TGI_38K5212317_A01_c2v2.rev1.pdf

PDF 241 KB Posted

Attached to
USS RALPH JOHNSON DDG114 FY25 SRA 5C1 Bundle 2 (YOKOSUKA, JAPAN)
Solicitation number
N6264925RA025
Issued by

About this file

This is a Task Group Instruction (TGI) document for maintenance work on the USS RALPH JOHNSON (DDG-114) fuel system, specifically focusing on opening and cleaning the Fuel Expansion Seawater Overflow Tank Group-1 (5-214-1-F). The document includes detailed specifications for work locations across multiple ship compartments, including the CPO Baggage Room, Crew Living Space, Sonar Cooling Equipment Room, and Engine Room areas.

The work involves maintaining one 3,480-gallon fuel expansion seawater overflow tank and associated components, including two manhole cover plates with specific dimensions (15x18 inches and 15x23 inches). The document specifies Level III cleanliness requirements for piping systems/equipment and includes procedures for tank cleaning, surface preparation, and inspection requirements. The work is scheduled to be performed between July 14, 2025, and December 11, 2025, at Yokosuka Naval Base. The TGI document has undergone two changes: an administrative change on September 14, 2024, and a revision of task names for tasks one through four on September 18, 2024.

View the file

Other files

File Type Posted
2.03 Amendment 0003 25RA025.pdf PDF
2.03 Amendment 0002 25RA025.pdf PDF
2.03 Amendment 0001 25RA025.pdf PDF
TGI_38K5263408A01_c0v0.pdf PDF
TGI_38K5212351A01_c3v1.rev1.pdf PDF
2.02 Attachment V Contract Data Sheet 25RA025.pdf PDF
TGI_38K5259310A01_c0v0.pdf PDF
TGI_38K5212347A01_c0v0.rev1.pdf PDF
TGI_38K5212352A01_c0v0.rev1.pdf PDF
TGI_38K5212346A01_c0v0.rev1.pdf PDF
TGI_38K5212389A01_c0v0.pdf PDF
TGI_38K5213001A01_c1v1.pdf PDF
TGI_38K5212314_A01_c0v0.rev1.pdf PDF
TGI_38K5212315_A01_c0v0.rev1.pdf PDF
TGI_38K5212382A01_c0v0.pdf PDF
TGI_38K5212365A01_c0v0.pdf PDF
TGI_38K5213102A01_c1v1.pdf PDF
TGI_38K5215401A01_c0v0.pdf PDF
TGI_38K5212329_A01_c1v1.rev1.pdf PDF
TGI_38K5212363T01_c0v0.pdf PDF
TGI_38K5212321A01_c2v0.rev1.pdf PDF
TGI_38K5212342A01_c0v0.rev1.pdf PDF
TGI_38K5212364A01_c0v0.pdf PDF
TGI_38K5216702_A01_c0v0.pdf PDF
TGI_38K5212325_A01_c0v0.rev1.pdf PDF
TGI_38K5212377A01_c1v1.pdf PDF
TGI_38K5212312_A01_c0v0.rev1.pdf PDF
TGI_38K5212340A01_c0v0.rev1.pdf PDF
TGI_38K5212313_A01_c0v1.rev1.pdf PDF
TGI_38K5212323_A01_c0v0.rev1.pdf PDF
TGI_38K5212309_A01_c0v0.rev1.pdf PDF
TGI_38K5212392A01_c1v1.pdf PDF
2.02 Attachment IV N6264925RA025 Request for Information Form.doc DOC document
TGI_38K5216704_A01_c0v0.pdf PDF
TGI_38K5212356A01_c0v0.rev1.pdf PDF
TGI_38K5212391A01_c0v0.pdf PDF
2.02 Attachment II Price Proposal Form N6264925RA025.xlsx XLSX spreadsheet
TGI_38K5212336_A01_c0v0.pdf PDF
TGI_38K5212320_A01_c1v1.rev1.pdf PDF
TGI_38K5212328_A01_c0v0.rev1.pdf PDF
TGI_38K5212319_A01_c2v1.rev1.pdf PDF
TGI_38K5216705_A01_c0v1.pdf PDF
TGI_38K5212390A01_c0v0.pdf PDF
TGI_38K5212330_A01_c0v0.rev1.pdf PDF
TGI_38K5212327_A01_c1v2.rev1.pdf PDF
TGI_38K5212355A01_c0v0.rev1.pdf PDF
2.02 Attachment III N6264925RA025 Government Furnished Property (GFP-GFM listings).xlsx XLSX spreadsheet
TGI_38K5212348A01_c0v0.pdf PDF
TGI_38K5216703_A01_c0v0.pdf PDF
TGI_38K5212311A01_c1v0.rev1.pdf PDF
Show 40 more

Latest 50 of 73 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

FOUO: Public availability to be determined under 5 USC 552

TASK GROUP INSTRUCTION

AIM REV 20.11.4.0 (OCTOBER 2020)

TGI COMPONENT NAME: TYPE: PHASE: REPEAT: CHANGE:

NO.: FO TK GP-1 5-214-1-F AY A 0 2

SHIP/HULL NO.: SHIP/HULL NAME: SYSTEM: PROJ/WO NO: CASREP CAT:

DDG-114 USS RALPH JOHNSON K52

CU PHASE TITLE:

F/O - OPEN AND CLEAN FUEL EXPANSION SEAWATER OVERFLOW TANK GROUP-1 (5-214-1-F)

PREPARING ACTIVITY:

PREPARED BY: CODE PHONE DATE

DAISUKE TAMURA 231A. 315-243-9526 14-SEP-2024

APPROVED BY: CODE PHONE DATE

YUUJI NAKAMURA 231A 315-243-6041 14-SEP-2024

CONCURRED BY: CODE PHONE DATE

CONCURRED BY: CODE PHONE DATE

CONCURRED BY: CODE PHONE DATE

CONCURRED BY: CODE PHONE DATE

REASON FOR WORK/NEED FOR CHANGE:

Task names of task numbers one through 4 were incorrect.

CHANGE INSTRUCTIONS:

CH-1: Admin Change. (09/14/2024) CH-2: Revise task names of task numbers one through 4. (09/18/2024)

SPECIAL REQUIREMENTS:

CLEANLINESS FOR PIPING SYSTEM/EQUIPMENT LEVEL III, SURFMEPP

WORK CERTIFICATION SIGNATURES

COMPLETION OF WORK REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:

ACCEPTANCE OF COMPLETED WORK

PHYSICAL INSPECTION PHYSICAL INSPECTION COMPLETED: BADGE NO.: SHOP/CODE: PHONE: DATE:

REQUIRED:☐YES ☒NO

RECORDS REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:

TGI NO.: FO TK GP-1 5-214-1-F AY A 0

FOUO

SHIP: DDG-114 CHG/VER: 2/2

LIST OF EFFECTIVE PAGES

SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO.

1-5 J-1 M-1

1. SCOPE/PURPOSE

1.1 Title: Fuel Expansion Seawater Overflow Tank Group-1 (5-214-1-F); open and clean

1.2 Location of Work:

1.2.1 CPO Baggage Room (3-78-1-A)

1.2.2 Crew Baggage Room No. One (3-78-2-A)

1.2.3 Crew Living Space No. 2 (3-97-02-L)

1.2.4 Sonar Cooling Equipment Room (4-42-0-Q)

1.2.5 Auxiliary Machinery Room No. One (4-126-0-E)

1.2.6 Engine Room No. One (4-174-0-E)

1.2.7 Fuel Expansion Seawater Overflow Tank Group-1 (5-214-1-F)

1.3 Identification:

1.3.1 Quantity (One EA), Fuel Expansion Seawater Overflow Tank Group-1

Tank No. 5-214-1-F Capacity: 3,480 Gallons

1.3.2 Quantity (One Lot/11 Tanks), Fuel Tank Group-1 and Group-2

Total Capacity: 150,248 Gallons Required amount of water to dewater: 49,169 Gallons

1.3.2.1 Fuel Receiving Tank Group-1

Tank No. 4-78-1-F Capacity: 11,706 Gallons

1.3.2.2 Fuel Tank Group-1

Tank No. 5-42-0-F Capacity: 13,623 Gallons

1.3.2.3 Fuel Tank Group-1

Tank No. 5-78-1-F Capacity: 15,800 Gallons

1.3.2.4 Fuel Tank Group-1

FOUO

SHIP: DDG-114 CHG/VER: 2/2

Tank No. 5-126-1-F Capacity: 19,596 Gallons

1.3.2.5 Fuel Tank Group-1

Tank No. 5-174-1-F Capacity: 15,434 Gallons

1.3.2.6 Fuel Expansion Seawater OverflowTank Group-1

Tank No. 5-214-1-F Capacity: 3,480 Gallons

1.3.2.7 Fuel Receiving Tank Group-2

Tank No. 4-78-2-F Capacity: 11,785 Gallons

1.3.2.8 Fuel Tank Group-2

Tank No. 5-78-2-F Capacity: 16,200 Gallons

1.3.2.9 Fuel Tank Group-2

Tank No. 5-126-2-F Capacity: 19,222 Gallons

1.3.2.10 Fuel Tank Group-2

Tank No. 5-174-4-F Capacity: 21,208 Gallons

1.3.2.11 Fuel Expansion Seawater OverflowTank Group-2

Tank No. 5-212-4-F Capacity: 2,194 Gallons

1.3.3 Quantity (2 EA), Manhole Cover Plate(s) for 5-214-1-F

1.3.3.1 Quantity (One EA), Manhole Cover Plate

Manhole No(s).: 4-217-1 Size: 15 Inches x 18 Inches Material: Steel

1.3.3.2 Quantity (One EA), Manhole Cover Plate

Manhole No(s).: 4-217-3 Size: 15 Inches x 23 Inches Material: Steel

1.3.4 Quantity (2 EA), Bolting Ring for Manhole Cover Plate(s) for 5-214-1-F

Manhole No(s).: 4-217-1 and 4-217-3

FOUO

SHIP: DDG-114 CHG/VER: 2/2

Material: Steel

1.4 Security Classification: None. 1.5 Initial Condition:

None.

1.6 Contractor work start date: 14 JUL 2025

1.7 Contractor work completion date: 11 DEC 2025

2. REFERENCES:

REF.

NO.

DOCUMENT

/DRAWING

NUMBER

DOCUMENT/DRAWING TITLE REV CHG

NO.

COPY

REQ’D

(Y/N)

SOURCE

DOC

(Y/N)

PARA SEC PG CHP

1 NSI FY-25 NAVSEA Standard Items - 1 N 2 LI FY-25 Local Standard Items - ORG N

3 TM S9086-

CJ-STM-

010/CH-075

Fasteners 7 N

3. APPENDICES:

3.1 Appendix “J” TGI Job Summary Information Sheet

3.2 Appendix “M” TGI Material List

3.3 Appendix “D” Deficiency Form

4. GENERAL REQUIREMENTS:

4.1 Not Applicable.

5. PROCEDURE:

5.1 Accomplish the requirements of 099-902YO of 2.2 for each tank listed in 1.3.1.

5.1.1 Accomplish the requirements of 099-909YO of 2.2 for each tank listed in 1.3.2.

5.1.1.1 Accomplish the requirements of 009-09 of 2.1.

5.1.2 Accomplish the requirements of 009-107 of 2.1 for each tank listed in 1.3.1.

5.1.2.1 Ensure General Cleaning must be Level III.

5.1.3 Install each manhole cover for each tank listed in 1.3.1 in accordance with Figure 075-4-1 of 2.3.

5.2 Accomplish the requirements of 009-32 of 2.1, including Table 4, Line(s) 11, for tank side surface, and Table 3, Line(s) 12, for machinery space side surface of each cover plate listed in 1.3.3.

5.3 Accomplish the requirements of 009-32 of 2.1 for each bolting ring listed in 1.3.4.

5.4 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.

5.5 Notes:

Masato.Endo.ja Cross-Out

Masato.Endo.ja Typewritten Text

12/14/2024 C-1209 M. ENDO 11030028

FOUO

SHIP: DDG-114 CHG/VER: 2/2

5.5.1 Planner: Code 231A D. Tamura, 243-9526

5.5.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5149-0598

5.5.3 This TGI meets the intent of DDG CSWT File No. 123-133.

5.5.4 JCN EB14-ZA86 is related to this TGI.

5.6 Government Furnished Material (GFM): None.

5.7 SRF-JRMC will provide the following service work: (TGI No. 38K5212317S02)

5.7.1 [C740] Crane and crane rigging service.

5.7.2 [X99E] Utility service, electrical.

5.7.3 [X99M] Utility service, including low pressure air supply, water supply, and steam supply.

5.7.4 [C106.1] Safety inspection for SRF-JRMC employees.

5.7.5 [C106.2] Gas free inspection for SRF-JRMC employees.

5.7.6 [C133] QA inspection for (G) symbol(s).

FOUO

J-1

SHIP: DDG-114 CHG/VER: 2/2

APPENDIX "J"

TGI JOB SUMMARY INFORMATION SHEET

SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH

VERSION:

CASREP

CAT:

FO TK GP-1 5-214-1-F AY A 0 2

CU PHASE TITLE:

F/O - OPEN AND CLEAN FUEL EXPANSION SEAWATER OVERFLOW TANK GROUP-1 (5-214-1-F)

PRIMARY COMPONENT:

COMPONENT UNIT LIST (FOR ASSEMBLIES):

FOCT 4-78-1-F TK FOCT 4-78-2-F TK FOCT 5-42-0-F TK MANHOLE 4-217-1 HA FOCT 5-126-1-

F TK FOCT 5-126-2-F TKFOCT 5-212-4-F TKFOCT 5-214-1-F TKFOCT 5-78-1-F TK FOCT

5-78-2-F TK FOCT 5-174-1-F TKFOCT 5-174-4-F TKMANHOLE 4-217-3 HA

ATTACHMENT LIST:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

YAGINUMA ,TAKEHIDE

JO: KO: TOTAL MAN HRS: TOTAL MAT’L COST TOTAL DURATION: PLANNING ACCEPTANCE:

38K5212317 A01 813 $0.00 1

CU PHASE DESCRIPTION:

The purpose of this TGI is to open and clean fuel expansion seawater overflow tank group-1, 5-214-1-F

Location of Work:

CPO Baggage Room (3-78-1-A) Crew Baggage Room No. One (3-78-2-A) Crew Living Space No. 2 (3-97-02-L) Sonar Cooling Equipment Room (4-42-0-Q) Auxiliary Machinery Room No. One (4-126-0-E) Engine Room No. One (4-174-0-E) Fuel Expansion Seawater Overflow Tank Group-1 (5-214-1-F)

TASK NAME

SHOP TSD/WC TS CREW# MHRS

HIGH RAD

HOURS

RC

GRID#

Version-1: change to long form. C231A Y. Nakamura -/-/N V-01 0 0 0

Version-2: revise task names of task No. One through No. 4.

C231A Y. Aoki, 09/18/2024, -/-/N

V-02 0 0 0

FOUO

M-1

SHIP: DDG-114 CHG/VER: 2/2

APPENDIX “M”

TGI MATERIAL LIST

SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH

VERSION:

CASREP

CAT:

FO TK GP-1 5-214-1-F AY A 0 2

CU PHASE TITLE:

F/O - OPEN AND CLEAN FUEL EXPANSION SEAWATER OVERFLOW TANK GROUP-1 (5-214-1-F)

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING

NUMBER

DOCUMENT/DRAWING TITLE REV

JOB ORDER: KEY OP:

38K5212317 A01

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

NOTES:

FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____

☐ NUCLEAR APPENDIX "D"

DEFICIENCY FORM

☐ NON-NUCLEAR

1. SHIP/HULL NO.: 2a. DL or DR No.

(Circle One)

2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:

DDG-114 FO TK GP-1 5-214-1-F AY A 0

4a. ICN: 4b. KEY OP: 5. LOC SPACE/LVL: FRAME: P/S/C: 6. CAUSED BY:

38K5212317 A01

7. DESCRIPTION:

8. ORIGINATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:

9. CORRECTIVE ACTION:

10. EVALUATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:

FOR NON-NUCLEAR USE ONLY

11. RFD/RFW REQ’D ☐ LAR REQ'D ☐

ILS MOD REQ’D ☐

SRD/PLAN REV REQ'D ☐

DWG NO.: _____________________ S/A NO.: ___________________

12. ISOLATION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.:

SATISFACTORY:

13. SUBSAFE OQE RECORD? SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.

YES ☐ NO ☐

14. CORRECTIVE ACTION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.

COMPLETE:

15. INSPECTION REQ’D? INSPECTION COMPLETE/SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.

_________:YES ☐ NO ☐

16. RECORDS REVIEW SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.

COMPLETE (DR ONLY)

DL’s ISSUED

(DR ONLY)

FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____

☐ NUCLEAR Deficiency Form Continuation Sheet ☐ NON-NUCLEAR

1. SHIP/HULL NO.: 2a. DL or DR No.

(Circle One) 2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:

DDG-114 FO TK GP-1 5-214-1-F AY A 0

File details come from the government source that posted it. Updated .