This is a Task Group Instruction (TGI) document detailing structural repair work to be performed on USS RALPH JOHNSON (DDG-114) in compartments 5-300-01-E (Air Conditioning Machinery and Pump Room), 4-300-0-E (Vacuum Collection Holding Tank Room No. 2), and 3-300-0-C (IC and Gyro Room No. 2).
The work includes repairing and replacing various structural components including: longitudinal 4P between frames 301-313, cable penetration on longitudinal 4P at frame 309, brackets on longitudinal 4P between frames 312-313, web frame on longitudinal 4P at frame 308, No. 4 A/C plant check valve, closure plates on longitudinal 4P between frames 319-320 and 322-323, and web plate repairs on stringer 5S at frame 307. The work requires Level II cleanliness for piping systems/equipment and must be performed between July 14, 2025 and December 11, 2025. Government Furnished Material (GFM) will be provided by SRF-JRMC, along with various support services including crane operations, utilities, safety inspections, and QA inspections. The work clears deficiency report DFS DDG-114-1022-2023.
View the file
Other files
Show 40 more
Latest 50 of 73 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
FOUO: Public availability to be determined under 5 USC 552
TASK GROUP INSTRUCTION
AIM REV 20.11.4.0 (OCTOBER 2020)
TGI COMPONENT NAME: TYPE: PHASE: REPEAT: CHANGE:
NO.: STRCT 5-300-01-E AY A 0 0
SHIP/HULL NO.: SHIP/HULL NAME: SYSTEM: PROJ/WO NO: CASREP CAT:
DDG-114 USS RALPH JOHNSON K52
CU PHASE TITLE:
F/O – REPAIR STRUCTURAL MEMEBR IN 5-300-01-E
PREPARING ACTIVITY:
PREPARED BY: CODE PHONE DATE
TETSUYA UEMATSU 231A 315-243-9943 23-SEP-2024
APPROVED BY: CODE PHONE DATE
YUUJI NAKAMURA 231A 315-243-6041 23-SEP-2024
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
REASON FOR WORK/NEED FOR CHANGE:
CHANGE INSTRUCTIONS:
SPECIAL REQUIREMENTS:
CLEANLINESS FOR PIPING SYSTEM/EQUIPMENT LEVEL II
WORK CERTIFICATION SIGNATURES
COMPLETION OF WORK REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
ACCEPTANCE OF COMPLETED WORK
PHYSICAL INSPECTION PHYSICAL INSPECTION COMPLETED: BADGE NO.: SHOP/CODE: PHONE: DATE:
REQUIRED:☐YES ☒NO
RECORDS REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
TGI NO.: STRCT 5-300-01-E AY A 0
FOUO
SHIP: DDG-114 CHG/VER: 0/0
LIST OF EFFECTIVE PAGES
SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO.
1-5 Map (1)
J1-2 QA34A
(1) M1-4 Sketch (1-2)
1. SCOPE/PURPOSE
1.1 Title: Structural Member in 5-300-01-E; repair
1.2 Location of Work:
1.2.1 Air Conditioning Machinery and Pump Room (5-300-01-E)
1.2.2 Vacuum Collection Holding Tank Room No. 2 (4-300-0-E)
1.2.3 IC and Gyro Room No. 2 (3-300-0-C)
1.3 Identification:
1.3.1 Quantity (One Lot), Longitudinal 4P in 5-300-01-E and 4-300-0-E, Frames between 301 and 313
JCN: ES01-NA53
Material: HTS, MIL-S-22698 GR-AH36, 12 Inches x 4 Inches x 14 LBs IT Remarks: See Elevation 3-A of 2.3 for detail
1.3.2 Quantity (One EA), Cable Penetration on Longitudinal 4P in 5-300-01-E, Frame 309
JCN: ES01-NA53
Material: Steel, ASTM-A53, 3 Inches IPS Schedule 40, Pipe Remarks: See Elevation 3-A of 2.3 for detail
1.3.3 Quantity (2 EA), Bracket on Longitudinal 4P in 5-300-01-E, Frames between 312 and 313
JCN: ES01-NA53
Material: HTS, MIL-S-22698 GR-DH36, 10.2 LBs Plate Remarks: See Elevation 3-C of 2.3 for detail
1.3.4 Quantity (One EA), Web Frame on Longitudinal 4P in 5-300-01-E, Frame 308
JCN: ES01-NA53
Material: HTS, MIL-S-22698 GR-AH36, 12 Inches x 4 Inches x 14 LBs IT Remarks: See Elevation 3-C of 2.3 for detail
1.3.5 Quantity (One EA), No. 4 Air Conditioning (A/C) Plant Check Valve Mfr Id: 803-1385721-8 Type: Swing, Union End Size: 2.00-Inch IPS Valve No: REA/V0127
1.3.6 Quantity (2 EA), Closure plate on Longitudinal 4P in 5-300-01-E, Frames between 322 and 323
FOUO
SHIP: DDG-114 CHG/VER: 0/0
JCN: ES01-NA54
Material: HTS, MIL-S-22698 GR-DH36, 10.2 LBs Plate Remarks: See Elevation 3-A of 2.3 for material and detail
1.3.6.1 Quantity (One EA), Closure plate, Frames between 319 and 320
1.3.6.2 Quantity (One EA), Closure plate, Frames between 322 and 323
1.3.7 Quantity (One Lot), Web Plate of Stringer 5S on Shell Plating in 5-300-01-E, Frame between 307, Starboard
JCN: ES01-NA51
Remarks: See 2.8 for base material and Sketch Enclosure-01 for material and detail
1.4 Security Classification: None.
1.5 Initial Condition: None.
1.6 Contractor work start date:
1.7 Contractor work completion date:
2. REFERENCES:
REF.
NO.
DOCUMENT
/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV CHG
NO.
COPY
REQ’D
(Y/N)
SOURCE
DOC
(Y/N)
PARA SEC PG CHP
1 NSI FY-25 NAVSEA Standard Items - 1 N 2 LI FY-25 Local Standard Items - ORG N
3 PDD 100-
ELM-240397
RPR OF DEFORMED & MECH
HOLES IN L-4P IN AIR COND
MCHRY & PUMP RM (5-300-01-E)
- Y AL
L
4 DWG 516-
7060039
REFRIGERATION SYSTEM
DIAGRAM
E Y 5D
5 DWG 516-
7061971
REFRIGERATION GAS SYSTEMS,
ZONE 3120
- Y 4,5 A
6 DWG 803-
1385721
Valves Bronze 1/4 - 2 Union End Swing Check
Y N
7 DWG 803-
7063850
TAILPIECE ASSEMBLIES, UNION
END (BW, SW, SB), 1/4 - 2 INCH.
400PSI WOG
B Y 1
8 DWG 100-
7063209
UNIT STRUCTURAL ARR DWG
ASSY UNIT 3110
- Y 9A ,9-
3. APPENDICES:
3.1 Appendix “J” TGI Job Summary Information Sheet
3.2 Appendix "M" TGI Material List
3.3 Appendix “D” Deficiency Form
4. GENERAL REQUIREMENTS:
4.1 Not Applicable.
5. PROCEDURE:
5.1 Pump out, clean, and dry each space located in 1.2.1 to free from oil, debris, and other foreign matter.
Masato.Endo.ja Typewritten Text
11 DEC 2025
Masato.Endo.ja Typewritten Text
14 JUL 2025
Masato.Endo.ja Cross-Out
Masato.Endo.ja Typewritten Text
12/21/2024 C-1209 M. ENDO 11030028
FOUO
SHIP: DDG-114 CHG/VER: 0/0
5.2 Remove existing, fabricate and install new each longitudinal 4P, penetration coaming, and bracket listed in 1.3.1 through 1.3.3 in accordance with 2.3.
5.2.1 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column(s) A, Lines One through 7.
5.3 Fabricate and install each new web frame listed in 1.3.4 in accordance with 2.3.
5.3.1 Remove unused stud for cableway on longitudinal 4P frame 308.
5.3.2 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column(s) A, Lines One through 7.
5.4 Remove and install each valve listed in 1.3.5, using DETAIL 5D-10E of Sheet 5D on 2.4 and 2.5 for guidance.
5.4.1 Restore each mating surface exposed by removal. Repair by removing each high spot, burr, abrasion, and foreign matter, where removal can be accomplished by hand tool.
5.4.2 Remove existing and install new each piping joint gasket. Union gaskets must conform to MIL-G-24748, Type A or equal.
5.4.3 Connect each mechanical joint shown on Mapping Plan Enclosure-02, using 2.6 and 2.7 for guidance.
5.4.3.1 Document the controlled assembly joints on QA Form 34A Enclosure-03-1.
(I) “CONTROLLED ASSEMBLY JOINT INSTALLATION”
5.5 Fabricate and install each new closure plate listed in 1.3.6 in accordance with 2.3.
5.5.1 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column(s) A, Lines One through 7.
5.6 Accomplish weld repair of mechanical hole on each existing stringer 5S listed in 1.3.7, using 2.8 for guidance.
See 5.8.4.
5.6.1 Shape mechanical hole to minimum 20 degrees countersink.
5.6.2 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column(s) A, Lines One through 7.
5.7 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
5.8 Notes:
5.8.1 Planner: Code 231A T. Uematsu, 243-9943
Planner: Code 232 K. Nakamura, 070-7787-1977 Planner: Code 233 H. Sasano, 080-9350-1453 Planner: Code 234 H. Komoto, 243-0975 Planner: Code 234 K. Furukawa, 243-2242 Engineer: Code 250 M. Kunugi, 070-7787-2080
5.8.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598
5.8.3 This TGI clears DFS DDG-114-1022-2023 in its entirety.
5.8.4 Installation, maintaining, and removal of cofferdam on exterior side of underwater hull, and preservation work for disturbed exterior surfaces of underwater hull for weld repair of stringer 5S listed in 1.3.7 will be covered by TGI Nos. 38K5212382R02, 38K5212382M02, and 38 K5212382U02 (SRF-JRMC TGI).
5.8.5 JCNs ES01-NA51, ES01-NA53, and ES01-NA54 are related to this TGI.
FOUO
SHIP: DDG-114 CHG/VER: 0/0
5.9 Government Furnished Material (GFM):
5.9.1 SRF-JRMC will provide GFM listed in Appendix ”M”.
5.10 SRF-JRMC will provide the following service work: (TGI No. 38K5212382S02).
5.10.1 [C740] Crane and crane rigging service.
5.10.2 [X99E] Utility service, electrical.
5.10.3 [X99M] Utilities service, including low pressure air supply, water supply, and steam supply.
5.10.4 [C106.1] Safety inspection for SRF-JRMC employees.
5.10.5 [C106.2] Gas free inspection for SRF-JRMC employees.
5.10.6 [C133] QA inspection for (G) symbol(s).
FOUO
J-1
SHIP: DDG-114 CHG/VER: 0/0
APPENDIX "J"
TGI JOB SUMMARY INFORMATION SHEET
SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH
VERSION:
CASREP
CAT:
STRCT 5-300-01-E AY A 0 0
CU PHASE TITLE:
F/O – REPAIR STRUCTURAL MEMEBR IN 5-300-01-E
PRIMARY COMPONENT:
COMPONENT UNIT LIST (FOR ASSEMBLIES):
CMPT 5-300-01-E MS CMPT 4-300-0-E MS REA-V-0127 V-
ATTACHMENT LIST:
1. ENCLOSURE-01 (38K5212382A01-Sketch.pdf) saved on 19-SEP-2024 0000.
2. ENCLOSURE-02 (38K5212382A01-Map.docx) saved on 29-AUG-2024 0000.
3. ENCLOSURE-03 (38K5212382A01-QA34A.docx) saved on 29-AUG-2024 0000.
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
YAGINUMA ,TAKEHIDE
JO: KO: TOTAL MAN HRS: TOTAL MAT’L COST TOTAL DURATION: PLANNING ACCEPTANCE:
38K5212382 A01 1787 $7,437.77 1
CU PHASE DESCRIPTION:
The purpose of this TGI is to repair structural member in 5-300-01-E.
Location of Work:
Air Conditioning Machinery and Pump Room (5-300-01-E) Vacuum Collection Holding Tank Room No. 2 (4-300-0-E) IC and Gyro Room No. 2 (3-300-0-C)
TASK NAME
SHOP TSD/WC TS CREW# MHRS
HIGH RAD
HOURS
RC
GRID#
FOUO
J-2
SHIP: DDG-114 CHG/VER: 0/0
TASK NAME
SHOP TSD/WC TS CREW# MHRS
HIGH RAD
HOURS
RC
GRID#
FOUO
M-1
SHIP: DDG-114 CHG/VER: 0/0
APPENDIX “M”
TGI MATERIAL LIST
SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH
VERSION:
CASREP
CAT:
STRCT 5-300-01-E AY A 0 0
CU PHASE TITLE:
F/O – REPAIR STRUCTURAL MEMEBR IN 5-300-01-E
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV
JOB ORDER: KEY OP:
38K5212382 A01
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
001 M PLATE,ME, ORDERED FOR
KTR
ORIG: C231, T.UEMATSU, 243-
(2FT X 2FT)
9B 9515 002243086 NA 4 N 42645035 4/SF
002 M BEAM,STRUCTURAL, I -,
BEAM,STRUCTURAL, I -SHAPE,
12" X 4" X 14LBS. STEEL,MIL-S-
22698, GRADE AH36,HIGH
TENSILE STRENGTH STEEL
ORDERED FOR KTR
ORIG: C231, T.UEMATSU, 243-
LL4729849 NA 4 N 16/FT
003 M PIPE,METALLIC, ORDERED
FOR KTR
ORIG: C231, T.UEMATSU, 243-
9B 4710 002785344 NA 4 N 42645038 1/FT
004 M SHEET,METAL, ORDERED FOR
KTR
ORIG: C231, T.UEMATSU, 243-
9B 9515 002306720 NA 4 N 42645039 2/SH
NOTES:
FOUO
M-2
SHIP: DDG-114 CHG/VER: 0/0
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
005 M ACOUSTIC, ORDERED FOR
KTR
ORIG: C231, T.UEMATSU, 243-
9Q 5640 LL4558975 NA 4 N 42657404 5/SH
006 M INSULATI, ORDERED FOR KTR
ORIG: C231, T.UEMATSU, 243-
9Q 5640 LL4558976 NA 4 N 42657405 12/SH
007 M CAP,SNAP, ORDERED FOR
KTR
ORIG: C231, T.UEMATSU, 243-
9B 5325 007377648 NA 4 N 42645041
100/EA
008 M ADHESIVE, ORDERED FOR
KTR
ORIG: C231, T.UEMATSU, 243-
9B 8040 002738708 NA 4 Y 42645045 1/GL
009 M TAPE,TEX, ORDERED FOR
KTR
ORIG: C231, T.UEMATSU, 243-
9B 8315 002671632 NA 4 N 42645047 3/RO
010 M TAPE,TEX, ORDERED FOR
KTR
ORIG: C231, T.UEMATSU, 243-
9B 8315 002671633 NA 4 N 42645048 1/RO
011 M MATTING,FLOOR, ORDERED
FOR KTR
ORIG: C231, T.UEMATSU, 243-
9Q 7220 010249040 NA 4 N 42645049 1/RO
201 M GASKET, ORIG: C232 K.
NAKAMURA, 070-7787-1977
ORDRED FOR KTR
UNION GASKET, 2” IPS, MIL-G-
24748, TYPE A
FOR CONTD ASSY JT: ITEM
NO. 9 OF DWG 803-7063850
REV. B
9B 5330 013776202 NA 4 N 42435278 2/EA
400 M COUPLING,TUBE, SIZE: ONE
INCH IPS
MATERIAL: CU-NI 90-10
ORDERED FOR: KTR
ORIG: C234 H. KOMOTO 070-
7787-2047
9B 4730 014635857 NA 4 N 42565088 8/EA
401 M COUPLING,TUBE, SIZE: 1-1/2
INCH IPS
MATERIAL: CU-NI 90-10
ORDERED FOR: KTR
ORIG: C234 H. KOMOTO 070-
7787-2047
9B 4730 014645439 NA 4 N 42565090 4/EA
FOUO
M-3
SHIP: DDG-114 CHG/VER: 0/0
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
450 M INSULATION, PIPE,
INSULATION, PIPE, K-FLEX
ECO, NON-HALOGEN,
SPECIFICATION COMPLIANCE:
EB 4013,
SIZE: 2-1/8"ID X 3/4" THK X 6FT
LG,
UI: EA/6 FT(ONE CONTINUOUS
LENGTH REQUIRED),
**GSA ADVANTAGE ITEM**
ORDER FOR KTR
ORIG: C234 K.FURUKAWA,
243-2242
9B 5970 LL9607843 NA 4 N 42487446 2/EA
451 M INSULATION, PIPE,
INSULATION, PIPE,
BRAND: K-FLEX ECO,
SPECIFICATION COMPLIANCE:
EB 4013,
FOR SIZE: 1" IPS,
SIZE: 1-3/8" ID X 3/4" THK X 6FT
LG,
UI: EA/6 FT(ONE CONTINUOUS
LENGTH REQUIRED),
MATL: NON-HALOGEN,
**GSA ADVANTAGE ITEM**
ORDER FOR KTR
ORIG: C234 K.FURUKAWA,
243-2242
9B 5970 LL4783096 NA 4 N 42487444 4/EA
452 M INSULATION, PIPE,
INSULATION, PIPE, BRAND: K-
FLEX ECO, SPECIFICATION
COMPLIANCE: EB 4013, FOR
SIZE: 2-1/2" IPS, SIZE: 2-7/8" ID
X 3/4" THK X 6FT LG, UI: EA/6
FT(ONE CONTINUOUS
LENGTH REQUIRED), MATL:
NON-HALOGEN, **GSA
ADVANTAGE ITEM**
ORDER FOR KTR
ORIG: C234 K.FURUKAWA,
243-2242
9B 5970 LL9607845 NA 4 N 42487447 2/EA
453 M INSULATION, PIPE,
NSULATION, PIPE, BRAND: K-
FLEX ECO, SPECIFICATION
COMPLIANCE: EB 4013, FOR
SIZE: 6" IPS, SIZE: 6-5/8" ID X
3/4" THK X 6FT LG, UI: EA/6
FT(ONE CONTINUOUS
LENGTH REQUIRED), MATL:
NON-HALOGEN,
ORDER FOR KTR
ORIG: C234 K.FURUKAWA,
243-2242
9B 5640 LL9607850 NA 4 N 42487448 3/EA
454 M INSULATION, INSULATION,
PIPE,
BRAND: K-FLEX ECO,
SPECIFICATION COMPLIANCE:
EB 4013,
FOR SIZE: 8" IPS,
SIZE: 8-5/8" ID X 3/4" THK X 6
FT LG,
UI: EA/6 FT(ONE CONTINUOUS
LENGTH REQUIRED),
MATL: NON-HALOGEN,
ORDER FOR KTR
ORIG: C234 K.FURUKAWA,
243-2242
9B 5970 LL9607851 NA 4 N 42487449 2/EA
FOUO
M-4
SHIP: DDG-114 CHG/VER: 0/0
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
455 M ADHESIVE, ADHESIVE FOR
CLOTH,
ORDER FOR KTR
ORIG: C234 K.FURUKAWA,
243-2242
9B 8040 002738708 NA 4 Y 42485076 1/GL
456 M ADHESIVE, ADHESIVE FOR
PLASTIC TUBE
ORDER FOR KTR
ORIG: C234 K.FURUKAWA,
243-2242
9B 8040 008419773 NA 4 Y 42485093 2/PT
457 M SEALING COMPOUND,
ADHESIVE FOR INSULATION
SLEEVING
ORDER FOR KTR
ORIG: C234 K.FURUKAWA,
243-2242
9B 8030 001742588 NA 4 Y 42485094 1/GL
FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____
☐ NUCLEAR APPENDIX "D"
DEFICIENCY FORM
☐ NON-NUCLEAR
1. SHIP/HULL NO.: 2a. DL or DR No.
(Circle One)
2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:
DDG-114 STRCT 5-300-01-E AY A 0
4a. ICN: 4b. KEY OP: 5. LOC SPACE/LVL: FRAME: P/S/C: 6. CAUSED BY:
38K5212382 A01
7. DESCRIPTION:
8. ORIGINATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:
9. CORRECTIVE ACTION:
10. EVALUATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:
FOR NON-NUCLEAR USE ONLY
11. RFD/RFW REQ’D ☐ LAR REQ'D ☐
ILS MOD REQ’D ☐
SRD/PLAN REV REQ'D ☐
DWG NO.: _____________________ S/A NO.: ___________________
12. ISOLATION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.:
SATISFACTORY:
13. SUBSAFE OQE RECORD? SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
YES ☐ NO ☐
14. CORRECTIVE ACTION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
COMPLETE:
15. INSPECTION REQ’D? INSPECTION COMPLETE/SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
_________:YES ☐ NO ☐
16. RECORDS REVIEW SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
COMPLETE (DR ONLY)
DL’s ISSUED
(DR ONLY)
FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____
☐ NUCLEAR Deficiency Form Continuation Sheet ☐ NON-NUCLEAR
1. SHIP/HULL NO.: 2a. DL or DR No.
(Circle One) 2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:
DDG-114 STRCT 5-300-01-E AY A 0
AIR COND MCHRY & PUMP ROOM (5-300-01-E)
PLAN VIEW
SKETCH
ENCLOSURE-0138K5212382A01 SHEET 1 OF 2
LOCATION MAP OF MECHANICAL HOLE ON STRINGER 5S IN 5-300-01-E
SECT A-A
Tetsuya.Uematsu.ja Rectangle
Tetsuya.Uematsu.ja_1 Line
Tetsuya.Uematsu.ja_2 Line
Tetsuya.Uematsu.ja_3 Line
Tetsuya.Uematsu.ja_4 Line
Tetsuya.Uematsu.ja_5 Line
Tetsuya.Uematsu.ja_6 Line
SECT A-A
STRINGER 5S FR307
STBD LKG INBD
DET A-B
DET A-B
SKETCH
ENCLOSURE-0138K5212382A01 SHEET 2 OF 2
Tetsuya.Uematsu.ja_7 Rectangle
Tetsuya.Uematsu.ja_8 Rectangle
38K5212382A01
MAPPING PLAN
ENCLOSURE-02 SHEET 1 OF 1
CJ-1
CJ-2
COMUSFLTFORCOMINST 4790.3 REV D CHG 3
07 Nov 2023
38K5212382A01 ENCLOSURE-03-1 TOTAL 1
JOINT/COMPONENT ASSEMBLY RECORD Planning must fill in blocks identified by a prior to issuing.
QA FORM 34A
(For Assemblies Not Requiring Torque Documentation)
1. SHIP HULL NO. 2. JCN 3. LWC/SHOP 4. CWP/REC NO. 5. SYSTEM/COMPONENT/ROTATABLE POOL NO USS RALPH JOHNSON DDG-114 ES01-NA51, ES01-NA53 and
ES01-NA54
KTR N/A Valve REA/V0127
6. REFERENCES (Specify Assembly Number if applicable.)
A. DWG: 516-7061971 Rev. - B. DWG: 803-1385721 Rev. Y C. DWG: 803-7063850 Rev. B
D. MAPPING PLAN of 38K5212382A01 E. 38K5212382A01 F.
7. NEW MATERIAL
PC
NO.
REF. JOINT
ID
DESCRIPTION
(Include thickness for shims; diameter and thread pitch for fasteners)
QTY LOE IDENT (E.G., MIC NO/NSN/ROTATABLE POOL
NO)
(FOR LEVEL I FASTENERS: Include Material Marking, Color Code, Heat/Lot Number, and
Manufacturer’s Symbol)
CRAFT
INT
8. JOINT DATA
FOR OTHER THAN JOINT MAKE-UP, DESCRIBE
THE SPECIFIC ATTRIBUTE AND LOCATION OF
THE ACCEPTANCE CRITERIA. IDENTIFY
JOINTS THAT REQUIRE CONTROLLED
ASSEMBLY PROCEDURES.
INSPECTOR (SHIPYARDS ONLY - FOR CONTROLLED ASSEMBLY JOINTS ONLY) & CRAFTSMAN
SIGNATURE CERTIFIES:
(1) JOINT SEALING SURFACES, ALIGNMENT, GAP AND PARALLELISM ARE SAT PER
SPECIFIED REQUIREMENTS AND STUDS HAVE BEEN CHECKED FOR ROTATION IF APPLICABLE, OR
ATTRIBUTE IS ACCEPTABLE PER SPECIFIED CRITERIA.
(2) ALL NEW MATERIAL ASSOCIATED WITH THIS JOINT MEETS SPECIFIED REQUIREMENTS, IS
INSTALLED & LISTED IN BLOCK 7; EXISTING MATERIAL ASSOCIATED WITH THIS JOINT IS
ACCEPTABLE AND CORRECTLY INSTALLED.
FOR FLEET ONLY: FOR NON-CONTROLLED ASSEMBLIES WHEN NO SPECIFIC ATTRIBUTE IS
SPECIFIED, INSPECTOR SIGNATURE CERTIFIES ACCEPTANCE OF LEVEL I MATERIAL ONLY.
JOINT ID & JOINT TYPE OR ATTRIBUTE
DESCRIPTION
JT.
REF
(C) FOR
CRAFTSMAN OR
(I) FOR
INSPECTOR
CRAFTSMAN SIGNATURE/BADGE/DATE (FOR EACH JOINT/ATTRIBUTE)
INSPECTOR SIGNATURE/BADGE/DATE (FOR EACH (I) JOINT/ATTRIBUTE)
(I)
A. CJ-1
A,B,C ,D,E
(I)
B. CJ-2
A,B,C ,D,E
C.
D.
E.
9. LOCKING DEVICE INSTALLED
OR REQD ACTION:
NA
MATL. DESCRIPTION/NSN/PC. NO. JT. ID. CRAFTSMAN SIGNATURE/BADGE/DATE SAT
10. REMARKS (CRAFTSMAN/QAI SUBMIT A DF TO RESOLVE UNSAT DATA) (FOR USE WHEN SIGNATURE DOES NOT ALREADY
APPEAR ON FORM)
INITIAL SIGNATURE/BADGE NO.
11. LWC SUPERVISOR/SHOP SUPERVISOR SIGNATURE/BADGE NO (RECORD
REVIEWED FOR FINAL ACCEPTANCE)
12. QAS SIGNATURE /BADGE NO (RECORD HAS BEEN REVIEWED FOR
COMPLETENESS)
File details come from the government source that posted it. Updated .