or small firs that don't obstruct view. Coordinate with DPW - Fish & Wildlife on which specific live and dead trees to leave. Staging and yarding must occur outside of MPG-occupied areas. Work must occur outside of nesting season (1 Apr - 31 Aug). Equipment must avoid kinnickinnick patches.

RG76_05

Remove 100% of black locust trees. Leave dead standing trees with occupied cavities.

Vehicles and equipment avoid gopher-occupied areas and butterfly plants (marked by FW).

Work must occur outside of nesting season (1 Apr - 31 Aug).

RG76_06

Remove tall trees. Leave dead standing trees with occupied cavities and small firs. Vehicles and equipment avoid gopher-occupied areas and butterfly plants (marked by FW). Work must occur outside of nesting season (1 Apr - 31 Aug). Equipment must avoid kinnickinnick patches.

RG76_07

Remove tall trees. Leave dead standing trees with occupied cavities and small firs. Vehicles and equipment avoid gopher-occupied areas and butterfly plants (marked by FW). Work must occur outside of nesting season (1 Apr - 31 Aug). Equipment must avoid kinnickinnick patches.

Salines_01

Remove 95% of trees over 1 year (Leave 3 trees, selected by FW). Leave dead standing trees with occupied cavities. Vehicles and equipment avoid gopher-occupied areas and butterfly plants (marked by FW). Work must occur outside of nesting season (1 Apr - 31 Aug).

Salines_02

Remove 75% of trees over 1 year (leave 1 live tree). Leave dead standing trees with occupied cavities. Vehicles and equipment avoid gopher-occupied areas and butterfly plants (marked by FW). Work must occur outside of nesting season (1 Apr - 31 Aug).

Salines_09

Remove 100% of non-oak trees. Remove 100% of oaks < 4" dbh. Leave dead standing trees with occupied cavities.Vehicles and equipment avoid gopher-occupied areas and butterfly plants (marked by FW). Work must occur outside of nesting season (1 Apr - 31 Aug).

Salines_10

Remove 100% of black locust trees. Leave dead standing trees with occupied cavities.

Vehicles and equipment avoid gopher-occupied areas and butterfly plants (marked by FW).

Work must occur outside of nesting season (1 Apr - 31 Aug).

SHEET ID

®of Engineers

US Army Corps

S O

L

IC

IT

A

T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S I Z

E

S U

B M

IT

T

E D

B Y

D A

T E

C O

N T

R A

C T

N O

C

H E

C K

E D

B Y

D R

A W

N B

Y

IS

S

U E

D A

T E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

P R

O J E

C T

N U

M B

E R

H U

N T

S V

IL

L

E

A L

A B

A M

A

E N

G

IN

E E

R

IN

G

S U

P P

O R

T C

E N

T E

R

U

S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

M A

Y

R A

N G

E A

N D

T R

A

IN

IN

G

L A

N D

P R

O G

R A

M

S T

A N

D A

R D

D E

S

IG

N M

A N

U A

L

GRAVEL (MAX 10% SLOPE) COURSE ROAD GRADE

SLOPE)

(MAX 10%

CONCRETE

POINT (F)

VERTICAL CONTROL

HORIZONTAL AND

9144mm

[30'-0"]

6096mm

[20'-0"]

22099mm

[72'-6"]

CONC. (MAX 10% SLOPE)

CONC. (MAX 10% SLOPE)

GRAVEL (MAX 10% SLOPE)

COURSE ROAD GRADE

POINT (G)

VERTICAL CONTROL

HORIZONTAL AND

POINT (E)

VERTICAL CONTROL

HORIZONTAL AND

COURSE ROAD GRADE

m m

[7

22098mm

[72'-6"]

9144mm

[30'-0"] 3048mm

[10'-0"]

6096mm

[20'-0"]

3048mm

[10'-0"] m m

[3

COURSE ROAD

POINT (A)

VERTICAL CONTROL

HORIZONTAL AND

POINT (B)

VERTICAL CONTROL

HORIZONTAL AND

POINT (G)

VERTICAL CONTROL

HORIZONTAL AND

POINT (E)

VERTICAL CONTROL

HORIZONTAL AND

POINT (F)

VERTICAL CONTROL

HORIZONTAL AND

POINT (C)

VERTICAL CONTROL

HORIZONTAL AND

POINT (D)

VERTICAL CONTROL

HORIZONTAL AND

OF FIRE

DIRECTION

SLOPE UP NO SLOPE SLOPE UP

11938mm

[39'-2"] m m

[2 m m

[1 m m

[2

NO SLOPE

PAD (TYP.)

CONCRETE TURNING

METRIC [ENGLISH] UNITS FOR INSTANCE, 1372mm [4'-6"]

4. ALL DIMENSIONS ARE INDICATED AS FOLLOWS:

REDUCE TARGET VISIBILITY.

NATURAL SURROUNDINGS. GROUND COVER SHALL NOT

BE REVEGETATED OR RESURFACED CONSISTENT WITH THE

3. AREAS DISTURBED BY CONSTRUCTION ACTIVITIES SHALL

60.

2. ALL REINFORCING STEEL SHALL BE PER ASTM A615, GRADE

STRENGTH OF 28 MPa [4000PSI] IN 28 DAYS.

1. CONCRETE SHALL DEVELOP A MINIMUM COMPRESSIVE

GENERAL NOTES:

HEIGHT DIMESION.

CONTROL POINT E LOCATION DICTATED BY SLOPE AND 3'-11" 4.

WHERE IT TIES TO EXISTING GROUND.

WALL SHALL BE COVERED WITH RIP-RAP DOWN TO THE POINT

3. SLOPED AREA AND TOP OF BERM IN FRONT OF RETAINING

COMMANDER'S SIGHT)

TRAINER. (HEIGHT MUST BE BELOW THAT OF THE TANK

2. HULL DOWN HEIGHT SHALL BE COORDINATED WITH THE

MIRROR IMAGE CONFIGURATION TO THAT SHOWN.

PLAN SHOULD BE ANNOTATED FOR CONSTRUCTION IN A

1. FOR DEFILADES LOCATED ON THE RIGHT SIDE OF THE TRAIL,

NOTES TO DESIGNER:

SCALE: 3/32" = 1'

BATTLE POSITION

REVERSE SLOPE

SCALE: 1" = 15'

PLAN

GRAPHIC SCALES:

R E

V E

R S

E S

L O

P E

B A

T T

L E

P O

S

IT

IO

N

D E

T A

IL

S

BP-04

15' 30'0

SCALE: 1" = 15'

16' 32'0 8'

SCALE: 3/32" = 1'

A

BP-04 BP-05

B

BP-04 BP-05

C

BP-05BP-04

11938mm

[39'-2"]

SEE DESIGNER NOTE 4

SEE DESIGNER NOTE 4

SHEET ID

®of Engineers

US Army Corps

S O

L

IC

IT

A

T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S I Z

E

S U

B M

IT

T

E D

B Y

D A

T E

C O

N T

R A

C T

N O

C

H E

C K

E D

B Y

D R

A W

N B

Y

IS

S

U E

D A

T E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

P R

O J E

C T

N U

M B

E R

H U

N T

S V

IL

L

E

A L

A B

A M

A

E N

G

IN

E E

R

IN

G

S U

P P

O R

T C

E N

T E

R

U S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

M A

Y

R A

N G

E A

N D

T R

A

IN

IN

G

L A

N D

P R

O G

R A

M

S T

A N

D A

R D

D E

S

IG

N M

A N

U A

L

GRAPHIC SCALES:

EXISTING GRADE

SECTION

SCALE: 1" = 5'

CS505CS504

C

POINT (F)

VERTICAL CONTROL

HORIZONTAL AND

TURNING PADS

WHICH WILL MATCH TYPICAL FOR

ROADS EXCEPT FOR CONCRETE PAD

MATCH TYPICAL SECTION FOR COURSE

SCALE: 1" = 5'

100 55

2% SLOPE2% SLOPE

2% SLOPE

4:1 MAX.

HEIGHT INCREASES -

SLOPE VARIES AS

EXISTING GRADE

SECTION

SCALE: 1" = 5'

CS505CS504

B

POINT (G)

VERTICAL CONTROL

HORIZONTAL AND

TURNING PADS

WHICH WILL MATCH TYPICAL FOR

ROADS EXCEPT FOR CONCRETE PAD

MATCH TYPICAL SECTION FOR COURSE

2% SLOPE2% SLOPE

2% SLOPE

4:1 MAX.

HEIGHT INCREASES -

SLOPE VARIES AS

SECTION

SCALE: 1" = 5'

CS505CS504

A

COURSE ROADS

MATCH TYPICAL SECTION FOR

2% SLOPE2% SLOPE

EXISTING GRADE

V A

R

IE

S

V A

R

IE

S

COURSE ROAD�

COURSE ROAD�

COURSE ROAD�

6096mm

[20'-0"]

4775mm

[15'-8"]

3048mm

[10'-0"]

3048mm

[10'-0"]

6087mm

[20'-0"]

4775mm

[15'-8"]

3048mm

[10'-0"]

3048mm

[10'-0"]

6096mm

[20'-0"]

3048mm

[10'-0"]

4775mm

[15'-8"]

3048mm

[10'-0"]

R E

V E

R S

E S

L O

P E

BP-05

B A

T T

L E

P O

S T

IO

N

D E

T A

IL

Area to be cleared, leveled, graded

Observa on Point

Building U074B

Building U074C

Building U074E

*no pictures of U074F

File details come from the government source that posted it. Updated .