This is a pricing proposal spreadsheet template for solicitation N6264925RA025 for ship repairs on the USS RALPH JOHNSON (DDG-114) during its FY25 SRA 5C1 Bundle 2 availability. The template requires contractors to provide labor hours, costs, and pricing for 66 Task Group Instructions (TGIs) covering various ship maintenance tasks including tank cleaning/repairs, structural repairs, preservation work, and system overhauls. The spreadsheet breaks down costs into in-house labor hours, subcontractor labor hours, material costs, and other direct costs (ODC), all to be quoted in Japanese Yen.
The work includes repairs to multiple fuel tanks, oil tanks, waste tanks, structural members, watertight hatches, and deck coverings throughout the ship. Notable items include VCHT piping replacement, flight deck safety net frame preservation, and GTM intake repairs. The template includes an 8.98% growth CLIN allocation. Labor categories specified include SFTR, INSL, WELD, SMTL, RGRS, PNTR, ELEC, PFTR, and QA positions. Each TGI has its own detailed worksheet for contractors to input staffing plans, labor rates, and associated costs.
View the file
Other files
Show 40 more
Latest 50 of 73 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUMMARY
OFFEROR/COMPANY NAME:
| TAB | SUMMARY | SUMMARY | CLIN | Total Labor (MH) | Labor Cost | Material Cost | ODC Cost | Proposed Price |
| SOLICITATION NO: | N6264925RA025 | CLIN 0001(66 TGIs) | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| SHIP NAME: | USS RALPH JOHNSON (DDG-114) | CLIN 0002 (Growth CLIN) | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| AVAILABILITY: | FY25 SRA 5C1 Bundle 2 | Total for All CLIN | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Total TGIs (Specify Total) | 66 | Total Evaluated Price | ¥0 |
| Growth CLIN % | 8.98% |
| Note to Offerors: The values in this Summary table is linked to the corresponding data from Tabs for each TGI listed, manual input is not necessary. | |||||||||
| No. | TGI No. | DESCRIPTION | Proposed Labor | Material/ODCs | Proposed Price (JPY) | ||||
| In-House Labor (MH) | Sub-Contractor Labor (MH) | Total Labor (MH) | Overall Total Labor Cost (JPY) | Material Cost (JPY) | ODC (JPY) | ||||
| 1 | 38K5212309-A01 | F/O - CLEAN, ASSESS, AND REPAIR CPCH PROP HYDR OIL SUMP TANK (4-208-1-F) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 2 | 38K5212311-A01 | F/O - CLEAN, ASSESS, AND REPAIR CPCH PROP HYDR OIL SUMP TANK (4-254-2-F) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 3 | 38K5212312-A01 | F/O - CLEAN AND ASSESS JP-5 SERVICE TANK (4-386-0-J) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 4 | 38K5212313-A01 | F/O - OPEN, CLEAN, AND ASESS JP-5 SERVICE TANK (4-390-0-J) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 5 | 38K5212314-A01 | F/O – CLEAN, ASSESS, AND REPAIR MRG LUBRICATING OIL SUMP TANK (5-254-6-F) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 6 | 38K5212315-A01 | F/O – CLEAN, ASSESS, AND REPAIR MRG LUBRICATING OIL SUMP TANK (5-206-1-F) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 7 | 38K5212316-A01 | F/O - CLEAN, ASSESS, REPAIR, AND PRESERVE FUEL TANK GROUP-1 TANK (5-174-1-F) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 8 | 38K5212317-A01 | F/O - OPEN AND CLEAN FUEL EXPANSION SEAWATER OVERFLOW TANK GROUP-1 (5-214-1-F) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 9 | 38K5212318-A01 | F/O – CLEAN, ASSESS, REPAIR, AND PRESERVE FUEL EXP SW OVFL TK GP-2 (5-212-4-F) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 10 | 38K5212319-A01 | F/O - CLN, ASSESS, RPR, AND PRSV FUEL TANK GROUP-2 (5-126-2-F) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 11 | 38K5212320-A01 | F/O - CLN, ASSESS, RPR, AND PRSV FUEL TANK GROUP-2 (5-174-4-F) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 12 | 38K5212321-A01 | F/O - CLEAN, ASSESS, REPAIR, AND PRESERVE FUEL TANK GROUP-1 (5-42-0-F) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 13 | 38K5212322-A01 | F/O - CLN, ASSESS, RPR, AND PRSV FUEL TANK GROUP-2 (5-78-2-F) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 14 | 38K5212323-A01 | F/O – CLEAN, ASSESS, REPAIR, AND PRESERVE OWD COLLECTING TANK (5-174-2-F) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 15 | 38K5212324-A01 | F/O - CLN, ASSESS, RPR, AND PRSV OILY WASTE DRAIN COLLECTING TANK (5-296-1-F) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 16 | 38K5212325-A01 | F/O – CLEAN, ASSESS, REPAIR, AND PSV GTRB WASTE DR COLLECTING TANK (5-177-1-F) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 17 | 38K5212326-A01 | F/O - CLEAN AND ASSESS GAS TURBINE WASTE DRAIN COLLECTING TANK (4-370-2-F) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 18 | 38K5212327-A01 | F/O - CLEAN, ASSESS, REPAIR, AND PRESERVE OILY WASTE HOLDING TANK (5-220-2-F) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 19 | 38K5212328-A01 | F/O – CLEAN AND ASSESS GAS TURBINE WASTE DRAIN COLLECTING TANK (5-300-0-F) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 20 | 38K5212329-A01 | F/O – CLEAN LUBRICATING OIL SETTLING TANK (3-254-2-F) & REPLACE MANHOLE ASSY | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 21 | 38K5212330-A01 | F/O – CLEAN, ASSESS, REPAIR, AND PRESERVE WASTE OIL TANK (5-220-1-F) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 22 | 38K5212331-A01 | F/O - CLEAN, ASSESS, RPR, AND PRESERVE GTRB WASTE DR COLLECTING TANK (5-292-1-F) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 23 | 38K5212336-A01 | F/O - OPEN AND CLEAN FUEL TANK GP-4 (4-272-2-F) AND FUEL TANK GP-4 (5-264-2-F) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 24 | 38K5212337-A01 | F/O - PRESERVE DECK PLATING IN 3-42-1-T | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 25 | 38K5212340-A01 | F/O – OPEN AND CLEAN FUEL RECEIVING TANK GP-3 (4-174-1-F) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 26 | 38K5212341-A01 | F/O - CLEAN, ASSESS, REPAIR, AND PRESERVE PLMB WASTE DRAIN TANK NO. ONE | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 27 | 38K5212342-A01 | F/O - CLN, ASSESS, RPR, AND PRSV PLUMBING WASTE DRAIN TANK NO. 2 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 28 | 38K5212343-A01 | F/O – CLEAN AND ASSESS WASTE WATER DRAIN COLLECTING TANK (5-292-2-W) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 29 | 38K5212344-A01 | F/O - CLN, ASSESS, RPR, AND PRSV WASTE WATER DRAIN COLLECTING TANK (5-212-2-W) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 30 | 38K5212345-A01 | F/O – CLEAN, ASSESS, REPAIR, PSV FOREPEAK TK (4-P-0-W) & REPLACE MH ASSY | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 31 | 38K5212346-A01 | F/O - OPEN AND CLEAN FUEL SERVICE TANK (4-220-4-F) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 32 | 38K5212347-A01 | F/O - OPEN AND CLEAN FUEL SERVICE TANK (4-220-1-F) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 33 | 38K5212348-A01 | F/O - CLN CHAIN LKR & CHAIN LKR SUMP 3-6-1-Q, 3-6-2-Q, & 3-12-0-W & REPL MH AY | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 34 | 38K5212351-A01 | F/O - OPEN AND CLEAN FUEL TANK GROUP-1 (5-126-1-F) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 35 | 38K5212352-A01 | F/O – OPEN AND CLEAN FUEL TANK GP-3 (5-254-3-F) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 36 | 38K5212353-A01 | F/O – OPEN & CLEAN FUEL RECEIVING TK GP-1 (4-78-1-F) & FUEL TK GP-1 (5-78-1-F) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 37 | 38K5212354-A01 | F/O - OPEN AND CLEAN FUEL TANK GROUP-4 (5-220-4-F) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 38 | 38K5212355-A01 | F/O – OPEN AND CLEAN FUEL TANK GP-3 (5-220-3-F) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 39 | 38K5212356-A01 | F/O - OPEN AND CLEAN COFFERDAM (5-204-1-V) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 40 | 38K5212357-A01 | F/O - OPEN AND CLEAN VOID (5-34-0-V) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 41 | 38K5212358-A01 | F/O - OPEN AND CLEAN COFFERDAM (5-254-4-V) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 42 | 38K5212363-A01 | REPAIR STRUCTURAL MEMBER AND MANHOLE ASSEMBLY IN 4-254-0-E | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 43 | 38K5212363-T01 | MAIN LUBE OIL, SHAFT #2 (T & OP) - KTR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 44 | 38K5212364-A01 | F/O – REPLACE CABLE SUPPORT FOR ELEX CABLE IN 02-186-0-Q | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 45 | 38K5212365-A01 | F/O – INSPECT, REPAIR, AND PRESERVE NO. 2A AND NO. 2B GTM INTAKE | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 46 | 38K5212377-A01 | F/O – REPAIR HORIZONTAL STIFFENER IN 01-378-2-Q AND 01-380-2-A | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 47 | 38K5212382-A01 | F/O – REPAIR STRUCTURAL MEMEBR IN 5-300-01-E | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 48 | 38K5212388-A01 | F/O - REPAIR TRANSVERSE BULKHEAD PLATE AND GRATING SUPPORT IN 3-97-2-T | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 49 | 38K5212389-A01 | F/O - REPAIR VERTICAL STIFFENER ON LONGITUDINAL BULKHEAD FR 100 IN 3-97-1-T | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 50 | 38K5212390-A01 | PRESERVE WIRNIG TRUNK ON 04 LEVEL AND 05 LEVEL | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 51 | 38K5212391-A01 | F/O - REPAIR STRUCTURAL MEMBER IN 4-174-0-E | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 52 | 38K5212392-A01 | F/O – REPAIR STRUCTURAL MEMBER IN 0 1/2-18-0-A | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 53 | 38K5212393-A01 | F/O - REPAIR STRUCTURE MEMBERS IN 4-370-5-A | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 54 | 38K5213001-A01 | F/O - ACCOMPLISH ASSESSMENT, REPAIR AND PSV RAST TRACK PLATE AND TROUGH | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 55 | 38K5213102-A01 | F/O - REPLACE NONSKID SYSTEM ON AMMO SRIKEDOWN PLATFORM IN 4-72-0-Q | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 56 | 38K5215401-A01 | F/O - PRESERVE UNDER SIDE OF BREDGE WING, PORT | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 57 | 38K5216702-A01 | F/O - OVERHAUL WATERTIGHT HATCH 1-444-2 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 58 | 38K5216703-A01 | F/O - OVERHAUL WATERTIGHT HATCH 1-440-2 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 59 | 38K5216704-A01 | F/O - OVERHAUL WTRTT HATCH AND SCUTTLE 1-428-1 IN WEA DK AND FAB BRACE ROD | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 60 | 38K5216705-A01 | F/O - OVERHAUL WATERTIGHT HATCH AND SCUTTLE 1-428-2 IN WEATHER DECK | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 61 | 38K5259310-A01 | F/O - ACCOMPLISH REPLACEMENT OF VARIOUS VCHT PIPING | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 62 | 38K5259310-T01 | SEWAGE SYS (T & OP) - KTR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 63 | 38K5261203-A01 | F/O - PRESERVE FLIGHT DECK SAFETY NET FRAME ASSEMBLY | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 64 | 38K5263403-A01 | F/O - REPLACE DECK COVERING IN 1-110-1-L | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 65 | 38K5263404-A01 | F/O - REPLACE DECK COVERING IN 1-115-1-L | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 66 | 38K5263408-A01 | F/O - REPAIR DAMAGED DECK COVERING IN 1-158-6-L | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 67 | |||||||||
| 68 | |||||||||
| 69 | |||||||||
| 70 | |||||||||
| 71 | |||||||||
| 72 | |||||||||
| 73 | |||||||||
| 74 | |||||||||
| 75 | |||||||||
| 76 | |||||||||
| 77 | |||||||||
| 78 | |||||||||
| 79 | |||||||||
| 80 | |||||||||
| 81 | |||||||||
| 82 | |||||||||
| 83 | |||||||||
| 84 | |||||||||
| 85 | |||||||||
| 86 | |||||||||
| 87 | |||||||||
| 88 | |||||||||
| 89 | |||||||||
| 90 | |||||||||
| 91 | |||||||||
| 92 | |||||||||
| 93 | |||||||||
| 94 | |||||||||
| 95 | |||||||||
| 96 | |||||||||
| 97 | |||||||||
| 98 | |||||||||
| 99 | |||||||||
| 100 |
1_38K5212309-A01
| SHIP NAME/AVAILABILITY: | USS RALPH JOHNSON (DDG-114) - FY25 SRA 5C1 Bundle 2 | TGI 1_38K5212309-A01 SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA025 | ||||||||||
| SRF-JRMC TGI #: | 1_38K5212309-A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | F/O - CLEAN, ASSESS, AND REPAIR CPCH PROP HYDR OIL SUMP TANK (4-208-1-F) | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
HOURS
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
2_38K5212311-A01
| SHIP NAME/AVAILABILITY: | USS RALPH JOHNSON (DDG-114) - FY25 SRA 5C1 Bundle 2 | TGI 2_38K5212311-A01 SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA025 | ||||||||||
| SRF-JRMC TGI #: | 2_38K5212311-A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | F/O - CLEAN, ASSESS, AND REPAIR CPCH PROP HYDR OIL SUMP TANK (4-254-2-F) | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
3_38K5212312-A01
| SHIP NAME/AVAILABILITY: | USS RALPH JOHNSON (DDG-114) - FY25 SRA 5C1 Bundle 2 | TGI 3_38K5212312-A01 SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA025 | ||||||||||
| SRF-JRMC TGI #: | 3_38K5212312-A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | F/O - CLEAN AND ASSESS JP-5 SERVICE TANK (4-386-0-J) | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
4_38K5212313-A01
| SHIP NAME/AVAILABILITY: | USS RALPH JOHNSON (DDG-114) - FY25 SRA 5C1 Bundle 2 | TGI 4_38K5212313-A01 SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA025 | ||||||||||
| SRF-JRMC TGI #: | 4_38K5212313-A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | F/O - OPEN, CLEAN, AND ASESS JP-5 SERVICE TANK (4-390-0-J) | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
5_38K5212314-A01
| SHIP NAME/AVAILABILITY: | USS RALPH JOHNSON (DDG-114) - FY25 SRA 5C1 Bundle 2 | TGI 5_38K5212314-A01 SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA025 | ||||||||||
| SRF-JRMC TGI #: | 5_38K5212314-A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | F/O – CLEAN, ASSESS, AND REPAIR MRG LUBRICATING OIL SUMP TANK (5-254-6-F) | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
6_38K5212315-A01
| SHIP NAME/AVAILABILITY: | USS RALPH JOHNSON (DDG-114) - FY25 SRA 5C1 Bundle 2 | TGI 6_38K5212315-A01 SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA025 | ||||||||||
| SRF-JRMC TGI #: | 6_38K5212315-A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | F/O – CLEAN, ASSESS, AND REPAIR MRG LUBRICATING OIL SUMP TANK (5-206-1-F) | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
7_38K5212316-A01
| SHIP NAME/AVAILABILITY: | USS RALPH JOHNSON (DDG-114) - FY25 SRA 5C1 Bundle 2 | TGI 7_38K5212316-A01 SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA025 | ||||||||||
| SRF-JRMC TGI #: | 7_38K5212316-A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | F/O - CLEAN, ASSESS, REPAIR, AND PRESERVE FUEL TANK GROUP-1 TANK (5-174-1-F) | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
8_38K5212317-A01
| SHIP NAME/AVAILABILITY: | USS RALPH JOHNSON (DDG-114) - FY25 SRA 5C1 Bundle 2 | TGI 8_38K5212317-A01 SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA025 | ||||||||||
| SRF-JRMC TGI #: | 8_38K5212317-A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | F/O - OPEN AND CLEAN FUEL EXPANSION SEAWATER OVERFLOW TANK GROUP-1 (5-214-1-F) | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
9_38K5212318-A01
| SHIP NAME/AVAILABILITY: | USS RALPH JOHNSON (DDG-114) - FY25 SRA 5C1 Bundle 2 | TGI 9_38K5212318-A01 SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA025 | ||||||||||
| SRF-JRMC TGI #: | 9_38K5212318-A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | F/O – CLEAN, ASSESS, REPAIR, AND PRESERVE FUEL EXP SW OVFL TK GP-2 (5-212-4-F) | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
10_38K5212319-A01
| SHIP NAME/AVAILABILITY: | USS RALPH JOHNSON (DDG-114) - FY25 SRA 5C1 Bundle 2 | TGI 10_38K5212319-A01 SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA025 | ||||||||||
| SRF-JRMC TGI #: | 10_38K5212319-A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | F/O - CLN, ASSESS, RPR, AND PRSV FUEL TANK GROUP-2 (5-126-2-F) | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
11_38K5212320-A01
| SHIP NAME/AVAILABILITY: | USS RALPH JOHNSON (DDG-114) - FY25 SRA 5C1 Bundle 2 | TGI 11_38K5212320-A01 SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA025 | ||||||||||
| SRF-JRMC TGI #: | 11_38K5212320-A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | F/O - CLN, ASSESS, RPR, AND PRSV FUEL TANK GROUP-2 (5-174-4-F) | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
12_38K5212321-A01
| SHIP NAME/AVAILABILITY: | USS RALPH JOHNSON (DDG-114) - FY25 SRA 5C1 Bundle 2 | TGI 12_38K5212321-A01 SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA025 | ||||||||||
| SRF-JRMC TGI #: | 12_38K5212321-A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | F/O - CLEAN, ASSESS, REPAIR, AND PRESERVE FUEL TANK GROUP-1 (5-42-0-F) | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
13_38K5212322-A01
| SHIP NAME/AVAILABILITY: | USS RALPH JOHNSON (DDG-114) - FY25 SRA 5C1 Bundle 2 | TGI 13_38K5212322-A01 SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA025 | ||||||||||
| SRF-JRMC TGI #: | 13_38K5212322-A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | F/O - CLN, ASSESS, RPR, AND PRSV FUEL TANK GROUP-2 (5-78-2-F) | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
14_38K5212323-A01
| SHIP NAME/AVAILABILITY: | USS RALPH JOHNSON (DDG-114) - FY25 SRA 5C1 Bundle 2 | TGI 14_38K5212323-A01 SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA025 | ||||||||||
| SRF-JRMC TGI #: | 14_38K5212323-A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | F/O – CLEAN, ASSESS, REPAIR, AND PRESERVE OWD COLLECTING TANK (5-174-2-F) | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
15_38K5212324-A01
| SHIP NAME/AVAILABILITY: | USS RALPH JOHNSON (DDG-114) - FY25 SRA 5C1 Bundle 2 | TGI 15_38K5212324-A01 SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA025 | ||||||||||
| SRF-JRMC TGI #: | 15_38K5212324-A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | F/O - CLN, ASSESS, RPR, AND PRSV OILY WASTE DRAIN COLLECTING TANK (5-296-1-F) | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
16_38K5212325-A01
| SHIP NAME/AVAILABILITY: | USS RALPH JOHNSON (DDG-114) - FY25 SRA 5C1 Bundle 2 | TGI 16_38K5212325-A01 SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA025 | ||||||||||
| SRF-JRMC TGI #: | 16_38K5212325-A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | F/O – CLEAN, ASSESS, REPAIR, AND PSV GTRB WASTE DR COLLECTING TANK (5-177-1-F) | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
17_38K5212326-A01
| SHIP NAME/AVAILABILITY: | USS RALPH JOHNSON (DDG-114) - FY25 SRA 5C1 Bundle 2 | TGI 17_38K5212326-A01 SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA025 | ||||||||||
| SRF-JRMC TGI #: | 17_38K5212326-A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | F/O - CLEAN AND ASSESS GAS TURBINE WASTE DRAIN COLLECTING TANK (4-370-2-F) | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
18_38K5212327-A01
| SHIP NAME/AVAILABILITY: | USS RALPH JOHNSON (DDG-114) - FY25 SRA 5C1 Bundle 2 | TGI 18_38K5212327-A01 SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA025 | ||||||||||
| SRF-JRMC TGI #: | 18_38K5212327-A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | F/O - CLEAN, ASSESS, REPAIR, AND PRESERVE OILY WASTE HOLDING TANK (5-220-2-F) | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
19_38K5212328-A01
| SHIP NAME/AVAILABILITY: | USS RALPH JOHNSON (DDG-114) - FY25 SRA 5C1 Bundle 2 | TGI 19_38K5212328-A01 SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA025 | ||||||||||
| SRF-JRMC TGI #: | 19_38K5212328-A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | F/O – CLEAN AND ASSESS GAS TURBINE WASTE DRAIN COLLECTING TANK (5-300-0-F) | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
20_38K5212329-A01
| SHIP NAME/AVAILABILITY: | USS RALPH JOHNSON (DDG-114) - FY25 SRA 5C1 Bundle 2 | TGI 20_38K5212329-A01 SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA025 | ||||||||||
| SRF-JRMC TGI #: | 20_38K5212329-A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | F/O – CLEAN LUBRICATING OIL SETTLING TANK (3-254-2-F) & REPLACE MANHOLE ASSY | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
21_38K5212330-A01
| SHIP NAME/AVAILABILITY: | USS RALPH JOHNSON (DDG-114) - FY25 SRA 5C1 Bundle 2 | TGI 21_38K5212330-A01 SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA025 | ||||||||||
| SRF-JRMC TGI #: | 21_38K5212330-A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | F/O – CLEAN, ASSESS, REPAIR, AND PRESERVE WASTE OIL TANK (5-220-1-F) | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
22_38K5212331-A01
| SHIP NAME/AVAILABILITY: | USS RALPH JOHNSON (DDG-114) - FY25 SRA 5C1 Bundle 2 | TGI 22_38K5212331-A01 SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA025 | ||||||||||
| SRF-JRMC TGI #: | 22_38K5212331-A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | F/O - CLEAN, ASSESS, RPR, AND PRESERVE GTRB WASTE DR COLLECTING TANK (5-292-1-F) | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
23_38K5212336-A01
| SHIP NAME/AVAILABILITY: | USS RALPH JOHNSON (DDG-114) - FY25 SRA 5C1 Bundle 2 | TGI 23_38K5212336-A01 SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA025 | ||||||||||
| SRF-JRMC TGI #: | 23_38K5212336-A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | F/O - OPEN AND CLEAN FUEL TANK GP-4 (4-272-2-F) AND FUEL TANK GP-4 (5-264-2-F) | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
24_38K5212337-A01
| SHIP NAME/AVAILABILITY: | USS RALPH JOHNSON (DDG-114) - FY25 SRA 5C1 Bundle 2 | TGI 24_38K5212337-A01 SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA025 | ||||||||||
| SRF-JRMC TGI #: | 24_38K5212337-A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | F/O - PRESERVE DECK PLATING IN 3-42-1-T | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
25_38K5212340-A01
| SHIP NAME/AVAILABILITY: | USS RALPH JOHNSON (DDG-114) - FY25 SRA 5C1 Bundle 2 | TGI 25_38K5212340-A01 SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA025 | ||||||||||
| SRF-JRMC TGI #: | 25_38K5212340-A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | F/O – OPEN AND CLEAN FUEL RECEIVING TANK GP-3 (4-174-1-F) | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
26_38K5212341-A01
| SHIP NAME/AVAILABILITY: | USS RALPH JOHNSON (DDG-114) - FY25 SRA 5C1 Bundle 2 | TGI 26_38K5212341-A01 SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA025 | ||||||||||
| SRF-JRMC TGI #: | 26_38K5212341-A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | F/O - CLEAN, ASSESS, REPAIR, AND PRESERVE PLMB WASTE DRAIN TANK NO. ONE | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
27_38K5212342-A01
| SHIP NAME/AVAILABILITY: | USS RALPH JOHNSON (DDG-114) - FY25 SRA 5C1 Bundle 2 | TGI 27_38K5212342-A01 SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA025 | ||||||||||
| SRF-JRMC TGI #: | 27_38K5212342-A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | F/O - CLN, ASSESS, RPR, AND PRSV PLUMBING WASTE DRAIN TANK NO. 2 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .