This document is a WebAIM Short Form Task Group Instruction (TGI) for the USS Blue Ridge, dated 06-MAY-2025, focused on a tightness test for Boiler #1A Desuperheater. The instruction involves three work categories: Contractor work (22/KE), QA work (33/G1), and Support/Facility (S/F) work, all of which are to accomplish and document a hydrostatic test in accordance with reference document TP 22111-2-101KTR. The task is associated with Project 19P, System 22111, and involves technical inspection of naval vessel equipment. Key personnel include Nakajima Hisato (prepared by), Jason Y. Ohta (approved), and Yasuhiko Takahashi (zone manager), with the document marked as For Official Use Only (FOUO).
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
06-MAY-2025 1554
20.14.15.2.9020 (September 2024) ICN: 3819P22114 KeyOp: T06
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 22111-2-101KTR TT T 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 22111
CU PHASE TITLE: BOILER 1A, DESUPERHEATER (T) - KTR
WORK CERTIFICATION SIGNATURES: DLs
COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
FOUO Pg 1 of 2
EM01ZAG1 * EM01ZAG3 * EM01ZAK5 * EM01ZAG9 * EM01ZAH0 * EM01ZAH3 * EM01ZAH6 * EM01ZAH8 * EM01ZAI0 *
EM01ZAI1 * EM01ZAI3 * EM01ZAI7 * EM02L194
PREPARING ACTIVITY: STATUS: APP WORKING STATUS:
PREPARED BY: CODE: PHONE: DATE:
NAKAJIMA, HISATO 246.2 3152434197 17-APR-2025
APPROVED BY: CODE: PHONE: DATE:
OHTA, JASON Y. 246.2 3152435901 05-MAY-2025
CONCURRED BY: CODE: PHONE: DATE:
REASON FOR WORK/NEED FOR CHANGE:
JCN:
EM01-ZAG1 * EM01-ZAG3 * EM01-ZAG9 * EM01-ZAH0 * EM01-ZAH3 * EM01-ZAH6 * EM01-ZAH8 * EM01-ZAI0 * EM01-ZAI1 *
EM01-ZAI3 * EM01-ZAI7 * EM01-ZAK5 * EM02-L194
SPECIAL REQUIREMENTS:
CU PHASE DESCRIPTION:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
TAKAHASHI, YASUHIKO U
JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:
221A1114, more...
Tightness Test for Boiler #1A, Desuperheater.
TGI Short Form
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
06-MAY-2025 1554
20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P22114 KeyOp: T06
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 22111-2-101KTR TT T 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 22111
CU PHASE TITLE: BOILER 1A, DESUPERHEATER (T) - KTR
FOUO Pg 2 of 2
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1 TP 22111-2-101KTR BOILER 1A (S & T) - KTR LAT Y
TASK NAME / TASK DESCRIPTION
SHOP/
TSD TS
SF
WC
CREW
# MHRS RWRK
(V) Contractor work:
Accomplish/document the hydrostatic test in accordance with reference, TP 22111-2-101KTR.
22/KE PC N
(G) QA work:
Accomplish/document the hydrostatic test in accordance with reference, TP 22111-2-101KTR.
33/G1 QA N
(S) S/F work:
Accomplish/document the hydrostatic test in accordance with reference, TP 22111-2-101KTR.
/ EM02 N
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE
REV
ICN: 3819P22114 KEY OP: T06
File details come from the government source that posted it. Updated .