This is a Task Group Instruction (TGI) detailing work requirements for replacement of Vacuum, Collection, Holding and Transfer (VCHT) piping systems on the USS RALPH JOHNSON (DDG-114). The work involves removing and replacing VCHT piping in multiple ship locations including the Vacuum Collection Holding Tank Rooms, Crew Living Space, and Air Conditioning Machinery and Pump Room. Specific requirements include replacing copper nickel alloy piping (2-inch IPS), performing hydrostatic testing at 68 PSIG, conducting liquid penetrant testing on weld joints, and reinstalling vent ducts.
The work is to be performed between July 14, 2025 and December 11, 2025 at Yokosuka Naval Base in Japan. The TGI includes detailed material requirements for tubes, couplings, elbows, adapters, and insulation materials with specific technical specifications. Quality assurance inspections and testing requirements are outlined, including NDT inspection for onboard weld joints. The total estimated cost for materials is $9,903.96 with 833 total man hours. The work is being managed by Naval Supply Systems Command (NAVSUP) Fleet Logistics Center Yokosuka as part of a larger ship repair availability package.
View the file
Other files
Show 40 more
Latest 50 of 73 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
FOUO: Public availability to be determined under 5 USC 552
TASK GROUP INSTRUCTION
AIM REV 20.11.4.0 (OCTOBER 2020)
TGI COMPONENT NAME: TYPE: PHASE: REPEAT: CHANGE:
NO.: VARIOUS VCHT PP AY A 0 0
SHIP/HULL NO.: SHIP/HULL NAME: SYSTEM: PROJ/WO NO: CASREP CAT:
DDG-114 USS RALPH JOHNSON K52
CU PHASE TITLE:
*F/O - ACCOMPLISH REPLACEMENT OF VARIOUS VCHT PIPING
PREPARING ACTIVITY:
PREPARED BY: CODE PHONE DATE
YOSHITSUGU KAWASHIMA 234. 090-9323-5312 29 NOV 2024
APPROVED BY: CODE PHONE DATE
HIDEKUNI SHINMEI 234. 315-243-2371 29 NOV 2024
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
REASON FOR WORK/NEED FOR CHANGE:
CHANGE INSTRUCTIONS:
SPECIAL REQUIREMENTS:
CLASS P-2 PIPING.
CLEANLINESS FOR PIPING SYSTEM/EQUIPMENT LEVEL III.
This Work Affects a Fire Zone Boundary. Fabrication and/or Staging of a Non-Flammable Closure is Required.
WORK CERTIFICATION SIGNATURES
COMPLETION OF WORK REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
ACCEPTANCE OF COMPLETED WORK
PHYSICAL INSPECTION PHYSICAL INSPECTION COMPLETED: BADGE NO.: SHOP/CODE: PHONE: DATE:
REQUIRED:☐YES ☒NO
RECORDS REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
TGI NO.: VARIOUS VCHT PP AY A 0
FOUO
SHIP: DDG-114 CHG/VER: 0/0
LIST OF EFFECTIVE PAGES
SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO.
1-5 J-1 M1-3
QA28 (1-3)
1. SCOPE/PURPOSE
1.1 Title: Replacement of Various Vacuum, Collection, Holding and Transfer (VCHT) Piping; accomplish
1.2 Location of Work:
1.2.1 Vacuum Collection Holding Tank Room No. One (4-110-0-E)
1.2.2 Crew Living Space No. 7 (3-350-2-L)
1.2.3 Air Conditioning Machinery and Pump Room (5-300-01-E)
1.2.4 Vacuum Collection Holding Tank Room No. 2 (4-300-0-E)
1.3 Identification:
1.3.1 Quantity (One Lot), Vent Duct, Collective Protection System (CPS)
System No.: CPS Exhaust System 01-248-1 Type: Non-watertight Material: Steel Location: Frames between 310 and 312, Port
JCN: EA01-1657
Remarks: See 2.3 for detail.
1.3.2 Quantity (One Lot), Forward (FWD) VCHT Piping located in 1.2.1, between Frames 119 and 124, Longitudinal No. L1(P) and Center Line.
Size: 2 Inch IPS (2.375 Inch OD x 0.083 Inch WT) Material: Copper Nickel Alloy, Class 200 Specification: MIL-T-16420
JCN: ER01-0294
Remarks: See followings for detail.
2.4: Sheet 3B (Zone 3-E) 2.5: Sheet 4F (Zone 3-C and 4-C)
1.3.3 Quantity (One Lot), After (AFT) VCHT Piping located in 1.2.2, between Frames 350 and 352, Longitudinal No(s). L11(P) and L12(P).
Size: 2 Inch IPS (2.375 Inch OD x 0.083 Inch WT) Material: Copper Nickel Alloy, Class 200 Specification: MIL-T-16420
JCN: CM01-0203
Remarks: See followings for detail.
2.4: Sheet 4A (Zone 8-G) 2.6: Sheet 4A (Zone 4-F and 4-G)
FOUO
SHIP: DDG-114 CHG/VER: 0/0
1.3.4 Quantity (One Lot), AFT VCHT Piping located in 1.2.3 and 1.2.4, between Frames 307 and 311, Longitudinal No. L1(P) and Center Line.
Size: 2 Inch IPS (2.375 Inch OD x 0.083 Inch WT) Material: Copper Nickel Alloy, Class 200 Specification: MIL-T-16420
JCN: EA01-1657
Remarks: See followings for detail.
2.4: Sheet 3B (Zone 7-E) 2.7: Sheet 4A (Zone 7-E) and Sheet 4C (Zone 3-G and 4-G)
1.4 Security Classification: None.
1.5 Initial Condition: None.
1.6 Contractor work start date:
1.7 Contractor work complication date:
2. REFERENCES:
REF.
NO.
DOCUMENT
/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV CHG
NO.
COPY
REQ’D
(Y/N)
SOURCE
DOC
(Y/N)
PARA SEC PG CHP
1 NSI FY-25 NAVSEA Standard Items - 1 N 2 LI FY-25 Local Standard Items - ORG N
3 DWG 512-
7061973
INSTL OF HVAC DESIGN ZONE
- Y 2
4 DWG 593-
7060037
VACUUM SEWAGE SYSTEM
PIPING DIAGRAM
E Y 3B 4A
5 DWG 528-
7061785
PLUMBING DRAINS ZONE 1420 - Y 4F
6 DWG 528-
7061999
PLUMBING DRAINS, ZONE 3230 - Y 4A
7 DWG 528-
7061970
PLUMBING DRAINS, ZONE 3120 - Y 4A
4C
8 MIL MIL-
STD-1627
Bending of Pipe or Tube for Ship Piping Systems
C N
9 TM T9074-
AS-GIB-
010/271
Requirements for Nondestructive Testing Methods
1 N
10 MIL MIL-
STD-2035
Nondestructive Testing Acceptable Criteria
A N
3. APPENDICES:
3.1. Appendix “J” TGI Job Summary Information Sheet
3.2. Appendix “M" TGI Material List
3.3. Appendix “D” Deficiency Form
4. GENERAL REQUIREMENTS:
4.1 Not Applicable.
Masato.Endo.ja Typewritten Text
14 JUL 2025
Masato.Endo.ja Typewritten Text
11 DEC 2025
Masato.Endo.ja Cross-Out
Masato.Endo.ja Typewritten Text
12/20/2024 C-1209 M. ENDO 11030028
FOUO
SHIP: DDG-114 CHG/VER: 0/0
5. PROCEDURE:
5.1 Remove each existing vent duct listed in 1.3.1, using 2.3 for guidance.
5.2 Remove existing, fabricate, and install new each VCHT piping listed in 1.3.2 through 1.3.4, using 2.4 through
2.7 for guidance.
5.2.1 Accomplish the requirements of 009-09 of 2.1 for the certification process.
5.2.2 Bend each new pipe in accordance with 2.8.
5.2.3 Accomplish the requirements of 009-12 of 2.1, including Table One, Column(s) A, Lines One through 10.
5.2.4 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean, fresh water at 68 PSIG, for each new and disturbed VCHT piping systems listed in 1.3.2 through 1.3.4.
5.2.4.1 Document shop hydrostatic test results on QA Form 28 Enclosure-01-1 through Enclosure-01-3.
5.2.5 Accomplish liquid penetrant test on final layer of each onboard weld joint for Class P-2 VCHT piping listed in
1.3.2 through 1.3.4 in accordance with Chapter 5 of 2.9. The accept or reject criteria must be in accordance with Class 2 of 2.10. See Note 5.5.2.
(I)(G) “NDT INSPECTION”
5.3 Reinstall each vent duct listed in 1.3.1, using 2.3 for guidance.
5.4 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
5.5 Notes:
5.5.1 Planner: Code 234 Y. Kawashima, 090-9323-5312
Planner: Code 231A T. Kawakami, 243-7064 Planner: Code 233 H. Sasano, 080-9350-1453
5.5.2 Non-destructive testing (NDT) inspection for onboard weld joint of VCHT piping listed in 1.3.2 through 1.3.4 is directed by C240 per Memorandum Ser 240/008 dated on 2 OCT 24.
5.5.2.1 Operational test for VCHT piping (Portions under vacuum) in accordance with Memorandum Ser 240/008 dated on 2 OCT 24 will be covered by T-phase.
5.5.3 Work per this instruction involves cutting an access (or removal of a door) through a fire zone bulkhead, through the hull of the ship above the turn of the bilge, through ventilation components (ducting, plenums, etc.), or through any air-tight, fume-tight or watertight bulkheads normally used to control air flow in the event of a shipboard fire. A nonflammable closure is required in accordance with COMNAVSEASYSCOM MSG R 261400Z JUL 12. The closure, if not continuously in use, shall be staged near the access, readily visible and accessible, so that any emergency responder can install the closure to affect proper air flow onboard the ship.
5.5.4 Work Integration Manager (WIM) C-333 T. Yaginuma, 080-5419-0598
5.5.5 JCNs CM01-0203, EA01-1657, and ER01-0294 are related to this TGI.
5.6 Government Furnished Material (GFM):
5.6.1 SRF-JRMC will provide GFM listed in the Appendix “M”.
FOUO
SHIP: DDG-114 CHG/VER: 0/0
5.7 SRF-JRMC will provide the following service work: (TGI No.: 38K5259310 S02)
5.7.1 [C740] Provide crane and crane rigging service.
5.7.2 [X99E] Utility service, electrical.
5.7.3 [X99M] Utility service, including low pressure air supply, water supply, and steam supply.
5.7.4 [C106.1] Safety inspection for SRF-JRMC employees.
5.7.5 [C106.2] Gas free inspection for SRF-JRMC employees.
5.7.6 [C133] QA inspection for (G) symbol(s).
5.7.7 [C135] QA inspection for (G) symbol(s).
FOUO
J-1
SHIP: DDG-114 CHG/VER: 0/0
APPENDIX "J"
TGI JOB SUMMARY INFORMATION SHEET
SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH
VERSION:
CASREP
CAT:
VARIOUS VCHT PP AY A 0 0
CU PHASE TITLE:
*F/O - ACCOMPLISH REPLACEMENT OF VARIOUS VCHT PIPING
PRIMARY COMPONENT:
COMPONENT UNIT LIST (FOR ASSEMBLIES):
SEW 3-350-2-L PP SEW 5-300-01-E PP SEW 4-110-0-E PP VNT ES 01-248-1 DT SEW 4-
300-0-E PP
ATTACHMENT LIST:
1. ENCLOSURE-01 (38K5259310A01-QA28.docx) saved on 27-NOV-2024 0000.
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
YAGINUMA ,TAKEHIDE
JO: KO: TOTAL MAN HRS: TOTAL MAT’L COST TOTAL DURATION: PLANNING ACCEPTANCE:
38K5259310 A01 833 $9,903.96 0
CU PHASE DESCRIPTION:
The purpose of this TGI is to accomplish replacement of various VCHT piping.
Location of Work:
Vacuum Collection Holding Tank Room No. One (4-110-0-E) Crew Living Space No. 7 (3-350-2-L) Air Conditioning Machinery and Pump Room (5-300-01-E) Vacuum Collection Holding Tank Room No. 2 (4-300-0-E)
TASK NAME
SHOP TSD/WC TS CREW# MHRS
HIGH RAD
HOURS
RC
GRID#
FOUO
M-1
SHIP: DDG-114 CHG/VER: 0/0
APPENDIX “M”
TGI MATERIAL LIST
SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH
VERSION:
CASREP
CAT:
VARIOUS VCHT PP AY A 0 0
CU PHASE TITLE:
*F/O - ACCOMPLISH REPLACEMENT OF VARIOUS VCHT PIPING
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV
JOB ORDER: KEY OP:
38K5259310 A01
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
001 M TUBE,METALLIC, TUBE, 2" IPS,
CNA 70-30
ORDER FOR KTR
C234 Y.KAWASHIMA 234-2241
**PROVIDE ONE
CONTINUEOUS LENGTH 20 FT
FOR 1 EA, DO NOT PROVIDE
SEPARATELY.
9B 4710 002897994 NA 4 N 43325109 20/FT
002 M TUBE,MET, TUBE, 2" IPS, CNA
70-30
ORDER FOR KTR
C234 Y.KAWASHIMA 234-2241
**PROVIDE ONE
CONTINUEOUS LENGTH 20 FT
FOR 1 EA, DO NOT PROVIDE
SEPARATELY.
9B 4710 002897994 NA 4 N 43325113 20/FT
003 M SLEEVE, CPLG, 2 IPS,
COUPLING, SLEEVE, 2" IPS,
CN 70-30, BW
ORDER FOR KTR
C234 Y.KAWASHIMA 234-2241
9B 4730 LL4462301 NA 4 N 43347496 20/EA
NOTES:
FOUO
M-2
SHIP: DDG-114 CHG/VER: 0/0
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
004 M BACKING RING, 2 IPS,
BACKING RING, 2"IPS, CNA
70/30, 200PSIG
ORDER FOR KTR
C234 Y.KAWASHIMA 234-2241
9B 4730 LL4558817 NA 4 N 43347497 20/EA
005 M ELBOW, 45D, BW, 2", ELBOW
45DEG, BUTT WELD, LONG
RADIUS,
SIZE: 2"IPS,
MATL: CU-NI 70/30,
PRESSURE: 200 PSI,
DWG: 810-1385880,
PREMIER COPPER P/N:
87104400, ORDER FOR KTR
C234 Y.KAWASHIMA 234-2241
9B 4730 LL4575188 NA 4 N 43347499 7/EA
006 M LATERAL, 2 IPS, CNA,
LATERAL, SIZE: 2 INCH IPS
SOCKET WELD, MATERIAL:
CU-NI 70-30 400PSI
ORDER FOR KTR, C234
Y.KAWASHIMA 234-2241
9B 4730 LL4706625 NA 4 N 43347498 1/EA
007 M ADAPTER, 2"IPS, ADAPTER,
MPT,
SIZE: 2"IPS, MALE THREAD X
FEMALE SOCKET WELDING,
MATL: CU-NI 70/30,
PRESSURE: 400PSI,
DWG: 803-6397430.
PREMIER COPPER P/N:
77160400.
ORDER FOR KTR
C234 Y.KAWASHIMA 234-2241
9B 4730 LL4462282 NA 4 N 43347500 1/EA
008 M CAP,PIPE, SIZE: 2 INCH IPS,
CAP, PIPE THREAD,
MATERIAL: BRONZE
ORDER FOR KTR
C234 Y.KAWASHIMA 234-2241
9B 4730 002312403 NA 4 N 43325115 1/EA
101 M INSULATI, ACOUSTIC
INSULATION,
SPEC: MIL-DTL-32585 TYPE II
FORM 2 FACING D (FORMER:
MIL-I-22023 TYPE 3)
THK: 2",
SIZE: 24" X 36",
MATL: FIBER GLASS,
FACING: FACED WITH
POLYESTER FILM
REINFORCED WITH FIBROUS
GLASS SCRIM,
TUFFSKIN STYLE: 1613,
DO NOT CROSS NSN: 5640-01-
509-0809(SMIC: X3),
BIW CAT#: 47068-011,
9Q 5640 LL4808709 NA 4 N 43187515 1/SH
FOUO
M-3
SHIP: DDG-114 CHG/VER: 0/0
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
102 M INSULATI, ACOUSTIC
INSULATION,
SPEC: MIL-DTL-32585 TYPE 2
FORM 2 FACING D (FORMER:
MIL-I-22023 TYPE 3),
THK: 1",
SIZE: 24" X 36",
MATL: FIBER GLASS,
FACING: FACED WITH
POLYESTER FILM
REINFORCED WITH FIBROUS
GLASS SCRIM,
TUFFSKIN STYLE: 1613,
BIW CAT#: 47068-002,
9Q 5640 LL4808710 NA 4 N 43187514 1/SH
103 M SOUND CONTROLLING F,
ORDERED FOR KTR
ORIG: C231A T. KAWAKAMI,
PHONE: 243-7064
9B 5640 012965989 NA 4 N 43185057 1/RO
104 M INSULATION,THERMAL,
ORDERED FOR KTR
ORIG: C231A T. KAWAKAMI,
PHONE: 243-7064
9B 5640 016493959 NA 4 N 43185060 1/SH
105 M SOUND CO, ORDERED FOR
KTR
ORIG: C231A T. KAWAKAMI,
PHONE: 243-7064
9Q 5640 013715238 NA 4 N 43185061 1/SH
FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____
☐ NUCLEAR APPENDIX "D"
DEFICIENCY FORM
☐ NON-NUCLEAR
1. SHIP/HULL NO.: 2a. DL or DR No.
(Circle One)
2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:
DDG-114 VARIOUS VCHT PP AY A 0
4a. ICN: 4b. KEY OP: 5. LOC SPACE/LVL: FRAME: P/S/C: 6. CAUSED BY:
38K5259310 A01
7. DESCRIPTION:
8. ORIGINATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:
9. CORRECTIVE ACTION:
10. EVALUATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:
FOR NON-NUCLEAR USE ONLY
11. RFD/RFW REQ’D ☐ LAR REQ'D ☐
ILS MOD REQ’D ☐
SRD/PLAN REV REQ'D ☐
DWG NO.: _____________________ S/A NO.: ___________________
12. ISOLATION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.:
SATISFACTORY:
13. SUBSAFE OQE RECORD? SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
YES ☐ NO ☐
14. CORRECTIVE ACTION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
COMPLETE:
15. INSPECTION REQ’D? INSPECTION COMPLETE/SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
_________:YES ☐ NO ☐
16. RECORDS REVIEW SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
COMPLETE (DR ONLY)
DL’s ISSUED
(DR ONLY)
FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____
☐ NUCLEAR Deficiency Form Continuation Sheet ☐ NON-NUCLEAR
1. SHIP/HULL NO.: 2a. DL or DR No.
(Circle One) 2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:
DDG-114 VARIOUS VCHT PP AY A 0
COMUSFLTFORCOMINST 4790.3 REV D CHG 3
07 Nov 2023
SHOP TEST RECORD Page 1 of 1
QA FORM 28 Planning must fill in blocks identified by a prior to issuing
1. SHIP HULL NO. 2. JCN 3. LWC/SHOP 4. CWP/REC SER NO. 5. SYSTEM/COMPONENT/ROTATABLE POOL SER NO.
USS RALPH JOHNSON DDG114 ER01-0294 KTR N/A VCHT SYSTEM PIPING
6. REFERENCES: TEST REF (E.G., MS, TECH MAN) & OTHER REFS (E.G., VLV DWG) 7. TEST GAGE RANGE /INSTRUMENT USED SERIAL NO. CAL DUE DATE 8. RELIEF VLV SET POINT
A. S9086-RK-STM-010/CH-505 Rev. 6
B. DWG 593-7060037 Rev. E
C.
D.
9. TEST REQUIREMENTS & RESULTS
TEST TYPE KEY H = STRENGTH AND POROSITY/ELEVATED PRESSURE TEST J = MECHANICAL JOINT TIGHTNESS ST = SEAT TIGHTNESS OP = OPERATIONAL O = OTHER
(SPECIFY): ______________________
TE
ST
T Y
PE
(S
EE
K
EY
) PARAGRAPH
DESCRIBING
VALVE POSITION
AND POINT OF
ENTRY
REF
LTR
GAGE
USED
(LTR
FROM
BLK 7)
REQUIRED
MEDIUM
USED
PRESSURE
ACTUAL
MINIMUM
DURATION
ALLOWED
LEAKAGE
ACTUAL
LEAKAGE SAT/UNSAT SIGNATURE, BADGE NO. & DATE
H 5.2.4 (For 1.3.2) A, B Clean Fresh Water 68 PSIG 30 minutes None
10. REMARKS. (CRAFTSMAN/QAI SUBMIT A DF TO RESOLVE UNSAT DATA)
11. QA INSPECTOR/SHOP SUPERVISOR SIGNATURE/BADGE NO. (RECORD
REVIEWED FOR FINAL ACCEPTANCE)
DATE 12. QAS SIGNATURE/BADGE NO. (RECORD HAS BEEN REVIEWED FOR
COMPLETENESS)
DATE
38K5259310A01 ENCLOSURE-01-1 TOTAL 3
SHOP TEST RECORD Page 1 of 1
QA FORM 28 Planning must fill in blocks identified by a prior to issuing
1. SHIP HULL NO. 2. JCN 3. LWC/SHOP 4. CWP/REC SER NO. 5. SYSTEM/COMPONENT/ROTATABLE POOL SER NO.
USS RALPH JOHNSON DDG114 CM01-0203 KTR N/A VCHT SYSTEM PIPING
6. REFERENCES: TEST REF (E.G., MS, TECH MAN) & OTHER REFS (E.G., VLV DWG) 7. TEST GAGE RANGE /INSTRUMENT USED SERIAL NO. CAL DUE DATE 8. RELIEF VLV SET POINT
A. S9086-RK-STM-010/CH-505 Rev. 6
B. DWG 593-7060037 Rev. E
C.
D.
9. TEST REQUIREMENTS & RESULTS
TEST TYPE KEY H = STRENGTH AND POROSITY/ELEVATED PRESSURE TEST J = MECHANICAL JOINT TIGHTNESS ST = SEAT TIGHTNESS OP = OPERATIONAL O = OTHER
(SPECIFY): ______________________
TE
ST
T
K
EY
) PARAGRAPH
DESCRIBING
VALVE POSITION
GAGE
USED
(LTR
ACTUAL
LEAKAGE SAT/UNSAT SIGNATURE, BADGE NO. & DATE
H 5.2.4 (For 1.3.3) A, B Clean Fresh Water 68 PSIG 30 minutes None
10. REMARKS. (CRAFTSMAN/QAI SUBMIT A DF TO RESOLVE UNSAT DATA)
11. QA INSPECTOR/SHOP SUPERVISOR SIGNATURE/BADGE NO. (RECORD
REVIEWED FOR FINAL ACCEPTANCE)
DATE 12. QAS SIGNATURE/BADGE NO. (RECORD HAS BEEN REVIEWED FOR
COMPLETENESS)
38K5259310A01 ENCLOSURE-01-2 TOTAL 3
SHOP TEST RECORD Page 1 of 1
QA FORM 28 Planning must fill in blocks identified by a prior to issuing
1. SHIP HULL NO. 2. JCN 3. LWC/SHOP 4. CWP/REC SER NO. 5. SYSTEM/COMPONENT/ROTATABLE POOL SER NO.
USS RALPH JOHNSON DDG114 EA01-1657 KTR N/A VCHT SYSTEM PIPING
6. REFERENCES: TEST REF (E.G., MS, TECH MAN) & OTHER REFS (E.G., VLV DWG) 7. TEST GAGE RANGE /INSTRUMENT USED SERIAL NO. CAL DUE DATE 8. RELIEF VLV SET POINT
A. S9086-RK-STM-010/CH-505 Rev. 6
B. DWG 593-7060037 Rev. E
C.
D.
9. TEST REQUIREMENTS & RESULTS
TEST TYPE KEY H = STRENGTH AND POROSITY/ELEVATED PRESSURE TEST J = MECHANICAL JOINT TIGHTNESS ST = SEAT TIGHTNESS OP = OPERATIONAL O = OTHER
(SPECIFY): ______________________
TE
ST
T
K
EY
) PARAGRAPH
DESCRIBING
VALVE POSITION
GAGE
USED
(LTR
ACTUAL
LEAKAGE SAT/UNSAT SIGNATURE, BADGE NO. & DATE
H 5.2.4 (For 1.3.4) A, B Clean Fresh Water 68 PSIG 30 minutes None
10. REMARKS. (CRAFTSMAN/QAI SUBMIT A DF TO RESOLVE UNSAT DATA)
11. QA INSPECTOR/SHOP SUPERVISOR SIGNATURE/BADGE NO. (RECORD
REVIEWED FOR FINAL ACCEPTANCE)
DATE 12. QAS SIGNATURE/BADGE NO. (RECORD HAS BEEN REVIEWED FOR
COMPLETENESS)
38K5259310A01 ENCLOSURE-01-3 TOTAL 3
File details come from the government source that posted it. Updated .