This is a Task Group Instruction (TGI) document for performing maintenance work on the USS RALPH JOHNSON (DDG-114) JP-5 service tank. The work involves opening, cleaning, and assessing a 1,629-gallon JP-5 service tank (4-390-0-J) located in the Generator Room (3-370-0-E).

The scope includes assessment of the tank's preservation coating, structural integrity, deterioration, and components including sounding tubes, vents, piping, ladders, and manhole covers. The contractor must perform Level II general cleaning and install manhole covers according to specifications. The work period is scheduled from July 14, 2025 to December 11, 2025. SRF-JRMC will provide support services including crane operations, utilities, safety inspections, gas-free inspections, QA inspections, and technical support for tank assessment. The work requires coordination between multiple stakeholders including the planner (Code 231A D. Tamura) and Work Integration Manager (Code 333 T. Yaginuma).

View the file

Other files

File Type Posted
2.03 Amendment 0003 25RA025.pdf PDF
2.03 Amendment 0002 25RA025.pdf PDF
2.03 Amendment 0001 25RA025.pdf PDF
TGI_38K5263408A01_c0v0.pdf PDF
TGI_38K5212351A01_c3v1.rev1.pdf PDF
2.02 Attachment V Contract Data Sheet 25RA025.pdf PDF
TGI_38K5259310A01_c0v0.pdf PDF
TGI_38K5212347A01_c0v0.rev1.pdf PDF
TGI_38K5212352A01_c0v0.rev1.pdf PDF
TGI_38K5212346A01_c0v0.rev1.pdf PDF
TGI_38K5212389A01_c0v0.pdf PDF
TGI_38K5213001A01_c1v1.pdf PDF
TGI_38K5212317_A01_c2v2.rev1.pdf PDF
TGI_38K5212314_A01_c0v0.rev1.pdf PDF
TGI_38K5212315_A01_c0v0.rev1.pdf PDF
TGI_38K5212382A01_c0v0.pdf PDF
TGI_38K5212365A01_c0v0.pdf PDF
TGI_38K5213102A01_c1v1.pdf PDF
TGI_38K5215401A01_c0v0.pdf PDF
TGI_38K5212329_A01_c1v1.rev1.pdf PDF
TGI_38K5212363T01_c0v0.pdf PDF
TGI_38K5212321A01_c2v0.rev1.pdf PDF
TGI_38K5212342A01_c0v0.rev1.pdf PDF
TGI_38K5212364A01_c0v0.pdf PDF
TGI_38K5216702_A01_c0v0.pdf PDF
TGI_38K5212325_A01_c0v0.rev1.pdf PDF
TGI_38K5212377A01_c1v1.pdf PDF
TGI_38K5212312_A01_c0v0.rev1.pdf PDF
TGI_38K5212340A01_c0v0.rev1.pdf PDF
TGI_38K5212323_A01_c0v0.rev1.pdf PDF
TGI_38K5212309_A01_c0v0.rev1.pdf PDF
TGI_38K5212392A01_c1v1.pdf PDF
2.02 Attachment IV N6264925RA025 Request for Information Form.doc DOC document
TGI_38K5216704_A01_c0v0.pdf PDF
TGI_38K5212356A01_c0v0.rev1.pdf PDF
TGI_38K5212391A01_c0v0.pdf PDF
2.02 Attachment II Price Proposal Form N6264925RA025.xlsx XLSX spreadsheet
TGI_38K5212336_A01_c0v0.pdf PDF
TGI_38K5212320_A01_c1v1.rev1.pdf PDF
TGI_38K5212328_A01_c0v0.rev1.pdf PDF
TGI_38K5212319_A01_c2v1.rev1.pdf PDF
TGI_38K5216705_A01_c0v1.pdf PDF
TGI_38K5212390A01_c0v0.pdf PDF
TGI_38K5212330_A01_c0v0.rev1.pdf PDF
TGI_38K5212327_A01_c1v2.rev1.pdf PDF
TGI_38K5212355A01_c0v0.rev1.pdf PDF
2.02 Attachment III N6264925RA025 Government Furnished Property (GFP-GFM listings).xlsx XLSX spreadsheet
TGI_38K5212348A01_c0v0.pdf PDF
TGI_38K5216703_A01_c0v0.pdf PDF
TGI_38K5212311A01_c1v0.rev1.pdf PDF
Show 40 more

Latest 50 of 73 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

26-NOV-2024 1509

20.14.15.2.9020 (September 2024) ICN: 38K5212313 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: JP5 SVC TK 4-390-0-J AY A 0 0/1

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-114 USS RALPH JOHNSON K52

CU PHASE TITLE: F/O - OPEN, CLEAN, AND ASESS JP-5 SERVICE TANK (4-390-0-J)

WORK CERTIFICATION SIGNATURES: DLs

COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

FOUO Pg 1 of 4

EB14ZAJ2 * EB14ZAH5

PREPARING ACTIVITY: STATUS: APP WORKING STATUS:

PREPARED BY: CODE: PHONE: DATE:

TAMURA, DAISUKE 231A 3152439526 13-SEP-2024

APPROVED BY: CODE: PHONE: DATE:

AOKI, YOSHINORI 231A 3152434503 18-SEP-2024

CONCURRED BY: CODE: PHONE: DATE:

REASON FOR WORK/NEED FOR CHANGE:

JCN:

EB14-ZAH5 * EB14-ZAJ2

SPECIAL REQUIREMENTS:

CU PHASE DESCRIPTION:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

YAGINUMA, TAKEHIDE

JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:

123A1213

1. SCOPE/PURPOSE:

1.1 Title: JP-5 Service Tank (4-390-0-J); open, clean, and assess

1.2 Location of Work:

1.2.1 JP-5 Service Tank (4-390-0-J)

1.2.2 Generator Room (3-370-0-E)

1.3 Identification:

1.3.1 Quantity (One EA), JP-5 Service Tank

Tank No.: 4-390-0-J Capacity: 1,629 Gallons

TGI Short Form

26-NOV-2024 1509

20.14.15.2.9020 (September 2024) (Continued) ICN: 38K5212313 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: JP5 SVC TK 4-390-0-J AY A 0 0/1

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-114 USS RALPH JOHNSON K52

CU PHASE TITLE: F/O - OPEN, CLEAN, AND ASESS JP-5 SERVICE TANK (4-390-0-J)

FOUO Pg 2 of 4

CU PHASE DESCRIPTION (Cont.)

1.3.2 Quantity (One EA), Manhole Cover Plate(s) for 4-390-0-J

Manhole No(s).: 3-391-1 Size: 15 Inches x 23 Inches

1.3.3 Quantity (One EA),Air Vent Hose Connection (AVHC) Cover Plate(s) for 4-390-0-J

AVHC No(s).: 3-393-1 Size: 10 Inches Diameter Material: Steel

1.3.3 Quantity (2 EA), Bolting Ring for Manhole Cover Plate(s) and AVHC Cover Plate(s) for 4-390-0-J

Manhole No(s).: 3-391-1 AVHC No(s).: 3-393-1 Material: Steel

1.4 Security Classification: None.

1.5 Initial Condition: None.

1.6 Contractor work start date: 14 JUL 2025

1.7 Contractor work completion date: 11 DEC 2025

2. PROCEDURE:

2.1 Accomplish the requirements of 099-902YO of Ref. No. 2 for each tank listed in 1.3.1.

2.1.1 Accomplish an assessment of each tank listed in 1.3.1 for existing preservation coating, structural integrity, deterioration, pitting, cracks, and areas of damage or distortion, including sounding tubes, tank/void vents, overflows, piping and associated material, structural members, ladders, anodes, desiccant, tank level indicator (TLI), radar TLI, and their electric cables, stud, and tank top cable penetration, and manhole covers in accordance with Ref. No. 3 and Ref. No. 4. Document the assessment on Ref. No. 4.

(I) "CCIMS ASSESSMENT"

2.1.1.1 Submit one legible copy, in hard copy or approved transferrable media, of completed assessment form Ref. No. 4 to the

SUPERVISOR.

2.1.2 Accomplish the requirements of 009-107 of Ref. No. One.

2.1.2.1 Accomplish the requirements of 009-09 of Ref. No. One.

2.1.2.2 Ensure General cleaning must be Level II .

2.1.3 Install each manhole cover for each tank listed in 1.3.1 in accordance with Figure 075-4-1 of Ref. No. 5.

2.2 Accomplish the requirements of 009-32 of Ref. No. One, including Table 4, Line(s) 11, for tank side surface, and Table 3, 26-NOV-2024 1509

20.14.15.2.9020 (September 2024) (Continued) ICN: 38K5212313 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: JP5 SVC TK 4-390-0-J AY A 0 0/1

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-114 USS RALPH JOHNSON K52

CU PHASE TITLE: F/O - OPEN, CLEAN, AND ASESS JP-5 SERVICE TANK (4-390-0-J)

FOUO Pg 3 of 4

CU PHASE DESCRIPTION (Cont.)

Line(s) 12, for machinery side surface of each cover plate listed in 1.3.2.

2.3 Accomplish the requirements of 009-32 of Ref. No. One for each bolting ring listed in 1.3.3.

2.4 Accomplish the requirements of 009-32 of Ref. No. One for each new and disturbed surface.

2.5 Notes:

2.5.1 Planner: Code 231A D. Tamura, 243-9526

2.5.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5149-0598

2.5.3 Ref. No. 4 is available on P:\C200\C225\Enclosures\C231\Tank and Void Structural and Coating Condition Survey (MRC G1N5).

2.5.4 This TGI meets the intent of DDG CSWT File No. 123-133.

2.5.5 JCNs EB14-ZAH5 and ZB14-ZAJ2 are related to this TGI.

2.6 Government Furnished Material (GFM): None.

2.7 SRF-JRMC will provide the following service work: (TGI No. 38K5212313S02)

2.7.1 [C740] Crane and crane rigging service.

2.7.2 [X99E] Utility service, electrical.

2.7.3 [X99M] Utility service, including low pressure air supply, water supply, and steam supply.

2.7.4 [C106.1] Safety inspection for SRF-JRMC employees.

2.7.5 [C106.2] Gas free inspection for SRF-JRMC employees.

2.7.6 [C133] QA inspection for (G) symbol(s) and data base entry for CCIMS.

2.7.7 [C135] QA inspection for (G) symbol(s).

2.7.8 [C250] Technical support and process of the tank/void assessment results.

26-NOV-2024 1509

20.14.15.2.9020 (September 2024) (Continued) ICN: 38K5212313 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: JP5 SVC TK 4-390-0-J AY A 0 0/1

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-114 USS RALPH JOHNSON K52

CU PHASE TITLE: F/O - OPEN, CLEAN, AND ASESS JP-5 SERVICE TANK (4-390-0-J)

FOUO Pg 4 of 4

OTHER SPECIAL REQUIREMENTS:

CLEANLINESS FOR PIPING SYSTEM/EQUIPMENT LEVEL II, SURFMEPP

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1 NSI FY-25 NAVSEA Standard Items - 1 N 2 LI FY-25 Local Standard Items - ORG N

3 TM T-9630-AB-MMD-

Corrosion Control Assessment and Maintenance Manual

(CCAMM)

- 3 N

4 TM NAVSEA 4790/14 Tank and Void Structural and Coating Condition Survey (MRC G1N5)

- N

5 TM S9086-CJ-STM-

010/CH-075

Fasteners 7 N

TASK NAME / TASK DESCRIPTION

SHOP/

TSD TS

SF

WC

CREW

# MHRS RWRK

Version-1: revise paragraph 2.7.6 and add paragraphs 2.7.7 and 2.7.8.

C231A Y. Aoki, 09/18/2024, -/-/N

/ V-01 0 0 N

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE

REV

ICN: 38K5212313 KEY OP: A01

File details come from the government source that posted it. Updated .