This is a Task Group Instruction (TGI) document for performing maintenance work on the USS RALPH JOHNSON (DDG-114) JP-5 service tank. The work involves opening, cleaning, and assessing a 1,629-gallon JP-5 service tank (4-390-0-J) located in the Generator Room (3-370-0-E).
The scope includes assessment of the tank's preservation coating, structural integrity, deterioration, and components including sounding tubes, vents, piping, ladders, and manhole covers. The contractor must perform Level II general cleaning and install manhole covers according to specifications. The work period is scheduled from July 14, 2025 to December 11, 2025. SRF-JRMC will provide support services including crane operations, utilities, safety inspections, gas-free inspections, QA inspections, and technical support for tank assessment. The work requires coordination between multiple stakeholders including the planner (Code 231A D. Tamura) and Work Integration Manager (Code 333 T. Yaginuma).
View the file
Other files
Show 40 more
Latest 50 of 73 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
26-NOV-2024 1509
20.14.15.2.9020 (September 2024) ICN: 38K5212313 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: JP5 SVC TK 4-390-0-J AY A 0 0/1
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-114 USS RALPH JOHNSON K52
CU PHASE TITLE: F/O - OPEN, CLEAN, AND ASESS JP-5 SERVICE TANK (4-390-0-J)
WORK CERTIFICATION SIGNATURES: DLs
COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
FOUO Pg 1 of 4
EB14ZAJ2 * EB14ZAH5
PREPARING ACTIVITY: STATUS: APP WORKING STATUS:
PREPARED BY: CODE: PHONE: DATE:
TAMURA, DAISUKE 231A 3152439526 13-SEP-2024
APPROVED BY: CODE: PHONE: DATE:
AOKI, YOSHINORI 231A 3152434503 18-SEP-2024
CONCURRED BY: CODE: PHONE: DATE:
REASON FOR WORK/NEED FOR CHANGE:
JCN:
EB14-ZAH5 * EB14-ZAJ2
SPECIAL REQUIREMENTS:
CU PHASE DESCRIPTION:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
YAGINUMA, TAKEHIDE
JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:
123A1213
1. SCOPE/PURPOSE:
1.1 Title: JP-5 Service Tank (4-390-0-J); open, clean, and assess
1.2 Location of Work:
1.2.1 JP-5 Service Tank (4-390-0-J)
1.2.2 Generator Room (3-370-0-E)
1.3 Identification:
1.3.1 Quantity (One EA), JP-5 Service Tank
Tank No.: 4-390-0-J Capacity: 1,629 Gallons
TGI Short Form
26-NOV-2024 1509
20.14.15.2.9020 (September 2024) (Continued) ICN: 38K5212313 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: JP5 SVC TK 4-390-0-J AY A 0 0/1
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-114 USS RALPH JOHNSON K52
CU PHASE TITLE: F/O - OPEN, CLEAN, AND ASESS JP-5 SERVICE TANK (4-390-0-J)
FOUO Pg 2 of 4
CU PHASE DESCRIPTION (Cont.)
1.3.2 Quantity (One EA), Manhole Cover Plate(s) for 4-390-0-J
Manhole No(s).: 3-391-1 Size: 15 Inches x 23 Inches
1.3.3 Quantity (One EA),Air Vent Hose Connection (AVHC) Cover Plate(s) for 4-390-0-J
AVHC No(s).: 3-393-1 Size: 10 Inches Diameter Material: Steel
1.3.3 Quantity (2 EA), Bolting Ring for Manhole Cover Plate(s) and AVHC Cover Plate(s) for 4-390-0-J
Manhole No(s).: 3-391-1 AVHC No(s).: 3-393-1 Material: Steel
1.4 Security Classification: None.
1.5 Initial Condition: None.
1.6 Contractor work start date: 14 JUL 2025
1.7 Contractor work completion date: 11 DEC 2025
2. PROCEDURE:
2.1 Accomplish the requirements of 099-902YO of Ref. No. 2 for each tank listed in 1.3.1.
2.1.1 Accomplish an assessment of each tank listed in 1.3.1 for existing preservation coating, structural integrity, deterioration, pitting, cracks, and areas of damage or distortion, including sounding tubes, tank/void vents, overflows, piping and associated material, structural members, ladders, anodes, desiccant, tank level indicator (TLI), radar TLI, and their electric cables, stud, and tank top cable penetration, and manhole covers in accordance with Ref. No. 3 and Ref. No. 4. Document the assessment on Ref. No. 4.
(I) "CCIMS ASSESSMENT"
2.1.1.1 Submit one legible copy, in hard copy or approved transferrable media, of completed assessment form Ref. No. 4 to the
SUPERVISOR.
2.1.2 Accomplish the requirements of 009-107 of Ref. No. One.
2.1.2.1 Accomplish the requirements of 009-09 of Ref. No. One.
2.1.2.2 Ensure General cleaning must be Level II .
2.1.3 Install each manhole cover for each tank listed in 1.3.1 in accordance with Figure 075-4-1 of Ref. No. 5.
2.2 Accomplish the requirements of 009-32 of Ref. No. One, including Table 4, Line(s) 11, for tank side surface, and Table 3, 26-NOV-2024 1509
20.14.15.2.9020 (September 2024) (Continued) ICN: 38K5212313 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: JP5 SVC TK 4-390-0-J AY A 0 0/1
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-114 USS RALPH JOHNSON K52
CU PHASE TITLE: F/O - OPEN, CLEAN, AND ASESS JP-5 SERVICE TANK (4-390-0-J)
FOUO Pg 3 of 4
CU PHASE DESCRIPTION (Cont.)
Line(s) 12, for machinery side surface of each cover plate listed in 1.3.2.
2.3 Accomplish the requirements of 009-32 of Ref. No. One for each bolting ring listed in 1.3.3.
2.4 Accomplish the requirements of 009-32 of Ref. No. One for each new and disturbed surface.
2.5 Notes:
2.5.1 Planner: Code 231A D. Tamura, 243-9526
2.5.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5149-0598
2.5.3 Ref. No. 4 is available on P:\C200\C225\Enclosures\C231\Tank and Void Structural and Coating Condition Survey (MRC G1N5).
2.5.4 This TGI meets the intent of DDG CSWT File No. 123-133.
2.5.5 JCNs EB14-ZAH5 and ZB14-ZAJ2 are related to this TGI.
2.6 Government Furnished Material (GFM): None.
2.7 SRF-JRMC will provide the following service work: (TGI No. 38K5212313S02)
2.7.1 [C740] Crane and crane rigging service.
2.7.2 [X99E] Utility service, electrical.
2.7.3 [X99M] Utility service, including low pressure air supply, water supply, and steam supply.
2.7.4 [C106.1] Safety inspection for SRF-JRMC employees.
2.7.5 [C106.2] Gas free inspection for SRF-JRMC employees.
2.7.6 [C133] QA inspection for (G) symbol(s) and data base entry for CCIMS.
2.7.7 [C135] QA inspection for (G) symbol(s).
2.7.8 [C250] Technical support and process of the tank/void assessment results.
26-NOV-2024 1509
20.14.15.2.9020 (September 2024) (Continued) ICN: 38K5212313 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: JP5 SVC TK 4-390-0-J AY A 0 0/1
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-114 USS RALPH JOHNSON K52
CU PHASE TITLE: F/O - OPEN, CLEAN, AND ASESS JP-5 SERVICE TANK (4-390-0-J)
FOUO Pg 4 of 4
OTHER SPECIAL REQUIREMENTS:
CLEANLINESS FOR PIPING SYSTEM/EQUIPMENT LEVEL II, SURFMEPP
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1 NSI FY-25 NAVSEA Standard Items - 1 N 2 LI FY-25 Local Standard Items - ORG N
3 TM T-9630-AB-MMD-
Corrosion Control Assessment and Maintenance Manual
(CCAMM)
- 3 N
4 TM NAVSEA 4790/14 Tank and Void Structural and Coating Condition Survey (MRC G1N5)
- N
5 TM S9086-CJ-STM-
010/CH-075
Fasteners 7 N
TASK NAME / TASK DESCRIPTION
SHOP/
TSD TS
SF
WC
CREW
# MHRS RWRK
Version-1: revise paragraph 2.7.6 and add paragraphs 2.7.7 and 2.7.8.
C231A Y. Aoki, 09/18/2024, -/-/N
/ V-01 0 0 N
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE
REV
ICN: 38K5212313 KEY OP: A01