This file is a Task Group Instruction (TGI) detailing repair work requirements for the RAST (Recovery Assist, Securing and Traversing) system trough and track components on the USS RALPH JOHNSON (DDG-114). The work involves assessment, repair, and preservation of RAST track plates and troughs located on the Main Deck Weather area between frames 399-475 on both port and starboard sides, including Hangar No. One (1-338-3-Q) and Hangar No. Two (1-338-8-Q).
The TGI specifies procedures including structural integrity assessment, documentation requirements, equipment removal, drainage cleaning, and flow checks. The work period is scheduled from July 14, 2025, through December 11, 2025, with a total estimated 2,475 man-hours and material costs of $17,254.50. The work will be performed at contractor facilities in Yokosuka, Japan, and requires specific documentation including assessment reports, sketches of existing periphery lines, and equipment locations to be submitted to the supervisor.
View the file
Other files
Show 40 more
Latest 50 of 73 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Masato.Endo.ja Typewritten Text
14 JUL 2025
Masato.Endo.ja
11 DEC 2025
FOUO
REF. DOCUMENT DOCUMENT/DRAWING TITLE
NO. /DRAWING
NUMBER
6 DWG 807- Repair Procedure for Specific RAST
7622611 Track/Trough Structural Components
7 DWG 588- RAST SYSTEM TAIL GUIDE
7059142 INSTALLATION AND DETAILS
8 TM RECOVERY ASSIST, SECURING
AD700A1- AND TRAVERSING (RAST)
IPB-000 SYSTEM A/W 42U-1 M
9 DWG Track Components Installation 520345 Control Drawing R.A.S.T. System
3. APPENDICES:
3.1 Appendix "J" TGI Job Summary Information Sheet
3.2 Appendix "M" TGI Material List
3.3 Appendix "D" Deficiency Form
4. GENERAL REQUIREMENTS:
4.1 Not Applicable.
5. PROCEDURE:
REV CHG COPY SOURCE PARA SEC PG CHP
NO. REQ'D DOC
(YIN) (YIN)
A y SE
E N
OT
E
B y AL L
- 14 N
H y AL L
5.1 Accomplish an assessment of each area listed in 1.3.1 for structural integrity, deterioration, pitting, cracks, and area of damage or distortion in accordance with 2.3, using 2.4 for guidance. Document the assessment on 2.5.
(I) "ASSESSMENT"
5.1.1 Submit one legible copy, in hard copy or approved transferrable media, of completed assessment from 2.5 to the SUPERVISOR.
5.2 Prepare a sketch showing each existing periphery line, exact location, and color, each dimension of nonskid coating , preserved coating, and marking, for each equipment listed in 1.3.2 and each surface located in 1.2.1 through 1.2.3.
5.2.1 Submit one legible copy, in hard copy or approved transferrable media, of a report listing results of the requirements of 5.2 to the SUPERVISOR.
5.3 Remove each equipment listed in 1.3.1.1, using 2.4 for guidance.
5.3.1 Disassemble each equipment listed in1 .3.1.1, using 2.4 for guidance.
5.3.2 Retain each equipment and associated mounting hardware for installation.
5.3.3 Matchmark, identify, and retain each removed RAST track plate, RAST track side plate, and access cover plate.
5.4 Clean each RAST trough drain in each RAST track trough free of dirt, grit, and foreign matter, listed in 1.3.1, and located in 1.2.1 through 1.2.3.
5.4.1 Accomplish flow check of drain of RAST track trough listed in 1.3.1, using clean, fresh water. Allowable leakage: None.
3 TGI NO.: RAST TROUGH AY I A
FOUO SHIP: DDG-114 CHGNER:
1/1
Masato.Endo.ja Cross-Out
Masato.Endo.ja
12/20/2024 C-1209 M. ENDO 11030028
APPENDIX "J"
TGI JOB SUMMARY INFORMATION SHEET
I SYSTEM,
I
PLANT NO.: I COMPGNENT -· TYPE: PHASE: REPEAT: CU PH CASREP
VERSION: CAT:
RAST TROUGH AY A 0 1
CU PHASE TITLE:
F /O -ACCOMPLISH ASSESSMENT, REPAIR AND PSV RAST TRACK PLATE AND TROUGH
PRIMARY COMPONENT:
COMPONENT UNIT LIST (FOR ASSEMBLIES):
MAIN DECK WEA STBD MS MAIN DECK WEA PORT MS CMPT 1-338-3-Q MS CMPT 1-338-8-Q
MS
ATTACHMENT LIST:
ZONE MANAGER:
I
ZONE:
I
COMPARTMENT: LEVEL: FRAME:
I
SIDE:
YAGINUMA ,TAKEHIDE
JO: I
��1 38K 5213001
I TOTAL MAN HRS: I TOTAL MAT'L COST
2475 $17,25 4. 5 0
I �OTAL DURATION: I PLANNING ACCEPTANCE:
CU PHASE DESCRIPTION:
The purpose of this TGI is to accomplish assessment, repair and preserve RAST track plate and trough.
Location of Work:
Main Deck Weather, Frames between 399 and 475, Port and Starboard (Stbd) Hangar No. One (1-338-3-Q) Hangar No. 2 (1-338-8-Q) Contractor's Facility
TASK NAME HIGH RAD RC
SHOP TSO/WC TS CREW# MHRS HOURS GRID#
J-1 TGI NO.: RAST TROUGH AY IA 0
FOUO SHIP: DDG -114 CHGNER: 1/ 1
HIGH RAD RC
SHOP TSO/WC TS CREW# MHRS HOURS GRID#
V-01 0 0 0 Version-01: revise document number of Ref. No. 3. C231A Y.
Nakamura, 12/9/2024, Y/Y/N
J-2 TGI NO.: RAST TROUGH AY IA 0
FOUO SHIP: DDG-114 CHGNER: 1/1
TASK NAME
File details come from the government source that posted it. Updated .