ATTACH0004 JBLM FORGE CLIN STRUCTURE.xlsx

XLSX spreadsheet 31 KB Posted

Attached to
Joint Base Lewis-McChord (JBLM) FORGE I Other Transaction Authority (OTA) Request for Prototype Proposal (RPP) W51EW7-26-R-A007
Solicitation number
W51EW7-26-R-A007
Issued by

About this file

This file is a CLIN (Contract Line Item Number) structure document for the Joint Base Lewis-McChord (JBLM) FORGE I Facilities Modernization Program, establishing the hierarchical breakdown of 19 construction and repair projects under a Fixed-Price (FFP) contract structure. The document prioritizes projects across barracks replacement, training facility development, airfield infrastructure, security improvements, and child development center upgrades, with each project assigned a unique IJO (Installation Job Order) number and organized into primary CLINs with corresponding sub-CLINs for specific work categories including construction, design, repairs, furniture and fixtures and equipment (FF&E), and communications systems. All proposed prices are currently listed at zero dollars, indicating this is a preliminary pricing template awaiting cost estimates.

The CLIN structure encompasses 19 primary line items distributed across multiple work types: CLIN 0001-0003 address barracks replacement and training areas; CLINs 0004-0005 cover security and communications infrastructure; CLINs 0006-0012 focus on airfield and facility repairs including HVAC, runway lighting, taxiway repairs, and railhead work; CLINs 0013-0016 involve Soldier Performance Readiness Center conversions and construction; CLIN 0017 encompasses the multi-phase I Corps Joint Doctrine Operations Center (JDOC) upgrade with nine sub-CLINs addressing security fencing, repairs, construction, FF&E, and communications; and CLINs 0018-0019 address backup power systems for child development centers. The FORGE Total line reflects the aggregate of all CLINs, currently showing zero dollars, and the document serves as the contractual framework for organizing deliverables under the Other Transaction Authority (OTA) agreement announced for industry day on January 20-23, 2026.

View the file

Other files

File Type Posted
Project 4_Attachment 0008 Scopes_14 May 2026.pdf PDF
QA_JBLM FORGE_20260518.pdf PDF
Project 17_Attachment 0021 Scopes_15 May 2026.pdf PDF
JBLM_FORGE_RPP_Amendment 3.pdf PDF
Project 14_Attachment 0018 Scopes_11 May 2026.pdf PDF
ATTACH0003 MICC_CONSTRUCTION_OTA_TC_FORGE ver05122026.pdf PDF
Project 15_Attachment 0019 Scopes_11 May 2026.pdf PDF
Project 1_Attachment 0005 D Scopes_11 May 2026.pdf PDF
Project 9_Attachment 0013 Scopes_11 May 2026.pdf PDF
Project 2_Attachment 0006 Scopes_10 May 2026.pdf PDF
Project 3_Attachment 0007 Scopes_10 May 2026.pdf PDF
JBLM_FORGE_RPP_Amendment 2.pdf PDF
Project 6_Attachment 0010 Scopes_11 May 2026.pdf PDF
JBLM_FORGE_RPP_Amendment_1.pdf PDF
QA_JBLM FORGE_20260428.pdf PDF
Project 1_Attachment 0005 A Scopes_07 Apr 2026.pdf PDF
FORGE Site Visits.pdf PDF
Special Notice JBLM Site Visit.pdf PDF
JBLM FORGE Site Visit Registration 20260422.xlsx XLSX spreadsheet
Project 1_Attachment 0005 B Scopes_07 Apr 2026.pdf PDF
Project 1_Attachment 0005 C Scopes_07 Apr 2026.pdf PDF
Project 4_Attachment 0008 Scopes_07 Apr 2026.pdf PDF
Project 17_Attachment 0021 Scopes_07 Apr 2026.pdf PDF
Project 10_Attachment 0014 Scopes_07 Apr 2026.pdf PDF
JBLM_FORGE_RPP_04172026.pdf PDF
Project 12_ Attachment 0016 Scopes_07 Apr 2026.pdf PDF
Project 13_ Attachment 0017 Scopes_07 Apr 2026.pdf PDF
Project 1_Attachment 0005 A Scopes_07 Apr 2026.pdf PDF
Project 3_ Attachment 0007 Scopes_07 Apr 2026.pdf PDF
Project 8_ Attachment 0012 Scopes_07 Apr 2026.pdf PDF
Project 5_Attachment 0009 Scopes_07 Apr 2026.pdf PDF
Project 16_ Attachment 0020 Scopes_07 Apr 2026.pdf PDF
Project 18_Attachment 0022 Scopes_07 Apr 2026.pdf PDF
Project 15_Attachment 0019 Scopes_07 Apr 2026.pdf PDF
Project 1_Attachment 0005 B Scopes_07 Apr 2026.pdf PDF
Project 19_Attachment 0023 Scopes_07 Apr 2026.pdf PDF
Project 1_Attachment 0005 C Scopes_07 Apr 2026.pdf PDF
Project 6_ Attachment 0010 Scopes_07 Apr 2026.pdf PDF
ATTACH0003 MICC_CONSTRUCTION_OTA_TC_FORGE ver04082026.pdf PDF
Project 2_ Attachment 0006 Scopes_07 Apr 2026.pdf PDF
ATTACH0002_Contract 01 Specifications_JBLMFORGE_RPP.pdf PDF
Project 7_ Attachment 0011 Scopes_07 Apr 2026.pdf PDF
Project 11_ Attachment 0015 Scopes_07 Apr 2026.pdf PDF
ATTACH0001_FY26 JBLM FORGE - Project List 20260414.xlsx XLSX spreadsheet
Project 9_ Attachment 0013 Scopes_07 Apr 2026.pdf PDF
Project 14_Attachment 0018 Scopes_07 Apr 2026.pdf PDF
MICC_JBLM_FORGE_INDUSTRYDAY_SAM.GOV NONCUI.pdf PDF
Pages 601-700 from Attachment 004 Project Scopes.pdf PDF
Pages 1-500 from Attachment 004 Project Scopes.pdf PDF
Pages 701-900 from Attachment 004 Project Scopes.pdf PDF
Show 40 more

Latest 50 of 66 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Priority Order

Project #IJO #Project Title
153465DER181758JReplace Barracks 3413 & 3414 (300 spaces)
253465DTC250125JMulti-Domain Operations Training Area (Training Area 20)
353465DTC240045JRng 76, 30mm Gunnery (NSF)
453465CJA250086JMDC-PAC Modular SCIF
553465MDA250285JMcChord Airfield Security Projects (NSF) 55 cipher locks
53465MDA250295JMcChord Airfield Security Projects (NSF) Anti-vehicle barriers
53465MDA250305JMcChord Airfield Security Projects (NSF) Clear vegetation
53465MDA250275JMcChord Airfield Security Projects (NSF) AF privacy slats
653465DEJ216251JReplace HVAC & Controls 446th AW Ops Facility (10,899 sf)
753465DEJ225502JRepair HVAC McChord Field Air Traffic Control Tower (Tower 2,325 sf)
853465DEJ247435JMcChord Runway Lighting Overt/Covert (NSF)
953465MBA160186JRepair Taxiway H, McChord Field J15002 (95,000 SY)
1053465MBA250035JRepair Taxiway D, McChord Field
1153465MBA250016JGroove McChord Field Main Runway, J16001
1253465DER190959JRepair JBLM Railhead
1353465CJA250106JConvert Company HQs to Soldier Performance Readiness Center (SPRC) Buidling 11371 (2-2 SBCT)
1453465CJA250096JConstruct SPRC (18.654 SF - 2-2 SBCT)
1553465CVA230053JConvert Company HQs to SPRC Buidling 3168 (1 MDTF)
1653465CJA250126JConstruct SPRC (18.654 SF - 1 MDTF)
1753465CJA230213JI Corps JDOC Phase II (2090 - 10,672sf / 2090 - 13,245sf) Upgrade 2090
53465CJA240054JI Corps JDOC Phase II - Security Fence
53465CJA230223JI Corps JDOC Phase II (2084 - 10,672sf / 2084 - 13,245sf) Upgrade 2084
1853465DPA240424JMadigan Child Development Center, Back Up Power - Bldg 6995
1953465DPA250156JMcChord Child Development Center(s), Back Up Power - Bldg J00578
53465DPA250166JMcChord Child Development Center(s), Back Up Power - Bldg J00580

CLIN Structure

CLINTypeSub-CLINIJO #TitleDesign CostsConstruction CostsProposed Price
0001FFP00010153465DER181758JReplace Barracks 3413 & 3414 - Repair$ - 0
000102Replace Barracks 3413 & 3414 - FF&E$ - 0
000103Replace Barracks 3413 & 3414 - Comms$ - 0
CLIN 0001 Total$ - 0
0002FFP53465DTC250125JMulti-Domain Operations Training Area (7 acres, Training Area 20) - Construction$ - 0
CLIN 0002 Total$ - 0
0003FFP53465DTC240045JRng 76, 30mm Gunnery (NSF) - Construction$ - 0
CLIN 0003 Total$ - 0
0004FFP00040153465CJA250086JMDC-PAC Modular SCIF - Construction$ - 0
000402MDC-PAC Modular SCIF - Communications (Comms)$ - 0
CLIN 0004 Total$ - 0
0005FFP00050153465MDA250285JMcChord Airfield Security Projects (NSF) 55 cipher locks - Construction$ - 0
00050253465MDA250295JMcChord Airfield Security Projects (NSF) Anti-vehicle barriers - Construction$ - 0
00050353465MDA250305JMcChord Airfield Security Projects (NSF) Clear vegetation - Repair$ - 0
00050453465MDA250275JMcChord Airfield Security Projects (NSF) AF privacy slats - Construction$ - 0
CLIN 0005 Total$ - 0
0006FFP53465DEJ216251JReplace HVAC & Controls 446th AW Ops Facility (10,899 sf) - Repair$ - 0
CLIN 0006 Total$ - 0
0007FFP53465DEJ225502JRepair HVAC McChord Field Air Traffic Control Tower (Tower 2,325 sf) - Repair$ - 0
CLIN 0007 Total$ - 0
0008FFP53465DEJ247435JMcChord Runway Lighting Overt/Covert (NSF) - Repair$ - 0
CLIN 0008 Total$ - 0
0009FFP53465MBA160186JRepair Taxiway H, McChord Field J15002 (95,000 SY) - Repair$ - 0
CLIN 0009 Total$ - 0
0010FFP53465MBA250035JRepair Taxiway D, McChord Field - Repair$ - 0
CLIN 0010 Total$ - 0
0011FFP53465MBA250016JGroove McChord Field Main Runway, J16001 - Repair$ - 0
CLIN 0011 Total$ - 0
0012FFP53465DER190959JRepair JBLM Railhead - Repair$ - 0
CLIN 0012 Total$ - 0
0013FFP00130153465CJA250106JConvert Company HQs to Soldier Performance Readiness Center (SPRC) Buidling 11371 (2-2 SBCT) - Repair$ - 0
001303Convert Company HQs to Soldier Performance Readiness Center (SPRC) Buidling 11371 (2-2 SBCT) - Comms$ - 0
CLIN 0013 Total$ - 0
0014FFP00140153465CJA250096JConstruct SPRC (18.654 SF - 2-2 SBCT) - Construction$ - 0
001403Construct SPRC (18.654 SF - 2-2 SBCT) - Comms$ - 0
CLIN 0014 Total$ - 0
0015FFP00150153465CVA230053JConvert Company HQs to SPRC Buidling 3168 (1 MDTF) - Repair$ - 0
001503Convert Company HQs to SPRC Buidling 3168 (1 MDTF) - Comms$ - 0
CLIN 0015 Total$ - 0
0016FFP00160153465CJA250126JConstruct SPRC (18.654 SF - 1 MDTF) - Construction$ - 0
001603Construct SPRC (18.654 SF - 1 MDTF) - Comms$ - 0
CLIN 0016 Total$ - 0
0017FFP00170153465CJA240054JI Corps JDOC Phase II - Security Fence - Construction$ - 0
00170253465CJA230213JI Corps JDOC Phase II (2090 - 10,672sf / 2090 - 13,245sf) Upgrade 2090 - Repair$ - 0
001703I Corps JDOC Phase II (2090 - 10,672sf / 2090 - 13,245sf) Upgrade 2090 - Construction$ - 0
001704I Corps JDOC Phase II (2090 - 10,672sf / 2090 - 13,245sf) Upgrade 2090 - FF&E$ - 0
001705I Corps JDOC Phase II (2090 - 10,672sf / 2090 - 13,245sf) Upgrade 2090 - Comms$ - 0
00170653465CJA230223JI Corps JDOC Phase II (2084 - 10,672sf / 2084 - 13,245sf) Upgrade 2084 - Repair$ - 0
001707I Corps JDOC Phase II (2084 - 10,672sf / 2084 - 13,245sf) Upgrade 2084 - Construction$ - 0
001708I Corps JDOC Phase II (2084 - 10,672sf / 2084 - 13,245sf) Upgrade 2084 - FF&E$ - 0
001709I Corps JDOC Phase II (2084 - 10,672sf / 2084 - 13,245sf) Upgrade 2084 - Comms$ - 0
CLIN 0017 Total$ - 0
0018FFP53465DPA240424JMadigan Child Development Center, Back Up Power - Bldg 6995 - Construction$ - 0
CLIN 0018 Total$ - 0
0019FFP00190153465DPA250156JMcChord Child Development Center(s), Back Up Power - Bldg J00578 - Construction$ - 0
00190253465DPA250166JMcChord Child Development Center(s), Back Up Power - Bldg J00580 - Construction$ - 0
CLIN 0019 Total$ - 0
FORGE TOTAL$ - 0

File details come from the government source that posted it. Updated .