This is a Task Group Instruction (TGI) document detailing work requirements for cleaning, assessing, repairing, and preserving an oily waste holding tank (5-220-2-F) aboard the USS RALPH JOHNSON (DDG-114) in Yokosuka, Japan. The work scope includes cleaning to Level III cleanliness, conducting structural and coating assessments, repairing approximately 11 square feet of plate defects in the tank bottom, preserving 52 square feet of defective painted surfaces, and addressing manhole cover plates and bolting rings.
The work is scheduled to begin July 14, 2025, and complete by December 11, 2025. The TGI specifies detailed procedures for welding repairs, surface preparation, and preservation requirements. Government-furnished crane services, utilities, safety inspections, and quality assurance support will be provided by SRF-JRMC. The work is part of a larger ship repair availability package being solicited under contract N6264925RA025, with proposals due March 11, 2025. The total estimated labor hours for this specific tank work is 388 hours.
View the file
Other files
Show 40 more
Latest 50 of 73 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
FOUO: Public availability to be determined under 5 USC 552
TASK GROUP INSTRUCTION
AIM REV 20.11.4.0 (OCTOBER 2020)
TGI COMPONENT NAME: TYPE: PHASE: REPEAT: CHANGE:
NO.: WASTE TK 5-220-2-F AY A 0 1
SHIP/HULL NO.: SHIP/HULL NAME: SYSTEM: PROJ/WO NO: CASREP CAT:
DDG-114 USS RALPH JOHNSON K52
CU PHASE TITLE:
F/O - CLEAN, ASSESS, REPAIR, AND PRESERVE OILY WASTE HOLDING TANK (5-220-2-F)
PREPARING ACTIVITY:
PREPARED BY: CODE PHONE DATE
DAISUKE TAMURA 231A 315-243-9526 21-SEP-2024
APPROVED BY: CODE PHONE DATE
NAKAMURA YUUJI 231A 315-243-6041 21-SEP-2024
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
REASON FOR WORK/NEED FOR CHANGE:
Paragraph 5.2.3 was unrequired.
CHANGE INSTRUCTIONS:
CH-1: Delete paragraph 5.2.3. (10/15/2024)
SPECIAL REQUIREMENTS:
SURFMEPP
CLEANLINESS FOR PIPING SYSTEM/EQUIPMENT LEVEL III.
WORK CERTIFICATION SIGNATURES
COMPLETION OF WORK REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
ACCEPTANCE OF COMPLETED WORK
PHYSICAL INSPECTION PHYSICAL INSPECTION COMPLETED: BADGE NO.: SHOP/CODE: PHONE: DATE:
REQUIRED:☐YES ☒NO
RECORDS REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
TGI NO.: WASTE TK 5-220-2-F AY A 0
FOUO
SHIP: DDG-114 CHG/VER: 1/2
LIST OF EFFECTIVE PAGES
SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO.
1-5 J-1 M-1
1. SCOPE/PURPOSE
1.1 Title: Oily Waste Holding Tank (5-220-2-F); clean, assess, repair, and preserve
1.2 Location of Work:
1.2.1 Oily Waste Holding Tank (5-220-2-F)
1.2.2 Auxiliary Machinery Room No. 2 (4-220-0-E)
1.3 Identification:
1.3.1 Quantity (One EA), Oily Waste Holding Tank
Tank No. 5-220-2-F Capacity: 2,868 Gallons
1.3.2 Quantity (2 EA), Manhole Cover Plate and Air Vent Hose Connection (AVHC) Cover Plate for 5-220-2-F
Manhole No(s).: 4-225-2 Size: 15 Inches x 23 Inches AVHC No(s).: 4-222-2 Size: 10 Inches Diameter Material: Steel
1.3.3 Quantity (2 EA), Bolting Ring for Manhole Cover Plate and AVHC Cover Plate for 5-220-2-F
Manhole No(s).: 4-225-2 AVHC No(s).: 4-222-2 Material: Steel
1.4 Security Classification: None.
1.5 Initial Condition: None.
1.6 Contractor work start date:
1.7 Contractor work completion date:
2. REFERENCES:
REF.
NO.
DOCUMENT
/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV CHG
NO.
COPY
REQ’D
(Y/N)
SOURCE
DOC
(Y/N)
PARA SEC PG CHP
1 NSI FY-25 NAVSEA Standard Items - 1 N 2 LI FY-25 Local Standard Items - ORG N
Masato.Endo.ja Typewritten Text
14 JUL 2025
Masato.Endo.ja Typewritten Text
11 DEC 2025
FOUO
SHIP: DDG-114 CHG/VER: 1/2
REF.
NO.
DOCUMENT
/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV CHG
NO.
COPY
REQ’D
(Y/N)
SOURCE
DOC
(Y/N)
PARA SEC PG CHP
3 TM T-9630-
AB-MMD-
Corrosion Control Assessment and Maintenance Manual (CCAMM)
- 3 N
4 TM NAVSEA
4790/14
Tank and Void Structural and Coating Condition Survey (MRC G1N5)
- N
5 DWG 633-
7284201
OILY WASTE TANK ZINC
INSTLLATION & ML
A Y 12, 17, 6 DWG 100-
7060394
UNIT STRL ARR DWG ASSY UNIT
C Y SE
E N
OT
E
7 TM S9086-
CJ-STM-
010/CH-075
Fasteners 7 N
3. APPENDICES:
3.1 Appendix “J” TGI Job Summary Information Sheet
3.2 Appendix “M” TGI Material List
3.3 Appendix “D” Deficiency Form
4. GENERAL REQUIREMENTS:
4.1 Not Applicable.
5. PROCEDURE:
5.1 Accomplish the requirements of 099-902YO of 2.2 for each tank listed in 1.3.1.
5.1.1 Accomplish an assessment of each tank listed in 1.3.1 for existing preservation coating, structural integrity, deterioration, pitting, cracks, and areas of damage or distortion, including sounding tubes, tank/void vents, overflows, piping and associated material, structural members, ladders, anodes, desiccant, tank level indicator (TLI), radar TLI, and their electric cables, stud, and tank top cable penetration, and manhole covers in accordance with 2.3 and 2.4, using 2.5 and 2.6 for guidance. Document the assessment on 2.4.
(I) "CCIMS ASSESSMENT"
5.1.1.1 Mark each corroded, damaged and/or deteriorated coating area in each tank.
5.1.1.2 Submit one legible copy, in hard copy or approved transferrable media, of completed assessment form 2.4 to the SUPERVISOR.
5.1.2 Accomplish the requirements of 009-107 of 2.1.
5.1.2.1 Ensure General Cleaning must be Level III.
5.1.3 Install each manhole cover for each tank listed in 1.3.1 in accordance with Figure 075-4-1 of 2.7.
5.2 Repair each tank listed in 1.3.1, based on 5.1.1.2 as designated by the SUPERVISOR, using 2.5 and 2.6 for guidance. See 5.7.5 and 5.7.6.
5.2.1 Base metal weld buildup a total of 11 square inches of each plate defect in the tank bottom.
Masato.Endo.ja Cross-Out
Masato.Endo.ja Typewritten Text
1/14/2025 C-1209 M. ENDO 11030028
FOUO
SHIP: DDG-114 CHG/VER: 1/2
5.2.1.1 For bidding purposes the base metal weld buildup must be one quarter inch thick.
5.2.1.2 Surface must be ground to sound metal prior to base metal weld buildup.
5.2.1.3 Fill each local pit and groove with weld material prior to application of each principal buildup layer.
5.2.1.4 Grind each surface of completed base metal weld buildup smooth if greater than 1/8 inch above plate surface.
5.2.2 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column(s) A Lines One through 7.
5.2.2.1 Accomplish nondestructive testing in accordance with Line 11.
5.3 Accomplish the requirements of 009-32 of 2.1, including Table 4, Line(s) 11, for tank side surface, and Table 3, Line(s) 12, for machinery space side surface of each cover plate listed in 1.3.2.
5.4 Accomplish the requirements of 009-32 of 2.1 for each bolting ring listed in 1.3.3.
5.5 Accomplish the requirements of 009-32 of 2.1, including Table 4, Line(s) 11, for a total of 52 square feet of defective painted surfaces, for each tank listed in 1.3.1, as designated by the SUPERVISOR.
5.5.1 The preservation area must not exceed 10 square feet per one area.
5.6 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
5.7 Notes:
5.7.1 Planner: Code 231A D. Tamura, 243-9526
5.7.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5149-0598
5.7.3 2.4 is available on P:\C200\C225\Enclosures\C231\Tank and Void Structural and Coating Condition Survey
(MRC G1N5).
5.7.4 This TGI meets the intent of DDG CSWT File Nos. 123-127, 123-129, and 123-133.
5.7.5 Removal and installation of interferences, and gas free operation, preservation of boundary spaces relating to front loading structure repair are not included in this TGI. They will be covered by a DL in the future based on Contractor submitted condition report.
5.7.6 Materials for structure members relating to front loading repair will be provided in the future as a DL based on Contractor submitted condition report.
5.7.7 WPC will copy the following pages in reference.
REF. 2.6: Pages 3, 4, 4A, 4B, 5-9, and 9-5.
5.7.8 JCNs EB14-ZAI9, EB14-ZAK1, EB14-ZAL3, and EB14-ZAM4 are related to this TGI.
5.8 Government Furnished Material (GFM): None.
5.9 SRF-JRMC will provide the following service work: (TGI No. 38K5212327S02)
5.9.1 [C740] Crane and crane rigging service.
FOUO
SHIP: DDG-114 CHG/VER: 1/2
5.9.2 [X99E] Utility service, electrical.
5.9.3 [X99M] Utility service, including low pressure air supply, water supply, and steam supply.
5.9.4 [C106.1] Safety inspection for SRF-JRMC employees.
5.9.5 [C106.2] Gas free inspection for SRF-JRMC employees.
5.9.6 [C133] QA inspection for (G) symbol(s) and Surface Corrosion Control Information Management System (CCIMS) entry.
5.9.7 [C135] QA inspection for (G) symbol(s).
5.9.8 [C250] Technical support and process of the tank/void assessment results.
FOUO
J-1
SHIP: DDG-114 CHG/VER: 1/2
APPENDIX "J"
TGI JOB SUMMARY INFORMATION SHEET
SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH
VERSION:
CASREP
CAT:
WASTE TK 5-220-2-F AY A 0 2
CU PHASE TITLE:
F/O - CLEAN, ASSESS, REPAIR, AND PRESERVE OILY WASTE HOLDING TANK (5-220-2-F)
PRIMARY COMPONENT:
COMPONENT UNIT LIST (FOR ASSEMBLIES):
AVHC CV 4-222-2 HA MANHOLE 4-225-2 HA OWHT 5-220-2-F TK
ATTACHMENT LIST:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
YAGINUMA, TAKEHIDE
JO: KO: TOTAL MAN HRS: TOTAL MAT’L COST TOTAL DURATION: PLANNING ACCEPTANCE:
38K5212327 A01 388 $0.00 0
CU PHASE DESCRIPTION:
The purpose of this TGI is to clean, assess, repair, and preserve oily waste holding tank, 5-220-2-F.
Location of Work:
Oily Waste Holding Tank (5-220-2-F) Auxiliary Machinery Room No. 2 (4-220-0-E)
TASK NAME
SHOP TSD/WC TS CREW# MHRS
HIGH RAD
HOURS
RC
GRID#
Version-1: re-sequence reference.C231A Y, Nakamura 09/21/2024 -/-/N
V-01 0 0 0
Version-2: revise special requirements and correct man-hours for 5.2, 5.5, and CFM for preservation work. C231A Y. Nakamura, 10/16/2024, Y/Y/N
V-02 0 0 0
FOUO
M-1
SHIP: DDG-114 CHG/VER: 1/2
APPENDIX “M”
TGI MATERIAL LIST
SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH
VERSION:
CASREP
CAT:
WASTE TK 5-220-2-F AY A 0 2
CU PHASE TITLE:
F/O - CLEAN, ASSESS, REPAIR, AND PRESERVE OILY WASTE HOLDING TANK (5-220-2-F)
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV
JOB ORDER: KEY OP:
38K5212327 A01
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
NOTES:
FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____
☐ NUCLEAR APPENDIX "D"
DEFICIENCY FORM
☐ NON-NUCLEAR
1. SHIP/HULL NO.: 2a. DL or DR No.
(Circle One)
2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:
DDG-114 WASTE TK 5-220-2-F AY A 0
4a. ICN: 4b. KEY OP: 5. LOC SPACE/LVL: FRAME: P/S/C: 6. CAUSED BY:
38K5212327 A01
7. DESCRIPTION:
8. ORIGINATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:
9. CORRECTIVE ACTION:
10. EVALUATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:
FOR NON-NUCLEAR USE ONLY
11. RFD/RFW REQ’D ☐ LAR REQ'D ☐
ILS MOD REQ’D ☐
SRD/PLAN REV REQ'D ☐
DWG NO.: _____________________ S/A NO.: ___________________
12. ISOLATION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.:
SATISFACTORY:
13. SUBSAFE OQE RECORD? SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
YES ☐ NO ☐
14. CORRECTIVE ACTION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
COMPLETE:
15. INSPECTION REQ’D? INSPECTION COMPLETE/SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
_________:YES ☐ NO ☐
16. RECORDS REVIEW SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
COMPLETE (DR ONLY)
DL’s ISSUED
(DR ONLY)
FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____
☐ NUCLEAR Deficiency Form Continuation Sheet ☐ NON-NUCLEAR
1. SHIP/HULL NO.: 2a. DL or DR No.
(Circle One) 2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:
DDG-114 WASTE TK 5-220-2-F AY A 0