This is a Task Group Instruction (TGI) document for cleaning, assessment, repair, and preservation work on the USS RALPH JOHNSON (DDG-114) Forepeak Tank (4-P-0-W) and replacement of its manhole assembly. The work involves cleaning and assessing the tank's preservation coating, structural integrity, deterioration, pitting, and cracks, as well as replacing the existing 23" x 15" flush deck water-tight manhole assembly. The scope includes work in the Forepeak Tank, Windlass Machinery Room, and Anchor Holding Equipment Storeroom.

The work period is scheduled for July 14, 2025 to August 21, 2025, with an estimated material cost of $4,650 and 901 total man-hours. Key requirements include Level III cleanliness for piping systems, non-flammable closure fabrication for fire zone boundary work, and preservation of 158 square feet of defective painted surfaces. The government will provide various support services including crane operations, utilities, safety inspections, and gas-free inspections. The work affects multiple ship systems including sounding tubes, tank vents, overflows, piping, structural members, ladders, anodes, and tank level indicators. One new manhole assembly (stock number LL4639459) will be provided as government-furnished material.

View the file

Other files

File Type Posted
2.03 Amendment 0003 25RA025.pdf PDF
2.03 Amendment 0002 25RA025.pdf PDF
2.03 Amendment 0001 25RA025.pdf PDF
TGI_38K5263408A01_c0v0.pdf PDF
TGI_38K5212351A01_c3v1.rev1.pdf PDF
2.02 Attachment V Contract Data Sheet 25RA025.pdf PDF
TGI_38K5259310A01_c0v0.pdf PDF
TGI_38K5212347A01_c0v0.rev1.pdf PDF
TGI_38K5212352A01_c0v0.rev1.pdf PDF
TGI_38K5212346A01_c0v0.rev1.pdf PDF
TGI_38K5212389A01_c0v0.pdf PDF
TGI_38K5213001A01_c1v1.pdf PDF
TGI_38K5212317_A01_c2v2.rev1.pdf PDF
TGI_38K5212314_A01_c0v0.rev1.pdf PDF
TGI_38K5212315_A01_c0v0.rev1.pdf PDF
TGI_38K5212382A01_c0v0.pdf PDF
TGI_38K5212365A01_c0v0.pdf PDF
TGI_38K5213102A01_c1v1.pdf PDF
TGI_38K5215401A01_c0v0.pdf PDF
TGI_38K5212329_A01_c1v1.rev1.pdf PDF
TGI_38K5212363T01_c0v0.pdf PDF
TGI_38K5212321A01_c2v0.rev1.pdf PDF
TGI_38K5212342A01_c0v0.rev1.pdf PDF
TGI_38K5212364A01_c0v0.pdf PDF
TGI_38K5216702_A01_c0v0.pdf PDF
TGI_38K5212325_A01_c0v0.rev1.pdf PDF
TGI_38K5212377A01_c1v1.pdf PDF
TGI_38K5212312_A01_c0v0.rev1.pdf PDF
TGI_38K5212340A01_c0v0.rev1.pdf PDF
TGI_38K5212313_A01_c0v1.rev1.pdf PDF
TGI_38K5212323_A01_c0v0.rev1.pdf PDF
TGI_38K5212309_A01_c0v0.rev1.pdf PDF
TGI_38K5212392A01_c1v1.pdf PDF
2.02 Attachment IV N6264925RA025 Request for Information Form.doc DOC document
TGI_38K5216704_A01_c0v0.pdf PDF
TGI_38K5212356A01_c0v0.rev1.pdf PDF
TGI_38K5212391A01_c0v0.pdf PDF
2.02 Attachment II Price Proposal Form N6264925RA025.xlsx XLSX spreadsheet
TGI_38K5212336_A01_c0v0.pdf PDF
TGI_38K5212320_A01_c1v1.rev1.pdf PDF
TGI_38K5212328_A01_c0v0.rev1.pdf PDF
TGI_38K5212319_A01_c2v1.rev1.pdf PDF
TGI_38K5216705_A01_c0v1.pdf PDF
TGI_38K5212390A01_c0v0.pdf PDF
TGI_38K5212330_A01_c0v0.rev1.pdf PDF
TGI_38K5212327_A01_c1v2.rev1.pdf PDF
TGI_38K5212355A01_c0v0.rev1.pdf PDF
2.02 Attachment III N6264925RA025 Government Furnished Property (GFP-GFM listings).xlsx XLSX spreadsheet
TGI_38K5212348A01_c0v0.pdf PDF
TGI_38K5216703_A01_c0v0.pdf PDF
Show 40 more

Latest 50 of 73 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

FOUO: Public availability to be determined under 5 USC 552

TASK GROUP INSTRUCTION

AIM REV 20.11.4.0 (OCTOBER 2020)

TGI COMPONENT NAME: TYPE: PHASE: REPEAT: CHANGE:

NO.: TK 4-P-0-W AY A 0 0

SHIP/HULL NO.: SHIP/HULL NAME: SYSTEM: PROJ/WO NO: CASREP CAT:

DDG-114 USS RALPH JOHNSON K52

CU PHASE TITLE:

F/O – CLEAN, ASSESS, REPAIR, PSV FOREPEAK TK (4-P-0-W) & REPLACE MH ASSY

PREPARING ACTIVITY:

PREPARED BY: CODE PHONE DATE

SHUUHEI KOMATSU 231A 315-243-6786 11-OCT-2024

APPROVED BY: CODE PHONE DATE

YUUJI NAKAMURA 231A 315-243-6041 11-OCT-2024

CONCURRED BY: CODE PHONE DATE

CONCURRED BY: CODE PHONE DATE

CONCURRED BY: CODE PHONE DATE

CONCURRED BY: CODE PHONE DATE

REASON FOR WORK/NEED FOR CHANGE:

CHANGE INSTRUCTIONS:

SPECIAL REQUIREMENTS:

This work Affects a fire zone boundary. Fabrication and/or staging of a non-flammable closure is required.

SURFMEPP

CLEANLINESS FOR PIPING SYSTEM/EQUIPMENT LEVEL III

WORK CERTIFICATION SIGNATURES

COMPLETION OF WORK REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:

ACCEPTANCE OF COMPLETED WORK

PHYSICAL INSPECTION PHYSICAL INSPECTION COMPLETED: BADGE NO.: SHOP/CODE: PHONE: DATE:

REQUIRED:☐YES ☒NO

RECORDS REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:

TGI NO.: TK 4-P-0-W AY A 0

FOUO

SHIP: DDG-114 CHG/VER: 0/0

LIST OF EFFECTIVE PAGES

SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO.

1-5 J-1 M-1

1. SCOPE/PURPOSE:

1.1 Title: Cleaning, Assessment, Repair, and Preservation of Forepeak Tank (4-P-0-W) and Replacement of Manhole Assembly for 4-P-0-W; accomplish

1.2 Location of Work:

1.2.1 Forepeak Tank (4-P-0-W)

1.2.2 Windlass Machinery Room (0 1/2-2-0-Q)

1.2.3 Anchor Holding Equipment Storeroom (0 1/2-W-0-A)

1.3 Identification:

1.3.1 Quantity (One EA), Forepeak Tank

Tank No.: 4-P-0-W Capacity: 12,482 Gallons

1.3.2 Quantity (One AY), Manhole Assembly for 4-P-0-W [Existing]

Manhole No. : 0 1/2-4-1 Manhole Size: 23 Inches x 15 Inches Type: Flush Deck, Water-Tight

1.3.3 Quantity (One AY), Manhole Assembly for 4-P-0-W [New]

Manhole No. : 0 1/2-4-1 Manhole Size: 23 Inches x 15 Inches Type: Flush Deck, Water-Tight Remarks: See Assy No. 7 of 2.7 for material and details

1.3.4 Quantity (2 EA), Manhole Cover Plate and Air Vent Hose Connection (AVHC) Cover Plate for 4-P-0-W

Manhole No(s).: 0 1/2-4-1 Size: 23 Inches x 15 Inches AVHC No(s).: 0 1/2-J-2 Size: 10 Inches Diameter Material: Steel

1.3.5 Quantity (2 EA), Bolting Ring for Manhole Cover Plate and AVHC Cover Plate for 4-P-0-W

Manhole No(s).: 0 1/2-4-1 AVHC No(s).: 0 1/2-J-2

1.4 Security Classification: None.

1.5 Initial Condition: None.

FOUO

SHIP: DDG-114 CHG/VER: 0/0

1.6 Contractor Work start date:

1.7 Contractor Work completion date:

2. REFERENCES:

REF.

NO.

DOCUMENT

/DRAWING

NUMBER

DOCUMENT/DRAWING TITLE REV CHG

NO.

COPY

REQ’D

(Y/N)

SOURCE

DOC

(Y/N)

PARA SEC PG CHP

1 NSI FY-25 NAVSEA Standard Items - 1 N 2 LI FY-25 Local Standard Items - ORG N

3 TM T-9630-

AB-MMD-

Corrosion Control Assessment and Maintenance Manual (CCAMM)

3 N

4 TM NAVSEA

4790/14

Tank and Void Structural and Coating Condition Survey (MRC G1N5)

- N

5 TM S9086-

CJ-STM-

010/CH-075

Fasteners 7 N

6 DWG 167-

7062372

MANHOLE LIST SHIP WIDE - Y 7H

,9 A

7 DWG 8100-

1254-0085

FLUSH DK. W.T. & OIL TIGHT

BOLTED PLATE MANHOLE 15" x 36", 15" x 18" & 15" x 23"

AA Y AL

L

8 DWG 100-

7063172

UNIT STRUCTURAL ARR DWG

ASSYUNIT 1150

- Y SE

E N

OT

E

9 DWG 100-

7063171

UNIT STRUCTURAL ARR DWG

ASSYUNIT 1210

- Y 3A

3. APPENDICES:

3.1 Appendix “J” TGI Job Summary Information Sheet

3.2 Appendix "M" TGI Material List

3.3 Appendix "D" Deficiency Form

4. GENERAL REQUIREMENTS:

4.1 Not Applicable.

5. PROCEDURE:

5.1 Accomplish the requirements of 099-902YO of 2.2 for each tank listed in 1.3.1.

5.1.1 Accomplish an assessment of each tank listed in 1.3.1 for existing preservation coating, structural integrity, deterioration, pitting, cracks, and areas of damage or distortion, including sounding tubes, tank/void vents, overflows, piping and associated material, structural members, ladders, anodes, desiccant, tank level indicator (TLI), radar TLI, and their electric cables, stud, and tank top cable penetration, and manhole covers in accordance with 2.3 and 2.4.

Document the assessment on 2.4.

(I) "CCIMS ASSESSMENT"

5.1.1.1 Mark each corroded, damaged and/or deteriorated coating area in each tank.

Masato.Endo.ja Cross-Out

Masato.Endo.ja Typewritten Text

21 AUG 2025

Masato.Endo.ja Typewritten Text

14 JUL 2025

Masato.Endo.ja Typewritten Text

12/16/2024 C-1209 M. ENDO 11030028

FOUO

SHIP: DDG-114 CHG/VER: 0/0

5.1.1.2 Submit one legible copy, in hard copy, or approved transferrable media, of completed assessment form 2.4 to the SUPERVISOR.

5.1.2 Accomplish the requirements of 009-107 of 2.1.

5.1.2.1 Ensure General Cleaning must be Level III.

5.1.3 Install each manhole cover for each tank listed in 1.3.1 in accordance with Figure 075-4-1 of 2.5.

5.2 Remove each existing manhole assembly listed in 1.3.2 and install each new manhole assembly listed in 1.3.3 in accordance with 2.6, using 2.7 and 2.8 for guidance.

5.2.1 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column(s) A, Lines One through 7.

5.2.2 Accomplish the requirements of 009-25 of 2.1 for a local air hose test of each new weld of each manhole assembly. Allowable leakage: None.

5.3 Repair each tank listed in 1.3.1, based on the CCIMS assessment report as designated by the SUPERVISOR, using 2.8 and 2.9 for guidance. See 5.8.4 and 5.8.5.

5.3.1 Base metal weld buildup a total of 36 square inches of each plate defect in the tank bottom.

5.3.1.1 For bidding purposes the base metal weld buildup must be one quarter inch thick.

5.3.1.2 Surface must be ground to sound metal prior to base metal weld buildup.

5.3.1.3 Fill each local pit and groove with weld material prior to application of each principal buildup layer.

5.3.1.4 Grind each surface of completed base metal weld buildup smooth if greater than 1/8 inch above plate surface.

5.3.2 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column(s) A, Lines One through 7.

5.3.2.1 Accomplish nondestructive testing in accordance with Line 11.

5.4 Accomplish the requirements of 009-32 of 2.1, including Table 4, Line(s) 18, for a total of 158 square feet of defective painted surfaces, for each tank listed in 1.3.1, as designated by the SUPERVISOR.

5.4.1 The preservation area must not exceed 10 square feet per one area.

5.5 Accomplish the requirements of 009-32 of 2.1, including Table 4, Line(s) 18, for tank side surface, and Table 3, Line(s) 27, for Windlass Machinery Room and Anchor Holding Equipment Storeroom side surface of each cover plate listed in 1.3.4.

5.6 Accomplish the requirements of 009-32 of 2.1 for each bolting ring listed in 1.3.5.

5.7 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.

5.8 Notes:

5.8.1 Planner: Code 231A S. Komatsu, 243-6786

5.8.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598

5.8.3 This TGI meets the intent of DDG CSWT File Nos. 123-117, 123-118, and 123-133.

FOUO

SHIP: DDG-114 CHG/VER: 0/0

5.8.4 Removal and installation of interferences, and gas free operation, preservation of boundary spaces relating to front loading structure repair are not included in this TGI. They will be covered by a DL in the future based on Contractor submitted condition report.

5.8.5 Materials for structure members relating to front loading repair will be provided in the future as a DL based on Contractor submitted condition report.

5.8.6 2.4 is available on P:\C200\C225\Enclosures\C231\Tank and Void Structural and Coating Condition Survey

(MRC G1N5).

5.8.7 WPC will copy the following pages in reference.

REF. 2.8: Pages 3, 3A, 3C, 4, 5A, 5B, 5C, 5D, 5E, 5F, 5G, 5H, 5J, 5K, 5L, 5M, 6, 9, 8-8, 3B-13, and 5-13.

5.8.8 Work per this instruction involves cutting an access (or removal of a door) through a fire zone bulkhead, through the hull of the ship above the turn of the bilge, through ventilation components (ducting, plenums, etc.), or through any air-tight, fume-tight or watertight bulkheads normally used to control air flow in the event of a shipboard fire. A nonflammable closure is required in accordance with COMNAVSEASYSCOM MSG R 261400Z JUL 12. The closure, if not continuously in use, shall be staged near the access, readily visible and accessible, so that any emergency responder can install the closure to affect proper air flow onboard the ship.

5.8.9 JCNs ER01-ZA80, ER01-ZAA8, ER01-ZAB9, and ER01-ZAC2 are related to this TGI.

5.9 Government Furnished Material (GFM):

5.9.1 SRF-JRMC will provide GFM listed in Appendix “M”.

5.10 SRF-JRMC will provide the following service work: (TGI No. 38K5212345S02).

5.10.1 [C740] Crane and crane rigging service.

5.10.2 [X99E] Utility service, electrical.

5.10.3 [X99M] Utility service, including low pressure air supply, water supply, and steam supply.

5.10.4 [C106.1] Safety inspection for SRF-JRMC employees.

5.10.5 [C106.2] Gas free inspection for SRF-JRMC employees.

5.10.6 [C133] QA inspection for (G) symbol(s) and data base entry for CCIMS.

5.10.7 [C250] Technical support and process of the tank/void assessment results.

FOUO

J-1

SHIP: DDG-114 CHG/VER: 0/0

APPENDIX "J"

TGI JOB SUMMARY INFORMATION SHEET

SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH

VERSION:

CASREP

CAT:

TK 4-P-0-W AY A 0 0

CU PHASE TITLE:

F/O – CLEAN, ASSESS, REPAIR, PSV FOREPEAK TK (4-P-0-W) & REPLACE MH ASSY

PRIMARY COMPONENT:

COMPONENT UNIT LIST (FOR ASSEMBLIES):

BLST TK 4-P-0-W TK CMPT 0.5-2-0-Q MS CMPT 0.5-W-0-A MS

ATTACHMENT LIST:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

YAGINUMA ,TAKEHIDE

JO: KO: TOTAL MAN HRS: TOTAL MAT’L COST TOTAL DURATION: PLANNING ACCEPTANCE:

38K5212345 A01 901 $4,650.00 1

CU PHASE DESCRIPTION:

The purpose of this TGI is to clean, assess, repair, and preserve Forepeak Tank (4-P-0-W) and replace manhole assembly for 4-P-0-W.

Location of Work:

Forepeak Tank (4-P-0-W) Windlass Machinery Room (0 1/2-2-0-Q) Anchor Holding Equipment Storeroom (0 1/2-W-0-A)

TASK NAME

SHOP TSD/WC TS CREW# MHRS

HIGH RAD

HOURS

RC

GRID#

FOUO

M-1

SHIP: DDG-114 CHG/VER: 0/0

APPENDIX “M”

TGI MATERIAL LIST

SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH

VERSION:

CASREP

CAT:

TK 4-P-0-W AY A 0 0

CU PHASE TITLE:

F/O – CLEAN, ASSESS, REPAIR, PSV FOREPEAK TK (4-P-0-W) & REPLACE MH ASSY

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING

NUMBER

DOCUMENT/DRAWING TITLE REV

JOB ORDER: KEY OP:

38K5212345 A01

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

001 M MANHOLE, MANHOLE,

MATERIAL: STEEL, SIZE: 15" X

23", DH-36, 0-15 PSI, FLUSH

DECK, W.T & O.T, BOLTED,

REFERENCE DRAWING: BIW

DWG: 8100-1254-0085 REV-AA,

ASSY NO 0007, BIW CAT#:

01201-077

ORIG: C231A S. KOMATSU,

243-6786

ORDERED FOR KTR

LL4639459 NA 4 N 1/EA

NOTES:

FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____

☐ NUCLEAR APPENDIX "D"

DEFICIENCY FORM

☐ NON-NUCLEAR

1. SHIP/HULL NO.: 2a. DL or DR No.

(Circle One)

2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:

DDG-114 TK 4-P-0-W AY A 0

4a. ICN: 4b. KEY OP: 5. LOC SPACE/LVL: FRAME: P/S/C: 6. CAUSED BY:

38K5212345 A01

7. DESCRIPTION:

8. ORIGINATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:

9. CORRECTIVE ACTION:

10. EVALUATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:

FOR NON-NUCLEAR USE ONLY

11. RFD/RFW REQ’D ☐ LAR REQ'D ☐

ILS MOD REQ’D ☐

SRD/PLAN REV REQ'D ☐

DWG NO.: _____________________ S/A NO.: ___________________

12. ISOLATION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.:

SATISFACTORY:

13. SUBSAFE OQE RECORD? SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.

YES ☐ NO ☐

14. CORRECTIVE ACTION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.

COMPLETE:

15. INSPECTION REQ’D? INSPECTION COMPLETE/SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.

_________:YES ☐ NO ☐

16. RECORDS REVIEW SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.

COMPLETE (DR ONLY)

DL’s ISSUED

(DR ONLY)

FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____

☐ NUCLEAR Deficiency Form Continuation Sheet ☐ NON-NUCLEAR

1. SHIP/HULL NO.: 2a. DL or DR No.

(Circle One) 2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:

DDG-114 TK 4-P-0-W AY A 0