Project #18: Madigan CDC Back-Up Power Building 6995

This is a project scope document for the installation of an emergency backup generator system at Building 6995, a child development facility at Joint Base Lewis-McChord (JBLM) in Washington. Building 6995 is designated as a Critical Asset and requires uninterrupted backup power to support sustained mission operations during emergencies.

Generator and Primary Equipment Requirements:

The project requires procurement and installation of a new diesel-powered emergency generator with a minimum capacity of 500kW at 208Y/120V, 3-phase to support the building's existing 1600-amp service. The generator must include an integrated double-wall sub-base fuel tank meeting Washington State environmental compliance standards, with fuel capacity sufficient for a minimum 48-hour continuous runtime, energy-efficient block heaters, and a site gauge. The generator controller must interface with the Enterprise Energy Data Reporting System (EEDRS) using Modbus communications protocols per JBLM specifications. A remote emergency stop switch must be installed on the generator enclosure exterior per NEC Section 445.19(B). The generator should include electrical packages with GFCI convenience receptacles and lights.

Switching and Metering Equipment:

The scope includes a 3-way manual transfer switch (1600A, 208Y/120V, NEMA 3R) to enable safe isolated load banking testing and connection of portable backup generators. A new 1600A, 208Y/120V automatic transfer switch (ATS) with isolation bypass and 4-pole configuration (NEMA 3R) must also be installed. An arc flash study is required for newly installed equipment. The existing EEDRS and JACE metering systems require replacement to interconnect with the generator set and provide real-time metering and generator performance data to building automation systems. The current metering system is in failing condition due to corrosion, power surges, and lack of preventive maintenance. EEDRS JACE installation is mandated per UFC 3-400-01 and JBLM Design Standards for code compliance. All work must comply with current editions of NFPA 110, 70, 70E, and JBLM Design Standards.

View the file

Other files

File Type Posted
Project 4_Attachment 0008 Scopes_14 May 2026.pdf PDF
QA_JBLM FORGE_20260518.pdf PDF
Project 17_Attachment 0021 Scopes_15 May 2026.pdf PDF
JBLM_FORGE_RPP_Amendment 3.pdf PDF
Project 14_Attachment 0018 Scopes_11 May 2026.pdf PDF
ATTACH0003 MICC_CONSTRUCTION_OTA_TC_FORGE ver05122026.pdf PDF
Project 15_Attachment 0019 Scopes_11 May 2026.pdf PDF
Project 1_Attachment 0005 D Scopes_11 May 2026.pdf PDF
Project 9_Attachment 0013 Scopes_11 May 2026.pdf PDF
Project 2_Attachment 0006 Scopes_10 May 2026.pdf PDF
Project 3_Attachment 0007 Scopes_10 May 2026.pdf PDF
JBLM_FORGE_RPP_Amendment 2.pdf PDF
Project 6_Attachment 0010 Scopes_11 May 2026.pdf PDF
JBLM_FORGE_RPP_Amendment_1.pdf PDF
QA_JBLM FORGE_20260428.pdf PDF
Project 1_Attachment 0005 A Scopes_07 Apr 2026.pdf PDF
FORGE Site Visits.pdf PDF
Special Notice JBLM Site Visit.pdf PDF
JBLM FORGE Site Visit Registration 20260422.xlsx XLSX spreadsheet
Project 1_Attachment 0005 B Scopes_07 Apr 2026.pdf PDF
Project 1_Attachment 0005 C Scopes_07 Apr 2026.pdf PDF
Project 4_Attachment 0008 Scopes_07 Apr 2026.pdf PDF
Project 17_Attachment 0021 Scopes_07 Apr 2026.pdf PDF
Project 10_Attachment 0014 Scopes_07 Apr 2026.pdf PDF
JBLM_FORGE_RPP_04172026.pdf PDF
Project 12_ Attachment 0016 Scopes_07 Apr 2026.pdf PDF
ATTACH0004 JBLM FORGE CLIN STRUCTURE.xlsx XLSX spreadsheet
Project 13_ Attachment 0017 Scopes_07 Apr 2026.pdf PDF
Project 1_Attachment 0005 A Scopes_07 Apr 2026.pdf PDF
Project 3_ Attachment 0007 Scopes_07 Apr 2026.pdf PDF
Project 8_ Attachment 0012 Scopes_07 Apr 2026.pdf PDF
Project 5_Attachment 0009 Scopes_07 Apr 2026.pdf PDF
Project 16_ Attachment 0020 Scopes_07 Apr 2026.pdf PDF
Project 15_Attachment 0019 Scopes_07 Apr 2026.pdf PDF
Project 1_Attachment 0005 B Scopes_07 Apr 2026.pdf PDF
Project 19_Attachment 0023 Scopes_07 Apr 2026.pdf PDF
Project 1_Attachment 0005 C Scopes_07 Apr 2026.pdf PDF
Project 6_ Attachment 0010 Scopes_07 Apr 2026.pdf PDF
ATTACH0003 MICC_CONSTRUCTION_OTA_TC_FORGE ver04082026.pdf PDF
Project 2_ Attachment 0006 Scopes_07 Apr 2026.pdf PDF
ATTACH0002_Contract 01 Specifications_JBLMFORGE_RPP.pdf PDF
Project 7_ Attachment 0011 Scopes_07 Apr 2026.pdf PDF
Project 11_ Attachment 0015 Scopes_07 Apr 2026.pdf PDF
ATTACH0001_FY26 JBLM FORGE - Project List 20260414.xlsx XLSX spreadsheet
Project 9_ Attachment 0013 Scopes_07 Apr 2026.pdf PDF
Project 14_Attachment 0018 Scopes_07 Apr 2026.pdf PDF
MICC_JBLM_FORGE_INDUSTRYDAY_SAM.GOV NONCUI.pdf PDF
Pages 601-700 from Attachment 004 Project Scopes.pdf PDF
Pages 1-500 from Attachment 004 Project Scopes.pdf PDF
Pages 701-900 from Attachment 004 Project Scopes.pdf PDF
Show 40 more

Latest 50 of 66 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project #18: Madigan CDC Back Up Power Building 6995

Project Title: Madigan Back-Up Generator

Project Scope:

Building 6995 is on the JBG CriƟcal Asset List and therefore authorized to have an emergency backup generator. The building requires backup power to provide uninterrupted power to support sustained mission operaƟons during emergency operaƟons.

Building 6995 has a 1600Amp 208Y/120 service.

Provide and install a new diesel-powered emergency generator providing stand-by power support to the whole building with a minimum set raƟng: 500kW, 208Y/120V, 3PH

The new generator shall have an integrated sub-base fuel tank incorporaƟng double-wall

Washington State environmentally compliant construcƟon. The fuel capacity for the sub-base fuel tank shall provide a minimum ‘run-Ɵme’ of 48-conƟnuous hours and incorporaƟng ‘Energy

Efficient’ Block Heaters and site gauge as sub-base fuel tank.

Generator controller shall be capable to interface the generator set to Enterprise Energy Data

ReporƟng System (EEDRS) equipment using Modbus communicaƟons protocols in accordance with JBLM 26 27 13.10 30 Rev 11, Para 3.3.8. Generators must have a remote emergency stop switch to shut down the prime mover, and it shall be installed on the exterior of the generator enclosure per NEC SecƟon 445.19(B). The new Generator should include electrical packages inside of the generator which included GFCI convenience receptacles and lights.

Provide and install a 3-way manual transfer switch, 1600A, 208Y/120V to allow safe isolated load banking tesƟng and connecƟon of a portable backup generator Ɵed in at the same Ɵme.

(NEMA 3R)

Provide and install a new 1600A, 208Y/120V ATS. The new ATS shall have isolaƟon bypass with 4 pole configuraƟon. (NEMA 3R)

Provide arc flash study for newly installed equipment.

The advanced metering system - Enterprise Energy Data ReporƟng System (EEDRS) and JACE require replacement to interconnect with the generator set. The intent of this is to provide the metering data and generator data to the local engineering staff first within the building automaƟon system that can execute applicaƟon programs to affect savings and able track energy usage. Electricity derived from a generator is charged at a different rate than uƟlity provided power. EEDRS is used to monitor generator output. It allows them to ensure the generator is performing properly and not producing unsaƟsfactory power that could cause damage to other building systems. The metering system in Building 6995 is in failing condiƟon due to corrosion, power surges, lack of preventaƟve maintenance, and general failures as display non funcƟonal, date and Ɵme in the meter get driŌed, and clearance provided between name plate and the casing of the meter was not enough that create an unsafe system.

AddiƟonally, it can no longer be calibrated due to age. EEDRS JACE is a requirement per UFC 3-

400-01 and JBLM Design Standards to be code-compliant with the installaƟon of metering.

All work shall comply with the most current ediƟons of NFPA 110, 70, 70E, and JBLM Design

Standard i'rans11o

�BN

r?

5,5

0� _1/ �- \ f·

I--.

.. ---s�

,-li11:t_? -··, .. - r·

.9.

ADMN

257 sf

ADMN

91 sf

ADMN

91 sf

ADMN

98 sf

ADMN

156 sf

ADMN

67 sf

ADMN

190 sf

LDRY

143 sf

MLTI

736 sf

RECP

270 sf

MLTI

561 sf

ACON

301 sf

LNGE

389 sf

MLTI

394 sf

CDCC

1013 sf

CDCC

1013 sf

CDCC

1013 sf

CDCC

1013 sf

CDCC

902 sf

CDCC

891 sf

CDCC

1013 sf

CDCC

873 sf

CDCC

879 sf

CDCC

869 sf

CDCC

860 sf

CDCC

612 sf

CDCC

636 sf

CDCC

614 sf

CDCC

578 sf

CDCC

581 sf

CDCC

745 sf

CDCC

653 sf

CDCC

653 sf

KITC

1021 sf

LDRY

149 sf

LNGE

345 sf

BATH

45 sf

HCBA

69 sf

BATH

56 sf

MECH

51 sf

BATH

49 sf

BATH

49 sf

BATH

49 sf

BATH

49 sf

BATH

49 sf

BATH

49 sf

BATH

49 sf

BATH

49 sf

BATH

49 sf

BATH

49 sf

BATH

54 sf

BATH

54 sf

BATH

49 sf

BATH

49 sf

TCOM

104 sf

BATH

49 sf

BATH

49 sf

BATH

49 sf

BATH

49 sf

BATH

49 sf

MECH

418 sf

MECH

53 sf

HALL

174 sf

BATH

26 sf

TCOM

108 sf

HALL

4023 sf

BATH

58 sf

BATH

33 sf

JANC

46 sf

BATH

96 sf

STOR

24 sf

STOR

37 sf

STOR

41 sf

STOR

41 sf

STOR

74 sf

STOR

30 sf

STOR

30 sf

STOR

32 sf

STOR

31 sf

STOR

31 sf

STOR

31 sf

STOR

31 sf

STOR

31 sf

STOR

31 sf

STOR

31 sf

STOR

180 sf

STOR

66 sf

STOR

96 sf

ESUP

272 sf

ESUP

67835 sf

LEWIS-McCHORD

WASHINGTON

UBLIC

ORKSW

JOINT-BASE

P

BLDG 6995

1st FLOOR

FAMILY SUPP (CHILD DEVELOPMENT)

FLOOR PLAN

SURVEY DATE: 6 APRIL 2015

NOT TO SCALE

AutoCAD SHX Text 31 August 2016 8:23:59 AM

PROPOSED_GENERATOR_LOCATION

BUILDING_6995

10/03/2024 R9642 0000-01.DWG

DRAWING TITLE:

DATE:

WORK ORDER:

PROJECT TITLE:

POC:

BUILDING NO.: FILE NO.:

WASHINGTON UBLIC

ORKSPW

JOINT BASE

LEWIS-McCHORD