About this file

This document is a site visit itinerary for the FORGE (Facilities Optimization for Real, Geothermal, and Energy) project at Joint Base Lewis-McChord (JBLM) in Washington scheduled for May 5-6, 2026.

Day 1 (May 5) begins at 0800 at Devotion Park, Lewis Main (2202 Liggett Ave, JBLM, WA 98433) and includes visits to eight projects located at Lewis Main and Lewis North. The route order covers Project #17 (I Corps JDOC Phase II), Project #4 (MDC-PAC Modular SCIF), Projects #15 & #16 (Construct and Convert SPRC Building 3168), Project #1 (Replace Barracks 3413 & 3414), Project #12 (Repair JBLM Railhead), Project #18 (Madigan CDC Backup Power), and Projects #13 & #14 (Construct and Convert SPRC Building 11371). Day 2 (May 6) begins at 0800 at Heritage Hill Airpark, McChord AFB (WA 98438) and focuses on McChord AFB and range facilities. The route includes Projects #8-11 (viewable from Heritage Hill Airpark), Project #7 (Air Traffic Control Tower HVAC), Project #5 (Cipher Locks), Project #6 (HVAC & Controls 446th Ops), Project #19 (McChord CDCs Backup Power), and Projects #2 & #3 (Multi-Domain Operations Training Area 20 and Range 76 Gunnery). Visitors to the ranges must sign a hold harmless form and provide vehicle information; carpooling is recommended due to rough terrain, and SUVs or trucks are advised for range access.

View the file

Other files

File Type Posted
Project 4_Attachment 0008 Scopes_14 May 2026.pdf PDF
QA_JBLM FORGE_20260518.pdf PDF
Project 17_Attachment 0021 Scopes_15 May 2026.pdf PDF
JBLM_FORGE_RPP_Amendment 3.pdf PDF
Project 14_Attachment 0018 Scopes_11 May 2026.pdf PDF
ATTACH0003 MICC_CONSTRUCTION_OTA_TC_FORGE ver05122026.pdf PDF
Project 15_Attachment 0019 Scopes_11 May 2026.pdf PDF
Project 1_Attachment 0005 D Scopes_11 May 2026.pdf PDF
Project 9_Attachment 0013 Scopes_11 May 2026.pdf PDF
Project 2_Attachment 0006 Scopes_10 May 2026.pdf PDF
Project 3_Attachment 0007 Scopes_10 May 2026.pdf PDF
JBLM_FORGE_RPP_Amendment 2.pdf PDF
Project 6_Attachment 0010 Scopes_11 May 2026.pdf PDF
JBLM_FORGE_RPP_Amendment_1.pdf PDF
QA_JBLM FORGE_20260428.pdf PDF
Project 1_Attachment 0005 A Scopes_07 Apr 2026.pdf PDF
Special Notice JBLM Site Visit.pdf PDF
JBLM FORGE Site Visit Registration 20260422.xlsx XLSX spreadsheet
Project 1_Attachment 0005 B Scopes_07 Apr 2026.pdf PDF
Project 1_Attachment 0005 C Scopes_07 Apr 2026.pdf PDF
Project 4_Attachment 0008 Scopes_07 Apr 2026.pdf PDF
Project 17_Attachment 0021 Scopes_07 Apr 2026.pdf PDF
Project 10_Attachment 0014 Scopes_07 Apr 2026.pdf PDF
JBLM_FORGE_RPP_04172026.pdf PDF
Project 12_ Attachment 0016 Scopes_07 Apr 2026.pdf PDF
ATTACH0004 JBLM FORGE CLIN STRUCTURE.xlsx XLSX spreadsheet
Project 13_ Attachment 0017 Scopes_07 Apr 2026.pdf PDF
Project 1_Attachment 0005 A Scopes_07 Apr 2026.pdf PDF
Project 3_ Attachment 0007 Scopes_07 Apr 2026.pdf PDF
Project 8_ Attachment 0012 Scopes_07 Apr 2026.pdf PDF
Project 5_Attachment 0009 Scopes_07 Apr 2026.pdf PDF
Project 16_ Attachment 0020 Scopes_07 Apr 2026.pdf PDF
Project 18_Attachment 0022 Scopes_07 Apr 2026.pdf PDF
Project 15_Attachment 0019 Scopes_07 Apr 2026.pdf PDF
Project 1_Attachment 0005 B Scopes_07 Apr 2026.pdf PDF
Project 19_Attachment 0023 Scopes_07 Apr 2026.pdf PDF
Project 1_Attachment 0005 C Scopes_07 Apr 2026.pdf PDF
Project 6_ Attachment 0010 Scopes_07 Apr 2026.pdf PDF
ATTACH0003 MICC_CONSTRUCTION_OTA_TC_FORGE ver04082026.pdf PDF
Project 2_ Attachment 0006 Scopes_07 Apr 2026.pdf PDF
ATTACH0002_Contract 01 Specifications_JBLMFORGE_RPP.pdf PDF
Project 7_ Attachment 0011 Scopes_07 Apr 2026.pdf PDF
Project 11_ Attachment 0015 Scopes_07 Apr 2026.pdf PDF
ATTACH0001_FY26 JBLM FORGE - Project List 20260414.xlsx XLSX spreadsheet
Project 9_ Attachment 0013 Scopes_07 Apr 2026.pdf PDF
Project 14_Attachment 0018 Scopes_07 Apr 2026.pdf PDF
MICC_JBLM_FORGE_INDUSTRYDAY_SAM.GOV NONCUI.pdf PDF
Pages 601-700 from Attachment 004 Project Scopes.pdf PDF
Pages 1-500 from Attachment 004 Project Scopes.pdf PDF
Pages 701-900 from Attachment 004 Project Scopes.pdf PDF
Show 40 more

Latest 50 of 66 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FORGE Site Visits 5-6 May 2026

• Site visits will be broken into two days as indicated in the color-coded screenshot of ATTACH 0001 of the RPP documents.

• Each day will begin @ 0800. Meeting locations are as follows:

• Day 1: Devotion Park, Lewis Main, 2202 Liggett Ave, Joint Base Lewis-McChord, WA 98433.

• Day 2: Heritage Hill Airpark, McChord AFB, WA 98438.

Day 1: Lewis Main and Lewis North (5 May)

• Route Order:

• Devotion Park (meeting location)

• Project #17: I Corps JDOC Phase II

• Project #4: MDC-PAC Modular SCIF

• Project #15 & #16: Construct SPRC, Convert to SPRC Bldg. 3168

• Project #1: Replace Barracks 3413 & 3414

• Project #12: Repair JBLM Railhead

• Project #18: Madigan CDC Backup Power

• Project #13 & #14: Construct SPRC, Convert to SPRC Bldg. 11371

Day 2: McChord AFB and Ranges (6 May)

• Route Order:

• Heritage Hill Airpark (meeting location)

• From this location, Project #’s 8-11 can be viewed.

• Throughout the route, aspects of Project #5 can be viewed.

• Project #7: Air Traffic Control Tower HVAC

• Project #5: Cipher Locks (example at Hangar 8)

• Project #6: HVAC & Controls 446th Ops

• Project #19: McChord CDCs Backup Power

• Project #2 & #3: Multi-Domain Operations Training & Range 76 Gunnery

• See next slide for more info on ranges.

Training Area 20 & Range 76

• Initial meeting location will be at Range Ops.

• Those visiting the ranges will be required to sign a ‘hold harmless’ form.

• While signing the form visitors will be required to provide their vehicle year, make, model, and license plate number.

• It is recommended visitors carpool to minimize vehicles on the ranges.

• Terrain is rough. SUV, truck, or similar is recommended.

FORGE Site Visits
Slide Number 2
Day 1: Lewis Main and Lewis North (5 May)
Slide Number 4
Day 2: McChord AFB and Ranges (6 May)
Slide Number 6
Training Area 20 & Range 76

File details come from the government source that posted it. Updated .