This is a Task Group Instruction (TGI) for conducting tightness and operational testing of the #2 Main Lube Oil Shaft system aboard the USS RALPH JOHNSON (DDG-114). The document specifies two main tasks: a Quality Assurance (QA) work component requiring 8 man-hours with one crew member, and a Shop/Fleet (S/F) work component requiring 0 man-hours with one crew member, both to be performed in accordance with reference TP 26212-3-300KTR.
The TGI was prepared by Kazuya Harada on October 4, 2024, approved by Riley Higa on October 8, 2024, and is scheduled for December 7, 2024. The work falls under project K52, system 26212, with job summary ID 123A4163. The document includes specifications for work certification signatures and records review, though these sections are not yet completed. The work is designated as FOUO (For Official Use Only) and appears to be part of a larger maintenance package for the ship's scheduled repair availability in Yokosuka, Japan.
View the file
Other files
Show 40 more
Latest 50 of 73 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
07-DEC-2024 1322
20.14.15.2.9020 (September 2024) ICN: 38K5212363 KeyOp: T01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 26212-3-300KTR TT T 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-114 USS RALPH JOHNSON K52 26212
CU PHASE TITLE: MAIN LUBE OIL, SHAFT #2 (T & OP) - KTR
WORK CERTIFICATION SIGNATURES: DLs
COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
FOUO Pg 1 of 2
ES01NA3N * ES01NA3P * ES01NA61 * ES01NA62
PREPARING ACTIVITY: STATUS: APP WORKING STATUS:
PREPARED BY: CODE: PHONE: DATE:
HARADA, KAZUYA 246.2 3152432048 04-OCT-2024
APPROVED BY: CODE: PHONE: DATE:
HIGA, RILEY 246.2 3152432291 08-OCT-2024
CONCURRED BY: CODE: PHONE: DATE:
REASON FOR WORK/NEED FOR CHANGE:
JCN:
ES01-NA3N * ES01-NA3P * ES01-NA61 * ES01-NA62
SPECIAL REQUIREMENTS:
CU PHASE DESCRIPTION:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
YAGINUMA, TAKEHIDE U
JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:
123A4163
Tightness & Operational Test for Lube Oil System #2 - KTR.
TGI Short Form
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
07-DEC-2024 1322
20.14.15.2.9020 (September 2024) (Continued) ICN: 38K5212363 KeyOp: T01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 26212-3-300KTR TT T 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-114 USS RALPH JOHNSON K52 26212
CU PHASE TITLE: MAIN LUBE OIL, SHAFT #2 (T & OP) - KTR
FOUO Pg 2 of 2
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1 TP 26212-3-300KTR MAIN LUBE OIL, SHAFT #2 (T
& OP) - KTR
LAT Y
TASK NAME / TASK DESCRIPTION
SHOP/
TSD TS
SF
WC
CREW
# MHRS RWRK
(G) QA work:
Accomplish/document the tightness & operational test in accordance with reference, TP 26212-3-300KTR.
33/G1 QA 1 8 N
(S) S/F work:
Accomplish/document the tightness & operational test in accordance with reference, TP 26212-3-300KTR.
/ ES01 1 0 N
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE
REV
ICN: 38K5212363 KEY OP: T01