This is a Task Group Instruction (TGI) document for cleaning, assessing, and repairing the Controllable Pitch Propeller Hydraulic Oil Sump Tank (4-208-1-F) aboard the USS RALPH JOHNSON (DDG-114). The work is to be performed in Engine Room No. One, with specific focus on a 1,199-gallon capacity tank and two manhole cover plates (sizes 15"x23" and 15"x18") with associated bolting rings.
The work period is scheduled from July 14, 2025 to December 11, 2025, requiring Level II cleanliness standards for piping system/equipment as specified by SURFMEPP. The scope includes conducting assessments of preservation coating, structural integrity, deterioration, pitting, cracks, and various tank components including sounding tubes, vents, piping, structural members, and access points. The TGI specifies base metal weld buildup requirements for plate defects in the tank bottom/sump, limiting individual buildup areas to 2 inches in diameter with a quarter-inch thickness. The document includes 429 total man-hours with a project number K52 and is marked as FOUO (For Official Use Only).
View the file
Other files
Show 40 more
Latest 50 of 73 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
FOUO: Public availability to be determined under 5 USC 552
TASK GROUP INSTRUCTION
AIM REV 20.11.4.0 (OCTOBER 2020)
TGI COMPONENT NAME: TYPE: PHASE: REPEAT: CHANGE:
NO.: HYD SUMP 4-208-1-F AY A 0 0
SHIP/HULL NO.: SHIP/HULL NAME: SYSTEM: PROJ/WO NO: CASREP CAT:
DDG-114 USS RALPH JOHNSON K52
CU PHASE TITLE:
F/O - CLEAN, ASSESS, AND REPAIR CPCH PROP HYDR OIL SUMP TANK (4-208-1-F)
PREPARING ACTIVITY:
PREPARED BY: CODE PHONE DATE
YUUTA KISHI 231A 315-243-6411 23-SEP-2024
APPROVED BY: CODE PHONE DATE
YUUJI NAKAMURA 231A 315-243-6041 23-SEP-2024
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
REASON FOR WORK/NEED FOR CHANGE:
CHANGE INSTRUCTIONS:
SPECIAL REQUIREMENTS:
SURFMEPP, CLEANLINESS FOR PIPING SYSTEM/EQUIPMENT LEVEL II
WORK CERTIFICATION SIGNATURES
COMPLETION OF WORK REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
ACCEPTANCE OF COMPLETED WORK
PHYSICAL INSPECTION PHYSICAL INSPECTION COMPLETED: BADGE NO.: SHOP/CODE: PHONE: DATE:
REQUIRED:☐YES ☒NO
RECORDS REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
TGI NO.: HYD SUMP 4-208-1-F AY A 0
FOUO
SHIP: DDG-114 CHG/VER: 0/0
LIST OF EFFECTIVE PAGES
SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO.
1-4 J-1 M-1
1. SCOPE/PURPOSE
1.1 Title: Controllable Pitch Propeller Hydraulic Oil Sump Tank (4-208-1-F); clean, assess, and repair
1.2 Location of Work:
1.2.1 Controllable Pitch Propeller Hydraulic Oil Sump Tank (4-208-1-F)
1.2.2 Engine Room No. One (4-174-0-E)
1.3 Identification:
1.3.1 Quantity (One EA), Controllable Pitch Propeller Hydraulic Oil Sump Tank Tank No.: 4-208-1-F Capacity: 1,199 Gallons
1.3.2 Quantity (2 EA), Manhole Cover Plate for 4-208-1-F
Manhole No.: 3 1/2-217-1 Size: 15 Inches x 23 Inches Manhole No.: 3 1/2-209-8 Size: 15 Inches x 18 Inches Material: Steel
1.3.3 Quantity (2 EA), Bolting Ring for Manhole Cover Plate and AVHC Cover Plate for 4-208-1-F Manhole No.: 3 1/2-217-1 and 3 1/2-209-8 Material: Steel
1.4 Security Classification: None.
1.5 Initial Condition: None.
1.6 Contractor work start date: 14 JUL 2025
1.7 Contractor work completion date: 11 DEC 2025
2. REFERENCES:
REF.
NO.
DOCUMENT
/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV CHG
NO.
COPY
REQ’D
(Y/N)
SOURCE
DOC
(Y/N)
PARA SEC PG CHP
1 NSI FY-25 NAVSEA Standard Items - 1 N 2 LI FY-25 Local Standard Items - ORG N
3 TM T-9630-
AB-MMD-
Corrosion Control Assessment and Maintenance Manual (CCAMM)
3 - N
4 TM NAVSEA
4790/14
Tank and Void Structural and Coating Condition Survey (MRC G1N5)
- N
FOUO
SHIP: DDG-114 CHG/VER: 0/0
REF.
NO.
DOCUMENT
/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV CHG
NO.
COPY
REQ’D
(Y/N)
SOURCE
DOC
(Y/N)
PARA SEC PG CHP
5 TM S9086-
CJ-STM-
010/CH-075
Fasteners 7 N
6 DWG 100-
7060390
UNIT STRL ARR DWG ASSY UNIT
D Y 8
7 DWG 100-
7060395
UNIT STRL ARR DWG ASSY UNIT
C Y 6
3. APPENDICES:
3.1. Appendix “J” TGI Job Summary Information Sheet
3.2. Appendix "M" TGI Material List
3.3. Appendix “D” Deficiency Form
4. GENERAL REQUIREMENTS:
4.1. Not Applicable.
5. PROCEDURE:
5.1 Accomplish the requirements of 099-902YO of 2.2 for each tank listed in 1.3.1.
5.1.1 Accomplish an assessment of each tank listed in 1.3.1 for existing preservation coating, structural integrity, deterioration, pitting, cracks, and areas of damage or distortion, including sounding tubes, tank/void vents, overflows, piping and associated material, structural members, ladders, anodes, desiccant, tank level indicator (TLI), radar TLI, and their electric cables, stud, and tank top cable penetration, and manhole covers in accordance with 2.3 and 2. 4.
Document the assessment on 2.4.
(I) “CCIMS ASSESSMENT”
5.1.1.1 Mark each corroded, damaged and/or deteriorated coating area in each tank.
5.1.1.2 Submit one legible copy, in hard copy or approved transferrable media, of completed assessment form 2.4 and a report with a sketch listing results of the requirements of 5.1.1.1 to the SUPERVISOR
5.1.2 Accomplish the requirements of 009-107 of 2.1.
5.1.2.1 Accomplish the requirements of 009-09 of 2.1.
5.1.2.2 Ensure General Cleaning must be Level II.
5.1.3 Install each manhole cover for each tank listed in 1.3.1 in accordance with figures 075-4-1 of 2.5.
5.2 Repair each tank listed in 1.3.1 as determined by the visual inspection 5.1.2 as designated by the SUPERVISOR, using 2.6 and 2.7 for guidance. See 5.6.6.
5.2.1 Base metal weld buildup a total of 16 square inches of each plate defect in the tank bottom/sump.
5.2.1.1 Ensure each base metal buildup area does not exceed 2 inches in diameter. For bidding purposes the base metal weld buildup must be one quarter inch thick.
5.2.1.2 Surface must be ground to sound metal prior to base metal weld buildup.
Masato.Endo.ja Cross-Out
Masato.Endo.ja Typewritten Text
12/14/2024 C-1209 M. ENDO 11030028
FOUO
SHIP: DDG-114 CHG/VER: 0/0
5.2.1.3 Fill each local pit and groove with weld material prior to application of each principal buildup layer.
5.2.1.4 Grind each surface of completed base metal weld buildup smooth if greater than 1/8 inch above plate surface.
5.2.2 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column(s) A, Lines One through 7.
5.2.2.1 Accomplish nondestructive testing in accordance with Line 11.
5.3 Accomplish the requirements of 009-32 of 2.1, including Table 4, Line(s) 14, for tank side surface, and Table 3, Line(s) 12, for machinery side surface of each cover plate listed in 1.3.2.
5.4 Accomplish the requirements of 009-32 of 2.1 for each bolting ring listed in 1.3.3.
5.5 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
5.6 Notes:
5.6.1 Planner: Code 231A Y. Kishi, 243-6411
Engineer: Code 250 J. Igarashi, 243-4230
5.6.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598
5.6.3 2.4 is available on P:\C200\C225\Enclosures\C231\Tank and Void Structural and Coating Condition Survey
(MRC G1N5).
5.6.4 This TGI meets the intent of DDG CSWT File No. 123-133 and 123-148.
5.6.5 JCNs EB14-ZAH2, EB14-ZAM7, and ER01-ZA96 are related to this TGI.
5.6.6 Removal and installation of interferences, and gas free operation, preservation of boundary spaces relating to front loading structure repair are not included in this TGI. They will be covered by a DL in the future based on Contractor submitted condition report.
5.7 Government Furnished Material (GFM): None.
5.8 SRF-JRMC will provide the following service work: (TGI No. 38K5212309S02)
5.8.1 [C740] Crane and crane rigging service.
5.8.2 [X99E] Utility service, electrical.
5.8.3 [X99M] Utility service, including low pressure air supply, water supply, and steam supply.
5.8.4 [C106.1] Safety inspection for SRF-JRMC employees.
5.8.5 [C106.2] Gas free inspection for SRF-JRMC employees.
5.8.6 [C133] QA inspection for (G) symbol(s) and SurfaceCCIMS entry.
5.8.7 [C135] QA inspection for (G) symbol(s).
5.8.8 [C250] Technical support and process of the tank/void assessment results.
FOUO
J-1
SHIP: DDG-114 CHG/VER: 0/0
APPENDIX "J"
TGI JOB SUMMARY INFORMATION SHEET
SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH
VERSION:
CASREP
CAT:
HYD SUMP 4-208-1-F AY A 0 0
CU PHASE TITLE:
F/O - CLEAN, ASSESS, AND REPAIR CPCH PROP HYDR OIL SUMP TANK (4-208-1-F)
PRIMARY COMPONENT:
COMPONENT UNIT LIST (FOR ASSEMBLIES):
MANHOLE 3.5-217-1 HA MANHOLE 3.5-209-8 HA HYD SUMP 4-208-1-F TK
ATTACHMENT LIST:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
YAGINUMA ,TAKEHIDE
JO: KO: TOTAL MAN HRS: TOTAL MAT’L COST TOTAL DURATION: PLANNING ACCEPTANCE:
38K5212309 A01 429 $0.00 1
CU PHASE DESCRIPTION:
The purpose of this TGI is to clean, assess, and repair Controllable Pitch Propeller Hydraulic Oil Sump Tank (4- 208-1-F).
Location of Work:
Controllable Pitch Propeller Hydraulic Oil Sump Tank (4-208-1-F) Engine Room No. One (4-174-0-E)
TASK NAME
SHOP TSD/WC TS CREW# MHRS
HIGH RAD
HOURS
RC
GRID#
FOUO
M-1
SHIP: DDG-114 CHG/VER: 0/0
APPENDIX “M”
TGI MATERIAL LIST
SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH
VERSION:
CASREP
CAT:
HYD SUMP 4-208-1-F AY A 0 0
CU PHASE TITLE:
F/O - CLEAN, ASSESS, AND REPAIR CPCH PROP HYDR OIL SUMP TANK (4-208-1-F)
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV
JOB ORDER: KEY OP:
38K5212309 A01
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
NOTES:
FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____
☐ NUCLEAR APPENDIX "D"
DEFICIENCY FORM
☐ NON-NUCLEAR
1. SHIP/HULL NO.: 2a. DL or DR No.
(Circle One)
2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:
DDG-114 HYD SUMP 4-208-1-F AY A 0
4a. ICN: 4b. KEY OP: 5. LOC SPACE/LVL: FRAME: P/S/C: 6. CAUSED BY:
38K5212309 A01
7. DESCRIPTION:
8. ORIGINATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:
9. CORRECTIVE ACTION:
10. EVALUATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:
FOR NON-NUCLEAR USE ONLY
11. RFD/RFW REQ’D ☐ LAR REQ'D ☐
ILS MOD REQ’D ☐
SRD/PLAN REV REQ'D ☐
DWG NO.: _____________________ S/A NO.: ___________________
12. ISOLATION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.:
SATISFACTORY:
13. SUBSAFE OQE RECORD? SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
YES ☐ NO ☐
14. CORRECTIVE ACTION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
COMPLETE:
15. INSPECTION REQ’D? INSPECTION COMPLETE/SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
_________:YES ☐ NO ☐
16. RECORDS REVIEW SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
COMPLETE (DR ONLY)
DL’s ISSUED
(DR ONLY)
FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____
☐ NUCLEAR Deficiency Form Continuation Sheet ☐ NON-NUCLEAR
1. SHIP/HULL NO.: 2a. DL or DR No.
(Circle One) 2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:
DDG-114 HYD SUMP 4-208-1-F AY A 0