About this file

This is a Statement of Work (SOW) for a federal construction project to repair deteriorating sections of Taxiway D at McChord Field.

The project involves repair of two asphalt pavement sections (T28C1 and T28C2) with Pavement Condition Index ratings of 64 and 54, respectively, which fall below the minimum requirement for primary taxiways. The total area to be treated is approximately 36,772 square feet. The contractor must perform crack sealing of medium-severity longitudinal and transverse cracks using high-quality sealant from the agency's qualifying material list, shallow patching of high-severity weathered areas in section T28C2, milling of both sections to a 2-inch depth, placement of a 2-inch hot-mix asphalt overlay on the milled surface, and re-striping of all pavement markings disturbed during the overlay process to match pre-existing airfield standards. The contractor must also develop and submit a final repair plan and construction specifications for customer approval prior to commencing work.

The contractor must adhere to strict airfield operational requirements, including coordinating all activities with the McChord Airfield Manager (Eileen Rodriguez, 253-273-6113), prioritizing weekend work to minimize runway disruptions, and planning for regular construction interruptions due to aircraft operations. All personnel, equipment, and materials must be evacuated from airfield safety areas during incoming and outgoing flights. Construction escorts are required for all personnel and vehicles unless they have completed required airfield training and certification. Airfield access requires approved daily scheduling, and designated qualified personnel must maintain continuous radio communication while on site. The use of a displaced threshold on the active runway is prohibited.

View the file

Other files

File Type Posted
Project 4_Attachment 0008 Scopes_14 May 2026.pdf PDF
QA_JBLM FORGE_20260518.pdf PDF
Project 17_Attachment 0021 Scopes_15 May 2026.pdf PDF
JBLM_FORGE_RPP_Amendment 3.pdf PDF
Project 14_Attachment 0018 Scopes_11 May 2026.pdf PDF
ATTACH0003 MICC_CONSTRUCTION_OTA_TC_FORGE ver05122026.pdf PDF
Project 15_Attachment 0019 Scopes_11 May 2026.pdf PDF
Project 1_Attachment 0005 D Scopes_11 May 2026.pdf PDF
Project 9_Attachment 0013 Scopes_11 May 2026.pdf PDF
Project 2_Attachment 0006 Scopes_10 May 2026.pdf PDF
Project 3_Attachment 0007 Scopes_10 May 2026.pdf PDF
JBLM_FORGE_RPP_Amendment 2.pdf PDF
Project 6_Attachment 0010 Scopes_11 May 2026.pdf PDF
JBLM_FORGE_RPP_Amendment_1.pdf PDF
QA_JBLM FORGE_20260428.pdf PDF
Project 1_Attachment 0005 A Scopes_07 Apr 2026.pdf PDF
FORGE Site Visits.pdf PDF
Special Notice JBLM Site Visit.pdf PDF
JBLM FORGE Site Visit Registration 20260422.xlsx XLSX spreadsheet
Project 1_Attachment 0005 B Scopes_07 Apr 2026.pdf PDF
Project 1_Attachment 0005 C Scopes_07 Apr 2026.pdf PDF
Project 4_Attachment 0008 Scopes_07 Apr 2026.pdf PDF
Project 17_Attachment 0021 Scopes_07 Apr 2026.pdf PDF
JBLM_FORGE_RPP_04172026.pdf PDF
Project 12_ Attachment 0016 Scopes_07 Apr 2026.pdf PDF
ATTACH0004 JBLM FORGE CLIN STRUCTURE.xlsx XLSX spreadsheet
Project 13_ Attachment 0017 Scopes_07 Apr 2026.pdf PDF
Project 1_Attachment 0005 A Scopes_07 Apr 2026.pdf PDF
Project 3_ Attachment 0007 Scopes_07 Apr 2026.pdf PDF
Project 8_ Attachment 0012 Scopes_07 Apr 2026.pdf PDF
Project 5_Attachment 0009 Scopes_07 Apr 2026.pdf PDF
Project 16_ Attachment 0020 Scopes_07 Apr 2026.pdf PDF
Project 18_Attachment 0022 Scopes_07 Apr 2026.pdf PDF
Project 15_Attachment 0019 Scopes_07 Apr 2026.pdf PDF
Project 1_Attachment 0005 B Scopes_07 Apr 2026.pdf PDF
Project 19_Attachment 0023 Scopes_07 Apr 2026.pdf PDF
Project 1_Attachment 0005 C Scopes_07 Apr 2026.pdf PDF
Project 6_ Attachment 0010 Scopes_07 Apr 2026.pdf PDF
ATTACH0003 MICC_CONSTRUCTION_OTA_TC_FORGE ver04082026.pdf PDF
Project 2_ Attachment 0006 Scopes_07 Apr 2026.pdf PDF
ATTACH0002_Contract 01 Specifications_JBLMFORGE_RPP.pdf PDF
Project 7_ Attachment 0011 Scopes_07 Apr 2026.pdf PDF
Project 11_ Attachment 0015 Scopes_07 Apr 2026.pdf PDF
ATTACH0001_FY26 JBLM FORGE - Project List 20260414.xlsx XLSX spreadsheet
Project 9_ Attachment 0013 Scopes_07 Apr 2026.pdf PDF
Project 14_Attachment 0018 Scopes_07 Apr 2026.pdf PDF
MICC_JBLM_FORGE_INDUSTRYDAY_SAM.GOV NONCUI.pdf PDF
Pages 601-700 from Attachment 004 Project Scopes.pdf PDF
Pages 1-500 from Attachment 004 Project Scopes.pdf PDF
Pages 701-900 from Attachment 004 Project Scopes.pdf PDF
Show 40 more

Latest 50 of 66 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project #10: Repair Taxiway D, McChord Field

Project Title: Repair Taxiway D, McChord Field

Project LocaƟon: Asphalt pavement secƟons T28C1 and T28C2 of Taxiway D, adjacent to the main runway at McChord Field, as visually detailed in the aƩached aerial images.

1.0 Project Summary

The primary objecƟve of this project is to repair two deterioraƟng secƟons of Taxiway D, idenƟfied as T28C1 and T28C2. The Pavement CondiƟon Index (PCI) for both secƟons (64 and

54, respecƟvely) is below the minimum requirement for primary taxiways. The work involves crack sealing, milling the exisƟng asphalt surface, and applying a new asphalt overlay to restore the taxiway to a safe and effecƟve operaƟonal condiƟon.

2.0 Scope of Work

The Contractor shall provide all labor, materials, equipment, and supervision necessary to perform the following tasks:

2.1 Final Repair Plan: Based on site invesƟgaƟons and the provided documents, develop and submit a final repair plan and construcƟon specificaƟons for review and approval by the customer.

2.2 Pavement PreparaƟon:

Crack Sealing: Clean and seal all medium-severity longitudinal and transverse

(L&T) cracks within secƟons T28C1 and T28C2. The sealant used must be a high-quality product that meets the agency's qualifying material list.

Shallow Patching (SecƟon T28C2): Repair areas of high-severity weathering as required prior to the overlay.

2.3 Asphalt Milling: Mill the enƟre surface of both secƟons T28C1 (21,618 sq. Ō.) and

T28C2 (15,154 sq. Ō.) to a depth of 2 inches.

2.4 Asphalt Overlay: Place a 2-inch hot-mix asphalt (HMA) overlay on the enƟre milled surface of both secƟons, ensuring a smooth and durable final pavement surface.

2.5 Pavement Markings: (AssumpƟon) Re-stripe all exisƟng pavement markings disturbed or covered during the overlay process to match pre-exisƟng layouts and conform to airfield standards.

3.0 Airfield CoordinaƟon & Site Constraints

The Contractor must adhere to the following strict operaƟonal requirements:

3.1 Airfield Management: All site survey, staging, scheduling, and construcƟon acƟviƟes must be coordinated with and receive prior approval from the McChord Airfield

Manager (Eileen Rodriguez, 253-273-6113).

3.2 Scheduling: The construcƟon schedule must prioriƟze weekend work to minimize interrupƟons to the adjacent acƟve runway.

3.3 Airfield OperaƟons:

Plan for regular disrupƟons to construcƟon acƟviƟes due to aircraŌ operaƟons.

All contractor personnel, equipment, and materials must be completely evacuated from the airfield safety areas during all incoming and outgoing flights.

Use of a displaced threshold on the acƟve runway is not permiƩed.

3.4 Site Access:

ConstrucƟon escorts are required for all personnel and vehicles unless personnel have completed the required airfield training and cerƟficaƟon.

Airfield access requires approved daily scheduling.

Designated and qualified personnel must maintain airfield radio communicaƟon at all Ɵmes while on site.

File details come from the government source that posted it. Updated .