This is a Task Group Instruction (TGI) document for cleaning a lubricating oil settling tank and replacing a manhole assembly on the USS RALPH JOHNSON (DDG-114). The work involves cleaning Tank 3-254-2-F (1,175 gallon capacity) located in Engine Room No. 2, replacing the existing 15" x 23" flush deck oil-tight manhole assembly, and installing a new manhole assembly with associated cover plates and bolting rings. The work affects a fire zone boundary and requires fabrication of non-flammable closure.
The work is to be performed between July 14, 2025 and December 11, 2025 at Yokosuka Naval Base. The job order number is 38K5212329 with key operation A01, requiring Level II cleanliness for the piping system/equipment. The total estimated cost is $6,975 with 539 man-hours. Special requirements include air hose testing of new welds with zero allowable leakage. The document details specific material requirements including a new manhole flush assembly made of steel with 1/8" panel thickness and 0-15 PSI test pressure. SRF-JRMC will provide various support services including crane operations, utilities, and safety inspections.
View the file
Other files
Show 40 more
Latest 50 of 73 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
FOUO: Public availability to be determined under 5 USC 552
TASK GROUP INSTRUCTION
AIM REV 20.11.4.0 (OCTOBER 2020)
TGI COMPONENT NAME: TYPE: PHASE: REPEAT: CHANGE:
NO.: LO TK 3-254-2-F AY A 0 1
SHIP/HULL NO.: SHIP/HULL NAME: SYSTEM: PROJ/WO NO: CASREP CAT:
DDG-114 USS RALPH JOHNSON K52
CU PHASE TITLE:
F/O – CLEAN LUBRICATING OIL SETTLING TANK (3-254-2-F) & REPLACE MANHOLE ASSY
PREPARING ACTIVITY:
PREPARED BY: CODE PHONE DATE
SHUUHEI KOMATSU 231A 315-243-6786 11-SEP-2024
APPROVED BY: CODE PHONE DATE
YUUJI NAKAMURA 231A 315-243-6041 11-SEP-2024
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
REASON FOR WORK/NEED FOR CHANGE:
Responsibility of preservation for tank side surface had been changed from Ship’s Force to contractor.
CHANGE INSTRUCTIONS:
CH1: Revise Paragraph 5.4 and 5.7.4 (10/11/2024)
SPECIAL REQUIREMENTS:
This work Affects a fire zone boundary. Fabrication and/or staging of a non-flammable closure is required.
CLEANLINESS FOR PIPING SYSTEM/EQUIPMENT LEVEL II
WORK CERTIFICATION SIGNATURES
COMPLETION OF WORK REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
ACCEPTANCE OF COMPLETED WORK
PHYSICAL INSPECTION PHYSICAL INSPECTION COMPLETED: BADGE NO.: SHOP/CODE: PHONE: DATE:
REQUIRED:☐YES ☒NO
RECORDS REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
TGI NO.: LO TK 3-254-2-F AY A 0
FOUO
SHIP: DDG-114 CHG/VER: 1/1
LIST OF EFFECTIVE PAGES
SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO.
1-4 J-1 M-1
1. SCOPE/PURPOSE
1.1 Title: Cleaning of Lubricating Oil Settling Tank (3-254-2-F) and Replacement of Manhole Assembly: accomplish
1.2 Location of Work:
1.2.1 Lubricating Oil Settling Tank (3-254-2-F)
1.2.2 Engine Room No. 2 (4-254-0-E)
1.3 Identification:
1.3.1 Quantity (One EA), Lubricating Oil Settling Tank
Tank No.: 3-254-2-F Capacity: 1,175 Gallons
1.3.2 Quantity (One AY), Manhole Assembly for 3-254-2-F [New]
Manhole No. : 2-256-2 Manhole Size: 15 Inches x 23 Inches Type: Flush Deck, Oil-Tight Remarks: See Assy No. 10 of 2.5 for material and details
1.3.3 Quantity (One AY), Manhole Assembly for 3-254-2-F [Existing]
Manhole No. : 2-256-2 Manhole Size: 15 Inches x 23 Inches Type: Flush Deck, Oil-Tight
1.3.4 Quantity (2 EA in Total), Cover Plate for 3-254-2-F
1.3.4.1 Quantity (One EA), Manhole Cover Plate
Manhole No(s).: 2-256-2 Size: 15 Inches x 23 Inches Material: Steel
1.3.4.2 Quantity (One EA), Air Vent Hose Connection (AVHC) Cover Plate AVHC No(s).: 2-262-2 Size: 10 Inches Diameter Material: Steel
1.3.5 Quantity (2 EA in Total), Bolting Ring of Cover Plate for 3-254-2-F
1.3.5.1 Quantity (One EA), Bolting Ring for Manhole Cover Plate Manhole No.(s): 2-256-2 Material: Steel
1.3.5.2 Quantity (One EA), Bolting Ring for AVHC
FOUO
SHIP: DDG-114 CHG/VER: 1/1
AVHC No(s).: 2-262-2 Material: Steel
1.4 Security Classification: None.
1.5 Initial Condition: None.
1.6 Contractor Work start date:
1.7 Contractor Work completion date:
2. REFERENCES:
REF.
NO.
DOCUMENT
/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV CHG
NO.
COPY
REQ’D
(Y/N)
SOURCE
DOC
(Y/N)
PARA SEC PG CHP
1 NSI FY-25 NAVSEA Standard Items - 1 N 2 LI FY-25 Local Standard Items - ORG N
3 TM S9086-
CJ-STM-
010/CH-075
Fasteners 7 N
4 DWG 167-
7062372
MANHOLE LIST SHIP WIDE - Y 7M
,9 K
5 DWG 8100-
1254-0085
FLUSH DK. W.T. & OIL TIGHT
BOLTED PLATE MANHOLE 15" x 36", 15" x 18" & 15" x 23"
AA Y AL
L
6 DWG 100-
7060400
UNIT STRL ARR DWG ASSY UNIT
D Y 3-6
3. APPENDICES:
3.1 Appendix “J” TGI Job Summary Information Sheet
3.2 Appendix "M" TGI Material List
3.3 Appendix "D" Deficiency Form
4. GENERAL REQUIREMENTS:
4.1 Not Applicable.
5. PROCEDURE:
5.1 Accomplish the requirements of 099-902YO of 2.2 for each tank listed in 1.3.1.
5.1.2 Accomplish the requirements of 009-107 of 2.1.
5.1.2.1 Accomplish the requirements of 009-09 of 2.1.
5.1.2.2 Ensure General Cleaning must be Level II.
5.1.3 Install each manhole cover for each tank listed in 1.3.1 in accordance with Figure 075-4-1 of 2.3.
5.2 Clean tank side surface of each new manhole assembly listed in 1.3.2 to bare metal for removal of foreign matter. Any threaded area must not be blasted.
5.3 Remove each existing manhole assembly listed in 1.3.3 and install each new manhole assembly listed in 1.3.2 in accordance with 2.4, using 2.5 and 2.6 for guidance.
Masato.Endo.ja Typewritten Text
14 JUL 2025
Masato.Endo.ja Typewritten Text
11 DEC 2025
Masato.Endo.ja Cross-Out
Masato.Endo.ja Typewritten Text
12/16/2024 C-1209 M. ENDO 11030028
FOUO
SHIP: DDG-114 CHG/VER: 1/1
5.3.1 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column(s) A, Lines One through 7.
5.3.2 Accomplish the requirements of 009-25 of 2.1 for a local air hose test of each new weld of each manhole assembly. Allowable leakage: None.
5.4 Accomplish the requirements of 009-32 of 2.1, including Table 4, Line(s) 14, for tank side surface, and Table 3, Line(s) 12, for machinery space side surface of each cover plate listed in 1.3.4. See 5.7.4
5.5 Accomplish the requirements of 009-32 of 2.1 for each bolting ring listed in 1.3.5. See 5.7.4
5.6 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface. See 5.7.4.
5.7 Notes:
5.7.1 Planner: Code 231A S. Komatsu, 243-6786
5.7.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598
5.7.3 This TGI meets the intent of DDG CSWT File No. 123-133.
5.7.4 Provision of system fluid for tank side surface will be accomplished by Ship’s Force.
5.7.5 Work per this instruction involves cutting an access (or removal of a door) through a fire zone bulkhead, through the hull of the ship above the turn of the bilge, through ventilation components (ducting, plenums, etc.), or through any air-tight, fume-tight or watertight bulkheads normally used to control air flow in the event of a shipboard fire. A nonflammable closure is required in accordance with COMNAVSEASYSCOM MSG R 261400Z JUL 12. The closure, if not continuously in use, shall be staged near the access, readily visible and accessible, so that any emergency responder can install the closure to affect proper air flow onboard the ship.
5.7.6 JCN EB14-ZAJ3 is related to this TGI.
5.8 Government Furnished Material (GFM):
5.8.1 SRF-JRMC will provide GFM listed in Appendix “M”.
5.9 SRF-JRMC will provide the following service work: (TGI No. 38K5212329S02).
5.9.1 [C740] Crane and crane rigging service.
5.9.2 [X99E] Utility service, electrical.
5.9.3 [X99M] Utility service, including low pressure air supply, water supply, and steam supply.
5.9.4 [C106.1] Safety inspection for SRF-JRMC employees.
5.9.5 [C106.2] Gas free inspection for SRF-JRMC employees.
5.9.6 [C133] QA inspection for (G) symbol(s).
FOUO
J-1
SHIP: DDG-114 CHG/VER: 1/1
APPENDIX "J"
TGI JOB SUMMARY INFORMATION SHEET
SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH
VERSION:
CASREP
CAT:
LO TK 3-254-2-F AY A 0 1
CU PHASE TITLE:
F/O – CLEAN LUBRICATING OIL SETTLING TANK (3-254-2-F) & REPLACE MANHOLE ASSY
PRIMARY COMPONENT:
COMPONENT UNIT LIST (FOR ASSEMBLIES):
LO SETLG 3-254-2-F TK CMPT 4-254-0-E MS
ATTACHMENT LIST:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
YAGINUMA ,TAKEHIDE
JO: KO: TOTAL MAN HRS: TOTAL MAT’L COST TOTAL DURATION: PLANNING ACCEPTANCE:
38K5212329 A01 539 $6,975.00 0
CU PHASE DESCRIPTION:
The purpose of this TGI is to clean Lubricating Oil Settling Tank (3-254-2-F) and replace manhole assembly for 3- 254-2-F.
Location of Work:
Lubricating Oil Settling Tank (3-254-2-F) Engine Room No. 2 (4-254-0-E)
TASK NAME
SHOP TSD/WC TS CREW# MHRS
HIGH RAD
HOURS
RC
GRID#
Version-1: change crew size of Task #4, 5, 6. C231A Y.
Nakamura, 10/10/2024. Y/Y/N.
V-01 0 0 0
FOUO
M-1
SHIP: DDG-114 CHG/VER: 1/1
APPENDIX “M”
TGI MATERIAL LIST
SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH
VERSION:
CASREP
CAT:
LO TK 3-254-2-F AY A 0 1
CU PHASE TITLE:
F/O – CLEAN LUBRICATING OIL SETTLING TANK (3-254-2-F) & REPLACE MANHOLE ASSY
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV
JOB ORDER: KEY OP:
38K5212329 A01
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
001 M MANHOLE FLUSH, MANHOLE
FLUSH,
MATERIAL: STEEL,
SIZE: 15" X 23" OT,
PANEL THICKNESS:
0.125"(1/8"), TEST PRESSURE: 0-15 PSI,
BIW CATALOG NO.:01201-107
DWG: 805-1480210 MOD &
8100-1254-0085/0010, ORIG: C231A S. KOMATSU,
243-6786
ORDERED FOR KTR
9B FY25 LL9006898 NA 4 N 1/EA
NOTES:
FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____
☐ NUCLEAR APPENDIX "D"
DEFICIENCY FORM
☐ NON-NUCLEAR
1. SHIP/HULL NO.: 2a. DL or DR No.
(Circle One)
2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:
DDG-114 LO TK 3-254-2-F AY A 0
4a. ICN: 4b. KEY OP: 5. LOC SPACE/LVL: FRAME: P/S/C: 6. CAUSED BY:
38K5212329 A01
7. DESCRIPTION:
8. ORIGINATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:
9. CORRECTIVE ACTION:
10. EVALUATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:
FOR NON-NUCLEAR USE ONLY
11. RFD/RFW REQ’D ☐ LAR REQ'D ☐
ILS MOD REQ’D ☐
SRD/PLAN REV REQ'D ☐
DWG NO.: _____________________ S/A NO.: ___________________
12. ISOLATION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.:
SATISFACTORY:
13. SUBSAFE OQE RECORD? SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
YES ☐ NO ☐
14. CORRECTIVE ACTION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
COMPLETE:
15. INSPECTION REQ’D? INSPECTION COMPLETE/SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
_________:YES ☐ NO ☐
16. RECORDS REVIEW SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
COMPLETE (DR ONLY)
DL’s ISSUED
(DR ONLY)
FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____
☐ NUCLEAR Deficiency Form Continuation Sheet ☐ NON-NUCLEAR
1. SHIP/HULL NO.: 2a. DL or DR No.
(Circle One) 2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:
DDG-114 LO TK 3-254-2-F AY A 0