This is a Task Group Instruction (TGI) document for cleaning a lubricating oil settling tank and replacing a manhole assembly on the USS RALPH JOHNSON (DDG-114). The work involves cleaning Tank 3-254-2-F (1,175 gallon capacity) located in Engine Room No. 2, replacing the existing 15" x 23" flush deck oil-tight manhole assembly, and installing a new manhole assembly with associated cover plates and bolting rings. The work affects a fire zone boundary and requires fabrication of non-flammable closure.

The work is to be performed between July 14, 2025 and December 11, 2025 at Yokosuka Naval Base. The job order number is 38K5212329 with key operation A01, requiring Level II cleanliness for the piping system/equipment. The total estimated cost is $6,975 with 539 man-hours. Special requirements include air hose testing of new welds with zero allowable leakage. The document details specific material requirements including a new manhole flush assembly made of steel with 1/8" panel thickness and 0-15 PSI test pressure. SRF-JRMC will provide various support services including crane operations, utilities, and safety inspections.

View the file

Other files

File Type Posted
2.03 Amendment 0003 25RA025.pdf PDF
2.03 Amendment 0002 25RA025.pdf PDF
2.03 Amendment 0001 25RA025.pdf PDF
TGI_38K5263408A01_c0v0.pdf PDF
TGI_38K5212351A01_c3v1.rev1.pdf PDF
2.02 Attachment V Contract Data Sheet 25RA025.pdf PDF
TGI_38K5259310A01_c0v0.pdf PDF
TGI_38K5212347A01_c0v0.rev1.pdf PDF
TGI_38K5212352A01_c0v0.rev1.pdf PDF
TGI_38K5212346A01_c0v0.rev1.pdf PDF
TGI_38K5212389A01_c0v0.pdf PDF
TGI_38K5213001A01_c1v1.pdf PDF
TGI_38K5212317_A01_c2v2.rev1.pdf PDF
TGI_38K5212314_A01_c0v0.rev1.pdf PDF
TGI_38K5212315_A01_c0v0.rev1.pdf PDF
TGI_38K5212382A01_c0v0.pdf PDF
TGI_38K5212365A01_c0v0.pdf PDF
TGI_38K5213102A01_c1v1.pdf PDF
TGI_38K5215401A01_c0v0.pdf PDF
TGI_38K5212363T01_c0v0.pdf PDF
TGI_38K5212321A01_c2v0.rev1.pdf PDF
TGI_38K5212342A01_c0v0.rev1.pdf PDF
TGI_38K5212364A01_c0v0.pdf PDF
TGI_38K5216702_A01_c0v0.pdf PDF
TGI_38K5212325_A01_c0v0.rev1.pdf PDF
TGI_38K5212377A01_c1v1.pdf PDF
TGI_38K5212312_A01_c0v0.rev1.pdf PDF
TGI_38K5212340A01_c0v0.rev1.pdf PDF
TGI_38K5212313_A01_c0v1.rev1.pdf PDF
TGI_38K5212323_A01_c0v0.rev1.pdf PDF
TGI_38K5212309_A01_c0v0.rev1.pdf PDF
TGI_38K5212392A01_c1v1.pdf PDF
2.02 Attachment IV N6264925RA025 Request for Information Form.doc DOC document
TGI_38K5216704_A01_c0v0.pdf PDF
TGI_38K5212356A01_c0v0.rev1.pdf PDF
TGI_38K5212391A01_c0v0.pdf PDF
2.02 Attachment II Price Proposal Form N6264925RA025.xlsx XLSX spreadsheet
TGI_38K5212336_A01_c0v0.pdf PDF
TGI_38K5212320_A01_c1v1.rev1.pdf PDF
TGI_38K5212328_A01_c0v0.rev1.pdf PDF
TGI_38K5212319_A01_c2v1.rev1.pdf PDF
TGI_38K5216705_A01_c0v1.pdf PDF
TGI_38K5212390A01_c0v0.pdf PDF
TGI_38K5212330_A01_c0v0.rev1.pdf PDF
TGI_38K5212327_A01_c1v2.rev1.pdf PDF
TGI_38K5212355A01_c0v0.rev1.pdf PDF
2.02 Attachment III N6264925RA025 Government Furnished Property (GFP-GFM listings).xlsx XLSX spreadsheet
TGI_38K5212348A01_c0v0.pdf PDF
TGI_38K5216703_A01_c0v0.pdf PDF
TGI_38K5212311A01_c1v0.rev1.pdf PDF
Show 40 more

Latest 50 of 73 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

FOUO: Public availability to be determined under 5 USC 552

TASK GROUP INSTRUCTION

AIM REV 20.11.4.0 (OCTOBER 2020)

TGI COMPONENT NAME: TYPE: PHASE: REPEAT: CHANGE:

NO.: LO TK 3-254-2-F AY A 0 1

SHIP/HULL NO.: SHIP/HULL NAME: SYSTEM: PROJ/WO NO: CASREP CAT:

DDG-114 USS RALPH JOHNSON K52

CU PHASE TITLE:

F/O – CLEAN LUBRICATING OIL SETTLING TANK (3-254-2-F) & REPLACE MANHOLE ASSY

PREPARING ACTIVITY:

PREPARED BY: CODE PHONE DATE

SHUUHEI KOMATSU 231A 315-243-6786 11-SEP-2024

APPROVED BY: CODE PHONE DATE

YUUJI NAKAMURA 231A 315-243-6041 11-SEP-2024

CONCURRED BY: CODE PHONE DATE

CONCURRED BY: CODE PHONE DATE

CONCURRED BY: CODE PHONE DATE

CONCURRED BY: CODE PHONE DATE

REASON FOR WORK/NEED FOR CHANGE:

Responsibility of preservation for tank side surface had been changed from Ship’s Force to contractor.

CHANGE INSTRUCTIONS:

CH1: Revise Paragraph 5.4 and 5.7.4 (10/11/2024)

SPECIAL REQUIREMENTS:

This work Affects a fire zone boundary. Fabrication and/or staging of a non-flammable closure is required.

CLEANLINESS FOR PIPING SYSTEM/EQUIPMENT LEVEL II

WORK CERTIFICATION SIGNATURES

COMPLETION OF WORK REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:

ACCEPTANCE OF COMPLETED WORK

PHYSICAL INSPECTION PHYSICAL INSPECTION COMPLETED: BADGE NO.: SHOP/CODE: PHONE: DATE:

REQUIRED:☐YES ☒NO

RECORDS REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:

TGI NO.: LO TK 3-254-2-F AY A 0

FOUO

SHIP: DDG-114 CHG/VER: 1/1

LIST OF EFFECTIVE PAGES

SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO.

1-4 J-1 M-1

1. SCOPE/PURPOSE

1.1 Title: Cleaning of Lubricating Oil Settling Tank (3-254-2-F) and Replacement of Manhole Assembly: accomplish

1.2 Location of Work:

1.2.1 Lubricating Oil Settling Tank (3-254-2-F)

1.2.2 Engine Room No. 2 (4-254-0-E)

1.3 Identification:

1.3.1 Quantity (One EA), Lubricating Oil Settling Tank

Tank No.: 3-254-2-F Capacity: 1,175 Gallons

1.3.2 Quantity (One AY), Manhole Assembly for 3-254-2-F [New]

Manhole No. : 2-256-2 Manhole Size: 15 Inches x 23 Inches Type: Flush Deck, Oil-Tight Remarks: See Assy No. 10 of 2.5 for material and details

1.3.3 Quantity (One AY), Manhole Assembly for 3-254-2-F [Existing]

Manhole No. : 2-256-2 Manhole Size: 15 Inches x 23 Inches Type: Flush Deck, Oil-Tight

1.3.4 Quantity (2 EA in Total), Cover Plate for 3-254-2-F

1.3.4.1 Quantity (One EA), Manhole Cover Plate

Manhole No(s).: 2-256-2 Size: 15 Inches x 23 Inches Material: Steel

1.3.4.2 Quantity (One EA), Air Vent Hose Connection (AVHC) Cover Plate AVHC No(s).: 2-262-2 Size: 10 Inches Diameter Material: Steel

1.3.5 Quantity (2 EA in Total), Bolting Ring of Cover Plate for 3-254-2-F

1.3.5.1 Quantity (One EA), Bolting Ring for Manhole Cover Plate Manhole No.(s): 2-256-2 Material: Steel

1.3.5.2 Quantity (One EA), Bolting Ring for AVHC

FOUO

SHIP: DDG-114 CHG/VER: 1/1

AVHC No(s).: 2-262-2 Material: Steel

1.4 Security Classification: None.

1.5 Initial Condition: None.

1.6 Contractor Work start date:

1.7 Contractor Work completion date:

2. REFERENCES:

REF.

NO.

DOCUMENT

/DRAWING

NUMBER

DOCUMENT/DRAWING TITLE REV CHG

NO.

COPY

REQ’D

(Y/N)

SOURCE

DOC

(Y/N)

PARA SEC PG CHP

1 NSI FY-25 NAVSEA Standard Items - 1 N 2 LI FY-25 Local Standard Items - ORG N

3 TM S9086-

CJ-STM-

010/CH-075

Fasteners 7 N

4 DWG 167-

7062372

MANHOLE LIST SHIP WIDE - Y 7M

,9 K

5 DWG 8100-

1254-0085

FLUSH DK. W.T. & OIL TIGHT

BOLTED PLATE MANHOLE 15" x 36", 15" x 18" & 15" x 23"

AA Y AL

L

6 DWG 100-

7060400

UNIT STRL ARR DWG ASSY UNIT

D Y 3-6

3. APPENDICES:

3.1 Appendix “J” TGI Job Summary Information Sheet

3.2 Appendix "M" TGI Material List

3.3 Appendix "D" Deficiency Form

4. GENERAL REQUIREMENTS:

4.1 Not Applicable.

5. PROCEDURE:

5.1 Accomplish the requirements of 099-902YO of 2.2 for each tank listed in 1.3.1.

5.1.2 Accomplish the requirements of 009-107 of 2.1.

5.1.2.1 Accomplish the requirements of 009-09 of 2.1.

5.1.2.2 Ensure General Cleaning must be Level II.

5.1.3 Install each manhole cover for each tank listed in 1.3.1 in accordance with Figure 075-4-1 of 2.3.

5.2 Clean tank side surface of each new manhole assembly listed in 1.3.2 to bare metal for removal of foreign matter. Any threaded area must not be blasted.

5.3 Remove each existing manhole assembly listed in 1.3.3 and install each new manhole assembly listed in 1.3.2 in accordance with 2.4, using 2.5 and 2.6 for guidance.

Masato.Endo.ja Typewritten Text

14 JUL 2025

Masato.Endo.ja Typewritten Text

11 DEC 2025

Masato.Endo.ja Cross-Out

Masato.Endo.ja Typewritten Text

12/16/2024 C-1209 M. ENDO 11030028

FOUO

SHIP: DDG-114 CHG/VER: 1/1

5.3.1 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column(s) A, Lines One through 7.

5.3.2 Accomplish the requirements of 009-25 of 2.1 for a local air hose test of each new weld of each manhole assembly. Allowable leakage: None.

5.4 Accomplish the requirements of 009-32 of 2.1, including Table 4, Line(s) 14, for tank side surface, and Table 3, Line(s) 12, for machinery space side surface of each cover plate listed in 1.3.4. See 5.7.4

5.5 Accomplish the requirements of 009-32 of 2.1 for each bolting ring listed in 1.3.5. See 5.7.4

5.6 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface. See 5.7.4.

5.7 Notes:

5.7.1 Planner: Code 231A S. Komatsu, 243-6786

5.7.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598

5.7.3 This TGI meets the intent of DDG CSWT File No. 123-133.

5.7.4 Provision of system fluid for tank side surface will be accomplished by Ship’s Force.

5.7.5 Work per this instruction involves cutting an access (or removal of a door) through a fire zone bulkhead, through the hull of the ship above the turn of the bilge, through ventilation components (ducting, plenums, etc.), or through any air-tight, fume-tight or watertight bulkheads normally used to control air flow in the event of a shipboard fire. A nonflammable closure is required in accordance with COMNAVSEASYSCOM MSG R 261400Z JUL 12. The closure, if not continuously in use, shall be staged near the access, readily visible and accessible, so that any emergency responder can install the closure to affect proper air flow onboard the ship.

5.7.6 JCN EB14-ZAJ3 is related to this TGI.

5.8 Government Furnished Material (GFM):

5.8.1 SRF-JRMC will provide GFM listed in Appendix “M”.

5.9 SRF-JRMC will provide the following service work: (TGI No. 38K5212329S02).

5.9.1 [C740] Crane and crane rigging service.

5.9.2 [X99E] Utility service, electrical.

5.9.3 [X99M] Utility service, including low pressure air supply, water supply, and steam supply.

5.9.4 [C106.1] Safety inspection for SRF-JRMC employees.

5.9.5 [C106.2] Gas free inspection for SRF-JRMC employees.

5.9.6 [C133] QA inspection for (G) symbol(s).

FOUO

J-1

SHIP: DDG-114 CHG/VER: 1/1

APPENDIX "J"

TGI JOB SUMMARY INFORMATION SHEET

SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH

VERSION:

CASREP

CAT:

LO TK 3-254-2-F AY A 0 1

CU PHASE TITLE:

F/O – CLEAN LUBRICATING OIL SETTLING TANK (3-254-2-F) & REPLACE MANHOLE ASSY

PRIMARY COMPONENT:

COMPONENT UNIT LIST (FOR ASSEMBLIES):

LO SETLG 3-254-2-F TK CMPT 4-254-0-E MS

ATTACHMENT LIST:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

YAGINUMA ,TAKEHIDE

JO: KO: TOTAL MAN HRS: TOTAL MAT’L COST TOTAL DURATION: PLANNING ACCEPTANCE:

38K5212329 A01 539 $6,975.00 0

CU PHASE DESCRIPTION:

The purpose of this TGI is to clean Lubricating Oil Settling Tank (3-254-2-F) and replace manhole assembly for 3- 254-2-F.

Location of Work:

Lubricating Oil Settling Tank (3-254-2-F) Engine Room No. 2 (4-254-0-E)

TASK NAME

SHOP TSD/WC TS CREW# MHRS

HIGH RAD

HOURS

RC

GRID#

Version-1: change crew size of Task #4, 5, 6. C231A Y.

Nakamura, 10/10/2024. Y/Y/N.

V-01 0 0 0

FOUO

M-1

SHIP: DDG-114 CHG/VER: 1/1

APPENDIX “M”

TGI MATERIAL LIST

SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH

VERSION:

CASREP

CAT:

LO TK 3-254-2-F AY A 0 1

CU PHASE TITLE:

F/O – CLEAN LUBRICATING OIL SETTLING TANK (3-254-2-F) & REPLACE MANHOLE ASSY

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING

NUMBER

DOCUMENT/DRAWING TITLE REV

JOB ORDER: KEY OP:

38K5212329 A01

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

001 M MANHOLE FLUSH, MANHOLE

FLUSH,

MATERIAL: STEEL,

SIZE: 15" X 23" OT,

PANEL THICKNESS:

0.125"(1/8"), TEST PRESSURE: 0-15 PSI,

BIW CATALOG NO.:01201-107

DWG: 805-1480210 MOD &

8100-1254-0085/0010, ORIG: C231A S. KOMATSU,

243-6786

ORDERED FOR KTR

9B FY25 LL9006898 NA 4 N 1/EA

NOTES:

FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____

☐ NUCLEAR APPENDIX "D"

DEFICIENCY FORM

☐ NON-NUCLEAR

1. SHIP/HULL NO.: 2a. DL or DR No.

(Circle One)

2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:

DDG-114 LO TK 3-254-2-F AY A 0

4a. ICN: 4b. KEY OP: 5. LOC SPACE/LVL: FRAME: P/S/C: 6. CAUSED BY:

38K5212329 A01

7. DESCRIPTION:

8. ORIGINATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:

9. CORRECTIVE ACTION:

10. EVALUATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:

FOR NON-NUCLEAR USE ONLY

11. RFD/RFW REQ’D ☐ LAR REQ'D ☐

ILS MOD REQ’D ☐

SRD/PLAN REV REQ'D ☐

DWG NO.: _____________________ S/A NO.: ___________________

12. ISOLATION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.:

SATISFACTORY:

13. SUBSAFE OQE RECORD? SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.

YES ☐ NO ☐

14. CORRECTIVE ACTION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.

COMPLETE:

15. INSPECTION REQ’D? INSPECTION COMPLETE/SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.

_________:YES ☐ NO ☐

16. RECORDS REVIEW SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.

COMPLETE (DR ONLY)

DL’s ISSUED

(DR ONLY)

FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____

☐ NUCLEAR Deficiency Form Continuation Sheet ☐ NON-NUCLEAR

1. SHIP/HULL NO.: 2a. DL or DR No.

(Circle One) 2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:

DDG-114 LO TK 3-254-2-F AY A 0