TGI_38K5212390A01_c0v0.pdf
PDF 144 KB Posted
- Solicitation number
- N6264925RA025
About this file
This Task Group Instruction (TGI) details preservation work required for wiring trunks on the USS RALPH JOHNSON (DDG-114) to be performed in Yokosuka, Japan. The work involves preserving approximately 350 square feet of interior structural surfaces in wiring trunks on the 04 and 05 levels, including areas in the Commanding Officer Sea Cabin, Sea Cabin Bath, and weather frame locations. The work requires primer conforming to MIL-PRF-23236 Type V, VI, or VII specifications.
The period of performance is July 14, 2025 through November 26, 2025. The government will provide various support services including crane operations, utilities (electrical, air, water, steam), safety inspections, and QA inspections. Materials to be furnished include washers, nuts, rubber gaskets, and adhesives. This TGI (38K5212390-A01) is part of a larger FY25 Selected Restricted Availability (SRA) maintenance package for the USS RALPH JOHNSON, with contractor responses due by March 11, 2025 at 10:00 AM Japan Standard Time.
View the file
Other files
Show 40 more
Latest 50 of 73 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
09-DEC-2024 1518
20.14.15.2.9020 (September 2024) ICN: 38K5212390 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: WIRING TRUNK AY A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-114 USS RALPH JOHNSON K52
CU PHASE TITLE: PRESERVE WIRNIG TRUNK ON 04 LEVEL AND 05 LEVEL
WORK CERTIFICATION SIGNATURES: DLs
COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
FOUO Pg 1 of 3
ES01NA7S
PREPARING ACTIVITY: STATUS: APP WORKING STATUS:
PREPARED BY: CODE: PHONE: DATE:
ISHIKAWA, HIROTSUGU 231A 3152436152 12-NOV-2024
APPROVED BY: CODE: PHONE: DATE:
NAKAMURA, YUUJI 231A 3152436041 12-NOV-2024
CONCURRED BY: CODE: PHONE: DATE:
REASON FOR WORK/NEED FOR CHANGE:
JCN:
ES01-NA7S
SPECIAL REQUIREMENTS:
CU PHASE DESCRIPTION:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
YAGINUMA, TAKEHIDE
JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:
123A2190
1 SCOPE/PURPOSE:
1.1 Title: Wiring Trunk on 04 Level and 05 Level; preserve
1.2 Location of Work:
1.2.1 Wiring Trunk (04-157-0-Q) [05 Level]
1.2.2 Wiring Trunk (04-158-0-Q) [04 Level]
1.2.3 Commanding Officer Sea Cabin (04-158-2-L)
1.2.4 Commanding Officer Sea Cabin Bath (04-158-1-L)
1.2.5 05 Level Weather, Frame 160, Center
1.3 Identification:
TGI Short Form
09-DEC-2024 1518
20.14.15.2.9020 (September 2024) (Continued) ICN: 38K5212390 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: WIRING TRUNK AY A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-114 USS RALPH JOHNSON K52
CU PHASE TITLE: PRESERVE WIRNIG TRUNK ON 04 LEVEL AND 05 LEVEL
FOUO Pg 2 of 3
CU PHASE DESCRIPTION (Cont.)
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1.3.1 Quantity (350 SF in Total), Entire Interior Structural Surface located in 1.2.1 and 1.2.2 Remarks: The area including interior surface of access cover plate on 05 Level.
1.4 Security Classification: None.
1.5 Initial Condition: None.
1.6 Contractor work start date: 14 JUL 2025
1.7 Contractor work completion date: 26 NOV 2025
2 PROCEDURE:
2.1 Accomplish the requirements of 009-32 of Ref. No. One, including Table 3, Line(s) 6, for each area listed in 1.3.1. Primer must conform to MIL-PRF-23236, Type V, VI, or VII.
2.2 Notes:
2.2.1 Planner: Code 231A H. Ishikawa, 243-6152
2.2.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598
2.2.3 This TGI is in response to CCIMS report No. CCIMS-G1N6-DDG114-070-24 from TGI No. 38K5A11004-I02.
2.2.4 JCN ES01-NA7S is related to this TGI.
2.3 Government Furnished Material (GFM):
2.3.1 SRF-JRMC will provide GFM listed in the Material List.
2.4 SRF-JRMC will provide the following service work: (TGI No. 38K5212390S02).
2.4.1 [C740] Crane and crane rigging service.
2.4.2 [X99E] Utility service, electrical.
2.4.3 [X99M] Utility service, including low pressure air supply, water supply, and steam supply.
2.4.4 [C106.1] Safety inspection for SRF-JRMC employees.
2.4.5 [C106.2] Gas free inspection for SRF-JRMC employees.
2.4.6 [C133] QA inspection for (G) symbol(s).
09-DEC-2024 1518
20.14.15.2.9020 (September 2024) (Continued) ICN: 38K5212390 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: WIRING TRUNK AY A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-114 USS RALPH JOHNSON K52
CU PHASE TITLE: PRESERVE WIRNIG TRUNK ON 04 LEVEL AND 05 LEVEL
FOUO Pg 3 of 3
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1 NSI FY-25 NAVSEA Standard Items - 1 N 2 LI FY-25 Local Standard Items - ORG N
TASK NAME / TASK DESCRIPTION
SHOP/
TSD TS
SF
WC
CREW
# MHRS RWRK
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
001 M WASHER, FLAT, ROUND,
ORDERED FOR KTR, ORIG:
C231A H. ISHIKAWA 243-6152
9B 5310 LL9301403 NA 4 N 42997474
100/EA
002 M NUT,SELF, ORDERED FOR
KTR, ORIG: C231A H.
ISHIKAWA 243-6152
9B 5310 015311591 EY NA 4 N 42905146
100/EA
003 M RUBBER S, GASKET SHEET,
SYNTHETIC RUBBER,
SPEC: MIL-PRF-1149
(FORMERLY: MIL-G-1149) TY-I
CL-1,
SIZE: 3FT X 3FT X 3/16"THK,
MATERIAL: SYNTHETIC
RUBBER, 50 DUROMETER, OIL
RESISTANT,
ORDERED FOR KTR, ORIG:
C231A H. ISHIKAWA 243-6152
9G 9320 LL4820283 NA 4 N 42907523 36/SF
004 M ADHESIVE, ORDERED FOR
KTR, ORIG: C231A H.
ISHIKAWA 243-6152
9B 8040 016640296 NA 4 Y 42905148 4/TU
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE
REV
ICN: 38K5212390 KEY OP: A01
File details come from the government source that posted it. Updated .