About this file

This is a Statement of Work (SOW) for the repair and replacement of the overt/covert lighting system at McChord Airfield, located at Joint Base Lewis-McChord (JBLM).

The project scope encompasses replacing the entire failing overt/covert lighting system, the Sequence Flasher Lights (SFL) system, and providing training to JBLM Airfield Lighting technicians. Task 1 requires Logi Track Device Hardware Upgrade for Runways 16/34, specifically 48 Logi Track Remotes (P/N: T6540-03-01-00 CLD, 2XLAMP, ON/OFF PROGR 11768824), with 44 units to be installed and 4 designated as spares. Task 2 involves Sequence Flasher Remote Control Replacement, requiring two Remote Control Units (P/N: 1500867-2-C) for Runways 16 and 34, each containing an IP 66 Enclosure, I/O Unit, Managed Gigabit Ethernet Switch, and Single Mode SFP Module. Additional components include two Single Mode SFP Modules for the Vault for Runway 16/34 SFL communications. Software deliverables include a new Communication Protocol for the SFL interface, database modifications for the new SFL configuration, and factory testing.

The contractor is responsible for performing and recording testing and evaluation results, coordinating commissioning tasks with the manufacturer's representative, supporting and logging all equipment and software updates with manufacturer-specified testing, advising JBLM representatives of any deviations or discrepancies, providing a final trip/maintenance report, organizing and retaining project documentation, and delivering comprehensive training to all JBLM technicians. All work must comply with FAA 150/5340-26(x), Chapter 2 safety protocols.

View the file

Other files

File Type Posted
Project 4_Attachment 0008 Scopes_14 May 2026.pdf PDF
QA_JBLM FORGE_20260518.pdf PDF
Project 17_Attachment 0021 Scopes_15 May 2026.pdf PDF
JBLM_FORGE_RPP_Amendment 3.pdf PDF
Project 14_Attachment 0018 Scopes_11 May 2026.pdf PDF
ATTACH0003 MICC_CONSTRUCTION_OTA_TC_FORGE ver05122026.pdf PDF
Project 15_Attachment 0019 Scopes_11 May 2026.pdf PDF
Project 1_Attachment 0005 D Scopes_11 May 2026.pdf PDF
Project 9_Attachment 0013 Scopes_11 May 2026.pdf PDF
Project 2_Attachment 0006 Scopes_10 May 2026.pdf PDF
Project 3_Attachment 0007 Scopes_10 May 2026.pdf PDF
JBLM_FORGE_RPP_Amendment 2.pdf PDF
Project 6_Attachment 0010 Scopes_11 May 2026.pdf PDF
JBLM_FORGE_RPP_Amendment_1.pdf PDF
QA_JBLM FORGE_20260428.pdf PDF
Project 1_Attachment 0005 A Scopes_07 Apr 2026.pdf PDF
FORGE Site Visits.pdf PDF
Special Notice JBLM Site Visit.pdf PDF
JBLM FORGE Site Visit Registration 20260422.xlsx XLSX spreadsheet
Project 1_Attachment 0005 B Scopes_07 Apr 2026.pdf PDF
Project 1_Attachment 0005 C Scopes_07 Apr 2026.pdf PDF
Project 4_Attachment 0008 Scopes_07 Apr 2026.pdf PDF
Project 17_Attachment 0021 Scopes_07 Apr 2026.pdf PDF
Project 10_Attachment 0014 Scopes_07 Apr 2026.pdf PDF
JBLM_FORGE_RPP_04172026.pdf PDF
Project 12_ Attachment 0016 Scopes_07 Apr 2026.pdf PDF
ATTACH0004 JBLM FORGE CLIN STRUCTURE.xlsx XLSX spreadsheet
Project 13_ Attachment 0017 Scopes_07 Apr 2026.pdf PDF
Project 1_Attachment 0005 A Scopes_07 Apr 2026.pdf PDF
Project 3_ Attachment 0007 Scopes_07 Apr 2026.pdf PDF
Project 5_Attachment 0009 Scopes_07 Apr 2026.pdf PDF
Project 16_ Attachment 0020 Scopes_07 Apr 2026.pdf PDF
Project 18_Attachment 0022 Scopes_07 Apr 2026.pdf PDF
Project 15_Attachment 0019 Scopes_07 Apr 2026.pdf PDF
Project 1_Attachment 0005 B Scopes_07 Apr 2026.pdf PDF
Project 19_Attachment 0023 Scopes_07 Apr 2026.pdf PDF
Project 1_Attachment 0005 C Scopes_07 Apr 2026.pdf PDF
Project 6_ Attachment 0010 Scopes_07 Apr 2026.pdf PDF
ATTACH0003 MICC_CONSTRUCTION_OTA_TC_FORGE ver04082026.pdf PDF
Project 2_ Attachment 0006 Scopes_07 Apr 2026.pdf PDF
ATTACH0002_Contract 01 Specifications_JBLMFORGE_RPP.pdf PDF
Project 7_ Attachment 0011 Scopes_07 Apr 2026.pdf PDF
Project 11_ Attachment 0015 Scopes_07 Apr 2026.pdf PDF
ATTACH0001_FY26 JBLM FORGE - Project List 20260414.xlsx XLSX spreadsheet
Project 9_ Attachment 0013 Scopes_07 Apr 2026.pdf PDF
Project 14_Attachment 0018 Scopes_07 Apr 2026.pdf PDF
MICC_JBLM_FORGE_INDUSTRYDAY_SAM.GOV NONCUI.pdf PDF
Pages 601-700 from Attachment 004 Project Scopes.pdf PDF
Pages 1-500 from Attachment 004 Project Scopes.pdf PDF
Pages 701-900 from Attachment 004 Project Scopes.pdf PDF
Show 40 more

Latest 50 of 66 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project #8: McChord Runway Lighting Overt/Covert

Project: Repair Assault Overt/Covert Lights, McChord Field

1. Overview

The McChord Airfield overt/covert ligh ng system is currently in a failing state. Scope is to replace the en re overt/covert ligh ng system, replacement of the SFL system, and the training for the JBLM Airfield Ligh ng technicians.

2. Safety

All appropriate safety protocols will be followed, referencing the guidelines in FAA

150/5340-26(x), Chapter 2.

3. Tasks: This project includes two main tasks detailed below.

Task 1: Ligh ng system Replacement.

An example replacement system is detailed below:

Logi Track Device Hardware Upgrade

Runway 16/34:

Forty-eight (48) Logi Track Remotes (P/N: T6540-03-01-00 CLD, 2XLAMP, ON/OFF

PROGR 11768824)

Forty-four (44) to be installed.

Four (4) units designated as spares.

Task 2: Sequence Flasher Remote Control Replacement

An example replacement system is detailed below:

Sequencer Flasher Remote Control Hardware:

Runway 16:

One (1) Remote Control Unit (P/N: 1500867-2-C), which includes:

One (1) IP 66 Enclosure

One (1) I/O Unit

One (1) Managed Gigabit Ethernet Switch

One (1) Single Mode SFP Module

Runway 34:

One (1) Remote Control Unit (P/N: 1500867-2-C), which includes:

One (1) IP 66 Enclosure

One (1) I/O Unit

One (1) Managed Gigabit Ethernet Switch

One (1) Single Mode SFP Module

Vault:

Two (2) Single Mode SFP Modules for Runway 16/34 SFL communica ons.

So ware:

New Communica on Protocol for the new SFL interface.

Database Modifica on for the new SFL configura on.

Factory Test.

4. Maintenance & Service Responsibili es

Perform and record tes ng and evalua on results before services begin.

Coordinate commissioning tasks with the product manufacturer's representa ve, including new enclosure installa on support, new so ware installa on, onsite tes ng, and drawing updates.

Support and log the comple on of all equipment updates, so ware updates, and manufacturer-specified tes ng.

Advise the JBLM representa ves of any devia ons or discrepancies from approved services.

Provide a final trip/maintenance report for review and signature upon service comple on.

Organize, provide, and retain copies of all relevant project documenta on.

Provide training for all JBLM technicians.