This document is a project scope summary for two related federal construction projects at Joint Base Lewis-McChord (JBLM) involving the installation of backup power generation systems at the McChord Child Development Center.

Project 19 - Building J00578: IJO #53465DPA250156J requires installation of a 180kW diesel-powered emergency generator with 208Y/120V, 3-phase service to support the entire building. The generator must include an integrated double-wall sub-base fuel tank with 48-hour minimum runtime, energy-efficient block heaters, and site gauge. The system requires a generator controller capable of interfacing with the Enterprise Energy Data Reporting System (EEDRS) using Modbus communications per JBLM 26 27 13.10 30 Rev 11. The scope includes installation of a 600A, 208Y/120V three-way manual transfer switch (NEMA 3R) and a 600A, 208Y/120V automatic transfer switch (ATS) with isolation bypass and 4-pole configuration (NEMA 3R). The generator must include a remote emergency stop switch on the exterior per NEC Section 445.19(B), GFCI convenience receptacles, and internal lighting. Placement should be in the existing enclosure in front of the electrical/mechanical room due to cultural concerns. An arc flash study for newly installed equipment is required. The advanced metering system (EEDRS and JACE) requires replacement for interconnection with the generator set to monitor output and ensure proper performance. All work must comply with current editions of NFPA 110, 70, 70E, and JBLM Design Standards.

Project 19 - Building J00580: IJO #53465DPA250275J involves installation of a larger 300kW diesel-powered emergency generator with 208Y/120V, 3-phase service for the entire building. Similar specifications apply: integrated double-wall sub-base fuel tank with 48-hour runtime, energy-efficient block heaters, and Modbus-capable generator controller per JBLM standards. The system includes a 1000A, 208Y/120V three-way manual transfer switch (NEMA 3R) and 1000A, 208Y/120V ATS with isolation bypass and 4-pole configuration (NEMA 3R). A brick enclosure surrounding the generator, ATS, and MTS should match existing building materials to address cultural concerns. Arc flash study, remote emergency stop switch, and GFCI receptacles are required. The existing metering system is in failing condition due to corrosion, power surges, and lack of maintenance, necessitating replacement of EEDRS and JACE equipment per UFC 3-400-01 and JBLM Design Standards. All work must comply with NFPA 110, 70, 70E, and JBLM Design Standards.

View the file

Other files

File Type Posted
Project 4_Attachment 0008 Scopes_14 May 2026.pdf PDF
QA_JBLM FORGE_20260518.pdf PDF
Project 17_Attachment 0021 Scopes_15 May 2026.pdf PDF
JBLM_FORGE_RPP_Amendment 3.pdf PDF
Project 14_Attachment 0018 Scopes_11 May 2026.pdf PDF
ATTACH0003 MICC_CONSTRUCTION_OTA_TC_FORGE ver05122026.pdf PDF
Project 15_Attachment 0019 Scopes_11 May 2026.pdf PDF
Project 1_Attachment 0005 D Scopes_11 May 2026.pdf PDF
Project 9_Attachment 0013 Scopes_11 May 2026.pdf PDF
Project 2_Attachment 0006 Scopes_10 May 2026.pdf PDF
Project 3_Attachment 0007 Scopes_10 May 2026.pdf PDF
JBLM_FORGE_RPP_Amendment 2.pdf PDF
Project 6_Attachment 0010 Scopes_11 May 2026.pdf PDF
JBLM_FORGE_RPP_Amendment_1.pdf PDF
QA_JBLM FORGE_20260428.pdf PDF
Project 1_Attachment 0005 A Scopes_07 Apr 2026.pdf PDF
FORGE Site Visits.pdf PDF
Special Notice JBLM Site Visit.pdf PDF
JBLM FORGE Site Visit Registration 20260422.xlsx XLSX spreadsheet
Project 1_Attachment 0005 B Scopes_07 Apr 2026.pdf PDF
Project 1_Attachment 0005 C Scopes_07 Apr 2026.pdf PDF
Project 4_Attachment 0008 Scopes_07 Apr 2026.pdf PDF
Project 17_Attachment 0021 Scopes_07 Apr 2026.pdf PDF
Project 10_Attachment 0014 Scopes_07 Apr 2026.pdf PDF
JBLM_FORGE_RPP_04172026.pdf PDF
Project 12_ Attachment 0016 Scopes_07 Apr 2026.pdf PDF
ATTACH0004 JBLM FORGE CLIN STRUCTURE.xlsx XLSX spreadsheet
Project 13_ Attachment 0017 Scopes_07 Apr 2026.pdf PDF
Project 1_Attachment 0005 A Scopes_07 Apr 2026.pdf PDF
Project 3_ Attachment 0007 Scopes_07 Apr 2026.pdf PDF
Project 8_ Attachment 0012 Scopes_07 Apr 2026.pdf PDF
Project 5_Attachment 0009 Scopes_07 Apr 2026.pdf PDF
Project 16_ Attachment 0020 Scopes_07 Apr 2026.pdf PDF
Project 18_Attachment 0022 Scopes_07 Apr 2026.pdf PDF
Project 15_Attachment 0019 Scopes_07 Apr 2026.pdf PDF
Project 1_Attachment 0005 B Scopes_07 Apr 2026.pdf PDF
Project 1_Attachment 0005 C Scopes_07 Apr 2026.pdf PDF
Project 6_ Attachment 0010 Scopes_07 Apr 2026.pdf PDF
ATTACH0003 MICC_CONSTRUCTION_OTA_TC_FORGE ver04082026.pdf PDF
Project 2_ Attachment 0006 Scopes_07 Apr 2026.pdf PDF
ATTACH0002_Contract 01 Specifications_JBLMFORGE_RPP.pdf PDF
Project 7_ Attachment 0011 Scopes_07 Apr 2026.pdf PDF
Project 11_ Attachment 0015 Scopes_07 Apr 2026.pdf PDF
ATTACH0001_FY26 JBLM FORGE - Project List 20260414.xlsx XLSX spreadsheet
Project 9_ Attachment 0013 Scopes_07 Apr 2026.pdf PDF
Project 14_Attachment 0018 Scopes_07 Apr 2026.pdf PDF
MICC_JBLM_FORGE_INDUSTRYDAY_SAM.GOV NONCUI.pdf PDF
Pages 601-700 from Attachment 004 Project Scopes.pdf PDF
Pages 1-500 from Attachment 004 Project Scopes.pdf PDF
Pages 701-900 from Attachment 004 Project Scopes.pdf PDF
Show 40 more

Latest 50 of 66 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project #19: McChord CDC Back Up Power Building J00578, J00580

Project Title: Install Backup Generator in Building J00578, McChord Child Development

Center

IJO #: 53465DPA250156J

Project Scope:

Building J00578 is on the JBG CriƟcal Asset List and therefore authorized to have an emergency backup generator. The building requires backup power to provide uninterrupted power to support sustained mission operaƟons during emergency operaƟons.

Building J00578 has a 600Amp 208Y/120 service.

Provide and install a new diesel-powered emergency generator providing stand-by power support to the whole building with a minimum set raƟng: 180kW, 208Y/120V, 3PH

The new generator shall have an integrated sub-base fuel tank incorporaƟng double-wall

Washington State environmentally compliant construcƟon. The fuel capacity for the sub-base fuel tank shall provide a minimum ‘run-Ɵme’ of 48-conƟnuous hours and incorporaƟng ‘Energy

Efficient’ Block Heaters and site gauge as sub-base fuel tank.

Generator controller shall be capable to interface the generator set to Enterprise Energy Data

ReporƟng System (EEDRS) equipment using Modbus communicaƟons protocols in accordance with JBLM 26 27 13.10 30 Rev 11, Para 3.3.8. Generators must have a remote emergency stop switch to shut down the prime mover, and it shall be installed on the exterior of the generator enclosure per NEC SecƟon 445.19(B). The new Generator should include electrical packages inside of the generator which included GFCI convenience receptacles and lights.

Provide and install a 3-way manual transfer switch, 600A, 208Y/120V to allow safe isolated load banking tesƟng and connecƟon of a portable backup generator Ɵed in at the same Ɵme. (NEMA

3R)

Provide and install a new 600A, 208Y/120V ATS. The new ATS shall have isolaƟon bypass with 4 pole configuraƟon. (NEMA 3R)

Consider placing the new generator in the exisƟng enclosure, in front of electrical/mechanical room. (Cultural concern)

Provide arc flash study for newly installed equipment.

The advanced metering system - Enterprise Energy Data ReporƟng System (EEDRS) and JACE require replacement to interconnect with the generator set. The intent of this is to provide the metering data and generator data to the local engineering staff first within the building automaƟon system that can execute applicaƟon programs to affect savings and able track energy usage. Electricity derived from a generator is charged at a different rate than uƟlity provided power. EEDRS is used to monitor generator output. It allows them to ensure the generator is performing properly and not producing unsaƟsfactory power that could cause damage to other building systems. The metering system in Building J00580 is in failing condiƟon due to corrosion, power surges, lack of preventaƟve maintenance, and general failures as display non funcƟonal, date and Ɵme in the meter get driŌed, and clearance provided between name plate and the casing of the meter was not enough that create an unsafe system.

AddiƟonally, it can no longer be calibrated due to age. EEDRS JACE is a requirement per UFC 3-

400-01 and JBLM Design Standards to be code-compliant with the installaƟon of metering.

All work shall comply with the most current ediƟons of NFPA 110, 70, 70E, and JBLM Design

Standard

ADMN

84 sf

ADMN

180 sf

ADMN

198 sf

ADMN

158 sf

KITC

117 sf

LDRY

118 sf

ACON

179 sf

LNGE

233 sf

CDCC

77 sf

RECP

1180 sf

CDCC

510 sf

CDCC

425 sf

CDCC

425 sf

CDCC

420 sf

CDCC

423 sf

CDCC

423 sf

CDCC

405 sf

CDCC

405 sf

CDCC

533 sf

BATH

62 sf

BATH

44 sf

BATH

44 sf

TCOM

26 sf

HALL

982 sf

MECH

448 sf

HALL

879 sf

BATH

45 sf

BATH

61 sf

BATH

61 sf

BATH

61 sf

BATH

61 sf

BATH

61 sf

BATH

61 sf

BATH

57 sf

BATH

75 sf

BATH

61 sf

BATH

61 sf

BATH

68 sf

FOYR

157 sf

STOR

330 sf

STOR

35 sf

EMEC

452 sf

ESUP

32 sf

ESUP

172 sf

ESUP

7827 sf

ESUP

17821 sf

ESUP

7499 sf

LOKR

75 sf

CDCC

420 sf

CDCC

420 sf

BATH

68 sf

CDCC

510 sf

LEWIS-McCHORD

WASHINGTON

UBLIC

ORKSW

JOINT-BASE

P

BLDG J00578

Ist FLOOR

FAMILY SUPPORT (CHILD DEVELOP.)

FLOOR PLAN

SURVEY DATE: 20 FEBRUARY 2015

NOT TO SCALE

AutoCAD SHX Text 26 August 2016 8:41:51 AM timothy.panza Highlight

TCOM

26 sf

MECH

448 sf

BATH BATH

EMEC

452 sf

T

LEWIS-McCHORD

WASHINGTON

UBLIC

ORKSW

JOINT-BASE

P

BLDG J00578

Ist FLOOR

FAMILY SUPPORT (CHILD DEVELOP.)

PROPOSED GENERATOR LOCATION

SURVEY DATE:

NOT TO SCALE

AutoCAD SHX Text 13 January 2026 2:22:28 PM

Building J00578 Utilities

Building J00580

Building J00578

Project Title: Install Backup Generator in Building J00580, McChord Child Development

Center

IJO #: 53465DPA250275J

Project Scope:

Building J00580 is on the JBG CriƟcal Asset List and therefore authorized to have an emergency backup generator. The building requires backup power to provide uninterrupted power to support sustained mission operaƟons during emergency operaƟons.

Building J00580 has a 1000Amp 208Y/120 service.

Provide and install a new diesel-powered emergency generator providing stand-by power support to the whole building with a minimum set raƟng: 300kW, 208Y/120V, 3PH

The new generator shall have an integrated sub-base fuel tank incorporaƟng double-wall

Washington State environmentally compliant construcƟon. The fuel capacity for the sub-base fuel tank shall provide a minimum ‘run-Ɵme’ of 48-conƟnuous hours and incorporaƟng ‘Energy

Efficient’ Block Heaters and site gauge as sub-base fuel tank.

Generator controller shall be capable to interface the generator set to Enterprise Energy Data

ReporƟng System (EEDRS) equipment using Modbus communicaƟons protocols in accordance with JBLM 26 27 13.10 30 Rev 11, Para 3.3.8. Generators must have a remote emergency stop switch to shut down the prime mover, and it shall be installed on the exterior of the generator enclosure per NEC SecƟon 445.19(B). The new Generator should include electrical packages inside of the generator which included GFCI convenience receptacles and lights.

Provide and install a 3-way manual transfer switch, 1000A, 208Y/120V to allow safe isolated load banking tesƟng and connecƟon of a portable backup generator Ɵed in at the same Ɵme.

(NEMA 3R)

Provide and install a new 1000A, 208Y/120V ATS. The new ATS shall have isolaƟon bypass with 4 pole configuraƟon. (NEMA 3R)

A brick enclosure around the new Gen/ATS/MTS to match exisƟng brick wall and building materials should be considered in order to prevent altering the character of the space. (Cultural concern)

Provide arc flash study for newly installed equipment.

The advanced metering system - Enterprise Energy Data ReporƟng System (EEDRS) and JACE require replacement to interconnect with the generator set. The intent of this is to provide the metering data and generator data to the local engineering staff first within the building automaƟon system that can execute applicaƟon programs to affect savings and able track energy usage. Electricity derived from a generator is charged at a different rate than uƟlity provided power. EEDRS is used to monitor generator output. It allows them to ensure the generator is performing properly and not producing unsaƟsfactory power that could cause damage to other building systems. The metering system in Building J00580 is in failing condiƟon due to corrosion, power surges, lack of preventaƟve maintenance, and general failures as display non funcƟonal, date and Ɵme in the meter get driŌed, and clearance provided between name plate and the casing of the meter was not enough that create an unsafe system.

AddiƟonally, it can no longer be calibrated due to age. EEDRS JACE is a requirement per UFC 3-

400-01 and JBLM Design Standards to be code-compliant with the installaƟon of metering.

All work shall comply with the most current ediƟons of NFPA 110, 70, 70E, and JBLM Design

Standard

163 sf

ADMN

114 sf

ADMN

178 sf

ADMN

206 sf

SVRM

70 sf

SSTO

53 sf

LDRY

112 sf

CONF

200 sf

RETL

21 sf

RECP

1222 sf

KITC

1034 sf

CDCC

464 sf

LNGE

559 sf

CDCC

602 sf

CDCC

449 sf

CDCC

887 sf

CDCC

899 sf

CDCC

443 sf

CDCC

442 sf

CDCC

607 sf

CDCC

904 sf135

CDCC

952 sf

CDCC

888 sf

CDCC

882 sf

CDCC

624 sf

BATH

70 sf

BATH

38 sf

BATH

37 sf

TCOM

24 sf

HALL

1612 sf

HALL

1570 sf

FOYR

126 sf

MECH

692 sf

BATH

68 sf

BATH

69 sf

BATH

61 sf

BATH

61 sf

JANC

11 sf

BATH

54 sf

BATH

54 sf

BATH

54 sf

BATH

54 sf

BATH

54 sf

BATH

59 sf

BATH

54 sf

BATH

61 sf

BATH

61 sf

BATH

70 sf

BATH

69 sf

BATH

58 sf

STOR

18 sf

STOR

16 sf

STOR

18 sf

STOR

18 sf

STOR

18 sf

STOR

16 sf

STOR

16 sf

STOR

16 sf

LOKR

54 sf

MECH

32 sf

ESUP

253 sf

STRN

259 sf

BATH

38 sf

SSTO

50 sf

STOR

15 sf

STOR

15 sf

STOR

15 sf

STOR

15 sf

LEWIS-McCHORD

WASHINGTON

UBLIC

ORKSW

JOINT-BASE

P

BLDG J00580

1st FLOOR

FAMILY SUP (CHILD DEVELOPMENT)

FLOOR PLAN

SURVEY DATE:7 APRIL 2023

NOT TO SCALE

20 February 2024 11:00:18 AM

178 sf

VEND

21 sf

LNGE

559 sf

BATH

38 sf

BATH

37 sf

TCOM

24 sf

MECH

692 sf

LOKR

54 sf

ESUP

253 sf

EMEC

482 sf

T

LEWIS-McCHORD

WASHINGTON

UBLIC

ORKSPW

JOINT-BASE

BLDG J00580

1st FLOOR

FAMILY SUPPORT (CHILD DEVELOP.)

PROPOSED GENERATOR LOCATION

SURVEY DATE: 20 SEPT 2025

NOT TO SCALE

AutoCAD SHX Text 10ft Minimum

AutoCAD SHX Text Approx 26ft

AutoCAD SHX Text Approx 16ft

AutoCAD SHX Text 10ft Minimum

AutoCAD SHX Text Approx 26ft

AutoCAD SHX Text Approx 16ft

25 September 2025 1:00:36 PM

Building J00580 Utilities

1521440780.CIV

Line

1521440780.CIV

Line

1521440780.CIV

Line

Building J00580

Building J00578