This WebAIM Short Form Task Group Instruction (TGI) details a technical task for the USS Blue Ridge (LCC-19) involving a Firemain System Tightness & Operational Test. The document is dated 06-MAY-2025 and is marked FOUO (For Official Use Only), with a specific Job Control Number (JCN) of EM01-L261. The task involves contractor (KTR) work to accomplish and document a tightness and operational test in accordance with technical procedure TP 52111-3-300KTR, with additional quality assurance (QA) and ship's force (S/F) work components. The preparation was initiated by Noda, Kouichiro on 22-APR-2025 and approved by Ohta, Jason Y. on 05-MAY-2025, with Yaginuma, Takehide listed as the Zone Manager. The task is associated with Project 19P and System 52111, though specific man-hours, duration, and total job cost are not populated in the document.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
06-MAY-2025 1252
20.14.15.2.9020 (September 2024) ICN: 3819P123AG KeyOp: T12
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 52111-3-300KTR TT T 7 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 52111
CU PHASE TITLE: FIREMAIN SYS (T & OP) - KTR
WORK CERTIFICATION SIGNATURES: DLs
COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
FOUO Pg 1 of 2
EM01L261
PREPARING ACTIVITY: STATUS: APP WORKING STATUS:
PREPARED BY: CODE: PHONE: DATE:
NODA, KOUICHIRO 246.2 3152434116 22-APR-2025
APPROVED BY: CODE: PHONE: DATE:
OHTA, JASON Y. 246.2 3152435901 05-MAY-2025
CONCURRED BY: CODE: PHONE: DATE:
REASON FOR WORK/NEED FOR CHANGE:
JCN:
EM01-L261
SPECIAL REQUIREMENTS:
CU PHASE DESCRIPTION:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
YAGINUMA, TAKEHIDE U
JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:
123A41AG
Tightness & Operational Test for Firemain System - KTR.
TGI Short Form
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
06-MAY-2025 1252
20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P123AG KeyOp: T12
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 52111-3-300KTR TT T 7 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 52111
CU PHASE TITLE: FIREMAIN SYS (T & OP) - KTR
FOUO Pg 2 of 2
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1 TP 52111-3-300KTR FIREMAIN SYSTEM (T & OP) -
KTR
LAT Y
TASK NAME / TASK DESCRIPTION
SHOP/
TSD TS
SF
WC
CREW
# MHRS RWRK
(V) Contractor work:
Accomplish/document the tightness & operational test in accordance with reference, TP 52111-3-300KTR.
22/KE PC N
(G) QA work:
Accomplish/document the tightness & operational test in accordance with reference, TP 52111-3-300KTR.
33/G1 QA N
(S) S/F work:
Accomplish/document the tightness & operational test in accordance with reference, TP 52111-3-300KTR.
/ EM01 N
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE
REV
ICN: 3819P123AG KEY OP: T12