This Task Group Instruction (TGI) details maintenance procedures for the USS Blue Ridge's 1B Boiler GIS Safety Valve Operation System. The document specifies cleaning, inspection, and lubrication of hand easing gear boxes, safety valve actuators, and associated cables, located in the Fire Room. The work is scheduled for contractor execution from 7/21/2026 to 11/21/2027, in response to a Boiler Inspection and Repair Management Information System (BIRMIS) report dated 17 OCT 2024.

Specific tasks include removing and installing new lubricating oil and grease for gear box components, performing mechanical functional inspections to verify ease of operation and alignment, and ensuring no binding in the systems. The Ship Repair Facility-Japan Regional Maintenance Center (SRF-JRMC) will provide supporting services including crane and rigging, utility services (electrical, air, water, steam), safety inspections, and quality assurance inspections. The work is associated with Job Control Number (JCN) EM02-L192 and involves equipment from manufacturer KUT-ROL, including a model KR610-3 Cam Action Speed Reducer.

View the file

Other files

File Type Posted
N6264925RA059-0009.pdf PDF
3819P43701T01_c0v0_TGI.pdf PDF
3819P25001T02_c0v0_TGI.pdf PDF
TGI_3819P22115T02_c0v0.pdf PDF
TGI_3819P22114T05_c0v0.pdf PDF
TGI_3819P22114T03_c0v0.pdf PDF
TGI_3819P123AGT12_c0v0.pdf PDF
TGI_3819P123AGT04_c0v0.pdf PDF
TGI_3819P123AGT02_c0v0_TT_rev.pdf PDF
Attachment VII Warranty Tracking Information.pdf PDF
EXHIBIT - Contract Data Requirements List (CDRL)_R1.pdf PDF
3819P25514A01_c0v0_FY26_TGI.pdf PDF
3819P25001A01_c1v0_FY26_TGI.pdf PDF
3819P22124A01_c0v0_FY26_TGI.pdf PDF
3819P22115A11_c0v0_FY26_TGI.pdf PDF
3819P22115A10_c0v0_FY26_TGI.pdf PDF
3819P22115A08_c0v0_FY26_TGI.pdf PDF
3819P22115A02_c1v1_FY26_TGI.pdf PDF
3819P22114A15_c0v0_FY26_TGI.pdf PDF
3819P22114A11_c1v2_FY26_TGI.pdf PDF
3819P22114A05_c0v0_FY26_TGI.pdf PDF
3819P22114A04_c1v1_FY26_TGI.pdf PDF
3819P22114A02_c0v0_FY26_TGI.pdf PDF
3819P22114A01_c0v0_FY26_TGI.pdf PDF
N6264925RA059-0002.pdf PDF
N6264925RA059-0001.pdf PDF
3819P25001T04_c0v0_TGI.pdf PDF
3819P25001T01_c0v0_TGI.pdf PDF
TGI_3819P22115T01_c0v0.pdf PDF
TGI_3819P22114T06_c0v0.pdf PDF
TGI_3819P123AGT11_c0v0.pdf PDF
TGI_3819P123AGT01_c0v0.pdf PDF
Attachment VI Quality Assurance Surveillance Plan (QASP).pdf PDF
Attachment V Contract Data Sheet.pdf PDF
3819P65416A01_c1v2_FY26_TGI.pdf PDF
3819P26001A01_c0v0_FY26_TGI.pdf PDF
3819P25201A01_c0v0_FY26_TGI.pdf PDF
3819P22115A12_c0v0_FY26_TGI.pdf PDF
3819P22115A06_c0v0_FY26_TGI.pdf PDF
3819P22115A05_c0v0_FY26_TGI.pdf PDF
3819P22115A01_c1v1_FY26_TGI.pdf PDF
3819P22114A17_c0v0_FY26_TGI.pdf PDF
3819P22114A13_c0v1_FY26_TGI.pdf PDF
3819P22114A12_c0v1_FY26_TGI.pdf PDF
3819P22114A10_c0v0_FY26_TGI.pdf PDF
2.01 N6264925RA059.pdf PDF
N6264925RA059-0008.pdf PDF
N6264925RA059-0007.pdf PDF
N6264925RA059-0006.pdf PDF
N6264925RA059-0005.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

06-MAR-2025 1009

20.14.15.2.9020 (September 2024) ICN: 3819P22115 KeyOp: A13

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 1B GIS SAFE V OP AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P

CU PHASE TITLE: (K22-01) F/O – CLEAN, INSP, AND LUBE 1B BOILER GIS SAFETY VALVE OP SYSTEM

WORK CERTIFICATION SIGNATURES: DLs

COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

FOUO Pg 1 of 4

EM02L192

PREPARING ACTIVITY: STATUS: APP WORKING STATUS:

PREPARED BY: CODE: PHONE: DATE:

IKEDA, KOUTARO 232 3152430958 24-FEB-2025

APPROVED BY: CODE: PHONE: DATE:

MOMOSE, HARUHISA 232 3152434533 25-FEB-2025

CONCURRED BY: CODE: PHONE: DATE:

REASON FOR WORK/NEED FOR CHANGE:

JCN:

EM02-L192

SPECIAL REQUIREMENTS:

CU PHASE DESCRIPTION:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

YAGINUMA, TAKEHIDE

JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:

221A1115

1. SCOPE/PURPOSE:

1.1 Title: 1B Boiler Low and High Drum Safety Valve Hand Easing Gear Box, Superheater Actuator, and Cables; clean, inspect, and lubricate

1.2 Location of Work:

1.2.1 Fire Room (8-76-0-E)

1.3 Identification:

1.3.1 Quantity (One EA), Low and High Drum Safety Valves Hand Easing Gear Box Mfr: KUT-ROL Mfr Dwg: 651201 Model No: KR610-3 Type: Cam Action, Speed Reducer

TGI Short Form

06-MAR-2025 1009

20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P22115 KeyOp: A13

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 1B GIS SAFE V OP AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P

CU PHASE TITLE: (K22-01) F/O – CLEAN, INSP, AND LUBE 1B BOILER GIS SAFETY VALVE OP SYSTEM

FOUO Pg 2 of 4

CU PHASE DESCRIPTION (Cont.)

1.3.1.1 Quantity (2 EA), Cable for Hand Easing Gear Box

1.3.2 Quantity (One EA), Superheater Safety Valve Actuator

Type: Lever Operated Lever Material: Steel, MIL-S-22698 Remarks: MOD PLAN and ELEVATION 87-A on sheet 11 of Ref. No. 5 for detail

1.3.2.1 Quantity (One EA), Cable for Actuator Handle

1.4 Security Classification: None.

1.5 Initial Condition: None.

1.6 Contractor work start date: 7/21/2026

1.7 Contractor work completion date: 11/21/2027

2. PROCEDURE:

2.1 Clean and lubricate each hand easing gear box listed in 1.3.1, each superheater actuator listed in 1.3.2, and each cable listed in 1.3.1.1 and 1.3.2.1, using Ref. No. 3 through Ref. No. 5, and Preliminary “g” through “m”, and “r” of Ref. No. 6 for guidance.

2.1.1 Remove existing and install each new lubricating oil for hand easing gear box cable end rod, conforming to 2190 TEP.

2.1.2 Remove existing and install each new grease for zerk fittings and cam roller of each hand easing gear box, conforming to

DOD-G-24508.

2.2 Accomplish a mechanical functional inspection of each hand easing gear box listed in 1.3.1 and each superheater actuator listed in 1.3.2 with each cable listed in 1.3.1.1 and 1.3.2.1, using Ref. No. 4 through Ref. No. 6 for guidance.

2.2.1 Verify each hand easing gear box listed in 1.3.1 and each cable listed in 1.3.1.1 for ease of operation and alignment.

Allowable binding: None.

2.2.2 Verify each superheater actuator listed in 1.3.2 and each cable listed in 1.3.2.1 by manually pulling and releasing for ease of operation and alignment. Allowable binding: None.

2.3 Notes:

2.3.1 Planner: Code 232 K. Ikeda, 243-0958

2.3.2 Zone Manager (ZM): Code 333 T. Yaginuma, 080-5419-0598

2.3.3 This TGI is response to Boiler Inspection and Repair Management Information System (BIRMIS) for 1B Boiler report dated 17 OCT 2024, Line Item K22-01.

2.3.4 Removal and installation of GIS safety valve and pilot panel has been accomplished by KTR TGI No. 3819P22115-A12, Line Item K2-01.

06-MAR-2025 1009

20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P22115 KeyOp: A13

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 1B GIS SAFE V OP AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P

CU PHASE TITLE: (K22-01) F/O – CLEAN, INSP, AND LUBE 1B BOILER GIS SAFETY VALVE OP SYSTEM

FOUO Pg 3 of 4

CU PHASE DESCRIPTION (Cont.)

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

2.3.5 Each cable listed in 1.3.1.1 and 1.3.1.2 has been disconnected from each control panel for low and high drum and superheater safety relief valve during accomplishment of mechanical functional inspection.

2.3.6 JCN EM02-L192 is related to this TGI.

2.4 Government Furnished Material (GFM): None.

2.5 SRF-JRMC will provide following service work: (TGI No. 3819P22115-S13)

2.5.1 [C740] Crane and crane rigging service.

2.5.2 [X99E] Utility service, electrical.

2.5.3 [X99M] Utility service, including low pressure air supply, water supply, and steam supply.

2.5.4 [C106.1] Safety inspection for SRF-JRMC employees.

2.5.5 [C106.2] Gas free inspection for SRF-JRMC employees.

2.5.6 [C133] QA inspection for (G) Symbol(s).

06-MAR-2025 1009

20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P22115 KeyOp: A13

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 1B GIS SAFE V OP AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P

CU PHASE TITLE: (K22-01) F/O – CLEAN, INSP, AND LUBE 1B BOILER GIS SAFETY VALVE OP SYSTEM

FOUO Pg 4 of 4

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1 NSI FY-25 NAVSEA Standard Items - ORG N 2 LI FY-25 Local Standard Items - ORG N

3 DWG 651201 KUT-ROL MODEL KR610-3

EASING GEAR OPERATOR

ASSEMBLY

D Y ALL

4 DWG 200-8337505 BOILER/ATM ESCAPE

SYSTEM EASING GEAR GIS

HIGH DRUM SAFETY VALVE

- Y ALL

5 DWG 200-6577980 S/A 1371 LCC-19

SUPHTR/LOW DRUM SAFE V

REPL AND ASSOC PP INSTL

B Y ALL

6 MRC 64 Y62U N Cam Action Safety Valve Hand Easing Gear.

- Y ALL

TASK NAME / TASK DESCRIPTION

SHOP/

TSD TS

SF

WC

CREW

# MHRS RWRK

2.1 OMCH: HRs, RGRS: HRs 22/KE PC N

2.2 OMCH: HRs 22/KE PC N

Outside Machinist Work CFM for fasteners, connection equipment, and misc.

22/MQ CS N

Process Funding Document. 10/CT OM N

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE

REV

ICN: 3819P22115 KEY OP: A13