3819P22115A06_c0v0_FY26_TGI.pdf

PDF 81 KB Posted

Attached to
USS BLUE RIDGE 5C1 DSRA TYCOM 7 (YOKOSUKA, JAPAN)
Solicitation number
N6264925RA059-0008
Issued by

About this file

This document is a WebAIM Short Form Task Group Instruction (TGI) for the USS Blue Ridge (LCC-19) dated 05-MAR-2025, focusing on a hydrostatic test of the 1B Boiler Fuel Oil (FO) Burner Lead Piping in Fire Room 8-76-0-E. The task involves disconnecting and reconnecting three separate fuel oil burner lead piping sections for testing, with each 1/2 inch IPS carbon steel pipe being tested using clean, fresh water at 605 PSIG for 30 minutes. The work is scheduled to start on 7/21/2026 and complete by 11/21/2027, triggered by a Boiler Inspection and Repair Management Information System (BIRMIS) report from 17 OCT 2024.

The document specifies that the Ship Repair Facility - Japan Regional Maintenance Center (SRF-JRMC) will provide government-furnished materials and services, including crane and rigging, utility services (electrical, low pressure air, water, and steam), safety inspections, gas-free inspections, and quality assurance inspections. The task requires Level II cleanliness for piping systems/equipment, and includes provisions for material procurement such as spiral wound gaskets. The job involves multiple work tasks including piping, painting, electrical work, and process funding, with careful documentation required on QA Form 28 to record the hydrostatic test results.

View the file

Other files

File Type Posted
N6264925RA059-0009.pdf PDF
3819P43701T01_c0v0_TGI.pdf PDF
3819P25001T02_c0v0_TGI.pdf PDF
TGI_3819P22115T02_c0v0.pdf PDF
TGI_3819P22114T05_c0v0.pdf PDF
TGI_3819P22114T03_c0v0.pdf PDF
TGI_3819P123AGT12_c0v0.pdf PDF
TGI_3819P123AGT04_c0v0.pdf PDF
TGI_3819P123AGT02_c0v0_TT_rev.pdf PDF
Attachment VII Warranty Tracking Information.pdf PDF
EXHIBIT - Contract Data Requirements List (CDRL)_R1.pdf PDF
3819P25514A01_c0v0_FY26_TGI.pdf PDF
3819P25001A01_c1v0_FY26_TGI.pdf PDF
3819P22124A01_c0v0_FY26_TGI.pdf PDF
3819P22115A11_c0v0_FY26_TGI.pdf PDF
3819P22115A10_c0v0_FY26_TGI.pdf PDF
3819P22115A08_c0v0_FY26_TGI.pdf PDF
3819P22115A02_c1v1_FY26_TGI.pdf PDF
3819P22114A15_c0v0_FY26_TGI.pdf PDF
3819P22114A11_c1v2_FY26_TGI.pdf PDF
3819P22114A05_c0v0_FY26_TGI.pdf PDF
3819P22114A04_c1v1_FY26_TGI.pdf PDF
3819P22114A02_c0v0_FY26_TGI.pdf PDF
3819P22114A01_c0v0_FY26_TGI.pdf PDF
N6264925RA059-0002.pdf PDF
N6264925RA059-0001.pdf PDF
3819P25001T04_c0v0_TGI.pdf PDF
3819P25001T01_c0v0_TGI.pdf PDF
TGI_3819P22115T01_c0v0.pdf PDF
TGI_3819P22114T06_c0v0.pdf PDF
TGI_3819P123AGT11_c0v0.pdf PDF
TGI_3819P123AGT01_c0v0.pdf PDF
Attachment VI Quality Assurance Surveillance Plan (QASP).pdf PDF
Attachment V Contract Data Sheet.pdf PDF
3819P65416A01_c1v2_FY26_TGI.pdf PDF
3819P26001A01_c0v0_FY26_TGI.pdf PDF
3819P25201A01_c0v0_FY26_TGI.pdf PDF
3819P22115A12_c0v0_FY26_TGI.pdf PDF
3819P22115A05_c0v0_FY26_TGI.pdf PDF
3819P22115A01_c1v1_FY26_TGI.pdf PDF
3819P22114A17_c0v0_FY26_TGI.pdf PDF
3819P22114A13_c0v1_FY26_TGI.pdf PDF
3819P22114A12_c0v1_FY26_TGI.pdf PDF
3819P22114A10_c0v0_FY26_TGI.pdf PDF
N6264925RA059-0003.pdf PDF
3819P43701T02_c0v0_TGI.pdf PDF
3819P25606T01_c0v0_TGI.pdf PDF
3819P25001T03_c0v0_TGI.pdf PDF
TGI_3819P22115T05_c0v0.pdf PDF
TGI_3819P22114T04_c0v0.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

05-MAR-2025 1644

20.14.15.2.9020 (September 2024) ICN: 3819P22115 KeyOp: A06

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 1B BLR FO BNR LD PPG AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P

CU PHASE TITLE: *(K37A-02) F/O - ACCOMPLISH HYDRST TEST OF 1B BLR FO BURNER LEAD PP IN 8-76-0-E

WORK CERTIFICATION SIGNATURES: DLs

COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

FOUO Pg 1 of 4

EM02L192

PREPARING ACTIVITY: STATUS: APP WORKING STATUS:

PREPARED BY: CODE: PHONE: DATE:

NAGASHIMA, TETSU 234 3152434527 24-FEB-2025

APPROVED BY: CODE: PHONE: DATE:

SHINMEI, HIDEKUNI 234 3152432371 24-FEB-2025

CONCURRED BY: CODE: PHONE: DATE:

REASON FOR WORK/NEED FOR CHANGE:

JCN:

EM02-L192

SPECIAL REQUIREMENTS:

CU PHASE DESCRIPTION:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

YAGINUMA, TAKEHIDE

JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:

221A1115

1. SCOPE/PURPOSE:

1.1 Title: Hydrostatic Test of 1B Boiler Fuel Oil (FO) Burner Lead Piping; accomplish

1.2 Location of Work:

1.2.1 Fire Room (8-76-0-E)

1.3 Identification:

1.3.1 Quantity (One AY), No. One FO Burner Lead Piping including FO Valve Actuator (1B-BIS-F-1) for 1B Boiler, from FO Manifold Root Valve No. 23 to No. One Burner

Size: 1/2 Inch IPS Material: Carbon Steel Specification: MIL-T-20157C, SCH 40 Remarks: See Sheet One (Zone 11-A and Zone 11-B) of Ref. No. 3 for detail.

TGI Short Form

05-MAR-2025 1644

20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P22115 KeyOp: A06

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 1B BLR FO BNR LD PPG AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P

CU PHASE TITLE: *(K37A-02) F/O - ACCOMPLISH HYDRST TEST OF 1B BLR FO BURNER LEAD PP IN 8-76-0-E

FOUO Pg 2 of 4

CU PHASE DESCRIPTION (Cont.)

1.3.2 Quantity (One AY), No. 2 FO Burner Lead Piping for 1B Boiler, from FO Manifold Root Valve No. 24 to No. 2 Burner

Size: 1/2 Inch IPS Material: Carbon Steel Specification: MIL-T-20157C, SCH 40 Remarks: See Sheet One (Zone 11-A and Zone 11-B) of Ref. No. 3 for detail.

1.3.3 Quantity (One AY), No. 3 FO Burner Lead Piping for 1B Boiler, from FO Manifold Root Valve No. 25 to No. 3 Burner

Size: 1/2 Inch IPS Material: Carbon Steel Specification: MIL-T-20157C, SCH 40 Remarks: See Sheet One (Zone 11-A and Zone 11-B) of Ref. No. 3 for detail.

1.4 Security Classification: None.

1.5 Initial Condition:

1.5.1 Potential Lead Hazard.

1.6 Contractor work start date: 7/21/2026

1.7 Contractor work completion date: 11/21/2027

2. PROCEDURE:

2.1 Disconnect and reconnect each existing FO burner lead piping listed in 1.3.1 through 1.3.3 for accomplishment of hydrostatic test, using Ref. No. 3 for guidance.

2.1.1 Accomplish the requirements of 009-71 of Ref. No. One for hydrostatic test, using clean, fresh water at 605 PSIG, for each existing FO burner lead piping listed 1.3.1 through 1.3.3.

2.1.1.1 Document shop hydrostatic test results on QA Form 28 Enclosure-01-1.

2.2 Accomplish the requirements of 009-32 of Ref. No. One for each new and disturbed surface.

2.3 Notes:

2.3.1 Planner: Code 234 T. Nagashima, 243-4527

Planner: Code 233 M. Takemura, 080-9350-1458

2.3.2 This TGI is response to Boiler Inspection and Repair Management Information System (BIRMIS) for 1B Boiler report dated 17 OCT 2024, Line Item(s) K37A-02.

2.3.3 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598

2.3.4 JCN EM02-L192 is related to this TGI.

2.4 Government Furnished Material (GFM):

05-MAR-2025 1644

20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P22115 KeyOp: A06

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 1B BLR FO BNR LD PPG AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P

CU PHASE TITLE: *(K37A-02) F/O - ACCOMPLISH HYDRST TEST OF 1B BLR FO BURNER LEAD PP IN 8-76-0-E

FOUO Pg 3 of 4

CU PHASE DESCRIPTION (Cont.)

2.4.1 SRF-JRMC will provide GFM listed in Material List.

2.5 SRF-JRMC will provide the following Service Work: (TGI No. 3819P22115S07).

2.5.1 [C740] Crane and crane rigging service.

2.5.2 [X99E] Utility Service, electrical.

2.5.3 [X99M] Utility Service, including low pressure air supply, water supply, and steam supply.

2.5.4 [C106.1] Safety inspection for SRF-JRMC employees.

2.5.5 [C106.2] Gas free inspection for SRF-JRMC employees.

2.5.6 [C133] QA inspection for (G) symbols.

05-MAR-2025 1644

20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P22115 KeyOp: A06

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 1B BLR FO BNR LD PPG AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P

CU PHASE TITLE: *(K37A-02) F/O - ACCOMPLISH HYDRST TEST OF 1B BLR FO BURNER LEAD PP IN 8-76-0-E

FOUO Pg 4 of 4

OTHER SPECIAL REQUIREMENTS:

CLEANLINESS FOR PIPING SYSTEM/EQUIPMENT LEVEL II.

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1 NSI FY-25 NAVSEA Standard Items - ORG N 2 LI FY-25 Local Standard Items - ORG N 3 DWG 210-2492122 F.O SERV. DISCH. Piping -

ARR

G Y ALL

TASK NAME / TASK DESCRIPTION

SHOP/

TSD TS

SF

WC

CREW

# MHRS RWRK

2.1 PFTR HRs, RGRS HRs, INSL HRs, ELEC HRs, QA HRs 22/KE PC N

2.2 PNTR HRs, QA HRs 22/KE PC N

Piping Work CFM sample cost for lead paint, misc such as painting material, plastic bag and tapes.

22/MQ CS N

Electrical Work CFM for insulation tape, plastic bags, rope, and other consumable.

22/MQ CS N

Process Funding Document. 10/CT OM N

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

001 M GASKET,SPIRAL WOUND,

GASKET, SPIRAL WOUND,

1/2"- 600

ORDERED FOR KTR, ORG:

C234, T. NAGASHIMA, TEL:

243-4527

9B 5330 013387849 NA 4 N 50435171 6/EA

002 M GASKET,SPIRAL WOUND,

GASKET, SPIRAL WOUND,

3/4"-600

ORDERED FOR KTR, ORG:

C234, T. NAGASHIMA, TEL:

243-4527

9B 5330 013387875 NA 4 N 50435166 6/EA

ATTACHMENT LIST

TITLE FILE NAME SAVED DATE

ENCLOSURE-01 3819P22115A06-QA28.docx 10-FEB-2025 0000

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE

REV

ICN: 3819P22115 KEY OP: A06

COMUSFLTFORCOMINST 4790.3 REV D CHG 3

07 Nov 2023

3819P22115A06 ENCLOSURE-01-1 TOTAL 1

SHOP TEST RECORD Page 1 of 1

QA FORM 28 Planning must fill in blocks identified by a prior to issuing

1. SHIP HULL NO. 2. JCN 3. LWC/SHOP 4. CWP/REC SER NO. 5. SYSTEM/COMPONENT/ROTATABLE POOL SER NO.

USS BLUE RIDGE LCC19 EM02-L192 KTR N/A FO BURNER LEAD SYSTEM PIPING

6. REFERENCES: TEST REF (E.G., MS, TECH MAN) & OTHER REFS (E.G., VLV DWG) 7. TEST GAGE RANGE /INSTRUMENT USED SERIAL NO. CAL DUE DATE 8. RELIEF VLV SET POINT

A. S9086-RK-STM-010/CH-505 Rev. 6

B. DWG 210-2492121 Rev. E

C.

D.

9. TEST REQUIREMENTS & RESULTS

TEST TYPE KEY H = STRENGTH AND POROSITY/ELEVATED PRESSURE TEST J = MECHANICAL JOINT TIGHTNESS ST = SEAT TIGHTNESS OP = OPERATIONAL O = OTHER

(SPECIFY): ______________________

TE

ST

T Y

PE

(S

EE

K

EY

) PARAGRAPH

DESCRIBING

VALVE POSITION

AND POINT OF

ENTRY

REF

LTR

GAGE

USED

(LTR

FROM

BLK 7)

REQUIRED

MEDIUM

MEDIUM

USED

REQUIRED

PRESSURE

ACTUAL

PRESSURE

MINIMUM

DURATION

ACTUAL

DURATION

ALLOWED

LEAKAGE

ACTUAL

LEAKAGE SAT/UNSAT SIGNATURE, BADGE NO. & DATE

H 2.1.1 for 1.3.1 A,B Clean Fresh Water 605 PSIG 30 minutes None

H 2.1.1 for 1.3.2 A,B Clean Fresh Water 605 PSIG 30 minutes None

H 2.1.1 for 1.3.3 A,B Clean Fresh Water 605 PSIG 30 minutes None

10. REMARKS. (CRAFTSMAN/QAI SUBMIT A DF TO RESOLVE UNSAT DATA)

11. QA INSPECTOR/SHOP SUPERVISOR SIGNATURE/BADGE NO. (RECORD

REVIEWED FOR FINAL ACCEPTANCE)

DATE 12. QAS SIGNATURE/BADGE NO. (RECORD HAS BEEN REVIEWED FOR

COMPLETENESS)

DATE