Project 7_ Attachment 0011 Scopes_07 Apr 2026.pdf
PDF 18 MB Posted
- Solicitation number
- W51EW7-26-R-A007
About this file
This is a scope of work document for Project #7: Repair HVAC McChord Field Air Traffic Control Tower, part of the Joint Base Lewis-McChord (JBLM) FORGE I Facilities Modernization Program under contract FA462023D0002 / FA462024F0092. The project involves the complete replacement of an existing Variable Refrigerant Flow (VRF) HVAC system with a new, redundant, 4-pipe hydronic system utilizing high-efficiency heat pump chillers at Building J00008. The Air Traffic Control Tower must remain fully operational 24/7 throughout construction, necessitating a carefully phased approach executed across four distinct phases: Phase 1 involves installing one permanent heat pump chiller (HPC-01), a temporary heat pump chiller (HPC-TEMP), supporting pumps and equipment, and running temporary piping to new fan coil units; Phase 2 includes decommissioning and demolishing the existing VRF system with EPA-certified refrigerant recovery; Phase 3 encompasses installation of permanent interior hydronic piping and the second permanent heat pump chiller (HPC-02); and Phase 4 covers removal of temporary systems, final connections, and commissioning. The scope encompasses architectural work (window demolition and replacement, wall patching and painting), civil and structural work (concrete pad demolition and new foundation installation, structural steel supports for piping), mechanical systems (two York YMAE0035 heat pump chillers, new 4-pipe fan coil units, primary and secondary pumps, Energy Recovery Ventilator, full hydronic distribution system with controls via BACnet DDC system), and electrical systems (new 800A Main Switchboard, 200kW diesel generator, 800A Automatic Transfer Switch, 75kVA step-up transformer, 480/277V panelboard, heat trace system for exterior piping, and relocation of existing electrical equipment). The contractor is responsible for all supervision, labor, materials, permits, site management, field verification of existing conditions, environmental protection planning, as-built documentation in CAD/PDF formats, and compliance with the Buy American Act. All materials must be new, and the contractor must develop detailed phasing plans, Environmental Protection Plans, Stormwater Pollution Prevention Plans, and coordinate extensively with the Contracting Officer's Representative to maintain facility operations.
View the file
Other files
Show 40 more
Latest 50 of 66 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project #7: Repair HVAC McChord Field Air Traffic Control Tower
Project Overview
The project involves the complete replacement of the exisƟng Variable Refrigerant Flow (VRF)
HVAC system with a new, redundant, 4-pipe hydronic system uƟlizing high-efficiency heat pump chillers. The work includes the demoliƟon of the exisƟng system, installaƟon of new mechanical and electrical equipment, and associated architectural and structural modificaƟons. The Air
Traffic Control Tower must remain fully operaƟonal 24/7 throughout the enƟre duraƟon of the project, which will necessitate a carefully phased construcƟon approach.
General Contractor ResponsibiliƟes
The contractor is responsible for all supervision, labor, materials, and equipment required to complete the work as described in the contract documents. Key responsibiliƟes include:
Compliance and Permiƫng: Adherence to all applicable local, state, and federal laws, regulaƟons, and standards, including OSHA, and obtaining all necessary permits for construcƟon.
Site Management: Ensuring site safety and security, including providing temporary fencing and barriers as needed. The contractor must also coordinate all site access, staging areas, and potenƟal road or walkway closures with the ContracƟng Officer's
RepresentaƟve (COR).
Field VerificaƟon: Verifying all exisƟng site condiƟons and dimensions prior to fabricaƟon or construcƟon and reporƟng any discrepancies to the COR.
Phasing and CoordinaƟon: Developing and execuƟng a detailed phasing plan to ensure the facility remains conƟnuously operaƟonal. This includes coordinaƟng all work and any uƟlity shutdowns with the COR and other trades.
Environmental ProtecƟon: Developing and implemenƟng an Environmental ProtecƟon
Plan (EPP) and a Stormwater PolluƟon PrevenƟon Plan (SWPPP) to manage waste, control erosion, and prevent polluƟon.
SubmiƩals and DocumentaƟon: Providing all required project submiƩals, including shop drawings, product data, and a final set of "as-built" record drawings in both digital
(CAD/PDF) and hard copy formats upon project compleƟon.
Materials: All materials used must be new and must comply with the Buy American Act.
ConstrucƟon Phasing
To ensure uninterrupted cooling and operaƟons, the project will be executed in the following major phases:
1. Phase 1: Temporary System InstallaƟon & New Equipment Staging
Install one of the new permanent heat pump chillers (HPC-01) and a separate temporary heat pump chiller (HPC-TEMP).
Install new pumps, expansion tanks, and air/dirt separators in the first-floor mechanical room.
Run temporary insulated hydronic piping up the exterior of the tower, using exisƟng louver and window openings to access each floor.
Install new 4-pipe fan coil units on all floors and connect them to the temporary piping system to make them operaƟonal. The exisƟng VRF system will conƟnue to operate during this Ɵme.
2. Phase 2: VRF System DemoliƟon
Once the new temporary hydronic system is fully funcƟonal, decommission and demolish the exisƟng VRF system. This includes the outdoor condensing unit, all indoor fan coil units, branch selector boxes, and associated refrigerant piping and controls.
All refrigerant must be recovered by an EPA-cerƟfied technician in accordance with regulaƟons.
Remove all exisƟng refrigerant lines from the main verƟcal uƟlity chase.
3. Phase 3: Permanent System InstallaƟon
Install the new permanent hot and chilled water hydronic piping inside the now-empty verƟcal chase.
AŌer removing the old VRF outdoor unit, install the second new permanent heat pump chiller (HPC-02) in its final designated locaƟon.
4. Phase 4: Final ConnecƟons and DemobilizaƟon
Disconnect and remove the temporary exterior piping and the temporary heat pump chiller (HPC-TEMP).
Connect the fan coil units to the new permanent interior piping and commission the complete system.
Reinstall salvaged windows and louvers, and complete all remaining architectural finishes.
Detailed Scope of Work by Discipline
Architectural
Demolish exisƟng windows on floors 3 and 7, and other windows/louvers as required to route temporary piping. Salvage designated units for reinstallaƟon.
Install new blast-resistant windows that match exisƟng units in size, profile, and performance.
Patch, repair, and paint all walls, floors, and ceilings disturbed by demoliƟon and construcƟon to match exisƟng adjacent finishes.
Where ceilings are disturbed, install new acousƟcal ceiling Ɵles or patch gypsum board to match exisƟng condiƟons.
Civil and Structural
Demolish exisƟng concrete equipment pads as indicated in the drawings.
Form and pour new concrete housekeeping pads and foundaƟons for the new exterior equipment, including the heat pump chillers, generator, transfer switches, and transformer.
Provide new structural steel supports for all new piping runs as detailed in the structural drawings.
Perform all necessary trenching, backfilling, and compacƟon for any new underground uƟliƟes, and restore all surfaces to their original condiƟon.
Mechanical
DemoliƟon: Completely demolish the exisƟng VRF system and other designated equipment, including unit heaters, exhaust fans, and pumps.
New Equipment:
Furnish and install two (2) new York YMAE0035 (or approved equal) heat pump chillers.
Furnish and install new 4-pipe fan coil units (ceiling casseƩe, verƟcal, and wall-mounted types) on each floor as specified in the schedules.
Furnish and install new primary and secondary pumps for both the heaƟng and chilled water loops.
Furnish and install a new Energy Recovery VenƟlator (ERV-01) on Floor 8.
Furnish and install all hydronic system accessories, including expansion tanks, air/dirt separators, and chemical feed systems.
Piping and Ductwork:
Install a complete new 4-pipe hydronic distribuƟon system, including all temporary and permanent piping, valves, and fiƫngs.
Install new condensate drain piping for all new fan coil units.
Install new ductwork associated with the new ERV and fan coil units.
Controls: Install a new, complete, and funcƟonal Direct Digital Control (DDC) system for the enƟre HVAC system, uƟlizing the BACnet protocol, and ensure it can be integrated into the base-wide control network. Provide all controllers, sensors, and actuators as shown on the control drawings.
Electrical
DemoliƟon: Demolish the exisƟng Main Switchboard (MSB), generator, AutomaƟc
Transfer Switch (ATS), Manual Transfer Switch (MTS), and all associated feeders, conduits, and wiring.
New Power System:
Furnish and install a new 800A, 208/120V Main Switchboard.
Furnish and install a new 200kW diesel generator.
Furnish and install a new 800A AutomaƟc Transfer Switch (ATS-1) with bypass isolaƟon and a new Manual Transfer Switch (MTS-1) with provisions for a temporary generator connecƟon.
Furnish and install a new 75kVA step-up transformer and a new 480/277V panelboard (MC) to power the new chillers.
Equipment ConnecƟons: Provide all final power connecƟons, including disconnects and starters, for all new mechanical equipment (chillers, pumps, fan coils, ERV, etc.).
Heat Trace: Install a heat trace system with a control panel for all new exterior piping to provide freeze protecƟon.
RelocaƟon: Relocate exisƟng electrical equipment, including the DPW panel and fire alarm juncƟon boxes, to accommodate the new mechanical layout.
M . K
IN
G
A.
J
AI
M
ES
M . K
IN
G
R . S
PE
ES
C O
VE
R
S H
EE
T
G-001 J00008
US Army Corps of Engineers ®
SOLICITATION NO.:
CONTRACT NO.:
ISSUE DATE:
SEATTLE DISTRICT
JOINT BASE LEWIS-MCCHORD, WASHINGTON
REPLACEMENT AT BLDG J00008 HVAC SYSTEM
PROJECT NO: PB2410
IJO NO: DEJ225502J
FA462024F0092
FA462023D0002
09/26/2025
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
SP
EE
S D
ES
IG
N B
U
IL
D
PA
C
IF
IC
H W
Y S
KE
N
T, W
A
P:
(2
) 5
-2
SE
AT
TL
E
D
IS
TR
IC
T
SE
AT
TL
E, W
AS
H
IN
G
TO
N
FA
D
/2
6/
AN
SI
D
FA
F0
JO
IN
T
BA
SE
L
EW
IS
-M C
C H
O R
D , W
AS
H
IN
G
TO
N
JB
LM
A
TC
T H
VA
C
R
EP
AI
R
S D
EJ
J
0%
E
LE
C
TR
O N
IC
B
ID
S
ET
IJ
O
: D
EJ
J
US ARMY CORPS OF
ENGINEERS ®
SEATTLE DISTRICT
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
PROJECT
WALLA WALLA
PENDLETON
UMATILLA ARMY DEPOT
BELLINGHAM
MT. VERNON
EVERETT
SEATTLE
OLYMPIA
ABERDEEN
CHEHALIS
VANCOUVER
YAKIMA
SPOKANE
TACOMA
I D A
H O
B R I T I S H C O L U M B I A
W A S H I N G T O N
MCCHORD FIELD
AREA MAP
PROJECT LOCATION MAPVICINITY MAP
NOT TO SCALE
N
NOT TO SCALE
N
BLDG J00008
A
ST
R
EE
T
N O
R
TH
-S O
R H
IN
ST
R U
N W
AY
LINCOLN BLVD
9/26/2025
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
SP
EE
S D
ES
IG
N B
U
IL
D
PA
C
IF
IC
H W
Y S
KE
N
T, W
A
P:
(2
) 5
-2
SE
AT
TL
E
D
IS
TR
IC
T
SE
AT
TL
E, W
AS
H
IN
G
TO
N
FA
D
/2
6/
AN
SI
D
FA
F0
JO
IN
T
BA
SE
L
EW
IS
-M C
C H
O R
D , W
AS
H
IN
G
TO
N
JB
LM
A
TC
T H
VA
C
R
EP
AI
R
S D
EJ
J
0%
E
LE
C
TR
O N
IC
B
ID
S
ET
IJ
O
: D
EJ
J
US ARMY CORPS OF
ENGINEERS ®
SEATTLE DISTRICT
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
M . K
IN
G
A.
J
AI
M
ES
M . K
IN
G
R . S
PE
ES
D R
AW
IN
G
IN
D
EX
G-002 J00008
DRAWING INDEX
PAGE # SHEET # SHEET NAME
GENERAL
1 OF 82 G-001 COVER SHEET
2 OF 82 G-002 DRAWING INDEX
CIVIL
3 OF 82 C-001 CIVIL SHEET INDEX AND GENERAL NOTES
4 OF 82 C-002 GENERAL NOTES AND LEGEND
5 OF 82 CS100 CIVIL SITE PLAN
STRUCTURAL
6 OF 82 S-001 STRUCTURAL GENERAL NOTES
7 OF 82 S-002 STRUCTURAL ABBREVIATIONS AND LEGENDS
8 OF 82 S-101 STRUCTURAL FOUNDATION PLAN
9 OF 82 S-501 CONCRETE FOUNDATION DETAILS
10 OF 82 S-502 CONCRETE FOUNDATION DETAILS
11 OF 82 S-511 PIPE SUPPORT DETAILS
ARCHITECTURAL
12 OF 82 A-001 ARCHITECTURAL SYMBOLS & ABBREVIATIONS
13 OF 82 AD101 DEMO FLOOR PLAN & RCP FLOOR 1
14 OF 82 AD102 DEMO FLOOR PLAN & RCP FLOOR 2
15 OF 82 AD103 DEMO FLOOR PLAN & RCP FLOOR 3
16 OF 82 AD104 DEMO FLOOR PLAN & RCP FLOOR 4
17 OF 82 AD105 DEMO FLOOR PLAN & RCP FLOOR 5
18 OF 82 AD106 DEMO FLOOR PLAN & RCP FLOOR 6
19 OF 82 AD107 DEMO FLOOR PLAN & RCP FLOOR 7
20 OF 82 AD108 DEMO FLOOR PLAN & RCP FLOOR 8
21 OF 82 AD109 FLOOR 9 DEMO FLOOR PLAN
22 OF 82 A-101 FLOOR PLAN & RCP FLOOR 1
23 OF 82 A-102 FLOOR PLAN & RCP FLOOR 2
24 OF 82 A-103 FLOOR PLAN & RCP FLOOR 3
25 OF 82 A-104 FLOOR 4 FLOOR PLAN & RCP
26 OF 82 A-105 FLOOR PLAN & RCP FLOOR 5
27 OF 82 A-106 FLOOR PLAN & RCP FLOOR 6
28 OF 82 A-107 FLOOR PLAN & RCP FLOOR 7
29 OF 82 A-108 FLOOR PLAN & RCP FLOOR 8
30 OF 82 A-109 FLOOR PLAN & RCP FLOOR 9
31 OF 82 AE200 INTERIOR ELEVATIONS
32 OF 82 A-500 WINDOW DETAILS, SCHEDULES & TYPES
MECHANICAL
33 OF 82 M-001 MECHANICAL COVER SHEET
34 OF 82 MH101 FLOOR 1 - MECHANICAL DUCTWORK PLAN - PHASE 0
35 OF 82 MP101 FLOOR 1 - MECHANICAL PIPING PLAN - PHASE 1
36 OF 82 MP102 FLOOR 1 - MECHANICAL PIPING PLAN - PHASE 2
37 OF 82 MP103 FLOOR 1 - MECHANICAL PIPING PLAN - PHASE 3
38 OF 82 MP104 FLOOR 1 - MECHANICAL PIPING PLAN - PHASE 4
39 OF 82 M-121 FLOOR 2 - MECHANICAL FLOOR PLAN - PHASE 1 & 2
40 OF 82 M-122 FLOOR 2 - MECHANICAL FLOOR PLAN - PHASE 3 & 4
41 OF 82 M-123 FLOOR 3 - MECHANICAL FLOOR PLAN - PHASE 1 & 2
42 OF 82 M-124 FLOOR 3 - MECHANICAL FLOOR PLAN - PHASE 3 & 4
43 OF 82 M-125 FLOOR 4 - MECHANICAL FLOOR PLAN - PHASE 1 & 2
44 OF 82 M-126 FLOOR 4 - MECHANICAL FLOOR PLAN - PHASE 3 & 4
45 OF 82 M-127 FLOOR 5 - MECHANICAL FLOOR PLAN - PHASE 1 - 4
46 OF 82 M-128 FLOOR 6 - MECHANICAL FLOOR PLAN - PHASE 1 - 4
47 OF 82 M-129 FLOOR 7 - MECHANICAL FLOOR PLAN - PHASE 1 & 2
48 OF 82 M-130 FLOOR 7 - MECHANICAL FLOOR PLAN - PHASE 3 & 4
49 OF 82 M-131 FLOOR 8 - MECHANICAL FLOOR PLAN - PHASE 1 - 4
50 OF 82 M-132
WALKWAY LEVEL - MECHANICAL FLOOR PLAN - PHASE
51 OF 82 M-133 FLOOR 9 - MECHANICAL FLOOR PLAN - PHASE 1
52 OF 82 M-501 MECHANICAL DETAILS I
53 OF 82 M-502 MECHANICAL DETAILS II
54 OF 82 M-503 MECHANICAL DETAILS III
55 OF 82 M-504 MECHANICAL DETAILS IV
56 OF 82 M-601 MECHANICAL SCHEDULES I
57 OF 82 M-602 MECHANICAL SCHEDULES II
58 OF 82 M-701 MECHANICAL CONTROLS I
59 OF 82 M-702 MECHANICAL CONTROLS II
ELECTRICAL
62 OF 82 EG001 ABBREVIATIONS, GENERAL NOTES, AND SHEET INDEX
63 OF 82 EG002 ELECTRICAL LEGENDS
64 OF 82 ED401 FLOOR 1 - ELECTRICAL PLAN - DEMOLITION
65 OF 82 EP401 FLOOR 1 - ELECTRICAL PLAN
66 OF 82 E-402 FLOOR 2 - ELECTRICAL PLANS
67 OF 82 E-403 FLOOR 3 - ELECTRICAL PLANS
68 OF 82 E-404 FLOOR 4 - ELECTRICAL PLANS
69 OF 82 E-405 FLOOR 5 - ELECTRICAL PLANS
70 OF 82 E-406 FLOOR 6 - ELECTRICAL PLANS
71 OF 82 E-407 FLOOR 7 - ELECTRICAL PLANS
72 OF 82 E-408 FLOOR 8 - ELECTRICAL PLANS
73 OF 82 E-501 ELECTRICAL DETAILS
74 OF 82 E-502 ELECTRICAL DETAILS
75 OF 82 ED601 ELECTRICAL ONE-LINE DIAGRAM - DEMOLITION
76 OF 82 EP601 ELECTRICAL ONE-LINE DIAGRAM - REVISED
77 OF 82 E-701 ELECTRICAL SCHEDULES
78 OF 82 E-702 ELECTRICAL SCHEDULES
79 OF 82 E-703 ELECTRICAL SCHEDULES
80 OF 82 E-704 ELECTRICAL SCHEDULES
81 OF 82 E-705 ELECTRICAL SCHEDULES
82 OF 82 E-706 ELECTRICAL SCHEDULES
9/26/2025
DRAWING INDEX
PAGE # SHEET # SHEET NAME
GENERAL
1 OF 82 G-001 COVER SHEET
2 OF 82 G-002 DRAWING INDEX
CIVIL
3 OF 82 C-001 CIVIL SHEET INDEX AND GENERAL NOTES
4 OF 82 C-002 GENERAL NOTES AND LEGEND
5 OF 82 CS100 CIVIL SITE PLAN
STRUCTURAL
6 OF 82 S-001 STRUCTURAL GENERAL NOTES
7 OF 82 S-002
STRUCTURAL GENERAL NOTES, ABBREVIATIONS, AND
LEGEND
8 OF 82 S-110 PEMB STRUCTURAL FOUNDATION PLAN
9 OF 82 S-501 CONCRETE FOUNDATION DETAILS
10 OF 82 S-502 CONCRETE FOUNDATION DETAILS
11 OF 82 S-511 PIPE SUPPORT DETAILS
ARCHITECTURAL
12 OF 82 A-001 ARCHITECTURAL SYMBOLS & ABBREVIATIONS
13 OF 82 AD101 DEMO FLOOR PLAN & RCP FLOOR 1
14 OF 82 AD102 DEMO FLOOR PLAN & RCP FLOOR 2
15 OF 82 AD103 DEMO FLOOR PLAN & RCP FLOOR 3
16 OF 82 AD104 DEMO FLOOR PLAN & RCP FLOOR 4
17 OF 82 AD105 DEMO FLOOR PLAN & RCP FLOOR 5
18 OF 82 AD106 DEMO FLOOR PLAN & RCP FLOOR 6
19 OF 82 AD107 DEMO FLOOR PLAN & RCP FLOOR 7
20 OF 82 AD108 DEMO FLOOR PLAN & RCP FLOOR 8
21 OF 82 AD109 DEMO FLOOR PLAN FLOOR 9
22 OF 82 A-101 FLOOR PLAN & RCP FLOOR 1
23 OF 82 A-102 FLOOR PLAN & RCP FLOOR 2
24 OF 82 A-103 FLOOR PLAN & RCP FLOOR 3
25 OF 82 A-104 FLOOR PLAN & RCP FLOOR 4
26 OF 82 A-105 FLOOR PLAN & RCP FLOOR 5
27 OF 82 A-106 FLOOR PLAN & RCP FLOOR 6
28 OF 82 A-107 FLOOR PLAN & RCP FLOOR 7
29 OF 82 A-108 FLOOR PLAN & RCP FLOOR 8
30 OF 82 A-109 FLOOR PLAN & RCP FLOOR 9
31 OF 82 AE200 INTERIOR ELEVATIONS
32 OF 82 A-500 WINDOW DETAILS, SCHEDULES & TYPES
MECHANICAL
33 OF 82 M-001 MECHANICAL COVER SHEET
34 OF 82 MH101 FLOOR 1 - MECHANICAL DUCTWORK PLAN - PHASE 0
35 OF 82 MP101 FLOOR 1 - MECHANICAL PIPING PLAN - PHASE 1
36 OF 82 MP102 FLOOR 1 - MECHANICAL PIPING PLAN - PHASE 2
37 OF 82 MP103 FLOOR 1 - MECHANICAL PIPING PLAN - PHASE 3
38 OF 82 MP104 FLOOR 1 - MECHANICAL PIPING PLAN - PHASE 4
39 OF 82 M-121 FLOOR 2 - MECHANICAL FLOOR PLAN - PHASE 1 & 2
40 OF 82 M-122 FLOOR 2 - MECHANICAL FLOOR PLAN - PHASE 3 & 4
41 OF 82 M-123 FLOOR 3 - MECHANICAL FLOOR PLAN - PHASE 1 & 2
42 OF 82 M-124 FLOOR 3 - MECHANICAL FLOOR PLAN - PHASE 3 & 4
43 OF 82 M-125 FLOOR 4 - MECHANICAL FLOOR PLAN - PHASE 1 & 2
44 OF 82 M-126 FLOOR 4 - MECHANICAL FLOOR PLAN - PHASE 3 & 4
45 OF 82 M-127 FLOOR 5 - MECHANICAL FLOOR PLAN - PHASE 1 - 4
46 OF 82 M-128 FLOOR 6 - MECHANICAL FLOOR PLAN - PHASE 1 - 4
47 OF 82 M-129 FLOOR 7 - MECHANICAL FLOOR PLAN - PHASE 1 & 2
48 OF 82 M-130 FLOOR 7 - MECHANICAL FLOOR PLAN - PHASE 3 & 4
49 OF 82 M-131 FLOOR 8 - MECHANICAL FLOOR PLAN - PHASE 1 - 4
50 OF 82 M-132 WALKWAY LEVEL - MECHANICAL FLOOR PLAN - PHASE 1
51 OF 82 M-133 FLOOR 9 - MECHANICAL FLOOR PLAN - PHASE 1
52 OF 82 M-501 MECHANICAL DETAILS I
53 OF 82 M-502 MECHANICAL DETAILS II
54 OF 82 M-503 MECHANICAL DETAILS III
55 OF 82 M-601 MECHANICAL SCHEDULES I
56 OF 82 M-602 MECHANICAL SCHEDULES II
57 OF 82 M-701 MECHANICAL CONTROLS I
58 OF 82 M-702 MECHANICAL CONTROLS II
59 OF 82 M-703 MECHANICAL CONTROLS III
60 OF 82 M-704 MECHANICAL CONTROLS IV
ELECTRICAL
61 OF 82 EG001 ABBREVIATIONS, GENERAL NOTES, AND SHEET INDEX
62 OF 82 EG002 ELECTRICAL LEGENDS
63 OF 82 ED401 FLOOR 1 - ELECTRICAL PLAN - DEMOLITION
64 OF 82 EP401 FLOOR 1 - ELECTRICAL PLAN
65 OF 82 E-402 FLOOR 2 - ELECTRICAL PLANS
66 OF 82 E-403 FLOOR 3 - ELECTRICAL PLANS
67 OF 82 E-404 FLOOR 4 - ELECTRICAL PLANS
68 OF 82 E-405 FLOOR 5 - ELECTRICAL PLANS
69 OF 82 E-406 FLOOR 6 - ELECTRICAL PLANS
70 OF 82 E-407 FLOOR 7 - ELECTRICAL PLANS
71 OF 82 E-408 FLOOR 8 - ELECTRICAL PLANS
72 OF 82 E-409 ENLARGED ELECTRICAL PLANS
73 OF 82 E-501 ELECTRICAL DETAILS
74 OF 82 E-502 ELECTRICAL DETAILS
75 OF 82 ED601 ELECTRICAL ONE-LINE DIAGRAM - DEMOLITION
76 OF 82 EP601 ELECTRICAL ONE-LINE DIAGRAM - REVISED
77 OF 82 E-701 ELECTRICAL SCHEDULES
78 OF 82 E-702 ELECTRICAL SCHEDULES
79 OF 82 E-703 ELECTRICAL SCHEDULES
80 OF 82 E-704 ELECTRICAL SCHEDULES
81 OF 82 E-705 ELECTRICAL SCHEDULES
82 OF 82 E-706 ELECTRICAL SCHEDULES
AAF AIR ASSISTED FIBER
ABAN ABANDONED
APROX APPROXIMATELY
APWA AMERICAN PUBLIC WORKS
ASSOCIATION
ASPH ASPHALT CONCRETE
AVE AVENUE
AWWA AMERICAN WATER WORKS
ASSOCIATION
BLDG BUILDING
BMP BEST MANAGEMENT
PRACTICES
BOT BOTTOM
BVC BEGIN VERTICAL CURVE
CL or ℄ CENTERLINE
CDF CONTROLLED DENSITY FILL
CFS CUBIC FEET PER SECOND
CLR CLEAR
CM CENTIMETER
CMP CORRUGATED METAL PIPE
COMM COMMUNICATION(S)
CONC PORTLAND CONCRETE
COR CONTRACTING OFFICER'S
REPRESENTATIVE
CPEP CORRUGATED
POLYETHELENE PIPE (N-12)
CSBC CRUSHED SURFACING BASE
COURSE
CSTC CRUSHED SURFACING TOP
COURSE
CTR CENTER
CY CUBIC YARDS
DDCV DOUBLE DETECTOR CHECK
VALVE
DI DUCTILE IRON
DIA or Ø DIAMETER
DWG DRAWING
E EAST
EA EACH
EG EXISTING GROUND
ELEC ELECTRICAL
ELEV ELEVATION
EP EDGE OF PAVEMENT
ESMT EASEMENT
EVC END VERTICAL CURVE
EXIST EXISTING
FG FINISH GRADE
FL FLANGE
FM FORCE MAIN
FT FEET
HDPE HIGH DENSITY
POLYETHYLENE PIPE
HP HIGH POINT
HMA HOT MIX ASPHALT
HORIZ HORIZONTAL
HWY HIGHWAY
ID INSIDE DIAMETER
IE INVERT ELEVATION
IN INCH(ES)
ISP INTERNET SERVICE
PROVIDER
LBS POUNDS
LF LINEAR FEET
LT LEFT
LP LOW POINT
MAX MAXIMUM
MH MANHOLE
MIN MINIMUM
MISC MISCELLANEOUS
MJ MECHANICAL JOINT
N NORTH
NAD NORTH AMERICAN DATUM
NAVD NORTH AMERICAN VERTICAL
DATUM
NE NORTHEAST
NOM NOMINAL
NTS NOT TO SCALE
NW NORTHWEST
OC ON CENTER
OD OUTSIDE DIAMETER
OSP OUTSIDE PLANT
OS1 OPTICAL SINGLEMODE
FIBER (LEGACY STANDARD)
OS2 OPTICAL SINGLEMODE
FIBER (LATEST STANDARD)
OVHD OVERHEAD
PC POINT OF CURVATURE
PE PROJECT ENGINEER
PI POINT OF HORIZONTAL
INTERSECTION
PHH PHYSICAL HAND HOLE
POC POINT ON CURVE
POB POINT OF BEGINNING
POP POINT OF PRESENCE
PPM PARTS PER MILLION
PROP PROPOSED
PT POINT OR POINT OF
TANGENCY
PVC POLYVINYL CHLORIDE PIPE
PVI POINT OF VERTICAL
INTERSECTION
R RADIUS
RJ RESTRAINED JOINT
RT RIGHT
S SOUTH
SD STORM DRAIN
SDCB STORM DRAIN CATCH BASIN
SDCO STORM DRAIN CLEANOUT
SDMH STORM DRAIN MANHOLE
SE SOUTHEAST
SEC SECTION
SF SQUARE FOOT
SMFO SINGLE MODE FIBER
OPTICS
SPEC SPECIFICATION
SS SANITARY SEWER
SSFM SANITARY SEWER FORCE
MAIN
SSMH SANITARY SEWER MANHOLE
ST STREET
STA STATION
STD STANDARD
SW SOUTHWEST
SWPPP STORMWATER POLLUTION
PREVENTION PLAN
TAN TANGENT POINT
TDR TELECOMMUNICATIONS
DISTRIBUTION ROOM
TDU TUBE CABLE DISTRIBUTION
UNIT
TESC TEMPORARY EROSION &
SEDIMENT CONTROL
TOC TOP OF CURB
TR TELECOMMUNICATIONS
ROOM
TYP TYPICAL
UFC UNIFIED FACILITIES CRITERIA
UG UNDERGROUND
VC VERTICAL CURVE
VERT VERTICAL
W WEST or WATER
WM WATER METER
WSEL WATER SURFACE ELEVATION
W/ WITH
J00008 CIVIL SHEET INDEX:
CIVIL ABBREVIATIONS
GENERAL NOTES:
1. CONTRACTOR SHALL COMPLY WITH ALL LOCAL, STATE AND FEDERAL LAWS PERTINENT TO THE WORK, AND AS DESCRIBED IN THE SPECIFICATIONS AND ON THESE DESIGN DRAWINGS. ALL WORKMANSHIP
AND MATERIALS SHALL BE IN ACCORDANCE WITH THE CONTRACT DOCUMENTS.
2. THE CONTRACTOR IS RESPONSIBLE FOR BECOMING FAMILIARIZED WITH THE EXISTING CONDITIONS AND VERIFYING CONSISTENCY WITH DESIGN DRAWINGS AND SPECIFICATIONS. THE CONTRACTOR
SHALL REPORT ANY DISCREPANCY TO THE CONTRACTING OFFICER IMMEDIATELY AND AWAIT
FURTHER INSTRUCTIONS.
3. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN ALL APPLICABLE PERMITS, LICENSES AND CERTIFICATES, AND MAKE ALL REQUIRED AGENCY NOTIFICATIONS TO COMPLETE THE PROJECT.
COMPLIANCE SHALL BE AT ALL LEVELS: FEDERAL, STATE, AND LOCAL RELATING TO THE
PERFORMANCE OF THE WORK.
4. PRIOR TO BEGINNING WORK AND PROCURING MATERIALS THAT COULD BE IMPACTED, CONTRACTOR SHALL INSPECT AND CONFIRM ALL POINTS OF CONNECTIONS TO EXISTING UTILITIES OR SYSTEMS.
POTHOLE WHERE NECESSARY TO VERIFY THE DRAWINGS AGAINST ALL APPLICABLE EXISTING
CONDITIONS. NOTIFY THE CONTRACTING OFFICER IMMEDIATELY UPON DISCOVERY OF UNFORESEEN
SITE CONDITIONS OR DISCREPANCIES.
5. CALL THE UNDERGROUND LOCATE LINE (811) A MINIMUM OF 48 HOURS PRIOR TO ANY EXCAVATIONS, AND HIRE PRIVATE UTILITY LOCATE COMPANY TO CONFIRM PRESENCE OF EXISTING BURIED UTILITIES PRIOR TO EXCAVATION. LOCATIONS OF EXISTING UTILITIES SHOWN HEREIN HAVE BEEN ESTABLISHED
BY FIELD SURVEY OR OBTAINED FROM AVAILABLE RECORDS AND SHOULD BE CONSIDERED
APPROXIMATE ONLY AND NOT NECESSARILY COMPLETE. IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO INDEPENDENTLY VERIFY THE ACCURACY OF ALL UTILITY LOCATIONS SHOWN, AND
TO FURTHER DISCOVER AND AVOID ANY OTHER UTILITIES NOT SHOWN HEREON WHICH MAY BE
AFFECTED BY THE IMPLEMENTATION OF THESE PLANS.
6. UTILITY SYSTEMS SHALL BE CONSTRUCTED ACCORDING TO APPROVED PLANS. ANY DEVIATION FROM
THE APPROVED PLANS WILL REQUIRE WRITTEN APPROVAL FROM THE CONTRACTING OFFICER.
7. CONTRACTOR SHALL PREPARE CONSTRUCTION STORM WATER POLLUTION PREVENTION PLAN
(SWPPP) IN ACCORDANCE WITH ALL APPLICABLE FEDERAL AND STATE REQUIREMENTS AND OBTAIN
PERMIT FOR PROPOSED WORK. CONTRACTOR SHALL MAINTAIN AND UPDATE SWPPP AS REQUIRED
THROUGHOUT CONSTRUCTION. A COPY OF THE APPROVED CONSTRUCTION SWPPP SHALL BE ON THE
JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS.
8. CONTRACTOR SHALL TAKE ALL POSSIBLE CARE TO PROTECT PERSONAL AND ADJACENT PROPERTY
AND TO ENSURE THE SAFETY OF THOSE INVOLVED DIRECTLY OR INDIRECTLY WITH THE WORK.
9. THE CONTRACTOR SHALL PERFORM ANY AND ALL CUTTING, PATCHING, REPAIRING, RESTORING AND
THE LIKE NECESSARY TO RETURN ALL SURFACES AFFECTED BY THE WORK TO THEIR ORIGINAL
CONDITION.
10. DEMOLITION SHALL BE TO THE LIMITS SHOWN ON THE PLANS. THE DEMOLITION LIMITS DEPICTED IN THE PLANS ARE BASED ON THE AVAILABLE INFORMATION OR SURVEY. DEMOLITION LIMITS MAY VARY
DEPENDING ON CHANGED SITE CONDITIONS AT THE TIME OF CONSTRUCTION.
11. EXISTING PAVEMENT, LANDSCAPING, SURFACE OR SUBSURFACE FACILITIES, WITHIN OR ADJACENT TO THE CONTRACTOR'S WORK AREA OR INDICATED ON THE PLANS TO REMAIN SHALL BE PROTECTED FROM DAMAGE. ANY FACILITIES DAMAGED BY THE CONTRACTOR'S ACTIVITIES SHALL BE IMMEDIATELY
REPAIRED TO MATCH ITS ORIGINAL CONDITION AND THE SATISFACTION OF THE CONTRACTING
OFFICER AT NO ADDITIONAL COST TO THE GOVERNMENT.
12. ALL MATERIALS SHALL BE NEW MATERIALS AND PURCHASED IN ACCORDANCE WITH THE BUY
AMERICAN ACT.
13. WRITTEN DIMENSIONS IN SCHEDULES AND DRAWINGS TAKE PRECEDENCE OVER SCALED DRAWINGS.
DO NOT SCALE DRAWINGS, AND BRING ALL DISCREPANCIES TO THE ATTENTION OF THE CONTRACTING
OFFICER AND AWAIT FURTHER INSTRUCTIONS.
14. IT IS THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE THE CONSTRUCTION PHASING AND
STAGING. NO ADDITIONAL COST TO THE OWNER WILL BE PERMITTED FOR THE RELOCATION OF
TRAILERS, STORED MATERIAL, REMOVAL AND REINSTALLATION OF BARRICADES, FENCING, OR ANY OTHER INCIDENTAL ITEMS THAT ARE REQUIRED AND NECESSARY TO ACCOMPLISH THE WORK UNDER THIS CONTRACT. COMPLETE RESTORATION BETWEEN CONSTRUCTION PHASES IS REQUIRED, UNLESS
OTHERWISE DIRECTED BY THE CONTRACTING OFFICER.
15. THE CONTRACTOR SHALL NOTIFY THE COR (CONTRACTING OFFICERS REPRESENTATIVE) OF ANY WORK TO BE PERFORMED IN CONFINED SPACE. CONTRACTOR SHALL CREATE AND SUBMIT INDIVIDUAL CONFINED SPACE WORK PLAN. CONTRACTOR SHALL RECEIVE APPROVAL PRIOR TO BEGINNING WORK.
16. ANY U.S.G.S. OR BASE SURVEY MONUMENTS WITHIN THE LIMITS OF DEMOLITION OR CONSTRUCTION SHALL BE PROTECTED. IF A MONUMENT IS IN DANGER OF BEING DESTROYED AND HAS NOT BEEN
PROPERLY REFERENCED IN THE PLANS, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE
CONTRACTING OFFICER. CONTRACTOR SHALL REPAIR ANY DAMAGED BENCH MARKS IN ACCORDANCE WITH N.O.A.A. NATIONAL GEODETIC SURVEY GUIDELINES, AND TO THE SATISFACTION OF THE
FACILITY'S G.I.S. BENCHMARK REPRESENTATIVE.
17. CONTRACTOR SHALL PROVIDE AND MAINTAIN ACCESS, AT ALL TIMES DURING CONSTRUCTION, TO ALL EXISTING FACILITIES AND THOSE THAT MAY BE UNDER CONSTRUCTION IN THE IMMEDIATE VICINITY.
FIRE TRUCK AND EMERGENCY VEHICLE ACCESS SHALL NOT BE BLOCKED.
18. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR DETERMINING THE ADEQUACY OF EXISTING
STRUCTURES AND UTILITIES TO SUPPORT CONSTRUCTION EQUIPMENT AND LOADS.
19. ALL DEVIATIONS FROM THESE PLANS SHALL BE RECORDED ON A SET OF "AS-BUILT" OR RECORD
REDLINE DRAWINGS. THE CONTRACTOR SHALL SUBMIT "AS-BUILT" REDLINE DRAWINGS TO THE
CONTRACTING OFFICER. THE "AS-BUILT" DRAWINGS SHALL BE CAD DRAFTED AND PROVIDED TO COR
IN PDF AND AUTOCAD FORMAT MEETING JBLM DESIGN STANDARDS.
20. ALL DEMOLITION MATERIAL, INCLUDING PAVEMENT AND EXCESS SOIL, EXCEPT AS NOTED IN THE CONTRACT DRAWINGS / SPECIFICATIONS AND / OR SPECIFIED BY THE CONTRACTING OFFICER, SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND BE COMPLETELY REMOVED AND DISPOSED OF BY
THE CONTRACTOR.
21. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR AND SHALL INSTALL AND MAINTAIN SHORING
AND BRACING NECESSARY TO PROTECT WORKERS, UTILITIES AND OTHER IMPROVEMENTS AND
EXCAVATIONS PER STATE AND FEDERAL REGULATIONS. THE CONTRACTOR SHALL ALSO BE
RESPONSIBLE FOR REMOVAL OF TEMPORARY SHORING AND BRACING.
EXISTING DATA NOTES:
1. THE EXISTING INFORMATION SHOWN ON THESE DRAWINGS HAVE BEEN PREPARED BASED UPON
INFORMATION FURNISHED BY OTHERS. WHILE THIS INFORMATION IS BELIEVED TO BE RELIABLE, GOVERNMENT CANNOT ENSURE ACCURACY AND THUS IS NOT RESPONSIBLE FOR THE ACCURACY OF
THAT INFORMATION OR FOR ANY ERRORS OR OMISSIONS WHICH MAY HAVE BEEN INCORPORATED
INTO THESE DRAWINGS AS A RESULT.
2. THE ENGINEER ASSUMES NO LIABILITY FOR DAMAGES TO ANY UTILITIES DURING CONSTRUCTION. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE TO REPAIR ANY DAMAGES THAT MAY OCCUR DURING
CONSTRUCTION.
3. THE CONTRACTOR MAY CONDUCT TEST PITS (POTHOLE) TO VERIFY EXISTING CONDITIONS. THE
CONTRACTOR SHALL COORDINATE ALL TEST PITS WITH THE COR.
RESTORATION NOTES:
1. RESTORATION SHALL BE IN ACCORDANCE WITH JBLM AND UFC REQUIREMENTS.
2. RESTORE ALL DISTURBED AREAS AS SHOWN ON PLANS OR AS DIRECTED BY THE CONTRACTING
OFFICER.
3. REPAIR ALL UTILITIES DAMAGED BY CONSTRUCTION IN ACCORDANCE WITH CONTRACTING OFFICER'S
REQUIREMENTS.
4. CONTRACTOR SHALL RESTORE THE SITE AND ALL OTHER PHYSICAL FEATURES TO MATCH EXISTING
CONDITIONS WHERE CONSTRUCTION WORK IS PERFORMED.
5. CONTRACTOR TO RETURN DISTURBED SOIL AND LANDSCAPING TO ITS ORIGINAL CONDITION.
DEMOLITION NOTES:
1. PERFORM DEMOLITION IN SUCH MANNER AS TO ELIMINATE HAZARDS TO PERSONS AND
PROPERTY; TO MINIMIZE INTERFERENCE WITH USE OF ADJACENT AREAS, UTILITIES AND
STRUCTURES OR INTERRUPTION OF USE OF SUCH UTILITIES; AND TO PROVIDE FREE PASSAGE TO
AND FROM SUCH ADJACENT AREAS OR STRUCTURES.
2. PROVIDE SAFEGUARDS, INCLUDING WARNING SIGNS, BARRICADES, TEMPORARY FENCES,
WARNING LIGHTS, AND OTHER SIMILAR ITEMS THAT ARE REQUIRED FOR PROTECTION OF ALL
PERSONNEL DURING DEMOLITION AND REMOVAL OPERATIONS.
3. MAINTAIN FENCES, BARRICADES, LIGHTS AND OTHER SIMILAR ITEMS AROUND EXPOSED
EXCAVATIONS UNTIL SUCH EXCAVATIONS HAVE BEEN COMPLETELY FILLED.
4. PREVENT SPREAD OF FLYING PARTICLES AND DUST. SPRINKLE RUBBISH AND DEBRIS WITH WATER
TO KEEP DUST TO A MINIMUM. DO NOT USE WATER IF IT RESULTS IN HAZARDOUS OR
OBJECTIONABLE CONDITIONS SUCH AS, BUT NOT LIMITED TO; ICE, FLOODING OR POLLUTION.
VACUUM, SWEEP, AND DUST THE WORK AREA DAILY.
5. BEFORE BEGINNING ANY DEMOLITION WORK, THE CONTRACTOR SHALL SURVEY THE SITE AND
EXAMINE THE DRAWINGS AND SPECIFICATIONS TO DETERMINE THE EXTENT OF THE WORK. THE
CONTRACTOR SHALL TAKE NECESSARY PRECAUTIONS TO AVOID DAMAGES TO EXISTING ITEMS TO REMAIN IN PLACE, TO BE REUSED, OR TO REMAIN THE PROPERTY OF JBLM; AND DAMAGED ITEMS
SHALL BE REPAIRED OR REPLACED AS APPROVED BY THE CONTRACTING OFFICER
REPRESENTATIVE (COR). THE CONTRACTOR SHALL COORDINATE THE WORK WITH ALL OTHER
WORK AND SHALL CONSTRUCT AND MAINTAIN SHORING, BRACING, AND SUPPORTS AS REQUIRED.
THE CONTRACTOR SHALL ENSURE THAT STRUCTURAL ELEMENTS ARE NOT OVERLOADED AND
SHALL BE RESPONSIBLE FOR INCREASING STRUCTURAL SUPPORTS OR ADDING NEW SUPPORTS
AS MAY BE REQUIRED AS A RESULT OF ANY CUTTING, REMOVAL, OR DEMOLITION WORK
PERFORMED.
6. DEMOLISH AND REMOVE OUTSIDE UTILITY SERVICE LINES SHOWN TO BE REMOVED.
7. REMOVE ABANDONED OUTSIDE UTILITY LINES THAT WOULD INTERFERE WITH INSTALLATION OF
NEW UTILITY LINES AND NEW CONSTRUCTION.
8. COMPLETELY DEMOLISH AND REMOVE BUILDINGS AND STRUCTURES, INCLUDING ALL
APPURTENANCES RELATED OR CONNECTED THERETO, AS NOTED BELOW:
8.A. AS REQUIRED FOR INSTALLATION OF NEW UTILITY SERVICE LINES.
8.B. TO FULL DEPTH WITHIN AN AREA DEFINED BY HYPOTHETICAL LINES LOCATED 5 FT (1500 MM)
OUTSIDE BUILDING LINES OF NEW STRUCTURES.
9. ALL WASTE DEBRIS, UNSUITABLE, AND EXCESS MATERIAL SHALL BE REMOVED FROM THE SITE
AND LAWFULLY DISPOSED OF. DEBRIS, INCLUDING BRICK, CONCRETE STONE, METALS AND
SIMILAR MATERIALS SHALL BECOME PROPERTY OF THE CONTRACTOR AND SHALL BE DISPOSED
OF BY THE CONTRACTOR DAILY, OFF THE BASE TO AVOID ACCUMULATION AT THE DEMOLITION
SITE. MATERIALS THAT CANNOT BE REMOVED DAILY SHALL BE STORED IN AREAS SPECIFIED BY
THE CONTRACTING OFFICERS REPRESENTATIVE. CONTRACTOR SHALL NOTIFY ENGINEER
IMMEDIATELY IF MATERIALS UNCOVERED DURING ANY PART OF THE WORK APPEAR TO BE
CONTAMINATED. ALL LOCAL, STATE AND FEDERAL LAWS SHALL PREVAIL IN THE EVENT OF
CONTAMINATED MATERIALS.
10. BREAK UP CONCRETE SLABS BELOW GRADE THAT DO NOT REQUIRE REMOVAL FROM PRESENT
LOCATION INTO PIECES NOT EXCEEDING 24 INCHES (600 MM) SQUARE TO PERMIT DRAINAGE.
CONTRACTOR SHALL DISPOSE OF DEBRIS IN COMPLIANCE WITH APPLICABLE FEDERAL, STATE
AND LOCAL PERMITS, RULES AND/OR REGULATIONS.
TRAFFIC MANAGEMENT NOTES:
1. ALL ROADWAYS SHALL REMAIN OPEN DURING CONSTRUCTION, UNLESS OTHERWISE APPROVED BY
THE CONTRACTING OFFICER. ROADWAY CLOSURE DURING CONSTRUCTION REQUIRES THE
CONTRACTOR SUBMIT A TRAFFIC CONTROL PLAN FOR REVIEW AND APPROVAL IN ADVANCE. IF
REQUIRED, ALL TEMPORARY TRAFFIC CONTROL DEVICES SHALL BE IN ACCORDANCE WITH THE MOST
CURRENT EDITION OF "MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS AND
HIGHWAYS".
2. THE CONTRACTOR SHALL MAINTAIN A MINIMUM OF ONE MOVING LANE ALONG ROADWAYS AT ALL
TIMES, EXCEPT WHERE GIVEN PERMISSION BY JBLM AND THE CONTRACTING OFFICERS
REPRESENTATIVE.
3. THE CONTRACTOR SHALL PROVIDE ALL SIGNAGE, BARRICADES, CAUTION TAPE, CONES AND
BARRELS REQUIRED TO FACILITATE A SAFE LANE OR SIDEWALK CLOSURE.
4. PEDESTRIAN ACCESS SHALL BE MAINTAINED AND MANAGED DURING SIDEWALK AND CROSSWALK
CLOSURES.
5. ACCESS TO ALL ROADWAYS, DRIVEWAYS AND LOADING RAMPS SHALL BE MAINTAINED DAILY
AFTER CONSTRUCTION ACTIVITIES HAVE CONCLUDED.
6. THE CONTRACTOR SHALL COORDINATE ANY ROADWAY, DRIVEWAY, LOADING RAMP AND/OR
SIDEWALK CLOSURES WITH THE COR PRIOR TO PERFORMING WORK.
7. ALL ROAD CLOSURES SHALL BE OUTSIDE NORMAL WORKING HOURS OF 8:00 AM TO 5:00 PM
MONDAY THROUGH FRIDAY. ROAD CLOSURES AND TRAFFIC CONTROL PLAN SHALL BE APPROVED
BY COR PRIOR TO CONSTRUCTION.
GENERAL UTILITY NOTES:
1. PRIOR TO THE COMMENCEMENT OF CONSTRUCTION, THE CONTRACTOR SHALL VERTICALLY AND
HORIZONTALLY FIELD LOCATE BY POTHOLING AND SURVEY ALL PROPOSED UTILITY CONFLICTS AND CROSSINGS. IF THE EXISTING UTILITY LOCATION DIFFERS FROM WHAT IS SHOWN ON THE PLANS, THE
CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER AND/OR CONTRACTING OFFICER'S
REPRESENTATIVE IMMEDIATELY AND AWAIT FURTHER INSTRUCTIONS.
2. THE CONTRACTOR IS ADVISED THAT ALL EXISTING UNDERGROUND UTILITIES, CABLES, DUCTS, MANHOLES, ETC. (UNDERGROUND FACILITIES) SHOWN ON PLANS WERE LOCATED USING THE BEST INFORMATION AVAILABLE. INFORMATION SHOWN ON THE DRAWING CONCERNING TYPE, SIZE AND LOCATION OF UNDERGROUND UTILITIES IS NOT GUARANTEED TO BE ACCURATE OR ALL-INCLUSIVE, AND IS PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THE CONTRACTOR IS SOLELY RESPONSIBLE
FOR LOCATING AND PROTECTING ALL UTILITIES. CONTRACTOR SHALL BE RESPONSIBLE FOR
CONTACTING GOVERNMENT UTILITY OWNERS TO IDENTIFY UNDERGROUND UTILITIES AND/OR CABLES WITHIN THE PROJECT LIMITS AND STAGING AREAS. THE CONTRACTOR SHALL ASSIST UTILITY OWNERS IN EFFORTS TO FIELD VERIFY UNDERGROUND UTILITIES. CONTRACTOR SHALL ALSO REVIEW ALL
UTILITIES WITH JBLM MAINTENANCE STAFF PRIOR TO BEGINNING WORK. PRIOR TO THE
COMMENCEMENT OF ANY CONSTRUCTION ACTIVITY, THE CONTRACTOR SHALL CONDUCT A FIELD
UTILITY LOCATION SURVEY USING ELECTRONIC, MAGNETIC OR OTHER UNDERGROUND UTILITY
LOCATING PRACTICES. UTILITY OWNERS SHALL BE NOTIFIED AND SHALL HAVE THE OPTION TO ACCOMPANY THIS FIELD INVESTIGATION. EXPLORATORY EXCAVATIONS IN THE VICINITY OF EXISTING UNDERGROUND UTILITIES, PARTICULARLY THOSE ASSOCIATED WITH OPERATING NAVIGATIONAL AIDS, SHALL BE CARRIED OUT WITH HAND TOOLS UNTIL THE EXACT CHARACTER AND LOCATION OF SUCH FACILITIES ARE DETERMINED. ALL INFORMATION SO OBTAINED FROM THIS UTILITY LOCATION SURVEY
SHALL BE FURNISHED TO THE CONTRACTING OFFICER AND CONTRACTING OFFICER'S
REPRESENTATIVE AND THE A/E PRIOR TO CONSTRUCTION.
3. ALL UNDERGROUND CABLE, UTILITIES, AND ASSOCIATED STRUCTURES SHALL BE PROTECTED FROM DAMAGE BY THE CONTRACTOR. ANY DAMAGE TO EXISTING UNDERGROUND CABLES AND/OR UTILITIES
CAUSED BY THE CONTRACTOR (REGARDLESS OF WHETHER THEY WERE LOCATED OR NOT BY THE
COMPUS, UTILITY COMPANY, ETC.) SHALL BE REPAIRED BY THE CONTRACTOR AT THE CONTRACTOR'S OWN EXPENSE AND TO THE SATISFACTION OF THE UTILITY OWNER'S AUTHORIZED REPRESENTATIVES.
ALL EXISTING UTILITIES, CABLE, DUCTS, EQUIPMENT, DEVICES, ETC. OUTSIDE THE AREA OF DEMOLITION OR CONSTRUCTION LIMITS WHICH ARE DAMAGED OR DISRUPTED AS A RESULT OF THE
CONTRACTOR'S OPERATIONS, SHALL BE IMMEDIATELY REPAIRED AT THE EXPENSE OF THE
CONTRACTOR AND TO THE SATISFACTION OF THE UTILITY OWNER'S AUTHORIZED REPRESENTATIVE.
4. ALL UTILITY OUTAGES SHALL BE SCHEDULED AND APPROVED THROUGH THE COR (CONTRACTING
OFFICERS REPRESENTATIVE) PER THE APPLICABLE OUTAGE NOTIFICATION REQUIREMENTS.
5. UNLESS ALREADY SPECIFIED IN THE CONTRACT DRAWINGS, CONTRACTOR SHALL RETROFIT ALL EXISTING UTILITY ACCESS POINTS TO BRING FLUSH WITH FINISHED SURFACE WITHIN AREAS OF WORK IN WHICH THE EXISTING GRADE IS MODIFIED BY CONSTRUCTION. THIS WORK IS CONSIDERED PART OF THE CONTRACTED SCOPE, AND APPLIES TO EXISTING UTILITIES THAT ARE NOT TO BE
DEMOLISHED OR ABANDONED WITHIN THE PROJECT LIMITS.
6. ALL MATERIALS, WORKMANSHIP, AND TESTING SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS
OF THE CONTRACT SPECIFICATIONS.
7. FIELD VERIFY LOCATION (INCLUDING POT HOLING FOR VERTICAL DEPTH) OF EXISTING UTILITIES AND
INVERT ELEVATIONS OF THE POINT OF CONNECTION PRIOR TO CONSTRUCTION.
8. COMPRESSIBLE MATERIALS:
FOR USE IN AREAS ABOVE BURIED PIPES WHERE OTHER PIPES ARE CROSSING WITH LESS THAN 1'-0" VERTICAL SEPARATION OR WHERE CALLED OUT ON DRAWINGS: POLYETHYLENE PLASTIC FOAM IN ACCORDANCE WITH FEDERAL SPECIFICATION PPP-C-1752C, TYPE 1, CLASS 2, SUCH AS "ETHAFOAM".
AT PIPE CROSSINGS, MATERIAL SHALL BE A MIN OF 2-INCH THK, 2-FT WIDE, AND 4-FT LONG, BUT SHALL
BE A MINIMUM OF 6-IN WIDER THAT OUTSIDE DIAMETER OF PIPE ON EACH SIDE.
9. GATE VALVES INSTALLED UNDER PAVEMENT SHALL HAVE A 2-INCH OPERATING NUT AND VALVE BOX W/ COVER FLUSH WITH ASPHALT SURFACE. GATE VALVES INSTALLED IN AREAS WHERE THE SURFACE
IS OTHER THAN ASPHALT OR CONCRETE, TOP OF VALVE BOX SHALL BE EMBEDDED IN A
CAST-IN-PLACE COLLAR THAT IS 3'-0" MIN SQUARE BY 8-INCHES THICK PLACED ON 4-INCH THICK (MIN)
COMPACTED BASE COURSE WITH SURFACE FLUSH WITH EXISTING GRADE
10. TESTING OF ALL INSTALLED UTILITY LINES AND STRUCTURES SHALL BE IN ACCORDANCE WITH
CONTRACT SPECIFICATIONS.
11. ANY REVISIONS TO THESE PLANS, ONCE APPROVED BY THE ENGINEER OF RECORD, SHALL BE
REVIEWED AND RE-APPROVED BY THE CONTRACTING OFFICER.
12. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR UTILITY TRENCH SAFETY INCLUDING SHORING (IF REQUIRED) DESIGNED BY A REGISTERED ENGINEER AND WORKER SAFETY WHILE WORKING WITHIN
THE TRENCH.
GRADING & BACKFILL NOTES:
1. BACKFILL MATERIAL SHALL NOT CONTAIN PETROLEUM PRODUCTS, OR SUBSTANCES WHICH ARE
HAZARDOUS, DANGEROUS, TOXIC, OR WHICH OTHERWISE VIOLATE ANY STATE, FEDERAL. OR LOCAL
LAW, ORDINANCE, CODE, REGULATION, RULE, ORDER, OR STANDARD.
2. GENERAL SITE BACKFILL MATERIAL SHALL MEET JBLM REQUIREMENTS FOR EARTHWORK AND BE IN
ACCORDANCE WITH THE RECOMMENDATIONS IN THE ORIGINAL GEOTECHNICAL REPORT FOR THIS
PROJECT.
3. SLOPE FINISH GRADE SURFACES UNIFORMLY BETWEEN ELEVATIONS SHOWN ON DRAWINGS UNLESS SPECIFIED OTHERWISE. GRADE AREAS TO ELIMINATE LOW SPOTS AND MAINTAIN POSITIVE DRAINAGE
AWAY FROM BUILDING AND STRUCTURES.
SECURITY:
1. THE CONTRACTOR SHALL COMPLY WITH ALL REQUIREMENTS OF THE JBLM SECURITY PROGRAM.
2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR BRIEFING ALL CONTRACTOR'S PERSONNEL OF THE JBLM SECURITY REQUIREMENTS. ALL NEW CONTRACTOR EMPLOYEES SHALL BE BRIEFED ON THESE
REQUIREMENTS PRIOR TO WORKING IN THE CONSTRUCTION AREA.
3. CONTRACTOR IS SOLELY RESPONSIBLE FOR SECURING JOBSITE AT ALL TIMES THROUGHOUT
CONSTRUCTION.
La st
S av ed b y:
U
SR
M o n:
O ct
, 2
4:
P
F ile
: C :\U se rs
\U
SR
M
\W
SP
O
5\ Fe de ra l G ro up
Jo bs
\3
8\
\C
AD
D
\D w gs \E xp or ts \2
5.
.3
- b ou nd a nd s ep ar at ed \C iv il\
JB
LM
A
TC
T
- J
8_ C
-0
.d w g
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
FI
LE
N
AM
E:
SO
LI
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
US Army Corps of Engineers
D
ES
C R
IP
TI
O N
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
W
SP
U
SA
In c.
Su ite
Ta co m a, W A
TE
L:
(2
) 4
-2
FA
X:
(2
) 4
-2
P ac ifi c
Av en ue
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
IJ
O
J0
_C
-0
.D W
G
TB
D
PBR
D
M
PB
C
IV
IL
S
H
EE
T
IN
D
EX
A N
D G
EN
ER
AL
N
O
TE
S
C-001 J00008
0%
E
LE
C
TR
O N
IC
B
ID
S
ET
JO
IN
T
BA
SE
L
EW
IS
-M cC
H O
R D
, W
AS
H
IN
G
TO
N
JB
LM
A
TC
T
H
VA
C R
EP
AI
R S
D
EJ
J
SE
AT
TL
E
D
IS
TR
IC
T
SE
AT
TL
E, W
AS
H
IN
G
TO
N
9/
/2
FA
F0
FA
D
AN
SI
D
D
EJ
J
GENERAL NOTES:
1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SITE SECURITY AND JOB SAFETY. CONSTRUCTION ACTIVITIES SHALL BE IN ACCORDANCE WITH OSHA
STANDARDS, STATE AND LOCAL REQUIREMENTS. THE CONTRACTOR SHALL PROVIDE FENCING OR BARRIERS WHEN CONSTRUCTION IS BEING PERFORMED
ADJACENT TO BUILDING ENTRANCES/WALKWAYS.
2. THE CONTRACTOR SHALL NOT COMMENCE CONSTRUCTION NOR CLOSE OR OBSTRUCT ROADWAYS, SIDEWALKS AND/OR FIRE HYDRANTS WITHOUT
APPROPRIATE PERMITS AND/OR PERMISSIONS.
3. AREAS OUTSIDE THE LIMITS OF PROPOSED WORK THAT BECOME DISTURBED BY THE CONTRACTOR'S OPERATIONS SHALL BE RESTORED BY THE
CONTRACTOR TO ITS ORIGINAL CONDITION AT THE CONTRACTOR'S EXPENSE.
4. VEGETATED AREAS DISTURBED DURING CONSTRUCTION SHALL RECEIVE A MINIMUM OF FOUR (4) INCHES OF TOPSOIL. THESE ARES SHALL BE IMMEDIATELY
SEEDED AND STABILIZED.
5. DAMAGE TO SURFACE FEATURES, SUBSURFACE FEATURES AND SUBSURFACE INFRASTRUCTURE RESULTING FROM CONSTRUCTION LOADS SHALL BE
REPAIRED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER.
6. THE CONTRACTOR SHALL CONTROL STORMWATER RUNOFF DURING CONSTRUCTION TO PREVENT ADVERSE IMPACTS TO OFF-SITE AREAS, AND SHALL BE
RESPONSIBLE TO REPAIR RESULTING DAMAGES, IF ANY, AT NO COST TO OWNER.
7. THE CONTRACTOR IS REQUIRED TO BACKFILL TRENCHES OR SECURE WITH METAL PLATES OR CONSTRUCTION FENCE DAILY. NO OPEN TRENCHES SHALL
BE LEFT UNATTENDED.
8. THE CONTRACTOR IS RESPONSIBLE FOR ALL FIELD MEASUREMENTS. THE GOVERNMENT WILL NOT BE HELD RESPONSIBLE FOR BIDDING ERRORS MADE OR FOR THE FAILURE TO ADEQUATELY INSPECT THE JOB SITE FOR EXISTING CONDITIONS, DIMENSIONS, AND GRADES.
9. THE CONTRACTOR SHALL VERIFY THE PROPOSED LAYOUT WITH ITS RELATIONSHIP TO THE EXISTING SITE. THE CONTRACTOR SHALL ALSO VERIFY ALL DIMENSIONS, SITE CONDITIONS, AND MATERIAL SPECIFICATIONS AND SHALL NOTIFY THE OWNER AND ENGINEER OF ANY DISCREPANCIES BEFORE
COMMENCING OR PROCEEDING WITH WORK.
10. THE CONTRACTOR SHALL NOTIFY OPERATORS WHO MAINTAIN UNDERGROUND UTILITY LINES IN THE AREA OF PROPOSED EXCAVATION AT LEAST TWO WORKING DAYS, BUT NOT MORE THAN TEN WORKING DAYS, PRIOR TO COMMENCEMENT OF EXCAVATION OR DEMOLITION. ALL WATER, GAS, SEWER, ELECTRIC AND OTHER UTILITIES SHALL BE MAINTAINED AT ALL TIMES DURING CONSTRUCTION.
11. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPLACING, WITH MATCHING MATERIALS, ANY PAVEMENT, WALKS, CURBS, ETC. THAT SHALL BE CUT OR
THAT ARE DAMAGED DURING CONSTRUCTION.
12. CONSTRUCTION ACTIVITIES SHALL NOT CONFLICT WITH THE JBLM OPERATIONS AND EMPLOYEE/STAFF PARKING. THE CONTRACTOR SHALL COORDINATE ALL WORK WITH THE COR. WORK AFFECTING BUILDING ENTRANCES, WALKWAYS, LOADING AREAS, PARKING, ETC. SHALL BE COORDINATED AND
SCHEDULED WITH THE COR.
13. THE CONTRACTOR SHALL MAINTAIN RECORD DOCUMENTS OF CONSTRUCTION CHANGES ("AS-BUILT DRAWINGS") AND SHALL PROVIDE SAID DOCUMENTATION TO THE ENGINEER UPON COMPLETION OF CONSTRUCTION IN BOTH DIGITAL AND HARD COPY FORMATS. RECORD DOCUMENTS SHALL ARTICULATE WHERE ACTUAL INSTALLATION OF WORK, PRODUCTS AND/OR SYSTEMS VARY FROM THE DESIGN INTENT EXPRESSED/SPECIFIED IN THE
CONTRACTOR DOCUMENTS. **NO EXCEPTION ALLOWED**
14. ANY EXISTING PROPERTY LINE MONUMENTATION DISTURBED DURING CONSTRUCTION SHALL BE RESET BY A PROFESSIONAL LICENSED SURVEYOR AT THE
CONTRACTOR'S EXPENSE.
15. THE CONTRACTOR SHALL PROTECT THE PROPERTY FROM DUST AND DAMAGE AT ALL TIMES. ANY RESULTING DAMAGE TO THE PROPERTY SHALL BE
IMMEDIATELY CORRECTED BY THE CONTRACTOR AT THE CONTRACTOR'S EXPENSE.
CONTRACTORS ACCESS & STORAGE AREAS:
1. THE CONTRACTOR SHALL COORDINATE WITH THE COR FOR EXACT LOCATION OF STAGING AREA(S) TO BE USED DURING CONSTRUCTION FOR STORAGE / STOCKPILING OF MATERIALS. CONTRACTOR SHALL NOTIFY THE COR PRIOR TO OCCUPYING STAGING AREA. THE CONTRACTOR SHALL VERIFY WITH THE CONTRACTING OFFICER'S REPRESENTATIVE OF ANY CHANGES IN STAGING / LAYDOWN AREAS THAT MAY HAVE OCCURRED AFTER PLANS WERE ISSUED.
2. UPON COMPLETION OF THE WORK, THE STAGING AREAS SHALL BE CLEANED AND RESTORED TO THEIR ORIGINAL CONDITION.
3. CONTRACTOR SHALL PROVIDE TEMPORARY SECURITY FENCING AROUND THE CONSTRUCTION STAGING AREAS WHERE REQUIRED BY COR. CONTRACTOR TO COORDINATE PRIVACY FABRIC REQUIREMENTS WITH COR. CONTRACTOR SHALL BE AWARE OF THE VERTICAL HEIGHTS OF OBJECTS NEAR FENCE LINES;
NO EQUIPMENT OR MATERIAL SHALL BE PLACED NEAR FENCE LINES THAT WOULD ALLOW THE FENCE TO BE SCALED. MAINTAIN A 10 FOOT MINIMUM SEPARATION FROM ALL FENCES FROM STOCKPILES, PARKED VEHICLES, OR OTHER MATERIALS WHICH COULD BE CLIMBED. POST A METALLIC SIGN
DISPLAYING THE CONTRACTOR'S 24 HOUR EMERGENCY CONTACT NUMBER.
4. ALL CONTRACTOR'S MATERIAL ORDERS FOR DELIVERY TO THE SITE SHALL USE THE ACCESS POINT AS DETERMINED BY THE COR. ALL ASSOCIATED FEES AND COSTS SHALL BE PAID BY CONTRACTOR AND ARE CONSIDERED INCIDENTAL TO THE VARIOUS BID ITEMS.
5. CONTRACTOR SHALL BE RESPONSIBLE FOR TRAFFIC CONTROL TO AND FROM THE CONSTRUCTION AND STAGING AREAS. THE TRAFFIC CONTROL MEASURES SHALL BE DIRECTED AND APPROVED BY THE CONTRACTING OFFICER AND/OR CONTRACTING OFFICER'S REPRESENTATIVE.
6. CONTRACTOR SHALL COORDINATE LOCATION(S) OF SOIL STOCKPILE AREAS WITH THE CONTRACTING OFFICER IN ADVANCE OF CONSTRUCTION START. AT A MINIMUM, SOIL STOCKPILES WILL CONSIST OF CLEAN IMPORTED FILL, AND EXCAVATED SOILS WAITING FOR REUSE OR OFF-SITE DISPOSAL, AND STOCKPILES SHALL BE ADEQUATELY SEPARATED FROM EACH OTHER WITHIN THE STOCKPILE AREA(S).
CONTRACTOR'S VEHICLES:
1. CONTRACTOR'S VEHICLES SHALL BE IN GOOD WORKING ORDER. CONTRACTOR'S PERSONNEL SHALL PARK WITHIN THE CONTRACTOR'S STAGING AREA OR
AREAS APPROVED BY THE COR.
2. ALL TRUCKS AND/OR ASSOCIATED VEHICLE HAULING TOOLS, LABOR, EQUIPMENT, MATERIAL OR DEBRIS ON JBLM SHALL BE EQUIPPED AND PREPARED TO PREVENT SPILLAGE OF DEBRIS DURING TRANSPORTATION. TRUCK BEDS SHALL BE SWEPT CLEAN BEFORE LEAVING THE WORK AREA. SIDEBOARDS SHALL BE KEPT IN GOOD REPAIR. UNDER NO CIRCUMSTANCES SHALL A VEHICLE BE LOADED BEYOND ITS LEGAL LIMITS OR HIGHER THAN THE SIDEBOARDS.
TEMPORARY EROSION AND SEDIMENT CONTROL NOTES:
1. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN TEMPORARY EROSION AND SEDIMENT CONTROL (TESC) FACILITIES. REFER TO THE APPLICABLE
DRAWINGS AND THE SPECIFICATIONS FOR PLANS AND DETAILS THAT DESCRIBE THE MINIMUM TESC FEATURES REQUIRED. AS CONSTRUCTION PROGRESSES AND SEASONAL CONDITIONS DICTATE, THE CONTRACTOR SHALL REVISE TESC FACILITIES AND CONFIGURATIONS AS NECESSARY TO ENSURE COMPLETE SILTATION CONTROL AND THAT NO SEDIMENT LADEN WATER ENTERS THE DOWNSTREAM NATURAL OR PIPED DRAINAGE SYSTEM.
2. DURING THE COURSE OF CONSTRUCTION, IT SHALL BE THE OBLIGATION AND RESPONSIBILITY OF THE CONTRACTOR TO ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED BY ITS ACTIVITIES AND TO PROVIDE ADDITIONAL TESC FACILITIES THAT MAY BE NEEDED TO PROTECT THE SITE, ADJACENT LAND AND EXISTING DRAINAGE FEATURES.
3. TEMPORARY EROSION/WATER POLLUTION PREVENTION MEASURES MUST BE REQUIRED IN ACCORDANCE WITH THE CURRENT ENVIRONMENTAL PROTECTION AGENCY'S (EPA) CONSTRUCTION STORMWATER GENERAL PERMIT AND THE APPLICABLE STATE STANDARDS OR MANUAL. DURING THE COURSE OF CONSTRUCTION, IT MUST BE THE OBLIGATION AND RESPONSIBILITY OF THE CONTRACTOR TO ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED BY ITS ACTIVITIES AND TO PROVIDE ADDITIONAL TESC FACILITIES THAT MAY BE NEEDED TO PROTECT THE SITE, ADJACENT LAND, AND
EXISTING DRAINAGE FEATURES.
4. THE CONTRACTOR SHALL ENSURE THE TEMPORARY EROSION AND SEDIMENTATION CONTROL MEASURES AS SHOWN ON THESE DRAWINGS PROVIDE ADEQUATE CONTROL SO THAT NO SEDIMENT LADEN WATER LEAVES THE SITE. THE CONTRACTOR MUST INSTALL ADDITIONAL FACILITIES AS NECESSARY TO PROTECT ADJACENT PROPERTIES, SENSITIVE AREAS, NATURAL WATER COURSES, AND/OR STORM DRAINAGE SYSTEMS TO ENSURE COMPLETE
SILTATION CONTROL.
5. PRIOR TO STARTING ANY WORK ON THE SITE, THE CONTRACTOR SHALL NOTIFY THE OWNER AND SHALL INSTALL ALL EROSION AND SEDIMENT CONTROL MEASURES AS SHOWN ON THE APPROVED PLANS. ALL TEMPORARY EROSION CONTROL MEASURES MUST BE MAINTAINED FOR THE DURATION OF
PROJECT CONSTRUCTION.
6. THE BMP FACILITIES SHOWN ON THIS PLAN MUST BE CONSTRUCTED IN CONJUNCTION WITH ALL CLEARING AND GRADING ACTIVITIES, AND IN SUCH A MANNER AS TO ENSURE THAT SEDIMENT AND SEDIMENT LADEN WATER DO NOT ENTER THE DRAINAGE SYSTEM, ROADWAYS, OR VIOLATE APPLICABLE
WATER STANDARDS.
7. PROVIDE STRAW WATTLE AND COMPOST FILTER SOCK SEDIMENT CONTROL MEASURES OR OTHER APPROVED PERIMETER PROTECTION SEDIMENT CONTROL MEASURES FOR EXISTING DRAINAGE CHANNELS NEARBY OR ADJACENT TO THE PROJECT SITE.
8. PROVIDE INLET PROTECTION AT ALL AREA STORM DRAIN STRUCTURES IN THE AREA OF CONSTRUCTION.
9. THE BMP FACILITIES MUST BE INSPECTED DAILY AND AFTER STORM EVENTS BY THE APPLICANT/CONTRACTOR AND MAINTAINED AS NECESSARY TO ENSURE THEIR CONTINUED FUNCTIONING. WRITTEN RECORDS MUST BE KEPT OF MONTHLY REVIEWS.
10. THE CONTRACTOR MUST BE RESPONSIBLE FOR CLEANING DIRT, MUD, AND OTHER CONSTRUCTION DEBRIS, WHICH MAY ACCUMULATE ON PAVED STREETS ADJACENT TO THE SITE AS A RESULT OF THE CONSTRUCTION ACTIVITY. AS A MINIMUM, DIRT, MUD AND OTHER DEBRIS MUST BE REMOVED
FROM PAVEMENT AT THE CLOSE OF EACH CONSTRUCTION DAY.
11. EXPOSED SLOPES AND SURFACES MUST BE STABILIZED FROM SEDIMENT TRANSPORT USING APPROVED BMPS UNTIL THE SITE HAS BEEN STABILIZED AND THE CONTRACTING OFFICER APPROVES THE REMOVAL OF SLOPE STABILIZATION MEASURES.
12. THE CONTRACTOR MUST BE RESPONSIBLE TO ENSURE THAT NO SEDIMENT LADEN RUNOFF LEAVES THE CONSTRUCTION SITE, WORK AREA, OR HAUL ROUTES. THE CONTRACTOR MUST SUBMIT A SEDIMENT AND WATER POLLUTION PREVENTION PLAN TO THE CONTRACTING OFFICER FOR APPROVAL
PRIOR TO BEGINNING ANY WORK.
13. THE CONTRACTOR MUST BE RESPONSIBLE FOR DEWATERING OF ANY EXCAVATION DURING INCLEMENT WEATHER. DEWATERING WATER MUST BE TESTED AND DISPOSED OF IN ACCORDANCE WITH STATE ENVIRONMENTAL REQUIREMENTS ACCORDING TO THE APPROVED SWPPP PLAN.
14. REMOVE ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES ONCE THE SITE IS STABILIZED AFTER CONSTRUCTION COMPLETION.
CIVIL PROPOSED LEGEND
CHILLER AND ELECTRICAL LINES
CHAIN LINK FENCE
CONCRETE PAVEMENT
CLEARING LIMITS W/ SILT FENCE
CLEARING LIMITS W/ FIBER ROLLS
STORM DRAIN INLET PROTECTION
E
SAN
W
F
SD
CIVIL EXISTING LEGEND
POWER LINE
POWER POLE
LIGHT POLE
WATER LINE
WATER VALVE
FIRE SUPPRESSION LINE
FIRE HYDRANT
SANITARY SEWER LINE
SANITARY SEWER MANHOLE
STORM DRAIN LINE
STORM DRAIN INLET
STORM DRAIN MANHOLE
BOLLARD
FENCE
ASPHALT PAVEMENT
CONCRETE PAVEMENT
X
X
CHWS
SF
CB
D
S
La st
S av ed b y:
U
SR
M o n:
S ep
9, 1:
: C
:\U se rs \U
SR
M
\W
SP
O
5\
Fe de ra l G ro up
Jo bs \3
8\
\C
AD
D \D w gs
\J
BL
M A
TC
T
- J
C iv il.
dw g
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
FI
LE
N
AM
E:
SO
LI
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
US Army Corps of Engineers
D
ES
C R
IP
TI
O N
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
W
SP
U
SA
In c.
Su ite
Ta co m a, W A
TE
L:
(2
) 4
-2
FA
X:
(2
) 4
-2
P ac ifi c
Av en ue
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
IJ
O
J0
_C
-0
.D W
G
TB
D
PBR
D
M
PB
C
IV
IL
G
EN
ER
AL
N
O
TE
S
AN
D L
EG
EN
D
C-002 J00008
0%
E
LE
C
TR
O N
IC
B
ID
S
ET
JO
IN
T
BA
SE
L
EW
IS
-M cC
H O
R D
, W
AS
H
IN
G
TO
N
JB
LM
A
TC
T
H
VA
C R
EP
AI
R S
D
EJ
J
SE
AT
TL
E
D
IS
TR
IC
T
SE
AT
TL
E, W
AS
H
IN
G
TO
N
9/
/2
FA
F0
FA
D
AN
SI
D
D
EJ
SAN
SAN
SAN
W
COMM
COMM
COMM
COMM
COMMC
O
M M
C O
M M
C O
M M
C O
M M
C O
M M
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
E
E
E
E
E
E
SD
SD SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
W
W
W
W
W
W
W
W
W
W W W W W
F
AFFF
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W
W W W
W
W
W
W
W
W
W
W
X
X
X
X
X X
AF
FF
BLDG 8
WW
SAN
SAN
SAN
W
COMM
COMM
COMM
COMMC
O
M M
C O
M M
C O
M M
C O
M M
C O
M M
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMMC
O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
E
E
E
E
E
E
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
W
W W
W
W
W
W
W
W
W W W W W
F
AFFF
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W
W W W
W
W
W
W
W
W
W
W
X
X
X
X
X X
BLDG 8
WW
DEMOLITION KEYNOTES
SAWCUT AND DEMOLISH EXISTING CONCRETE FOR NEW CONCRETE PADS
EXISTING CONCRETE PAD TO BE DEMOLISHED
1" = 10' scale feet
2010010
J00008 MECHANICAL YARD - DEMOLITION PLANH1
CS101 SCALE: 1" = 10'
J00008 MECHANICAL YARD - SITE PLANA1
CS101 SCALE: 1" = 10'
SITE KEYNOTES
CHILLER CONCRETE PAD, SEE STRUCTURAL PLANS
2 TRANSFORMER CONCRETE PAD, SEE STRUCTURAL PLANS
3 TRANSFER SWITCHES CONCRETE HOUSEKEEPING PAD, SEE STRUCTURAL
PLANS
4 GENERATOR CONCRETE HOUSEKEEPING PAD, SEE STRUCTURAL PLANS
La st
S av ed b y:
U
SR
M o n:
S ep
9, 1:
: C
:\U se rs \U
SR
M
\W
SP
O
5\
Fe de ra l G ro up
Jo bs \3
8\
\C
AD
D \D w gs
\J
BL
M A
TC
T
- J
C iv il.
dw g
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
FI
LE
N
AM
E:
SO
LI
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
US Army Corps of Engineers
D
ES
C R
IP
TI
O N
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
W
SP
U
SA
In c.
Su ite
Ta co m a, W A
TE
L:
(2
) 4
-2
FA
X:
(2
) 4
-2
P ac ifi c
Av en ue
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
IJ
O
J0
_C
S1
.D W
G
TB
D
PBR
D
M
PB
C
IV
IL
S
IT
E
PL
AN
CS100
J00008
0%
E
LE
C
TR
O N
IC
B
ID
S
ET
JO
IN
T
BA
SE
L
EW
IS
-M cC
H O
R D
, W
AS
H
IN
G
TO
N
JB
LM
A
TC
T
H
VA
C R
EP
AI
R S
D
EJ
J
SE
AT
TL
E
D
IS
TR
IC
T
SE
AT
TL
E, W
AS
H
IN
G
TO
N
9/
/2
FA
F0
FA
D
AN
SI
D
D
EJ
La st
S av ed b y:
U
SJ
M o n:
A ug
5, 9:
: C
:\U se rs \U
SR
M
\W
SP
O
5\
Fe de ra l G ro up
Jo bs \3
8\
\C
AD
D \D w gs
\2 0_
S-
1.
dw g
58056
PR
A
BHANJAN B. W
A
G
HST
AT
E OF WASHINGTON
R EGISTER ED
PROFESSIONAL ENGIN
EER
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
FI
LE
N
AM
E:
SO
LI
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
US Army Corps of Engineers
D
ES
C R
IP
TI
O N
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
W
SP
U
SA
In c.
Su ite
Ta co m a, W A
TE
L:
(2
) 4
-2
FA
X:
(2
) 4
-2
P ac ifi c
Av en ue
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
IJ
O
_S
-0
.D W
G
TB
D
D D
V
JK
M
PB
W
ST
R
U C
TU
R
AL
G
EN
ER
AL
N
O
TE
S
S-001 J00008
0%
E
LE
C
TR
O N
IC
B
ID
S
ET
JO
IN
T
BA
SE
L
EW
IS
-M cC
H O
R D
, W
AS
H
IN
G
TO
N
JB
LM
A
TC
T
H
VA
C R
EP
AI
R S
D
EJ
J
SE
AT
TL
E
D
IS
TR
IC
T
SE
AT
TL
E, W
AS
H
IN
G
TO
N
9/
/2
FA
F0
FA
D
AN
SI
D
D
EJ
La st
S av ed b y:
U
SJ
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .