This is a Task Group Instruction (TGI) for preservation work on the USS RALPH JOHNSON (DDG-114) under project K52. The work involves preserving the underside of the port bridge wing, covering approximately 70 square feet of exterior surface between frames 142 and 159 on the 03 and 04 Level Weather areas.
The contractor work period is scheduled for July 14, 2025 through November 26, 2025. The work requires compliance with specification 009-32 for surface preservation. SRF-JRMC will provide support services including crane and rigging, electrical utilities, water and steam supply, safety inspections, gas free inspections, and QA inspections. The work is being performed in response to CCIMS report CCIMS-G1N6-DDG114-026-24, with JCN ES01-NA4U. No government furnished materials are required for this task. The planner is D. Kano (Code 231A) and the Work Integration Manager is T. Yaginuma (Code 333).
View the file
Other files
Show 40 more
Latest 50 of 73 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
09-DEC-2024 1519
20.14.15.2.9020 (September 2024) ICN: 38K5215401 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: BRIDGE WING PORT AY A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-114 USS RALPH JOHNSON K52
CU PHASE TITLE: F/O - PRESERVE UNDER SIDE OF BREDGE WING, PORT
WORK CERTIFICATION SIGNATURES: DLs
COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
FOUO Pg 1 of 3
ES01NA4U
PREPARING ACTIVITY: STATUS: APP WORKING STATUS:
PREPARED BY: CODE: PHONE: DATE:
KANO, DAISUKE 231A 3152430098 16-SEP-2024
APPROVED BY: CODE: PHONE: DATE:
NAKAMURA, YUUJI 231A 3152436041 16-SEP-2024
CONCURRED BY: CODE: PHONE: DATE:
REASON FOR WORK/NEED FOR CHANGE:
JCN:
ES01-NA4U
SPECIAL REQUIREMENTS:
CU PHASE DESCRIPTION:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
YAGINUMA, TAKEHIDE
JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:
154A1101
1. SCOPE/PURPOSE:
1.1 Title: Under Side of Bridge Wing Port; preserve
1.2 Location of Work:
1.2.1 03 Level Weather, Frames between 142 and 159, Port
1.2.2 04 Level Weather, Frames between 142 and 159, Port
1.3 Identification:
1.3.1 Quantity (70 SF), Under Side of Bridge Wing, Frames between 142 and 159, Port Remarks: The area include exterior side surface of cover plate
1.4 Security Classification: None.
TGI Short Form
09-DEC-2024 1519
20.14.15.2.9020 (September 2024) (Continued) ICN: 38K5215401 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: BRIDGE WING PORT AY A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-114 USS RALPH JOHNSON K52
CU PHASE TITLE: F/O - PRESERVE UNDER SIDE OF BREDGE WING, PORT
FOUO Pg 2 of 3
CU PHASE DESCRIPTION (Cont.)
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1.5 Initial Condition: None.
1.6 Contractor Work start date: 14 JUL 2025
1.7 Contractor Work completion date: 26 NOV 2025
2. PROCEDURE:
2.1 Accomplish the requirements of 009-32 of Ref. No. One, including Table 2, Line(s) One, for each area listed in 1.3.1.
2.2 Accomplish the requirements of 009-32 of Ref. No. One for each new and disturbed surface.
2.3 Notes:
2.3.1 Planner: Code 231A D. Kano, 243-0098
2.3.2 Work Integration Manger (WIM): Code 333 T. Yaginuma, 080-5419-0598
2.3.3 This TGI is in response to CCIMS report No. CCIMS-G1N6-DDG114-026-24 from TGI No. 3814Y11010I03.
2.3.4 JCN ES01-NA4U is related to this TGI.
2.4 Government Furnished Material (GFM): None.
2.5 SRF-JRMC will provide the following service work: (TGI No. 38K5215401S02)
2.5.1 [C740] Crane and crane rigging service.
2.5.2 [X99E] Utility service, electrical.
2.5.3 [X99M] Utility service, including water supply and steam supply.
2.5.4 [C106.1] Safety inspection for SRF-JRMC employees.
2.5.5 [C106.2] Gas free inspection for SRF-JRMC employees.
2.5.6 [C133] QA inspection for (G) symbols.
09-DEC-2024 1519
20.14.15.2.9020 (September 2024) (Continued) ICN: 38K5215401 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: BRIDGE WING PORT AY A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-114 USS RALPH JOHNSON K52
CU PHASE TITLE: F/O - PRESERVE UNDER SIDE OF BREDGE WING, PORT
FOUO Pg 3 of 3
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1 NSI FY-25 NAVSEA Standard Items - 1 N 2 LI FY-25 Local Standard Items - ORG N
TASK NAME / TASK DESCRIPTION
SHOP/
TSD TS
SF
WC
CREW
# MHRS RWRK
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE
REV
ICN: 38K5215401 KEY OP: A01